Aldridge State High School
Date: 10/02/17
Project Number: ASHS2017.1
Please direct all enquiries during the tender period to:
Cynthia Jones, Project Manager
Telephone: 0741 208 410
Email: [email protected]
Tender Documentation
Administration Block Extension
TENDER DOCUMENTATIONAldridge State High School – ASHS2017.1
10/02/17
Table of ContentsTable of Contents............................................................................................................................................................1
Letter to Tenderer...........................................................................................................................................................2
Alterations and Extension Schedule…………………………………………………………………………………………………………………………….3
Notice to Tenderer………………………………………………………………………………………………………………………………………………………5
Request for Information………………………………………………………………………………………………………………………………………………6
2
PROJECT: Aldridge State High School – Administration Block Extension
TENDERER: (INSERT CONTRACTOR NAME HERE)
DATE: 10/02/17
Aldridge State High SchoolBoys Avenue, Maryborough. Q. 4650.Administration - Alterations & Extension Date
Ref Element AmountElem
0 Preliminaries1 Substructure2 Columns3 Upper Floors4 Stairs, Ramps, Handrails5 Roof (incl soffits)6 External Walls7 Windows8 External Doors9 Internal Walls10 Internal Doors11 Internal Screens and Borrowed Lights12 Wall Finishes13 Floor Finishes14 Ceiling Finishes15 Fitments16 Sanitary Fixtures
17-20 Hydraulics
21-24Air-conditioning and Mechanical Ventilation
25-27Electrical, Communications and Fire Protection Services
28 Transporation Systems29 Special Services30 Centalised Energy Systems31 Alterations and Demolition32 Site Preparation
3
33 Roads, Footpaths and Paved Areas34 Boundary Walls, Fences and Gates35 Outbuildings and Covered Ways36 Landscaping and Improvements
37-40 External Hydraulics
41-43External Electrical, Communications and Fire Protection Services
44 External Special Services45 External Alterations and Renovations46 Special Provisions (Asbestos removal)
Sub-Total
Qleave By Client
Total (excluding GST)
Goods and Service Tax (GST)
$
$
TOTAL (including GST)
% base for variations
Please ensure the above tender amount is transferred to the tender form exactly as shown above.
4
TENDER DOCUMENTATIONAldridge State High School – ASHS2017.1
10/2/17
Notice to Tenderer1.0WORK ACCESS PERMITS AND ASBESTOS CONTAINING MATERIALS (ACM)
Your attention is drawn to the possibility that areas covered in this scope of works may involve Asbestos Containing Materials (ACM). All builders, contractors and subcontractors are required to have a Work Area Access Permit (WAAP) which must be issued by the school prior to commencement of any works. (No Permit – No Work) Contained with the WAAP will be a copy of the latest issue of the Built Environment Materials Information Register (BEMIR) which will contain details of any ACM that have been tested or presumed. The Principal Contractor is responsible for providing the information contained within the WAAP and BEMIR ACM register to all contractors, suppliers and cleaners engaged under the principal contract.
Where ACM is located or presumed, extreme care is to be taken and the Project Manager is to be notified immediately if work is to commence in a possible ACM environment.
The Contractor is referred to the Working on Department of Education, Training and Employment (DETE) Facilities document which is included in these tender documents - see section 3 (Supporting Information) for management of Asbestos and Asbestos Containing Materials. The contractor to provide a clearance certificate from the Class A Asbestos Removalist and independent air monitoring during demolition
2.0TENDERER TO INFORM ITSELF
It is not mandatory for contractors to visit the site and familiarise yourself with the extent of works, however a site inspection has been arranged for Monday 27 February, 2016 at 10:00am - please meet at Administration Reception. The School will not take sub-contractors around the site at any other time.
The tenderer is deemed to have visited and inspected the site, its surrounds and satisfied itself of the conditions and facilities and otherwise acquainted itself with all matters relating to the proposed works before submitting a tender.
The tenderer is to include for a site visit to take accurate measurements, quantities and conditions prior to ordering any materials.
3.0 PROGRAMME
This government funded project has strict time frames and as such Tenderers should endeavour to complete works by the stipulated time. The successful contractor will be required to submit a programme for review and approval by the superintendent - this will need to be agreed with the schools and the contractor at the start of the project.
5
All works shall be completed by the 7th July, 2017.
4.0 COST OF TENDERING
Cost of tendering shall be borne by the Tenderer.
5.0 CONTRACT
The applicable contract will be the Medium Works Contract as modified by the special conditions of contract.
Contractors are to complete the Tender Form and the Tender Breakdown with their tender submission.
6.0 TENDER WEIGHTING
The Tender will be assessed on the following weighting:
Non-Price - 40 % - See Tender Form For Details
Tender Price - 60%
7.0 TENDER CLOSING
Tender Submissions are requested at or before 3:00pm on Friday the 24th March, 2017 Late tenders will not be accepted.
A tender report and recommendation will be carried within (5) days with the intention of starting works shortly thereafter.
8.0 PreliminariesThis section does not limit or replace any conditions of the contract nor restrict standard building practices.
The contractor is to allow for safe working areas at all times, in accordance with the Work Place Health and Safety Act and standard building practices.
The contractor is responsible for disposal of all removed and excess materials.
The contractor is to allow for and maintain hoarding to the works areas by means of an 1800 high hoarding during works on the site or locked works site - as required.
9.0 Telecommunications and ICTThe contractor is referred to the supporting document "Telecommunication Works - Instructions" regarding the requirement to engage one of the DET approved sub-contractors for any and all telecommunication works on DET assets and site. All contractors shall comply with this requirement.
6
Project: Aldridge State High School – Administration Block Extension REQUEST FOR INFORMATION
Client: The Department of Education and Training – Aldridge State High School
RFI No:
Date:
Project Particulars Project Number: ASHS2017.1Tender Number:
Distribution Company Name Contact Tenderers
Information Requested:
Response:
7