Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 1 of 50
TABLE OF CONTENTS
ITEM PARTICULARS PAGE NO
1 PROJECT OVER VIEW 03-04
1.1 Introduction 03
1.2 Salient Features of the Project 03
1.3 Scope of Work 03-04
2 Operation and Maintenance 05-40
2.1 Mobilization 05
2.2 Operations 05-06
2.3 Maintenance 06
2.4 Safety of Project Highway 06
2.5 Reporting and Records
Requirements 06-07
2.6 Complaint Registers 07
2.7 Deficiency in the O&M Obligation 07
2.8 Traffic Audit Report 07
2.9 Site Photographs 07
2.1
0
Key Issues and
Recommendations 07-08
Appendix A Organization Chart of (1) NHAI
(2) IE (3) Concessionaire 09-11
Appendix B Resources Provided by the
concessionaire 12
Appendix C Toll Rate for Road Users 13
Appendix D Monthly Toll Collection 14
Appendix E Traffic Report 15-16
Appendix F Frequency of the Maintenance
Activities 17
Appendix G Maintenance Carried out During
Month 18-26
Appendix H Road Accident Data 27-28
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 2 of 50
Appendix I Weather Report 29
Appendix J Escrow Account 30
Appendix K Lane-Non-Availability Report 31-32
Appendix L Complaint Register 33-40
Appendix M Deficiency Observed in the O&M
Obligation 41
Appendix N Traffic Audit Report 42-43
Appendix O IE Correspondence With NHAI &
L&T VBTL 44-46
Appendix P VTS Report 47-48
Appendix Q Site Photographs 49-50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 3 of 50
1. PROJECT OVERVIEW 1.1. Introduction:
National Highways Development Programme (NHDP) is the first and foremost task mandated to NHAI. It comprises of widening and strengthening of National Highway stretches connecting four metros namely Delhi, Kolkata, Chennai and Mumbai (Golden Quadrilateral), the North South and East West corridor development project. The project Independent Engineer Services for Six lanning of Vadodara – Bharuch Section (Km 108+700 – Km 192+000) of NH-8 during operation and maintenance period is part of NHDP Phase-V and comes in the State of Gujarat. L&T Vadodara – Bharuch Tollway Limited is the Concessionaire for this Project. CDM Smith India Pvt. Ltd. has been awarded for the Independent Engineer Services during Operation & Maintenance stage for the same.
1.2. Salient Features of the Project: Project Features Description
Project Name Six lining of Km. 108+700 to Km. 192+000, Vadodara to Bharuch Section of
NH-8 in Gujarat on build, operate and transfer (BOT) basis –Package BOT – 1
Chainage Km. 108+700 to Km. 192+000
Project length Project commences at Km.108+700 Vadodara and ends at Km.192+000 near
Bharuch with a total length of 83.30 Km.
Client National Highways Authority of India, New Delhi
Independent Engineers CDM Smith India Pvt. Ltd.
Concessionaire L&T Vadodara Bharuch Toll way Ltd.
DPR Engineers Lea Associate South Asia Pvt. Ltd.
Date of Signing of Concession agreement 12th
July 2006
Appointed date(Concessionaire) 08th
January, 2007
Date of Signing the Independent
Engineers agreement 03
rd March 2015
Date of commencement of Independent
Engineer Services 17
th March 2015
Concession period 15 years from the appointed date including construction period of 30 months.
Date of PCC issued 02/06/2009
Date of Completion 31/05/2009
1.3. Scope of Work:
Sr. No. Particular Unit Scope
1 Main Carriage way Km 83.30
2 Service Road Km 24.05
3 Fly-Over No 11
4 Rail Over Bridge No 3
5 Minor Bridge No 25
6 Major Bridge No 5
7 Slab Culvert No 8
8 Box Culvert No 18
9 Hume Pipe Culvert No 49
10 Pedestrian Underpass No 20
11 Vehicular Underpass No 1
12 Rest Area No 2
13 Cattle Crossing No 8
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 4 of 50
14 Equipment Summery
1) ECB No 82
2) CCTV No 13
3) VMS (Fixed) No 6
4) MET No 2
5) ATCC No 2
15 Toll Plaza
1) Toll Plaza No 1
2) Toll Booth No 16
3) Regular Lane No 12
4) Extra Wide Lane No 2
5) Future Lane No 2
6) Two Wheeler Lane No 2
16 Drainages and Inspections Chambers (Covered Drain below Footpath at Service Road)
Km 18.358
17 Median Longitudinal Drain Km 1.376
18 Median Cross Drain No 591
19 Bus Bay / Bus Shelters No 38
20 Truck Lay Bye No 2
21 Median Plantation No 104927
22 Landscaping Area Sq. MT 51535.80
23 Sign Boards Details No 1293
24 Metallic Beam Crash Barrier Km 18.052
25 Pedestrian Guard Rail RM 7156.00
26 Jumbo Bollard No 86
27 Kilo Meter Stone No 186
28 Cat Eyes No 19349
29 Delineators No 4244
30 Median Opening No 31
31 Median Opening Blinkers No 70
32 Thermoplastic Road Marking RM 454305.36
33 Service Road Marking RM 11840.00
34 ROW Fencing RM 89920.35
35 Toe Drain RM 91287.00
36 Avenue Plantation No
8724 (IE Considering Plants more than 2 mts. Heights - 4970 Nos and survivals percentage is .)
37 Stone Pitching Sq. MT 177181.360
38 Chain-Link Fencing RM 2556
39 Highway Lights No 2731
40 High-MAST Electrical Details No 92
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 5 of 50
2. OPERATION AND MAINTENANCE 2.1. MOBILIZATION:
IE has mobilized following Personnel in the Project
I - Key Personnel (Professional Staff)
1 Team Leader Vijaya Bharath. S
2 Highway Maintenance Engineer-I M. Pagavan Doss
3 Highway Maintenance Engineer-II B. Venkateswarlu 4 Quality cum Material Expert P.Jagan Mohan Reddy
5 Pavement Specialist Thyagaraj MN
6 Road Safety Expert Devasena. Veloo
7 Bridge/ Structural Engineer S.Jayakumar
8 Traffic & Transportation Expert Vittal Puvvada
9 HTMS/Toll Expert V.Rangarajan
II - SUB PROESSIONAL
1 Assistant Highway Maintenance Engineer-I Pratik N. Patel
2 Assistant Highway Maintenance Engineer-II TBN
3 Survey Engineer P.V.Shyamkumar 4 Cad Expert TBN
5 Electrical Engineer Shashikanth Joshi
6 Horticulture Expert Dr. Malla Reddy
7 Quantity Surveyor G.Senthil
III – SUPPORT STAFF
1 Technical Supervisor-I Abhishek Bagadia
2 Technical Supervisor-II Nilesh P. Machhi
3 Technical Supervisor-III Jaydeep Patel
4 Technical Supervisor-IV Sandeep J. Mistry
5 Laboratory Assistant Niyati R. Rathod
6 Office Manager Ravindra Singh Birdi
7 Accountant cum Cashier Samsul Hassan Pathan
9 Steno cum Computer Operator - 1 Mohammed Salim Pathan
10 Steno cum Computer Operator - 2 Priti B. Panchal
11 Office Boy – 1 Sachin Makwana
12 Office Boy – 2 Harish Bhai Tadvi
Concessionaire established their project office at Toll Plaza (Km. 157+750). The Organization Chart for IE and Concessionaire are attached as Appendix–A. In addition to that other resources provided are as attached in Appendix–B.
2.2. OPERATIONS: There is only one Toll Plaza in the project road and that was constructed at Km 157+700. There are total 9 nos. of
lanes in (LHS) direction& 8 nos. of lanes in (RHS) direction. This also includes the lane for oversized vehicles. For
oversized vehicles, width between two booths is 4.5m and for other vehicles width is kept 3.5 m.
Toll rate for the users is attached as Appendix – C. Toll collection during the month of July-2016 is attached as
Appendix – D. For smooth and safe traffic flow along the project road, Concessionaire has provided efficient Highway
Traffic Management System and it comprises to following sub-systems to collect/disseminate information about
traffic, Incident management for the safety of users.
i) Emergency Communication System
ii) Mobile Communication System
iii) Variable Message Sign System
iv) Meteorological Data System
v) Automatic Traffic Counter-Cum-Classifier System
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 6 of 50
vi) CCTV Surveillance System
All the above outdoor equipment’s are connected to the control center which is located near the Toll Plaza.
Therefore the user making an emergency call from ECBS can be provided the assistance of ambulance, crane and/or
highway patrol unit depending upon the type of emergency.
2.3. MAINTENANCE: Maintenance shall include inter-alia, routine, periodic and special maintenance of all the highway facilities, civil works, electrical/mechanical works and assets created under the Concession Agreement. Frequency of maintenance inspection is attached as Appendix - F.
The maintenance carried out during the month is attached as Appendix – G.
2.4. SAFETY OF PROJECT HIGHWAY: Concessionaire had provided following facilities on the Project Highway.
i) Ambulance - 02 nos.
ii) Patrol Vehicle - 03 nos.
iii) Crane - 02 nos.
All the above services are connected with the control center and mobile communication system.
2.5. REPORTING& RECORDS REQUIREMENTS: As per Schedule-X of Concession Agreement, the Concessionaire shall prepare & submit to the NHAI & IE one copy each of the following documents/reports. Status of reports/documents submitted by the concessionaire so far is as follows:
Sr.
No. Name of Report
Relevant Clause of
Concession Agreement Status Remarks
1 O & M Manual 4.1, Schedule - L Submitted
2 O & M Plan for the Current
year of operations 4.1, Schedule - L Submitted
3 Road Accident Report for the
month of July 2016 Schedule –X Submitted Attached as Appendix –H
4 Traffic Report for the month of
July 2016 Schedule –X Submitted Attached as Appendix –E
5 Escrow Account for the month
of July 2016 Schedule – X Submitted Attached as Appendix –J
6 Lane -Non-Availability Report
for the month of July 2016 Schedule – X Submitted Attached as Appendix –K
7 Weather report for the month
July 2016 Schedule – X Submitted Attached as Appendix –I
8 Toll Rates for Road Users for
the month of July 2016 Schedule – M Submitted Attached as Appendix –C
9 Fee collection statement for
the month of July 2016 Schedule – M Submitted Attached as Appendix –D
10 O&M inspection report
(May 2016)
As per clause number
:19.2 of Concession
Agreement
Submitted
Compliance of Inspection Report
Received L&T VBTL/O&M/ 4816
Dated :.05.07.2016 and IE’S
Letter No. CDM/CEI/SO/1415039
/623 Dated : 21.07.2016
11 O&M inspection report
(June 2016)
As per clause number
:19.2 of Concession
Agreement
Submitted
Compliance of Inspection Report
Received vide L&T VBTL/O&M/
4874 Dated :.05.08.2016 and IE
review is in progress.
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 7 of 50
Sr.
No. Name of Report
Relevant Clause of
Concession Agreement Status Remarks
12 O&M inspection report
(July 2016)
As per clause number
:19.2 of Concession
Agreement
Submitted
IE Issued the O&M Inspection
Report For the Month of July -
2016 to Concessionaire vide IE’S
Letter No CDM/CEI/SO/1415039
/640 Dated : 01.08.2016
2.6. COMPLAINT REGISTERS:
Details are provided as per Appendix-L
2.7. DEFIIENCY IN THE O&M OBLIGATION: Details are provided as per Appendix-M 2.8. TRAFFIC AUDIT REPORTS: Details are provided as per Appendix-N
2.9. SITE PHOTOGRAPHS: Photographs are as shown in Appendix-Q
2.10. KEY ISSUES AND RECOMMENDATIONS:
Recommendation of PD/IE and as per delegation of powers vide Policy Circular No.
144/2014 and 159/2015, the approval of competent Authority is hereby accorded for
installation of Weigh in Motion (WIM) & Static Weigh Bridge (SWB) for NH-8, BOT-1
under Change of Scope amounting to Rs. 224,23,123/- vide NHAI,RO Gandhinagar Letter
No. NHAI/12015/1/2010-RO-GNR/Tech/Surat(E)/V-B/Vol 43/F-248 dated 21.04.2016. As
per Clause 17.2 (C) NHAI Issued written confirmation vide as mentioned the above Letter
No & thereupon the concessionaire shall proceed with performance of such order and
submit the time for the completion of such order which is not at all submitted by the
concessionaire.
As per Approved annual Maintenance Programme for the year April 2016 the frequency
of inspection defined for the items has to be inspected by the Concessionaire and regular
reports on the same shall be sent to IE with proposed maintenance, repairs and
rehabilitation work found necessary as a result of such inspection as per clause 7.1 of
Schedule – L of Concession Agreement vide IE Letter No. CDM/CEI/SO/1415039/534
dated 11.05.2016(For the month of April-2016), CDM/CEI/SO/1415039/565 dated
04.06.2016 (For the month of May-2016) & CDM/CEI/SO/1415039/605 dated 05.07.2016
(For the month of June-2016) for which no action taken by the concessionaire
The Concessionaire has to start functioning of balance Works of (Already Intimated vide
letter no CDM/CEI/SO/1415039/045 dated 01/05/2015) Rest Area @ Km. 137+200 (LHS)
and Balance works of Rest Area @ Km. 189+900 (RHS) are to be taken up by
concessionaire and time bound program still to be submitted by the concessionaire
(already Intimated vide letter no CDM/CEI/SO/1415039/048 dated 29.04.2015), Further,
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 8 of 50
IE observed & notified to concessionaire vide IE Letter No. CDM/CEI/SO/1415039/628
dated 26.07.2016 laid paver block settled at 189+900 RHS.
There are so many unauthorized access along the highway from KM 108+700 to
192+000 both LHS and RHS and intimated to take immediate action to removal the
unauthorized access. List of Encroachment in the Project Highway With Video graphs
reported to Authority vide Letter No. CDM/CEI/SO/1415039/531 dated 09.05.2016.
The ECB & CCTV shall be repaired/replaced where ever they are not working and as
per authority instruction vide letter no. NHAI/PIU-Bharuch/10-E/2016/378 dated
03.06.2016 stated that please explore some other replacement of ECB or find out
some circular issued by NHAI.
For preparation of Planting Activities in Row & Median during forthcoming monsoon
concessionaire has to procure avenue plants, median plants & manures as per IE &
Concessionaire Horticulture Expert Direction & Tree Guards has to be ready before
start of planting activities as per IRC-SP-21-1979. Now, the work is in under progress
but concessionaire not followed the procedures as described in IRC-SP-21-1979.
Land Scaping areas Below Flyovers Shall be maintained as per Schedule-L of
Concession Agreement and IRC-SP-21-1979.
Non functioning of ATCC at km. 134+100 & 175+000 regarding that IE issued cure
period notice to concessionaire vide letter no. CDM/CEI/SO/1415039/636 dated
30.07.2016 as stated in the clause 18.12 of concession agreement.
Concessionaire has to be submitted work programme for rectification of damaged
stone pitching notified by IE vide Letter No. CDM/CEI/SO/1415039/614 dated
14.07.2016.
IE Safety Expert submitted the remedial measures for the black spot observed on the
analysis of accident data vide IE letter no. CDM/CEI/SO/1415039/642 dated
03.08.2016. The Concessionaire may be directed to immediately attend to these
Black Spot locations to comply with the specifications and Standards of Concession
Agreement by doing the rectification recommended by the Independent Engineer.
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 9 of 50
Appendix A: Organization Charts of (1) NHAI (2) IE (3) Concessionaire:
Organization Chart of NHAI
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 10 of 50
ORGANIZATION CHART –INDEPENDENT ENGINEERS
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 11 of 50
ORGANIZATION CHART -CONCESSIONAIRE
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 12 of 50
Appendix B: Resources Provided by the Concessionaire:
Route Services:
Sr. No
Vehicle Registration Number Located at
Chainage Area Covered
From To
1 Ambulance GJ 6 Y 220 134+000 LHS (Sub Centre 1)
108+700 157+750
2 Ambulance GJ 6 Y 260 157+750 (Toll Plaza)
157+750 (Toll Plaza)
192+000
3 Crane (Tow Vehicle)
GJ 6 DH 0040 135+000 LHS (Sub Centre 1)
108+700 157+750
4 Crane (Tow Vehicle)
GJ 6 DH 0039 157+750 (Toll Plaza)
157+750 (Toll Plaza)
192+000
5 Route Patrol Vehicle 02 nos. vehicles always on patrolling out of the three
following vehicles i.e. GJ 6 DQ 4294/GJ 13 X 0412/GJ 3 AW 6468
108+700 157+750
6 Route Patrol Vehicle
157+750 192+000
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 13 of 50
Appendix C: Toll Rate for the Road Users:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 14 of 50
Appendix D: Monthly Toll Collection:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 15 of 50
Appendix E: Traffic Report:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 16 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 17 of 50
Appendix F: Frequency of the Maintenance Activities:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 18 of 50
Appendix G: Maintenance Carried Out During the Month:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 19 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 20 of 50
Observation: As per above Inspection Schedule for the Month of July-2016 Visual Inspection, Close Inspection, Through Inspection for the Items
defined above inspection reports not Submitted by the Concessionaire as per the concession agreement clause 7.1 of Schedule – L stated that The
periodicity of inspections for maintenance activities by the Concessionaire shall be set out in the O&M Manual and regular reports on the same
shall be, sent to the Independent Consultant. Where required, the Concessionaire shall carry out any maintenance, repair or rehabilitation works
found necessary as a result of such inspections.
Hence, In view of above clause IE instructed the Concessionaire to submit the Inspection report and maintenance required to NHAI and
Independent Consultant for Review.
Further, the same was intimated & instructed the concessionaire for submitting the inspection report for the month of May-2016 &
June-2016 vide reported to Concessionaire IE letter no. CDM/CEI/SO/1415039/565 dated 04.06.2016 (For the month of May-2016) &
CDM/CEI/SO/1415039/605 dated 05.07.2016 (For the month of June-2016) for which no action taken by the concessionaire.
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 21 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 22 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 23 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 24 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 25 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 26 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 27 of 50
Appendix H: Road Accident Data:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 28 of 50
Observation/Recommendation: Vide Letter No. NHAI/PIU-Bharuch/10-E/2016/350 dated 30.05.2016 Authority Instructed the Concessionaire that Concessionaire are
requested to immediately inform to this PIU regarding fatal accident & other major accidents only, along with a copy to Team Leader, M/s CDM
Smith India Pvt. Ltd. Through control room, as usual practice. In Due course of time, the detailed accident report will be send by Project Manager of
M/s L&T VBTL to this PIU with copy to IC.
Further, as per Schedule X- B. Operation phase-5.Accident Reports as stated As soon as practicable and in any event no later than 7
days following the Occurrence of any accident on the Project Highway involving a fatality or serious personal injury or substantial property damage,
the Concessionaire shall investigate the circumstances of such accident and submit to the NHAI and Independent Consultant a report setting out
details of such accident and, to the extent they are known, the causes of such an accident, and the Concessionaire shall thereafter promptly report
to the NHAI and/or Independent Consultant any additional details of such accident or its causes which become known to it.
Hence, In view of above Concessionaire shall submit the report as per Authority instruction and as per Schedule X to NHAI and IE from
June-2016 Onwards.
But Concessionaire was not submitted the accident report to IE for the month of June-2016 & July-2016 as per the instruction given by
PD Bharuch and as per schedule-X.
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 29 of 50 Page | 29 of 50
Appendix I: Weather Report:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 30 of 50 Page | 30 of 50
Appendix J: Escrow Account:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 31 of 50
Appendix K: Lane-Non-Availability Report
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 32 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 33 of 50
Appendix L: Complaint Register:
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 34 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 35 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 36 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 37 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 38 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 39 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 40 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 41 of 50
Appendix M: Deficiency Observed in the O&M Obligation:
Sr. No. Deficiency in O&M
Requirement Letter No.
Action Taken by IE / Damages
Recommended (Rs.)
1 Rectification of Pavement Surface
SMEC/Vadodara/NHAI/281, dated 15.02.2013
4,00,000/-
2 Rectification of Highway Lighting
SMEC/Vadodara/NHAI/298, dated 14.03.2013
12,60,000/-
3 Rectification of Sudden Bumps
SMEC/Vadodara/NHAI/335, dated 01.05.2013
1,10,000/
4 Provision of Police Personnel in RPVs
SMEC/Vadodara/NHAI/369, dated 20.06.2013
6,60,000/-
5 Rectification of Service Road SMEC/Vadodara/NHAI/427, dated 21.09.2013
1,90,000/-
6 Non – Operation of Rest Area SMEC/Vadodara/NHAI/436, dated 08.10.2013
47,70,000/-
7 Non removal of Encroachments
SMEC/Vadodara/NHAI/497, dated 28.01.2014
31,30,000/-
8 Delay in Periodic Overlay SMEC/Vadodara/NHAI/620, dated 04.08.2014
36,42,836/-
9 Delay in rectification of Earthen Shoulder
SMEC/Vadodara/NHAI/621, dated 04.08.2014
49,00,000/-
10
Delay in rectification of Full Depth & Widh repair of Service road at Bhauch Flyover
CDM/CEI/SO/1415039/233 dated 08.09.2015
8,10,000/-
11
Delay in rectification of Defects in overlay and filling pot holes/rutting-ravelling repair – Future durability of pavement
CDM/CEI/SO/1415039/258 dated 01.10.2015
95,44,140/-
12 BC left over portion of flyovers and bridges over deck slab
CDM/CEI/SO/1415039/525 dated 04.05.2016
4,55,538/-
Total Damages recommended up to date 2,98,72,514/-
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 42 of 50
Appendix N: Traffic Audit Report:
1. Date of Traffic report:- 13.07.2016
Sr. No. Type of Vehicle
1st Shift (00:00 to 08:00 hours)
2nd Shift (08:00 to 16:00 hours)
3rd Shift (16:00 to 24:00 hours)
Total
LHS RHS LHS RHS LHS RHS LHS RHS
1 CAR/VAN/JEEP 1232 1206 3565 3775 3537 3065 8334 8046
2 LCV 754 627 554 705 659 703 1967 2045
3 BUS/TRUCK 1045 1067 593 661 869 924 2507 2652
4 MULTI AXLE TRUCK (AXLE ≥ 3) 1139 1661 1471 1404 1667 1743 4277 4808
GRAND TOTAL 4170 4561 6183 6545 6732 6445 17085 17551
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 43 of 50
2. Date of Traffic report:- 24.07.2016
Sr. No. Type of Vehicle
1st Shift (00:00 to 08:00 hours)
2nd Shift (08:00 to 16:00 hours)
3rd Shift (16:00 to 24:00 hours)
Total
LHS RHS LHS RHS LHS RHS LHS RHS
1 CAR/VAN/JEEP 1415 1804 3827 4463 5485 4017 10727 10284
2 LCV 676 527 456 586 537 601 1669 1714
3 BUS/TRUCK 1032 997 642 639 846 863 2520 2499
4 MULTI AXLE TRUCK (AXLE ≥ 3) 1519 1593 1824 1627 1593 1796 4936 5016
GRAND TOTAL 4642 4921 6749 7315 8461 7277 19852 19513
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 44 of 50
Appendix O: IE Correspondence With NHAI & L&T VBTL :
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 45 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 46 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 47 of 50
Appendix P: VTS Report :
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 48 of 50
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 49 of 50
Appendix Q: Site Photographs: 1. Earthen Shoulder Damaged lot of places in the project highway 2. Earthen Shoulder Damaged lot of places in the project highway (Sample Photograph Attached @ Ch.123+640 to 123+700 LHS) (Sample Photograph Attached @ Ch. 177+145 to 177+180 RHS)
Independent Engineer Services For Six Laning of Km. 108+700 To Km. 192+000, Vadodara To Bharuch, Section Of NH-8 During O&M Period.
Monthly Report July- 2016 O & M Inspection Report No. 56
Page | 50 of 50
3. Alligator Cracks observed various places in the project highway 4. Alligator Cracks observed various places in the project highway
(Sample Photograph Attached @ Ch.130+230 to 130+240 RHS (Service Road) (Sample Photograph Attached @ Ch. 114+400 to 114+420 RHS (MCW)