Broadband Infrastructure Application Submission to RUS Broadband Infrastructure Program Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109 Funding Opportunity: Broadband Initiatives Program Applicant Organization: PRIDE NETWORK, INC. Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq. Page 1 Table of Contents A. General Application Information B. Co-Applicant or Consortium C. Community Anchor Summary D. Project Map E. Service Area Details F. Technology Detail G. Project Budget H. Self Scoring I. Uploads

Table of Contents - USDA Rural Development · 2019. 11. 20. · Electronic Business POC JERRY E. HOOVER 8067882981 Ext. [email protected] Alternate Electronic Business POC BRAD WORTHINGTON

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 1

    Table of Contents

    A. General Application Information

    B. Co-Applicant or Consortium

    C. Community Anchor Summary

    D. Project Map

    E. Service Area Details

    F. Technology Detail

    G. Project Budget

    H. Self Scoring

    I. Uploads

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 2

    A. General Application Information Applicant Information

    Name and Federal ID for Applicant

    DUNS Number 830606260

    CCR # (CAGE) 5GW34

    Legal Business Name PRIDE NETWORK, INC.

    Point of Contact (POC) JERRY HOOVER

    8067882981

    Ext.

    [email protected]

    Alternate POC BRAD WORTHINGTON

    8067970687

    Ext.

    [email protected]

    Electronic Business POC JERRY E. HOOVER

    8067882981

    Ext.

    [email protected]

    Alternate Electronic Business

    POC

    BRAD WORTHINGTON

    8067970687

    Ext.

    [email protected]

    Name and Contact Information of Person to be Contacted on Matters Involving this Application:

    Prefix Mr.

    First Name Tony

    Middle Name

    Last Name Lee

    Suffix Esq.

    Telephone Number 202-344-8065

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 3

    Fax Number 202-344-8300

    Email [email protected]

    Title Partner

    Business Mailing Address of

    Applicant

    PRIDE Network, Inc5307 W. Loop 289Lubbock, TX 79414

    Additional Contact Information of Person to be Contacted on Matters Involving this Application:

    Project Role Name Phone Email

    Secondary Point of Contact

    Mr.

    Aaron , Peters

    8067970687

    aaron.peters@nt

    scom.com

    Other Contact

    Mr.

    Brad , Worthington Esq.

    8067970687

    bradw@ntscom.

    com

    Other Contact

    Mr.

    Scott , Mackinaw

    6017642195

    smackinaw@jdf

    ec.com

    Other Contact

    Miss

    Courtney L., Binford

    8067970687

    courtney.binford

    @ntscom.com

    Environmental Point of Contact

    Prefix: Miss

    Name: Binford, Courtney

    Suffix:

    Telephone Number: 8067970687

    Title: Director- Special Projects

    Additional Organization Information

    Type of Organization For-profit Corporation

    NON-CONFIDENTIAL: PRIDE Network, Inc. (PRIDE Net) was conceived from inception

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 4

    Summary of Organization

    Is the organization a small

    business? Yes

    Does the organization meet the

    definition of a socially and

    economically disadvantaged

    No

    (b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 5

    small business concern as

    defined under section 8(a) of

    the SBA?

    Congressional District of

    Applicant Headquarters Texas - 19

    If the applicant is a subsidiary,

    provide parent legal name NTS Communications, Inc.

    If the applicant is a startup,

    name of entity with controlling

    interest

    NTS Communications, Inc.

    Is the applicant deliquent on any federal debt?

    No

    If Yes, justification for deliquency:

    Is the applicant a current or former RUS borrower or Grantee?

    Yes

    Is the applicant a current or past RUS Title II borrower?

    No

    Authorized Organizational Representative

    AOR Name WORTHINGTON, BRAD

    AOR Email [email protected]

    Result Applicant Authorized

    Project Title and Project Description

    NON-CONFIDENTIAL: Project Title: North Shore Project

    NON-CONFIDENTIAL: Project Description: PRIDE Network, Inc. proposes to construct a FTTP

    telecommunications infrastructure, with a Wireless service-extension overlay, that will bring

    advanced broadband services to rural communities in the St. Helena, Washington, and

    Tangipahoa Parishes, Louisiana. The network will initially offer data speeds of 20 to 100 Mbps

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 6

    with the ability to increase to even higher speeds to ensure the greatest broadband benefits

    possible.

    NON-CONFIDENTIAL: How many jobs will be created or saved from this project? 1316

    Project Type: Last Mile

    Other Applications

    Are you or your co-applicants submitting any other applications during this round?

    Yes

    Easygrants ID Project Title

    5521

    PRIDE Central

    5523

    PRIDE South

    If YES, please explain any synergies and/or dependencies between this project and any other applications.

    Other Project Information

    Executive Summary of the proposed project

    PRIDE Network, Inc. (“PRIDE Net”), a wholly owned subsidiary of NTS Communications, Inc.

    (“NTS”), was granted funding for two applications during Round One of the American Recovery

    and Reinvestment Act of 2009 (ARRA) stimulus session. PRIDE Net is determined to provide

    reasonably priced, quality broadband service to areas of persistent poverty and to communities

    that have experienced the worst in the current economic recession. As evidenced by its prior

    granted awards and NTS’s extensive experience with Fiber-To-The-Premise (“FTTP”) and other

    communications networks, it is apparent that PRIDE Net is well suited to implement, manage,

    and succeed with projects of this magnitude and to comply with all rules and procedures required

    by the ARRA.

    The PRIDE Net North Shore Project plans and service objectives advance the goals of the FCC’s

    National Broadband Plan as published on March 15, 2010 by making available download speeds

    exceeding 5 megabits per second to the majority of the population in the project service area in

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 7

    advance of the time line proposed in the National Broadband Plan. As the PRIDE Net, North

    Shore Project evolves with technological improvements and reinvestment of income generated

    by the network, improvements in the speed capability will be expanded to a greater portion of the

    service area in realization of the goals of the National Broadband Plan.

    The communities that will be served by the North Shore Project will include Amite, Franklinton,

    Independence, Montpelier, Tickfaw, Natalbany, Hammond, and Ponchatoula, Louisiana. None

    of the areas listed have full access to Advanced Broadband Services today. Portions of the

    proposed project areas to have access to high speed internet access; however, such service is not

    affordable to most of the people that reside in those communities, including those that have lost

    their jobs during the current financial crisis and need the advantages that Advanced Broadband

    services can provide with respect to job training, placement, and new entrepreneurial ventures.

    Where broadband service is available, service is sporadic in terms of coverage, reliability, and

    speed. PRIDE Net will offer a competitive choice that will be far more affordable, reliable, and

    ubiquitous for the targeted populations in these difficult economic times.

    According to Children’s Defense (http://cdf.childrensdefense.org/site/DocServer/la-

    3.pdf?docID=653), Louisiana ranks 49th among states in the percent of children who are poor,

    with 73% of eligible persons receiving food stamps. This is an unsettling statistic, and it has been

    proven time and time again that the key to diminishing these high poverty numbers is with the

    availability of resources that people in urban areas have access to everyday. With Advanced

    Broadband Services, people in the state of Louisiana would have more access to the tools they

    need to be successful, take care of their families, and to thrive.

    Louisiana has a poverty level of 19.4% and is ranked 48th in the nation in this category. See:

    (http://www.statemaster.com/graph/eco_per_bel_pov_lev-economy-percent-below-poverty-

    level). Moreover, Louisiana has 80% of fourth graders reading below grade level, and 79%

    fourth graders below grade level in math. In St. Helena, Tangipahoa, and Washington Parishes,

    the site of the proposed construction, 26.6% of the population under age 18 is below poverty.

    Over the last 20 years, Louisiana’s poverty rate has fluctuated considerably, but today it is only 3

    points lower than it was in 1980. While the South narrowed the gap with the rest of the country

    during that time period, Louisiana’s poverty rate remains more than 50% above the national

    average.

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 8

    The North Shore Project will make affordable Advanced Broadband Services available to the

    following Louisiana communities: Amite, Franklinton, Independence, Montpelier, Tickfaw,

    Natalbany, Hammond, and Ponchatoula. The proposed construction sites will be in portions of

    St. Helena, Tangipahoa, and Washington Parishes. The North Shore Project will be extended to

    additional communities not listed above that also lack access to affordable Advanced Broadband

    service as profits are reinvested in new infrastructure construction. In this way, by first using

    federal grant/loan dollars to build the core of the network and its initial passings, and then by

    allowing future profits to further expand network growth, PRIDE Net will create a continuous

    benefit cycle to the entire region for generations to come.

    When complete, the North Shore Project will initially serve the following populations:

    Households passed: Businesses passed:

    (b) (4) (b) (4)

    (b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 10

    NTS, through its wholly-owned subsidiary PRIDE Net, is fully capable of constructing and

    operating the North Shore Project in a competent manner in compliance with all applicable

    Federal, state, and local laws. NTS and its sister company in Louisiana, Xfone USA, Inc., have

    an operating history of more than 30 years in the communications industry. Their operations

    have consistently proved their respective capability to provide high quality and low cost

    communications services to the communities they serve.

    NTS Communications, Inc. was formed in 1981 and achieved competitive local exchange carrier

    ("CLEC") status in 1999. NTS operates as a wholly owned subsidiary of Xfone, Inc. (NYSE

    Alternext: “XFN”). NTS is headquartered in Lubbock, Texas and with its staff of 300-plus

    employees, provides a full range of wireline voice and data services to customers in Arizona,

    Colorado, Kansas, New Mexico, Oklahoma, and Texas. Acting in a management capacity, NTS

    also directs the business and service delivery of its sister company, Xfone USA, Inc., which

    provides a full range of similar voice and data services to customers in Louisiana and

    Mississippi.

    Since 2004, NTS has engaged in an aggressive build-out of FTTP networks in Lubbock,

    Wolfforth, and Woodrow, Texas. To date, NTS has constructed approximately 650 route miles

    of fiber optic distribution plant encompassing in excess of 18,000 gross passings in these

    communities. Using its FTTP facilities, NTS provides full featured voice, IPTV video, and data

    services to its customers. Of note, one of NTS’s subsidiaries, NTS Telephone Company, LLC, is

    the recipient of an $11 million USDA Broadband Loan to bring FTTP voice, video, and data

    services to the communities of Levelland and Smyer, Texas. The project is currently in its last

    phases of construction. Implementation of this project has increased the management experience

    of NTS with regard to construction methodologies, unique accounting treatment, and overall

    project management required by RUS funded projects. Further, PRIDE Net is a recipient of two

    combination grant/loan awards from the USDA Broadband Initiatives Program for a total of

    approximately $65 million.

    PRIDE Net’s parent company, NTS, as described above, operates a large existing network that

    will provide a reliable support framework, back-office, and network interface infrastructure for

    the North Shore Project. PRIDE Net, via a service agreement with NTS, will have the resources

    it requires to allow it to immediately provide carrier class service and reliability for the North

    Shore Project service area. A service agreement with PRIDE Net’s sister company Xfone USA

    will also be in place to cover co-location and local sales and field support. These existing

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 11

    capabilities and resources will be instrumental in PRIDE Net’s ability to maintain the project

    schedule and provide the ongoing sales, back-office, and field support for North Shore Project

    network operations.

    There are no co-applicants with this application. However, it should be noted that PRIDE Net

    has collaborated with the City of Hammond, Louisiana in constructing the network plan. The

    City of Hammond was awarded grant funding for the improvement of water/sewer and public

    safety as part of ARRA.

    Full details regarding the cost of the entire project is set forth in the Attachment 22 – Project

    Capital Investment. The overall infrastructure cost of the proposed system is $36,198,857.

    Overall passings for the project are estimated to be 13,075 and expected subscriber take-rate

    projections, using our most conservative model, estimate providing Advanced Broadband

    Services to 5963 customers within the pro-forma period.

    PRIDE Net estimates the creation of 720 jobs to construct and operate the PRIDE Net North

    Shore project. This estimate is based on studies finding that 20 jobs are created for each $1

    million in investment in the construction of a fiber to the premises network (Jeffrey Eisenach,

    Hal Singer, and Jeffrey West, Empiris, LLC, Economic Effects of Tax Incentives for Broadband

    Infrastructure Deployment, pp. 8-9 (January, 2009)).

    In addition, by accelerating affordable Advanced Broadband deployment to communities without

    access to such state of the art technology today, the North Shore network will attract new

    businesses to these communities, which will generate economic activity and create

    approximately an additional 596 jobs. These projections are based on studies showing the

    indirect creation of one job for every 10 subscribers to an Advanced Broadband network.

    (Jeffrey Eisenach, Hal Singer, and Jeffrey West, Empiris, LLC, Economic Effects of Tax

    Incentives for Broadband Infrastructure Deployment, pp. 17-18 (January, 2009); see also, Robert

    Crandall, William Lehr, and Robert Litan; The Effects of Broadband Deployment on Output &

    Employment: A Cross Sectional Analysis of U.S. Data, 6 Issues in Economic Policy 12-14 (July

    2007).

    The PRIDE Net North Shore project promotes rural economic development by:

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 12

    (b)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 13

    Is the applicant cooperating with any other Recovery Act Awards?

    Yes

    If the answer to the above question is "Yes," description of Cooperation with other Recovery Act Awards:

    PRIDE Network, Inc. (PRIDE Net) will be cooperating, upon approval, with the City of

    Hammond, Louisiana. Hammond was the recipient of a $250,000.00 Recovery Act Award to

    improve the city's Department of Health and Human Services, a $190,280.00 award for the

    Department of Justice, a $46,239.00 award for the Department of Justice, and an additional

    $800,000.00 out of the $43 million awarded to the Louisiana Department of Environmental

    Quality. These collaborations will increase the quality of life and experience of the PRIDE

    Network, Inc./City of Hammond management capabilities. See Recovery Act upload for

    coordinating documentation.

    Is the applicant seeking a waiver of the Buy American provision?

    No

    If YES, click "Add" to provide your justification for the waiver:

    B. Co-Applicant or Consortium Are you applying with any other key institutions, organizations, or other entities for this project?

    No

    If YES, Co-Applicants are listed below:

    (b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 15

    Premises within the rural portion of the service area, without access to 5 Mb service:

    Total premises within the rural portion of the service area (including without access to 5 Mb service):

    Total square miles within this service area:

    Total rural square miles within this service area:

    Shortest number of miles from non-rural area:

    (b) (b)

    (b) (b)

    (b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 16

    F. Technology Detail Technology Feasibility

    Indicate the technology that will be used to deliver services. The following items were selected:

    Other:

    Technology Questions

    Description of Network Openness

    • End Users will be entitled to access the lawful Internet content of their choice;

    (b) (4)

    (b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 17

    • End Users will be entitled to run applications and use services of their choice accessed

    through the Internet, subject to the needs of law enforcement;

    • End Users will be entitled to connect their choice of legal devices that do not harm the

    network; and

    • End Users are entitled to competition among network providers, application and service

    providers, and content providers.

    G. Project Budget

    Project Budget

    Budget Loan

    Request

    Grant

    Request

    Equity Non-RUS

    Debt

    Bond Other

    Network & Access

    Equipment

    Outside Plant

    Buildings and Land

    Customer Premise

    Equipment

    Billing and Operational

    (b) (4)(b) (4)

    (b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 18

    Support Systems

    Operating Equipment

    Professional Services

    Testing

    Site Preparation

    Other

    TOTAL

    18,461,417

    17,737,440

    Total Capital Project Budget: $36,198,857

    Total Requested Award: $36,198,857

    Grant Percentage of Total Award: 49.0%

    Is the applicant seeking a waiver of the 75-25 grant-to-loan ratio? No

    If Yes, justification for the waiver:

    Premises Passed (from Proposed Funded Service Areas):

    Cost per Premesis Passed:

    Is the applicant seeking a waiver of the $10,000 per premise passed requirement? (Last Mile only): No

    If Yes, justification for the waiver:

    H. Self Scoring Criteria Method Points Self Score

    Proportion of

    Rural

    Residents

    Served in

    Unserved

    Areas

    Points will be awarded for serving rural residents located in

    unserved areas. For every 10 percent of unserved households

    compared to the total households to be served that will receive

    broadband service, 1 point will be awarded up to a maximum of

    10 points. For Middle Mile projects, this will be based on the

    location of the interconnection points.

    0 - 10

    (b) (4)(b) (4)(b) (4)

    (b)

    (b) (4)(b) (4)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 19

    Criteria Method Points Self Score

    Rural Area

    Targeting

    Points will be awarded for exceeding the 75 percent rural area

    service requirement. For every five percent increase in the total

    proposed funded service area that is above the 75% rural

    requirement, 2 points will be awarded up to a maximum of ten

    points. For MM projects, this will be based on the location of

    the interconnection points.

    0 - 10

    Distance from

    Non-Rural

    Areas

    One point will be awarded for each additional 10 miles that at

    least one proposed funded service area is located away from the

    closest non-rural area, up to a total of five points. For applicants

    with multiple service areas, this calculation will be based on the

    service area closest to the non-rural area. For MM projects, this

    will be based on the location of the interconnection points.

    0 - 5

    Title II

    Borrowers

    Eight points will be awarded to applications which are

    submitted by entities which have borrowed under Title II of the

    RE Act.

    0 or 8

    Other

    Recovery Act

    Awards

    Five points will be awarded for any cooperation with a

    Recovery Act award. 0 or 5

    Performance

    of the offered

    service

    For Last Mile Projects:

    For wireline projects that are constructed to deliver a minimum

    of 5 Mbps service to the premises (upstream and downstream

    combined), 5 points will be awarded. For wireline projects that

    are constructed to deliver a minimum of 20 Mbps service to the

    premises (upstream and downstream combined), 10 points will

    be awarded. For wireless projects that are constructed to deliver

    a minimum of 3 Mbps service to the end user (upstream and

    downstream combined), 8 points will be awarded. For mobile

    wireless projects that are constructed to deliver a minimum of 3

    Mbps service to the end user (upstream and downstream

    combined), 10 points will be awarded. Scoring will be based on

    the predominant technology used for combination systems.

    For Middle Mile Projects:

    For middle mile projects that are constructed to deliver 100

    Mbps service to all interconnection points in their network, 10

    points will be awarded.

    0, 5, 8, or

    10

    Services to

    Critical

    Community

    Facilities and

    Small

    Disadvantage

    d Businesses

    Points will be awarded to applications that are proposing to

    offer discounted rate packages to all critical community

    facilities in the proposed funded service area(s) that are at least

    25 percent lower than the proposed base rate packages for at

    least three years, 4 points wil be awarded. for Critical

    Community Facilities. For applications that are proposing to

    offer discounted rate packages to disadvantaged small

    businesses under section 8(a) of the SBA, 2 points will be

    0,2, 4, or 6

    (b) (4

    (b)

    (b)

    (b)

    (b)

    (b) (4

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 20

    Criteria Method Points Self Score

    awarded.

    Applicant’s

    organizational

    capability

    Up to ten points will be awarded based on the strength of the

    project’s management team. RUS will evaluate past

    performance and accomplishments and award points

    accordingly. Details of these requirements will be in the

    Application Guide.

    0 - 10

    Small

    Disadvantage

    d Businesses

    Three points will be awarded to applicants that meet the

    definition of a socially and economically disadvantaged small

    business concern under section 8(a) of the SBA.

    0 or 3

    Leverage of

    outside

    resources

    Up to 10 points will be awarded based on the amount of outside

    resources contributed to the total financing provided under BIP:

    a. 10 points if this ratio is greater than 100%.

    b. 7 points if this ratio is between 99% and 75%.

    c. 5 points if this ratio is between 74% and 50%.

    d. 3 points if this ratio is between 49% and 25%.

    e. 0 points if the ratio is less than 25%.

    Outside resources are limited to new investments that are

    proposed to support the project and do not include any existing

    assets that the Applicant already owns or has rights to or any

    revenues generating from the operations.

    0, 3, 5. 7,

    and 10

    Extent of

    grant funding

    Up to 15 points will be awarded based on the amount of grants

    funds requested in relation to the total amount of the award

    requested.

    a. 0 points if requesting a grant greater than 70%.

    b. 5 point if requesting a grant between 70 and 51%.

    c. 10 points if requesting a grant between 50 and 16%.

    d. 15 points if requesting a grant between 15 and 0%.

    0, 5, 10,

    and 15

    Cost

    Effectiveness

    For Last Mile projects only, up to 8 points will be awarded for

    projects that promote cost effectiveness of federal assistance,

    based on cost per premise passed. To calculate the cost per

    premise passed, the applicant shall divide the total award

    requested in the application by the total number of premises

    passed.

    0, 2, 4, 6

    and 8

    (b) (4

    (b)

    (b)

    (b) (4

    (b)

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 22

    Uploads

    The following pages contain the following uploads provided by the applicant:

    Upload Name File Name Uploaded By Uploaded Date

    Legal Opinion

    Pride Network.PDF

    Lee, Tony

    03/20/2010

    Communities in

    PFSA

    Communities PFSA 3.28.10cb.xls

    Lee, Tony

    03/28/2010

    Recovery Act

    Collaboration

    IMG.pdf

    Lee, Tony

    03/20/2010

    Recovery Act

    Collaboration

    Hammond Awards.PDF

    Lee, Tony

    03/20/2010

    Equal Opportunity

    and

    Nondiscrimination

    Equal

    Opportunity.NonDiscrimination.PRIDE.PDF

    Lee, Tony

    02/25/2010

    Certification

    Regarding

    Architectural

    Barriers

    Cert. Architectural Barriers.PDF

    Lee, Tony

    02/25/2010

    Uniform Relocation

    Assistance and Real

    Property

    Reallocation Assistance.Property.PDF

    Lee, Tony

    02/25/2010

    Certification

    Regarding

    Debarment.Suspension.Other.PDF Lee, Tony 02/25/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 23

    Debarment,

    Suspension etc

    Certification

    Regarding Lobbying

    for Contracts

    Lobbying.PDF

    Lee, Tony

    02/25/2010

    Environmental

    Questionnaire

    PRIDE NS-EQ 3-24-10 cb.doc

    Lee, Tony

    03/25/2010

    Competitor Service

    Offerings

    Competitor Service Offerings

    Mar212010.doc

    Lee, Tony

    03/21/2010

    System Design

    PRIDE NS System Design Mar28.2010

    cap.doc

    Lee, Tony

    03/28/2010

    Network Diagram

    Pride NS Design Map 3-24-10 tt.pdf

    Lee, Tony

    03/24/2010

    Network Diagram

    PRIDE NS-PG.2 Wireless.pdf

    Lee, Tony

    03/24/2010

    Network Diagram

    PRIDE NS-PG.3 PON Cabinets.pdf

    Lee, Tony

    03/24/2010

    Subscriber

    Projections and

    Service Tiers

    Service Projections download 3.25.10cb.xls

    Lee, Tony

    03/25/2010

    Service Metrics and

    Network

    Management

    Service Metrics download3 24 10bw2.doc

    Lee, Tony

    03/25/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 24

    Professional

    Engineer

    Certification

    PE Certification PRIDE North Shore.PDF

    Lee, Tony

    03/23/2010

    Licenses and

    Agreements

    Com.PRIDE DSA.PDF

    Lee, Tony

    03/23/2010

    Licenses and

    Agreements

    Xfone.PRIDE.PDF

    Lee, Tony

    03/23/2010

    Licenses and

    Agreements

    License.agreement download3.24.10cb.xls

    Lee, Tony

    03/24/2010

    Licenses and

    Agreements

    PRIDE Network Inc_formation

    docs_20090403.PDF

    Lee, Tony

    03/24/2010

    Licenses and

    Agreements

    Com to Pride Network General

    Agreement.PDF

    Lee, Tony

    03/21/2010

    Licenses and

    Agreements

    SPA 5_15 NCTC Member Agreement.pdf

    Lee, Tony

    03/21/2010

    Licenses and

    Agreements

    Pride Network Certificate of Operating.PDF

    Lee, Tony

    03/21/2010

    Licenses and

    Agreements

    level 3 agreement.PDF

    Lee, Tony

    03/21/2010

    Licenses and

    Agreements

    misc. cable agreeements.PDF

    Lee, Tony

    03/21/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 25

    Licenses and

    Agreements

    Nondiscrimination agreement. PRIDE.PDF

    Lee, Tony

    03/21/2010

    Licenses and

    Agreements

    XO Agreement.PDF

    Lee, Tony

    03/21/2010

    Licenses and

    Agreements

    PRIDE - NTS GSA Final 3-22-10.pdf

    Lee, Tony

    03/22/2010

    Licenses and

    Agreements

    PUC SPCOAA approval.pdf

    Lee, Tony

    03/28/2010

    Historical Financial

    Statements

    NTS Excel Consolidated Financials MTD

    and YTD Dec 31 2009-Board.xls

    Lee, Tony

    03/28/2010

    Historical Financial

    Statements

    Q47 Historical Financial Statments - Parent -

    NTS 2008.pdf

    Lee, Tony

    03/23/2010

    Pro-Forma 5-Year

    Financial Forecast -

    Multiple

    North Copy of 19 - Pro Forma 5-Year

    Financial Forecast - Multiple

    Applications.xls

    Lee, Tony

    03/27/2010

    Pro-Forma Financial

    Assumptions

    North Assumptions.doc

    Lee, Tony

    03/28/2010

    Project Capital

    Investment

    Workbook

    22 -PRIDE NS tab1 Project Capital

    Investment Workbook.pdf

    Lee, Tony

    03/28/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 26

    Project Capital

    Investment

    Workbook

    22 -PRIDE NS tab2 Project Capital

    Investment Workbook.pdf

    Lee, Tony

    03/28/2010

    Project Capital

    Investment

    Workbook

    22 -PRIDE NS tab3 Project Capital

    Investment Workbook.pdf

    Lee, Tony

    03/28/2010

    Project Capital

    Investment

    Workbook

    22 -PRIDE NS tab4 Project Capital

    Investment Workbook.pdf

    Lee, Tony

    03/28/2010

    Schedule of Debt

    and Equity Funding

    Sched. debt and equity 3.27.10.xls

    Lee, Tony

    03/27/2010

    Source

    Documentation for

    Debt and Equity

    Funding

    PRIDE 1 USDA Approval Let.pdf

    Lee, Tony

    03/27/2010

    Source

    Documentation for

    Debt and Equity

    Funding

    PRIDE 2 USDA Approval Let.pdf

    Lee, Tony

    03/27/2010

    Source

    Documentation for

    Debt and Equity

    Funding

    Capital Funding Commitment letter.PDF

    Lee, Tony

    03/24/2010

    Proof of Entity Type

    PRIDE Network Inc_formation

    docs_20090403.PDF

    Lee, Tony

    03/23/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 27

    Organization Charts

    Xfone Chart.pdf

    Lee, Tony

    03/23/2010

    Organization Charts

    Organizational Chart Pride Parent 3 28 10

    r4.pdf

    Lee, Tony

    03/28/2010

    Management Team

    Resumes

    Resume Milton W_ Schober Jr_072209.doc

    Lee, Tony

    03/28/2010

    Management Team

    Resumes

    Management Collaboration 3.28 ap.doc

    Lee, Tony

    03/28/2010

    Management Team

    Resumes

    Worthington Resume 3-28-10.docx

    Lee, Tony

    03/28/2010

    Management Team

    Resumes

    Resume_Hoover.doc

    Lee, Tony

    03/03/2010

    Management Team

    Resumes

    Resume_Collins.doc

    Lee, Tony

    03/03/2010

    Management Team

    Resumes

    Resume_Peters.doc

    Lee, Tony

    03/20/2010

    Affordability

    affordability 3.24.10ap.doc

    Lee, Tony

    03/24/2010

    Supplemental

    Document

    Phoenix PRIDE Support Letter.PDF

    Lee, Tony

    03/28/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 28

    Supplemental

    Document

    Unsolicited comments from the returned

    survey.doc

    Lee, Tony

    03/28/2010

    Supplemental

    Document

    Shippen PRIDE Support Letter.PDF

    Lee, Tony

    03/28/2010

    Supplemental

    Document

    STBs.pdf

    Lee, Tony

    03/28/2010

    Supplemental

    Document

    Moonblink.pdf

    Lee, Tony

    03/28/2010

    Supplemental

    Document

    Letter of Support-Cisco.doc

    Lee, Tony

    03/28/2010

    Supplemental

    Document

    0056_001.pdf

    Lee, Tony

    03/27/2010

    Supplemental

    Document

    0066_001.pdf

    Lee, Tony

    03/27/2010

    Supplemental

    Document

    Pride Commitment Letter.doc

    Lee, Tony

    03/24/2010

    Supplemental

    Document

    ROUND 2 BBSI Stndrd Support Letter--

    NTS Comm 03.23.10.pdf

    Lee, Tony

    03/24/2010

  • Broadband Infrastructure Application

    Submission to RUS – Broadband Infrastructure Program

    Submitted Date: 3/28/2010 9:09:57 PM Easygrants ID: 5109

    Funding Opportunity: Broadband Initiatives

    Program Applicant Organization: PRIDE NETWORK, INC.

    Task: Submit Application - BIP Applicant Name: Mr. Tony Lee Esq.

    Page 29