29
Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management Center [email protected] Dam Safety Workshop Brasília, Brazil 20-24 May 2013

TABLE ROCK DAM SLIDE – CASE STUDY

  • Upload
    liuz

  • View
    55

  • Download
    0

Embed Size (px)

DESCRIPTION

Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management Center [email protected] Dam Safety Workshop Brasília, Brazil 20-24 May 2013. TABLE ROCK DAM SLIDE – CASE STUDY. Purpose. Provide real-life application for reporting distress - PowerPoint PPT Presentation

Citation preview

Page 1: TABLE ROCK DAM SLIDE – CASE STUDY

Corps of EngineersBUILDING STRONG®

TABLE ROCK DAM SLIDE – CASE STUDYDave Paul, P.E.Lead Civil EngineerU.S. Army Corps of EngineersRisk Management Center [email protected]

Dam Safety WorkshopBrasília, Brazil20-24 May 2013

Page 2: TABLE ROCK DAM SLIDE – CASE STUDY

Purpose

Provide real-life application for reporting distress

Review project conditions and distress reporting

timeline

Stress Dam Safety training and communication

Emphasize the importance of partnering with

regional experts

Page 3: TABLE ROCK DAM SLIDE – CASE STUDY

Event Background

Page 4: TABLE ROCK DAM SLIDE – CASE STUDY
Page 5: TABLE ROCK DAM SLIDE – CASE STUDY

Rainfall Comparison

Average Rainfall Rainfall RainfallDAM April Rain 22-28 April April 2011 April

2008Beaver 4.5 in 11.57 in 15.1 in 9.16 inTable Rock 4.1 10.43 13.6 7.90Bull Shoals 3.9 12.06 15.3 7.90Norfork 4.1 13.23 16.8 8.15Greers Ferry 4.9 7.4 10.6 9.21Clearwater 4.5 11.31 14.01 9.16

Page 6: TABLE ROCK DAM SLIDE – CASE STUDY

Rainfall Comparison

Average Rainfall Rainfall RainfallDAM April Rain 22-28 April April 2011 April

2008Beaver 4.5 in 11.57 in 15.1 in 9.16 inTable Rock 4.1 10.43 13.6 7.90Bull Shoals 3.9 12.06 15.3 7.90Norfork 4.1 13.23 16.8 8.15Greers Ferry 4.9 7.4 10.6 9.21Clearwater 4.5 11.31 14.01 9.16

Page 7: TABLE ROCK DAM SLIDE – CASE STUDY

CHALLENGESDams

Page 8: TABLE ROCK DAM SLIDE – CASE STUDY

CHALLENGESLevees

Page 9: TABLE ROCK DAM SLIDE – CASE STUDY

CHALLENGESNavigation System

Page 10: TABLE ROCK DAM SLIDE – CASE STUDY

Table Rock Lake Dam

Page 11: TABLE ROCK DAM SLIDE – CASE STUDY

Records at Table Rock DamRECORD RAINFALL RECORD INFLOW

RECORD RELEASE RECORD POOL

Page 12: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 13: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 14: TABLE ROCK DAM SLIDE – CASE STUDY

Table Rock Slide

Page 15: TABLE ROCK DAM SLIDE – CASE STUDY

Table Rock Slide

Page 16: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 17: TABLE ROCK DAM SLIDE – CASE STUDY

Tulsa Tech Team

Little Rock Tech Team

Page 18: TABLE ROCK DAM SLIDE – CASE STUDY

24-Hour Observation

Page 19: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 20: TABLE ROCK DAM SLIDE – CASE STUDY

Table Rock Event

Page 21: TABLE ROCK DAM SLIDE – CASE STUDY

DSPMT Reporting

Page 22: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 23: TABLE ROCK DAM SLIDE – CASE STUDY

Emergency Repair

Page 24: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 25: TABLE ROCK DAM SLIDE – CASE STUDY

Repair

Page 26: TABLE ROCK DAM SLIDE – CASE STUDY

Distress Reporting Timeline

Discovery OPM Calls DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 27: TABLE ROCK DAM SLIDE – CASE STUDY

Lesson’s Learned District and technical team reacted well

Anticipate the unexpected Project challenges Performance may change Resources will be thin Plan for backup DSO

Dam safety training is critical It works – project personnel noted the distress

Page 28: TABLE ROCK DAM SLIDE – CASE STUDY

Lesson’s Learned Communication

Project Personnel to DSO DSO to Engineers/DSPM Engineers on Site to DSO/DSPM DSO/DSPM to MSC and HQ OPM/Lake Manager and PAO to Public and Media

Constantly educate the public Purpose and Value of Projects Consequences without Projects

Consult regional dam safety engineers