  • TACTICAL WHEELED VEHICLECONFERENCE

    TACTICAL WHEELED VEHICLECONFERENCE

    LTG John S. Caldwell, Jr.Military Deputy to the Assistant Secretary of the Army

    for Acquisition, Logistics, and TechnologyJanuary 28, 2003

    LTG John S. Caldwell, Jr.Military Deputy to the Assistant Secretary of the Army

    for Acquisition, Logistics, and TechnologyJanuary 28, 2003

  • “We have set an ambitious timeline for FCS andthe Objective Force. But our legacy processeswill not serve us well - - we know that. We canno longer take concepts to final form, presentthem for acceptance, and then go back to workout the kinks - - that takes time, energy, andmoney. ” - General Eric Shinseki , CSA

    1963 1983

    MS BMS B MS CMS C

    MAR ‘78 FEB ‘80

  • FUE: FY08

    FCS

    UA

    UE

    IOC: FY10

    IOC: FY11

  • SUSTAINMENT3 Days - High Intensity Conflict7 Days - Low Intensity Conflict

    TRANSPORTABILITYAir, Sea, Highway, Rail

    Inter-theater & Intra-theater

  • “Transformation, Objective Force, FutureCombat System, Lead Systems Integrator,Advanced Collaborative Environment - - All areexciting initiatives calling for bold, innovativerisk taking. We are in for the long haul ofdelivering the capabilities needed for the Armyof the 21st century.” - General Eric Shinseki , CSA

    2003 2011

    MS BMS B MS CMS C FUEFUE IOCIOC

    1stQtr O5 4thQtr O8 4thQtr 10MAY O3

  • DEC02 JAN03 FEB03 MAR03 APR03 MAY03 JUN03 JUL03 OCT03 NOV03 JAN04SEP03AUG03 DEC03

    Req

    ”ts

    Tec

    hn

    olo

    gy

    Acq

    uis

    itio

    n

    ORD Development

    LSIAgreement

    Award

    Critical Increment ISystems Contract

    Awards

    FY2003 FY2004

    PreliminarySoS Spec

    Preliminary Prime ItemDescriptions& Interface

    Control Documents

    SoS Trades and Analysis

    Requirements Update

    IncrementI SoS

    Design SetPDR

    Technology Demonstrations

    Army/LSI Alpha Contracting Process

    SoS Definition

    ProgramDocuments/Assessments Updated with System

    Detail

    ProgramDocuments/Assessments Updated with System

    Detail

    Repeated forSubsequent Spirals as

    Needed

    Repeated forSubsequent Spirals as

    Needed

    SoS Design

    ProgramDocuments/AssessmentsApproved with SoS Focus

    ProgramDocuments/AssessmentsApproved with SoS Focus

    MS B

    RemainingIncrement I Systems

    ContractsTechnology Maturity/Readiness Evaluation

    LSI Subcontracting Process

  • FCS Advanced Collaborative Environment(FCS ACE)

    FCS Advanced Collaborative Environment(FCS ACE)

    Supports:

    •Program Management at EVERY stage in theLife Cycle.

    •Real-Time data access from ANY PLACE atANY TIME!

  • Once off loaded, the FCS FoS must be capable ofrapid transition to Full Combat Configuration(FCC) mission postures with a 750km(Threshold)/1000km (Objective) operational rangecapability.

    4.1.1.6.1.1

    1250km1500km

  • • FCS ACE: the primary means of managing,developing, and testing the new FCS designs – if wedon’t use it, we won’t make it by 2008!

    • The tools are available now! Get involved and usethem!

    • Use it or be left behind! We will field FCS and theObjective Force with or without you…because….

    • FCS ACE: the primary means of managing,developing, and testing the new FCS designs – if wedon’t use it, we won’t make it by 2008!

    • The tools are available now! Get involved and usethem!

    • Use it or be left behind! We will field FCS and theObjective Force with or without you…because….

    http://www.boeing.com/fcs