15
TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann, DG ENV & DG NEAR, European Commission

TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann, DG ENV & DG NEAR, European Commission

Page 2: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

EU environmental policy and legislation bring many benefits

Weak implementation generates high societal, economic and environmental costs & uneven playing field for businesses

Therefore the Commission launched the first Environmental Implementation Review

The EIR is a tool to improve implementation and complements (not replaces) other efforts such as compliance assurance and infringements

EIR Rationale of the Environmental Implementation Review

Page 3: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

The EIR is a two-yearly cycle of analysis, dialogue and concrete collaboration to boost environmental implementation

EIR The EIR cycle

Analysis Dialogue

Collaboration

28 Country reports with main challenges, opportunities & successes Communication: Synthesis report on common trends and challenges Annex with all suggested actions

Inclusive, cross-sectoral, multi-level country dialogues Political exchanges in the Council

Concrete action: e.g. guidance; (administrative) reforms; Peer 2 Peer tool for sharing experiences & expertise; bilateral projects; political conclusions, etc.

Page 4: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

EIR: The 3rd way

1. Legal enforcement (procedures against Member States) ('stick')

2. EU funding for e.g. environmental infrastructure ('carrot')

3. The Environmental Implementation Review ('dialogue')

DG ENV 14-09-2017

The EIR adds a third approach to European Commission support to environmental implementation:

EIR

Page 5: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

EIR TAIEX-EIR P2P Tool

Objective Support spreading good practice which can be adapted to the specific situations in different Member States, Through a focused peer-to-peer exchange instrument among public bodies implementing EU environmental policy and law, Covering all implementation gaps identified in the context of the Environmental implementation Review

Page 6: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

TAIEX-EIR P2P Tool

EIR uses the well-established Commission TAIEX P2P tool. The tool is:

Quality-controlled Light Flexible Rapid Targeted

EIR

Page 7: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

EIR WHAT IS FINANCED?

EU Member State experts can be sent to institutions in other Member States that have requested peer advice and exchange of experience on a specific topic. Expert missions can last between 2 to 5 days.

Employees (maximum 3) from a requesting institution can be sent on a working visit to other EU Member State institutions to learn from peers and exchange good practices. Study visits can last between 2 to 5 days.

Single or multi-country workshops can be organised in a requesting institution. Workshops would normally last 2 days.

Page 8: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

WHAT IS FINANCED?

TAIEX-EIR P2P can arrange and cover travel and accommodation costs and per diems for experts travelling on missions or to workshops, and travel and accommodation for up to 3 participants in study visits. However, certain costs – such as catering – would have to be covered by the institution requesting assistance / the hosting institution. The working language for TAIEX-EIR P2P activities is English. However, interpretation may be arranged under request, when duly justified.

EIR

Page 9: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

WHO CAN APPLY?

National, regional and local departments and agencies

Coordinating authorities

Inspection and audit authorities

Permitting authorities

Regional or local environmental implementation businesses entrusted with a public task, and with the application supported by an authority

Networks of experts involved in environmental implementation and enforcement

The assistance is provided at request of public institutions involved in the implementation of EU environmental policy and law in the EU Member States, such as:

NGOs are not eligible, but can of course be invited to workshops by the requesting authority

EIR

Page 10: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

HOW TO APPLY?

A request for P2P support can be submitted via an e-Application link http://ec.europa.eu/environment/eir/p2p_en.htm It is subject to approval by the European Commission; National environment ministries will be asked for advice (e.g preventing doubling).

EIR

Page 11: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

MAIN INFORMATION REQUIRED

Objective

Content

Justification

Expertise

Timing

TType of exchange

Applicant

Contact person

Participants

Page 12: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

HOW TO REGISTER AS AN EXPERT?

EIR

A TAIEX-EIR P2P expert works for a central, regional or local Member State administration in one of the institutions responsible for management and implementation of EU environmental policy and law, at national, regional or local level; this may also be a company established by an authority, mandated to execute public tasks;

Page 13: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 14-09-2017

WHEN DOES IT START?

Registration of project requests has started in September 2017! All information, registration links and the P2P leaflet in 23 languages are available on the TAIEX-EIR P2P webpage http://ec.europa.eu/environment/eir/p2p/index_en.htm Questions on the P2P? Andreas Versmann, TAIEX-EIR P2P project manager: [email protected] General questions on the EIR? [email protected]

EIR

Page 14: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

DG ENV 07-09-2017

EIR P2P complements other initiatives

TAIEX-EIR P2P is not the only Peer 2 Peer tool that can be useful for environmental challenges. Others include: The Commission's Structural Reform Support Service (incl ENV) The TAIEX-REGIO P2P tool for Cohesion Policy (incl ENV) P2P- Water Framework and Floods Directive tool (2018) Peer review projects by IMPEL Other, such as Peer-learning of innovation agencies (H2020 project)

EIR

Page 15: TAIEX-EIR PEER 2 PEER a tool for capacity building on ......TAIEX-EIR PEER 2 PEER – a tool for capacity building on environmental implementation Jonathan Parker & Andreas Versmann,

Thank you for your attention

DG ENV 14-09-2017

EIR TAIEX-EIR P2P Tool