Fast track to Sustainable Mobility
Taiwan High Speed RailPrecursor of Asian High Speed
217 – 19 March 2008
Introduction BWG
3 plants in Germany
2 grinding trains specialized for turnouts
Branches, jv’s and service centers worldwide
Appr. 800 employee
Sales: 120 million euro
More than 500 High Speed turnouts worldwide in operation
Reference High Speed Lines:
- Germany- Spain- The Netherlands- Taiwan- China
317 – 19 March 2008
Introduction ARCADISKlanten:
70 % publiek
30% privaat
Projectmanagement
Design
Consultancy
Infrastructure
Environment
Buildings
Around 13.000 employee
Sales: 1,5 billion euro
417 – 19 March 2008
Project overview and the role of TTCJV
TTPJVT200
TSTJVT210 –T240
517 – 19 March 2008
Taiwan High Speed Rail (THSR)
Infrastructure
Environment
Buildings
TAIPEI – KAOHSIUNG
345 km300 km/hourTaipei – Kaohsiung in 90 min
Tunnels: 18%Bridges: 73%147 High Speed turnouts BWG16 rail expansion joints
Every 3 minutes a trainLongest viaduct on the world12 billion euro
617 – 19 March 2008
Proven BWG technology in combinationwith Japanese newest Shinkansen model 700T
Turnout features:
JIS 60 rail, head hardenedkinematic gauge optimizationelastic base platesswing nose crossingsHRS – locking devicetongue roller systemVAE Roadmaster 2000
717 – 19 March 2008
Proven BWG technology in combinationwith Japanese newest Shinkansen model 700 T
REJ features:
JIS 60 rail, head hardened+/- 300mm expansion lengthelastic base platesmoving stock rail to ensure the
standard gauge in all positions
817 – 19 March 2008
Turnout Monitoring SystemFeatures & benefit:
Reduced system down time, highest availability
detailed reportsreference graph and trend analysis
917 – 19 March 2008
Taiwan Track Consulting (TTC)
Process chain
Inquiry Documents;Method Statement;ITP
Procurement;Negotiation;Contract with Sub-contractor
Logistic & Transportation fromPort to Storage &Pre-Assembly
Pre-Assembly,Inspection & Storage
Just in TimeTransportationat Site
Surveying &Installation of the TSS(Turnout ShiftingSystem)
Lifting of T/O –Segments onto theViaduct
Moving to the finalLocation, setting &rough adjustment
Reinforcement,Formwork &Earthing
Fine Adjustment bySurveyors
Pouring Concrete Welding Survey of As-Built Data Installation of CoreComponents
Final Inspection & Handover
1017 – 19 March 2008
Specials
TransportLiftingShifting System
1117 – 19 March 2008
Taiwan Life as expat
1217 – 19 March 2008
And some colleagues never leave…
1317 – 19 March 2008
Film Taiwan High Speed