Hardware, 010 – TAKING CARE GUIDELINES

Scales use Controller board O/Ps for Feed Control (FCE’s)

Flow meters use their own on board O/Ps for Feed Control (FCE’s)

Set different addresses if more than one flow meter board is installed in a chassis

Set different addresses if more than one scale board is installed in a chassis

If using two speed control (QiLite only) the Fast Feed is controlled by an O/P on the multifunction board. (user can select which O/P)

The FCE should be in direct control of the physical control valve. (via Material Path selection matrix)

The EthernetIP interface is not active by default. It must be enabled and then its IP address set.

Page 3: TAKING CARE GUIDELINES Sub-title Place, Month Year

3 Internal usage only

Architecture, 020 - TAKING CARE GUIDELINES

The Qi Ethernet network must be physically separate from the admin and plant control network. (VLAN is sometimes acceptable)

Do not rely on an Ethernet Switch to separate network traffic.

Note the correct way of wiring the Qi O/P

Controller board O/P1 is associated with ScaleA

Controller board O/P2 is associated with ScaleB etc

Page 4: TAKING CARE GUIDELINES Sub-title Place, Month Year

4 Internal usage only

Designing a Cluster, 060 – TAKING CARE GUIDELINES

Each scale or flow meter is counted as a channel in the Qi database

Each material that is added is a Material Path in the database

A discharge from a scale is also a Material Path

LIW, discharges and flow meters have “Destination Channels” which MUST be entered correctly, the default value will not work.

Draw up a table with a row for each MP. The number of columns is up to you depending on how many parameters you feel like listing.

Page 5: TAKING CARE GUIDELINES Sub-title Place, Month Year

5 Internal usage only

Suggested sequence of events:

Setup and configure all Scales and Flow meters

Assign unique IP addresses and Matroller numbers to each QI !

Build cluster and assign master.- Tip: master can be the least active Qi in the cluster.

Short feed enabled, if required.

K1 & K2 limiting, if required.

Add channels and configure according to suggested defaults.- Tip: do not skip any installed Scales or Flow meters if possible. (recommended)

Add material paths and configure according to suggested defaults.

Gotcha !! Any LIW or flow meter based feeds MUST have the correct destination channel entered!

Tip: perform initial configuration with Qi in Setup mode

Tip: editing most channel and material path parameters can be done while in Run mode, BUT NOT WHILE THE QI IS BUSY FEEDING.

Configuration, 070 – TAKING CARE GUIDELINES

Page 6: TAKING CARE GUIDELINES Sub-title Place, Month Year

6 Internal usage only

xxxxxxxxxxxx

Sustaining Performance, 080 – TAKING CARE GUIDELINES

Page 7: TAKING CARE GUIDELINES Sub-title Place, Month Year

7 Internal usage only

Commissioning, 090T – TAKING CARE GUIDELINES

Make sure that the material is reset before the very first feed when commissioning a material

Spill and Flow limits must be very wide initially Use Spill Only algorithm when first commissioning a material Spill and Flow limits must be reduced once you have a good idea of where the material

will stabilize Use the “Material Transfer Check” screen to start test feeds independent of the host

controller. (optional) Check the status if your feed will not start. Check that the Matroller is in Auto mode if feed will not start. Use the “Material Transfer Process” screen to check your feeds !!! Check that all SIX of the Spill and Flow limit blocks are GREEN !! Check that the block: “Last Material Transfer Status” indicates a successful update. Do you need to “Enable Short Feeds” ??? (yes if you expect feedtimes of less than 8

secs.) Have you enabled K1 and K2 limit checking ?? (recommended.. But you must know

what your normal operating ranges are first!!)

Page 8: TAKING CARE GUIDELINES Sub-title Place, Month Year

8 Internal usage only

Optimizing, 110T – TAKING CARE GUIDELINES

The following parameters are important and should be optimized and/or checked on a routine basis. (in relative order of importance)

“Min PAC” flow thresholds

Spill and Flow min and max limits.

“Dump Trip Point” threshold. (If too small feed may not complete)

“Zero” and “unstable scale” flow thresholds.

“Draintime” (normally only after commissioning or experiencing noisy/unstable scale ay end of feeds)

Page 9: TAKING CARE GUIDELINES Sub-title Place, Month Year

9 Internal usage only

Communications, 120T – TAKING CARE GUIDELINES

ControlNet is enabled by default

EthernetIP must be enabled and its IP and subnet mask entered.

Qi does not support DHCP

The Assembly slot is the Channels indexed position in the Cyclic data to the host controller. (Assembly slot number is found on the Channel config page)

After sending a Command always read the Command Status.

The Command Status MUST ALWAYS be made available to the operators, especially when the Status value is > than 5.

The AIM is optional code which simplifies interfacing to the Qi Matroller

The AIMse can be used to simulate a large cluster of Qi’s

Commands must be sent sequentially to the Qi.

If a Channel is busy feeding you cannot send another command to that channel

Monitor channels toggle bit, if it stops toggling disable material feeds

Monitor channelOK status bit, if it turn Off, disable feed and abort any feeds using this channel

Page 10: TAKING CARE GUIDELINES Sub-title Place, Month Year

10 Internal usage only

xxxxxxxxxxxx

Maintenance, 130 – TAKING CARE GUIDELINES

Page 11: TAKING CARE GUIDELINES Sub-title Place, Month Year

11 Internal usage only

Agenda

Section 1

Section 2

Section 3- Sub-section 3.1

- Sub-section 3.2

Section 4

Section 5

Section 6

Page 12: TAKING CARE GUIDELINES Sub-title Place, Month Year

12 Internal usage only

Title

Bullet level 1- Bullet level 2

Bullet level 3

- Bullet level 4

Bullet level 1

Bullet level 1

Page 13: TAKING CARE GUIDELINES Sub-title Place, Month Year

13 Internal usage only

Graphical Elements (1/2)

Market conditions improving, sales growth expected to pick up in the next 2 quarters:

Sub-title 1

Bullet 1- Sub-bullet 1.1

- Sub-bullet 1.2

Bullet 2

Sub-title 2

Bullet 3

Bullet 4

Optional conclusion box

Source: XXX

Page 14: TAKING CARE GUIDELINES Sub-title Place, Month Year

14 Internal usage only

Graphical Elements (2/2)

Text Box

Main colors

ValueChain 1

ValueChain 2

Text

Text

Text

RGB204/102/0

RGB102/0/153

MT-grün51/153/0

RGB0/39/159

RGB102/102/102

RGB153/0/51

RGB253/153/0

RGB102/204/51

RGB51/153/255

RGB153/153/153

RGB204/51/102

RGB255/204/153

RGB204/204/255

RGB204/255/153

RGB204/255/255

RGB204/204/204

RGB255/204/255

RGB255/255/204

RGB255/255/153

RGB255/255/51

RGB153/102/255

Main colors

MT colorstandards