2
A.L.E. Middle East LLC, P.O. Box 52875, Abu Dhabi, United Arab Emirates Tel: +971 (0) 2 5508741 Fax: +971 (0) 2 5508742 Web: www.ale-heavylift.com Note: All contracts are subject to our normal terms and conditions. Paid up capital Dhs. 150, 000, C.R. No. 47626 TAKREER – CARBON BLACK DELAYED COKER PROJECT – ABU DHABI – UNITED ARAB EMIRATES ALE successfully discharged M/V Dongbang Giant No.1 at Abu Dhabi Freeport. The largest equipment – Propylene-Propane Splitter weighing 1531 tons and with a length of 115,4 meters is the longest equipment ever receiving by ALE in the United Arab Emirates and also the longest equipment Mina free port has ever received. Project: CARBON BLACK DELAYED COKER PROJECT Project location: RRE INDUSTRIAL AREA – RUWAIS – UNITED ARAB EMIRATE Equipment: Class-300 BARGE - SPMT Weights: Up to 1531t

TAKREER CARBON BLACK DELAYED COKER PROJECT … · Project: CARBON BLACK DELAYED COKER PROJECT Project location: RRE INDUSTRIAL AREA RUWAIS UNITED ARAB EMIRATE Equipment: Class-300

Embed Size (px)

Citation preview

A.L.E. Middle East LLC, P.O. Box 52875, Abu Dhabi, United Arab Emirates

Tel: +971 (0) 2 5508741

Fax: +971 (0) 2 5508742

Web: www.ale-heavylift.com

Note: All contracts are subject to our normal terms and conditions. Paid up capital Dhs. 150, 000, C.R. No. 47626

TAKREER – CARBON BLACK DELAYED COKER PROJECT – ABU DHABI – UNITED ARAB EMIRATES

ALE successfully discharged M/V Dongbang Giant No.1 at Abu Dhabi Freeport. The largest equipment – Propylene-Propane Splitter weighing 1531 tons and with a

length of 115,4 meters is the longest equipment ever receiving by ALE in the United Arab Emirates and also the longest equipment Mina free port has ever received.

Project:

CARBON BLACK DELAYED COKER PROJECT

Project location:

RRE INDUSTRIAL AREA – RUWAIS – UNITED ARAB EMIRATE

Equipment:

Class-300 BARGE - SPMT

Weights:

Up to 1531t

Page 2 of 2

Project: ZUBAIR OILFIELD

Location:

ZUBAIR-HAMMAR-RAFIDIYA,BASRA-IRAQ

SPMT trailers are inserted underneath the 1531t weighing equipment for load in / roll off

operation.

The largest equipment – Propylene-propane Splitter offloaded in Abu Dhabi Free Port