9
NPIC/R-683/64 August 1964 DIA r HR70-14 TOP CRET Copy 1: t1,4 8 Pages PHOTOGRAPHIC INTERPRETATION REPORT ICBM COMPLEX, ZHANGIZ-TOBE, USSR CIA Handle Via TALENT - KEYHOLE Control Only WARNING This document contains classifi•d information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission or the revelation of its contents in any manner to on unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive TALENT-KEYHOLE information. Its security must be maintained in accordance with KEYHOLE and TALENT regulations. NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER APPROVED FOR RELEASED DATE: 16-Jul-2011 F .•

TALENT - KEYHOLE

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TALENT - KEYHOLE

NPIC/R-683/64

August 1964

DIA

r HR70-14 TOP CRET

Copy 1: t1,4

8 PagesPHOTOGRAPHIC INTERPRETATION REPORT

ICBM COMPLEX,

ZHANGIZ-TOBE, USSR

CIA

Handle Via TALENT - KEYHOLE Control Only

WARNING

This document contains classifi•d information affecting the national security of the United States within themeaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmissionor the revelation of its contents in any manner to on unauthorized person, as well as its use in any mannerprejudicial to the safety or interest of the United States or for the benefit of any foreign government to thedetriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized toreceive TALENT-KEYHOLE information. Its security must be maintained in accordance with KEYHOLE andTALENT regulations.

NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER

APPROVED FORRELEASED DATE:16-Jul-2011

F .•

Page 2: TALENT - KEYHOLE

in February 1964

- I -

002818333handle Via

TALENT-KEYHOLEControl System Only

NPlf It-683:04

ICBM COMPLEX, ZHANGIZ-TOBE, USSR

launch Site A (11)1 Site 1)1,aunch Site 13 (MI Site 2)

49-IN 81-001;49-16N 80-59E

INTRODUCTION

The Zhangiz-Tobe ICBM Complex is located80.0 and 23.0 nautical miles (nm), respectively,south-southeast of Semipalatinsk and Charskiy(Figure 1). It is in an area of generally flat-to-hilly terrain, with a maximum elevation of 2,369feet. '[The complex consists of a complex supportfacility and a possible rail-to-road transferpoint, two launch areas (A and 13) containingTypeBIC launch sites under construction, and an un-identified area. It is the first deployed ICBMcomplex to be identified that contains single-

silo launch sites.Construction activity was observed it the

complex support facility and Launch Area Al'Che com-

plex can be negated on photography of November

1962 The dimensions given forelements of the launch sites were obtained duringearly stages of construction and are subject torevision.

There are no SA-2 SAM sites in the vicinityof the complex.

COMPLEX SUPPORT FACILITY

The complex support facility (49-12N 81-10E) is 1.8 nm west of Zhangiz-Tobe, at theeastern end of the complex. It is served by aspur from the rail line between Semipalatinskand Alma-Ata, and also has road connectionswith the highway between the two cities. Thefacility (Figures 2 and 3) is still under construc-tion, and consists of a probable railhead and stor-age area, a probable administration and housingarea, and a probable housing area. Theprobablerailhead and storage area contains a long and ashort rail siding, four completed buildings, andabout nine more buildings under construction.To the east of it is the probable administrationand housing area containing about 34 buildingswhich appear to be completed. Eighteen of thesebuildings, in an area about 1,380 feet long and

940 feet wide, are enclosed by a fence. Ditchingis discernible around two sides of the fence.Part of the ditching extends 1,100 feet northeast

to an isolated building and some scattered equip-ment . The probable housing area, containingeight buildings, is north of the probable rail-head and storage area.

Construction activity can be observed in anarea about 3,000 feet east of the complex supportfacility. Eight building foundations, the largest250 by 50 feet, and considerable ditching areidentifiable. This activity probably is associatedwith the complex support facility.

The rail spur serving the complex supportfacility is still under construction and, on[ in June 1964, terminates just westof the switch to the sidings which serve theprobable railhead and storage area. Gradingfor extension of the spur curves southwestabout 4,100 feet beyond the complex supportfacility and terminates in an area of groundscarring. This is probably the location of afuture rail-to-road transfer point.

Handle ViaTALENT-KEYHOLEControl System Only

Page 3: TALENT - KEYHOLE

7.HANGIZ-root•

\ TO SEMIPALATINSK

Trotu:koye

40"30I--

SALFLAT

Pokrovskuyo

COMPLEX SUPPORTFACILITY Burly Agach

Belterok1I1ANG1Z-TOBE

OSSIBLE RAIL-TO-ROADTRANSFER POINT

10

?/e joo'TO ALMA-ATA

45 011'

NAUTICAL MILES

I SALT FLATS

Bekieruir

Vosmoye !Marta

Railroad Road

FIGURE 1. LOCATION OF COMPLEX.

- 2 -Handle Via

TALENT-KEYHOLEControl System Only

CO2818333TO

CRET RUFFHandle Via

TALENT-KEYHOLEControl System Only

NPlCIR-683/64

LAUNCH AREA A

Launch Area A consists of a Type IIIClaunch site and a site support facility (Figure4). It is 6.3 nm west-southwest of the complexsupport facility in a small valley. 'The launcharea was in a very early stage of construction inrebruary 1964 1 It was notevident in November 1962

The launch site was still in an earl y stage

of construction in June 1964It contains an excavation with two ramps lead-ing into it. The coring for a single silo isunder construction within the excavation. Anunidentified object is discernible within thesilo coring. Seven buildings of various sizes

INPIC J-2037 18/6,11

Page 4: TALENT - KEYHOLE

CO2818333TO CRET RUFF

Handle ViaT AL ENT-KEYHOLE

Control System Only

NI)1( IR-("-)83,/(14

FIGURE 2. COMPLEX SUPPORT FACILITY.

- 3 -

Handle ViaTALENT-KEYHOLE

Control System Only

TOP SECRET RUFF

Page 5: TALENT - KEYHOLE

NPIC, k 683/64

TO ZHANGIZ -TODC

PROBABLE RAILHEAD..........................

AND STORAGE AREA1 U Building 180 x 45

70 x 4565 x 35

PROBABLE ADMINISTRATIONAND HOUSING AREA

7 Buildings 170 x 452 Buildings 170 x 352 Buildings 155 x 402 Buildings 145 x 351 Building 115 x 40

PROBABLE HOUSING AREA8 Buildings 85 x 25

DIMENSIONS IN EI I.1

PROBABLEADMINISTRATION

AND HOUSING AREA

-

s A/

PROBABLE RAILHEAD {11 /

AND STORAGE AREA \-\

\\LAUNCH

AREA B

\\\\fi 4

/r

\\\

TO POSSIBLEHAIL-TO-ROAD \

TRANSFER POINT \\

N PIC J-2133D 18 /(34,

CONSTRUCTIONACTIVITY

'

PROBABLEHOUSING AREA

RoadRailroadRailroad under

constructionTrailFenceDitchBuilding under

construction500 0 500 i000

FEET ;APPROXIMA/

CO2818333 TO RET RUFFHandle Via

TALENT-KEYHOLEControl System Only

FIGURE 3. LAYOUT OF COMPLEX SUPPORT FACILITY.

Handle ViaTALENT-KEYHOLEControl System Only

TOPSCRET RUFF

Page 6: TALENT - KEYHOLE

Handle ViaTALENT-KEYHOLE

Control System Only

NPIC,/lt -683/64

SITE SUPPORTFACILITY

2 Buildings 160 x 40

(DIMENSIONS IN FEET)

1

SILO CORING 40 OIAM

Road Trail

Fence

500 0 500 1000

FEET IAPRROXIMATEI

r41-(IC J-2840 (8/ 4

CO2818333 TOPS.ECRET RUFF

FIGURE 4. LAUNCH AREA A.

Handle ViaTALENT-K EYHOLE

Control System Only

Page 7: TALENT - KEYHOLE

NPICM-683/64

// •• /EXCAVATION /

11B x 110 • ///

/1/52 DIAMETER A / , /

..),'"--\---N/1 / 1//GROUNDSCARRING ii ''

../'

LAUNCH SITE

SILO CORING

Trail (DIMENSIONS IN FEET)---- 500 0 500 1000

FEET (APPROXIMATE)

.//

SITE SUPPORT FACILITY1 Building 170 x 401 Building 75 x 251 Building 60x 15

Road

onto 4-2841 (5/154)

CO2818333-TD01'S'ECRET RUFF

Handle ViaTALENT-KEYHOLEControl System Only

FIGURE 5. LAUNCH AREA B.

- 6 -

TOP SECRET RUFF

Handle ViaTALENT-KEYHOLEControl System Only

Page 8: TALENT - KEYHOLE

CO2818333Handle Via

TALENT-KEYHOLE

Control System Only

and some equipment also can be identifiedwithin the site. No security fencing is ap-parent.

The site support facility is 2,500 feetnorth of the launch site. It contains only twobuildings and several pieces of equipment.

NPIC/R-683/64

A fenced area, which measures 465 hy 330feet and contains three small unidentified ob-jects, is 2,500 feet west of the launch site. Twoother small unidentified objects are outside thefencing. There arc areas of ground scarring1,500 and 4,500 feet northwest of the launch site.

LAUNCH AREA B

Launch Area 13 consists of a Type IIIClaunch site and a site support facility (Figure5). It is 8.2 rim northwest of the complexsupport facility in a saddle between two hills.The launch area was first observed in June1964 and can be negated on photography of February 19641

The launch site was in an early stage of con-struction in June 1964 Anexcavation with two ramps leading into it is

visible within the site. Work appears to havebeen started on the silo coring within the exca-vation, which also contains three unidentifiedobjects or pieces of equipment. No securityfencing is apparent.

The site support facility is 700 feet southof the launch site. It contains only three build-ings. There is considerable ground scarring1,100 feet northwest of the site support facility.

UNIDENTIFIED AREA

An unidentified area (49-11N 81-06E) is2.8 rim southwest of the complex support facili-ty in a small valley (Figure 6). It was firstseen in June 1964 but wasnot evident in February 1964 1

The area is road served from the complex

support facility, and contains only three build-ings. Two small areas of ground scarring, oneof which may contain some shallow excavation,are visible 1,000 and 2,100 feet north of thebuildings.

- 7 -

TOP SECRET RUFF

Handle ViaTALENT-KEYHOLE

Control System Only

Page 9: TALENT - KEYHOLE

CO2818333 TONSECRET RUFF

Pass Camera Frames rassilical ion

TOP SECRET RUFF

'POP SECRET RUFF

TOP ,-;Ecia:T IE CF

- 8 -

Handle ViaTALENT-KEYHOLEControl System Only

NPIC71■•683/64

REFERENCES

PHOTOGRAPHY

MAPS OR CHARTS

ACIC. USAF Pilot:Igo Char, Sheet 209D, I sl ed, Feb scale 1::i00,000 (UNCLASSIFIED)

CIC. (INC 1st ed, Apr GI, scale 1:101)11,000 (CONFIDENTIAL)

REQUIREMENT

F. GAIC- 6 , 1 (partir.1 answ(,r)

NPIC PROJECT

N -702/01

TOP'SECRET RUFF

Handle ViaTALENT-KEYHOLEControl System Only