30
T ALES FROM ESTABLISHING A PORTFOLIO AND PROJECT GOVERNANCE POLICIES Chao-Yee Watson October 6, 2014

TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

TALES FROM ESTABLISHING APORTFOLIO AND PROJECT

GOVERNANCE POLICIES

Chao-Yee WatsonOctober 6, 2014

Page 2: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Agenda

• Introduction• Speaker Biography• 2012: Disorganized Labor• 2013: Laying the Foundations• 2014: Execution of Strategy • Summary – Key Best Practices

Page 3: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Introduction

• Projects of lesser scale are critical to maximize the business value gained from successful completion of the large initiatives.

• Establishment of business process governance framework to enable the Xilinx Customer Operations department – Organize their strategic initiatives into a project portfolio – Enforce project managers’ accountability– Provide visibility of the projects’ statuses to senior management

• Xilinx, Inc.– Semi-conductor company headquartered in San Jose, CA – $2.3B in revenues in fiscal year 2014– Over 3500 employees and 20,000 customers– Longmont, CO; Dublin, Ireland; Singapore and Hyderabad, India– Smaller R&D and sales locations throughout the world.

Page 4: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Speaker Background

Chao-Yee Watson• Over 19 years managing business process and system change in High Technology

• Extensive experience driving international change management and enterprise-wide roll-outs with a focus on process design, key performance metrics design and resource optimization

• Thought leader in design and re-engineering of processes in the areas of supply chain management, demand management, forecasting, inventory management, logistics, outsourced manufacturing / logistics and product lifecycle management

PMP® certifiedMBA from Santa Clara UniversityBS in Mechanical Engineering from UC Berkeley

• http://www.linkedin.com/in/chaoyee/

Page 5: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2012: Resetting After Major Global Change

• Corporate Enterprise Systems unfrozen after two year lockdown – Upgrade to Oracle E-Business Suite to R12

• All departments had lists of desired projects – Required evaluation, prioritization and resourcing

• IT was ready for the Business to prioritize the workload– IT wouldn’t assign resources without explicit prioritization

• Business was not as ready…

Page 6: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2012: Customer Operations

VP Customer Operations

Director of NA COAM

Manager 1

Team 1

Manager 2

Team 2

Manager 3

Team 3

Director of APAC COAM

Manager 1

Team 1

Manager 2

Team 2

Manager 3

Team 3

Manager 4

Team 4

Director of EMEA COAM

Manager 1

Team 1

Manager 2

Team 2

Manager 3

Team 3

Director of Global Cust Ops

Manager 1

Team 1

Manager 2

Team 2

PMO PM

Team 3

Director of GTC

Manager 1

Team 1

Page 7: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2012: Project Free-For-All

• Project Prioritization Process

− Lists of projects that individuals wanted to do

− Managers gave their Directors the lists of projects

− Vice President and Directors decided on which projects to keep on the list and which to strike off the list

• No explicit connection between proposed projects and business processes

• No direction towards business process improvement

Page 8: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2012: Non-Optimal Results

• No visibility of status or progress of projects

− No regular forum for project updates

− No common format for project metrics

• Last minute scramble at the end of each quarter

− Lack of alignment with Department goals

• Projects were late or not completed

• Strategic goals were not met

Page 9: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Identifying the Gap

• Vice President was not satisfied with the 2012 results

• Vice President wanted to understand the current state of business processes

• Without an understanding the As-Is business process globally, management can not make educated decisions on which projects to green light

• Top down request for the establishment of business process governance

Page 10: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Creation of a New Process

• Steps to establishment of the business process governance process

− Define what is the governance process

− Explain why the department needs a governance process

− Define the processes to be managed

− Define the owners of the processes

− Establish the timeline and milestones

− Create the templates for status updates and metrics

Page 11: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

• Methodology monitoring and optimizing the execution of WW Customer Operations business processes

• Purpose is to identify areas of potential improvement– Policies, methods, documentation, roles, technologies and metrics

• Business Value:– Clearly defined ownership for business processes– Develop To-Be business process vision focused on continuous process

improvement– Disciplined identification, prioritization and execution of process improvements– Facilitate management’s understanding of the relative value of proposed process

changes and set priorities– Focus management team on continuous business process improvements

What is Business Process Governance?

Page 12: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Process Name Process Definition Process Owner

Direct Forecast Includes customer forecast and Monster forecast for Direct accounts Global Cust Ops Director

Order Management Includes the Order Import, Order Entry, Order Management and Order Fulfillment processes. APAC Manager 1

Expedite Includes the creation and management of expedites EMEA Manager 1

Master Data Processes include the activities to ensure clean data in the Customer Master Hub and the CMF APAC Manager 1

Product Lifecycle (Components)

The management of processes from NPI through production to end of life for Component products NA Manager 1

Product Lifecycle(Dev Sys)

The management of processes from NPI through production to end of life for Development Systems products

Global Cust Ops Manager 3

CVMI Includes the processes used to manage CVMI customer relationships, service levels and hub inventories

Global Cust Ops Manager 2

RMA Processes include all Xilinx RMAs for both Components and Development Systems Global Cust Ops Manager 2

Case Management (Dev Sys)

Processes for managing customer inquiries regarding Development Systems product orders Global Cust Ops Manager 3

Business Process Automation

Processes include B2B, automated communications with any party (Customers, Partners and Internal), web tools, corporate IT project management and testing automation

Global Cust Ops Manager 2

E-Commerce Processes include all functions related to the Xilinx Online Storefront Global Cust Ops Manager 3

Software Fulfillment Processes for managing the electronic fulfillment of Development Systems software Global Cust Ops Manager 3

Channel Ops Processes for managing the relationships with Xilinx’s Channel Partners, includes revenue forecasting

Global Cust Ops Manager 1

Direct Account Management

Processes for managing direct customer accounts EMEA Manager 2

Case Management (Components)

TBD Global Cust Ops Manager 3

High Level Process Definitions and Owners

Page 13: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Process

Metric

Dire

ctFo

reca

st

Ord

erM

anag

emen

t

Expe

dite

Mas

terD

ata

Prod

uctL

ifecy

cle

(Com

pone

nts)

Prod

uct L

ifecy

cle

(Dev

Sys)

CVM

I

RMA

Case

Man

agem

ent

(Dev

Sys)

Busi

ness

Proc

ess

Auto

mat

ion

E-Co

mm

erce

Elec

tron

ic

Fulfi

llmen

t (XE

F)

Chan

nel O

ps

Dire

ct A

ccou

nt

Man

agem

ent

Com

pone

nt C

ase

Man

agem

ent

Number of Sub-processes Identified

2 ? ? ? 3 3 ? 9 3 ? 2 4 4 ? ?

% of Sub-processes “As-Is” Documented

100% ? ? ? ? 30% ? 100% 100% ? 50% 100% ? ? ?

As-Is Documentation Quality

High Med High ? Med High

% of Sub-processes with defined “To Be” state

0% ? ? ? ? 33% ? 10% 2 ? 50% 50% ? ? ?

% of To-Be withOFI actions in process

2 1 2 ? 1 1

SMEs Identified & Trained Y/N ? ? ? ? Y/N ? No Y/Y Y/N Y/Y Y/N ? ? ?

Process Metrics Identified 0 ? ? ? ? 0 ? 0 2 0 1 1 ? ? ?

Overall Weighted Score

WW Customer Operations Business Process Health Dashboard

Page 14: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Education of the Masses

• Rolled out in March 2013

− Published and communicated schedule and deliverables

− Provided training to all directors and managers

• Selling the idea of governance

− Met with influential individual contributors

• Training

− Many lacked experience in documenting business process

− Trained process owners on business process mapping

− Visio and Cross-Functional Flow Diagrams

Page 15: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Page 15

FY14 Business Process Governance Timeline

Progress to Organizational Process Maturity

Page 16: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Establishing Protocol• Process Area Owner Responsibility

− Identify sub-processes in Process Area

− Document and evaluate As-Is sub-processes

− Associate all projects to sub-processes

− Document To-Be business process based on changes implemented by projects

− Provide quarterly status updates of Process Area

• PMO Responsibility

− Create and assist process owners in use of standardized template

− Train process owners in business process mapping and metrics

− Schedule status updates into the agendas of existing managers meetings

− Publish and present summary of governance status to all levels of management in WW Operations quarterly

Page 17: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Page 17

Quarter

Metric

Q1FY14 Targets Q2FY14 Targets Q3FY14 Targets Q4FY14 Targets

Number of Sub-processes Identified< 30% 30%-

80% > 80% < 80% 80%-90% 100% < 85% 85%-

99% 100% < 90% 90%-99% 100%

% of Sub-processes “As-Is” Documented < 80% 80% -

90% > 90% < 80% 80% -90% > 90% < 85% 85%-

95% > 95% < 90% 90%-99% 100%

As-Is Documentation QualityLow Med High Low Med High Low Med High Low Med High

% of Sub-processes with defined “ToBe” state < 34% 34% -

66% > 66% < 50% 50% -80% > 80% < 60% 60% -

85% > 85% < 70% 70% -90% > 90%

% of To-Be with OFI actions in process 0% 1% -

33% > 33% < 33% 33% -66% > 66% < 45% 45%-

75% > 75% < 50% 50%-80% > 80%

SMEs Identified & TrainedN/N Y/N Y/Y N/N Y/N Y/Y N/N Y/N Y/Y N/N Y/N Y/Y

Process Metrics Identified< 33% 33% -

66% > 67% `< 50 % 50% -80% > 80% < 75% 75%-

90% > 90% < 80% 80%-95% > 95%

Percentage of Metrics Meeting Targets(Starting Q4FY14)

< 50% 50%-80% > 80%

WW Customer Operations Business Process Health Metrics Targets

Progress to Organizational Process Maturity

Page 18: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Executing on the Plan

• Challenges to execution

− Goals misalignment

− Cultural misunderstandings

− Time zone differences

− Negative impressions

• Status in December 2013− All process owners reporting quarterly− All directors expected standard updates

Page 19: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Page 19

Process

Metric

Dire

ctFo

reca

st

(EM

EAM

gr1)

Ord

erM

anag

emen

t (A

PAC

Mgr

1)

Expe

dite

(EM

EAM

gr2)

Mas

terD

ata

(APA

C M

gr1)

Prod

uctL

ifecy

cle

Com

pone

nts

(N

A M

gr3)

Prod

uct L

ifecy

cle

Dev

Sys (

Glob

alCu

stO

ps M

gr3)

CVM

I (PM

OPM

)

RMA

(PM

OPM

)

Case

Man

agem

ent

Dev

Sys (

Glob

al C

ust

Ops

Mgr

2)

Busi

ness

Proc

ess

Man

agem

ent

(PM

O

PM)

XEF/

E-Co

mm

erce

{G

loba

lCus

tOps

M

gr3)

Chan

nel O

ps (G

loba

lCu

stO

ps M

gr1)

Dire

ct A

ccou

nt

Man

agem

ent (

EMEA

Mgr

3)

Number of Sub-processes Identified 100% 100% 6 6 100% 100% 100% 100% 3 100% 100% 100% 6

% of Sub-processes “As-Is” Documented 100% 100% 90% 100% 100% 100% 100% 100% 100% 65% 100% 90% 100%

As-Is Documentation QualityHigh 100% High High High High High Med High Med High High High

% of Sub-processes with defined “To Be” state 100% High 70% 98% 90% 75% 80% 10% 100% 60% 80% 85% 60%

% of To-Be with OFI actions in process 4 30% 70% 94% 50% 100% 80% 10% 66% 60% 80% 75% 50%

SMEs Identified & TrainedY/N 70% Y/Y Y/Y Y/Y Y/Y Y/Y Y/Y Y/Y Y/N Y/Y Y/Y Y/N

Process Metrics IdentifiedNo 7 100% 100% 85% 100% 80% 10% 100% 60% 100% 100% Y

Percentage of Metrics Meeting Targets 80.5% 100% 66% 100% 10% NA 86% 50%

Overall Weighted Score

Q4FY14 WW Customer Operations Business Process Health Dashboardas of 4/4/14*

• Merged XEF and E-Commerce into single process area going forward• Added Percentage of Metrics Meeting Targets• Further consolidation of Process Areas will occur in future quarters

Page 20: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Page 20

Process

QuarterDi

rect

Fore

cast

(E

MEA

Mgr

1)

Ord

erM

anag

emen

t (A

PAC

Mgr

1)

Expe

dite

(EM

EAM

gr2)

Mas

terD

ata

(APA

C M

gr1)

Prod

uctL

ifecy

cle

Com

pone

nts

(N

A M

gr3)

Prod

uct L

ifecy

cle

Dev

Sys (

Glob

alCu

stO

ps M

gr3)

CVM

I (PM

OPM

)

RMA

(PM

OPM

)

Case

Man

agem

ent

Dev

Sys (

Glob

al C

ust

Ops

Mgr

2)

Busi

ness

Proc

ess

Man

agem

ent

(PM

O

PM)

XEF/

E-Co

mm

erce

{G

loba

lCus

tOps

M

gr3)

Chan

nel O

ps (G

loba

lCu

stO

ps M

gr1)

Dire

ct A

ccou

nt

Man

agem

ent (

EMEA

Mgr

3)

Q1FY14

Q2FY14

Q3FY14

Q4FY14

Q1FY15

Q2FY15

Q3FY15

Q4FY15

Qtr to Qtr WW Customer Operations Business Process Health Comparison

Progress to Organizational Process Maturity

Page 21: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Tying Past Results to Strategic Planning

• Vice President was pleased with the results

• Agreed to tie CY 2014 Strategic Initiative Planning with Business Process Governance

• All Strategic Initiatives were identified and mapped to a process area

Page 22: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

VP Customer Operations

Director of NA COAM

Manager 1

Team 1

Manager 2

Team 2

Director of APAC COAM

Manager 1

Team 1

Manager 2

Team 2

Manager 3

Team 3

Manager 4

Team 4

Director of EMEA COAM

Manager 1

Team 1

Manager 2

Team 2

Director of WW CustOps

Manager 1

Team 1

Manager 2

Team 2

Manager 3

Team 3

PMO PM

Team 4

Director of GTC

Manager 1

Team 1

Manager 2

Team 2

2014: Customer Operations

Page 23: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2013: Tying Past Results to Strategic Planning

VP and Directors

PMO PM PMO PM

PMO PM PMO PMAPAC Mgr 1 APAC Mgr 1Global Cust Ops Mgr 3Global Cust Ops Mgr 1 EMEA Mgr 1

EMEA Mgr 2

EMEA Mgr 3

NA Mgr 2

Page 24: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2014: Establishing Protocol

Page 25: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

2014: How are we doing?

• Vice President and Directors have full visibility to statuses of strategic initiatives

• Separate monthly governance meetings established

• Management educated on the difference between projects and ongoing operations

• Steering members critically assess each of the projects

• All requests from Customer Operations to IT tracked by PMO

• Planning for 2015 Strategic Initiatives based on the 2014 statuses

Page 26: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

VP and Directors

PMO PM PMO PM

PMO PM PMO PMAPAC Mgr 2 APAC Mgr 3EMEA Mgr 1

EMEA Mgr 2

NA Mgr 3

Global CustOps Mgr 3

Global CustOps Mgr 1

Page 27: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Process

Quarter

Dire

ctFo

reca

st (E

MEA

Mgr

1)

Dire

ct A

ccou

nt

Man

agem

ent (

EMEA

Mgr

3) Ord

erM

anag

emen

t (AP

AC

Mgr

1)

Expe

dite

(EM

EAM

gr2)

Mas

terD

ata

(APA

C M

gr1)

Prod

uctL

ifecy

cle

Com

pone

nts (

NA

Mgr

3)

CVM

I (PM

OPM

)

RMA

(PM

OPM

)

Case

Man

agem

entD

ev

Sys (

Glob

al C

ustO

ps M

gr2) Bu

sine

ssPr

oces

s M

anag

emen

t (P

MO

PM

)

Elec

tron

ic F

ulfil

lmen

t XEF

(Glo

bal C

O M

gr3)

E-Co

mm

erce

(Glo

balC

O

Mgr

3)

Prod

uct L

ifecy

cle

Dev

Sys

(Gla

balC

O M

gr3)

Chan

nel O

ps (G

loba

lCO

M

gr1)

Q1FY14

Q2FY14

Q3FY14

Q4FY14

Process

Quarter Dire

ctFo

reca

st

(EM

EAM

gr1)

Dire

ct A

ccou

nt

Man

agem

ent

(EM

EAM

gr3)

Ord

erM

anag

emen

t (A

PAC

Mgr

1)

Expe

dite

(EM

EAM

gr2)

Mas

terD

ata

(APA

C M

gr1)

Prod

uctL

ifecy

cle

Com

pone

nts (

NA

Mgr

3)

CVM

I (PM

OPM

)

RMA

\Ca

se M

anag

emen

tDe

v Sy

s (PM

O P

M)

Busi

ness

Proc

ess

Man

agem

ent

(PM

O

PM)

Elec

tron

ic

Fulfi

llmen

t XEF

/ E-

Com

mer

ce \

Prod

uct L

ifecy

cle

Dev

Sys (

Glob

alCO

M

gr3)

Chan

nel O

ps

(Glo

balC

O M

gr1)

Q1FY15

Process

Quarter Dire

ctFo

reca

st \

Dire

ct A

ccou

nt

Man

agem

ent

(EM

EAM

gr1)

Ord

erM

anag

emen

t (A

PAC

Mgr

2)

Expe

dite

(EM

EAM

gr2)

Mas

terD

ata

(APA

C M

gr3)

Prod

uctL

ifecy

cle

Com

pone

nts (

NA

Mgr

3)

CVM

I (PM

OPM

)

RMA

\Ca

se M

anag

emen

tDe

v Sy

s (PM

O P

M)

Busi

ness

Proc

ess

Man

agem

ent

(PM

O

PM)

Elec

tron

ic

Fulfi

llmen

t XEF

/ E-

Com

mer

ce \

Prod

uct L

ifecy

cle

Dev

Sys (

Glob

alCO

M

gr3)

Chan

nel O

ps

(Glo

balC

O M

gr1)

Q2FY15 (*)

Q3FY15

Q4FY15

Qtr to Qtr WW Customer Operations Business Process Health Comparison

Progress to Organizational Process Maturity

Page 28: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

Summary: Key Best Practices

• Educate Management

• Obtain buy-in from all stakeholders

• Establish common language

• Establish timetable

• Enforce consistency

• Measure results

• Communicate results frequently

Page 29: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

QUESTIONS?

Page 30: TALES FROM STABLISHING A PORTFOLIO AND ROJECT …

THANK YOU

Chao-Yee [email protected]

http://www.linkedin.com/in/chaoyee