Structural, Mechanical, Piping Taloona Gas Plant Stage 1 and 2 CLIENT Origin Energy LOCATION 80km from Roma CONTRACT Lump Sum Fixed Price CONTRACT VALUE $10 million START DATE March 2008 COMPLETION December 2008 Origin Energy CSG Limited is developing the Spring Gully coal bed methane field situated approximately 80Km north of Roma, Queensland. The ongoing development included the construction of a gas processing plant at Taloona. Decmil EDE were contracted to supply all labour, material, tools, plant and equipment required to complete the following works: Supply of all pipes, fittings, consumables and materials for the fabrication of pipe spools. Supply, manufacture and site installation of compressor canopy shed, structural steel, access platforms, pipe racks and pipe supports. Installation of sound proof doors within the compressor shed. Installation of pipe spools, including pig launcher and pig receiver. Construction, installation and testing of process and utility piping systems Installation of major equipment including 2 inlet separators, 3 gas compressors, glycol dehydration package, sales gas metering skid, 2 fuel gas heaters, oily water system, 3 air compressors, compressed air receiver, oil storage tanks, dry waste oil tanks, plant water tank and flare tip. The project achieved 750,000 man hours LTI free. Eastcoast Development Engineering Pty Ltd ABN 63 093 799 387 is a wholly-owned subsidiary of Decmil Group Limited

Taloona Gas Plant Stage 1 and 2 - Decmil · compressors, glycol dehydration package, sales gas metering skid, 2 fuel gas heaters, oily water system, 3 air compressors, compressed

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Taloona Gas Plant Stage 1 and 2 - Decmil · compressors, glycol dehydration package, sales gas metering skid, 2 fuel gas heaters, oily water system, 3 air compressors, compressed

Structural, Mechanical, Piping

Taloona Gas Plant Stage 1 and 2

CLIENTOrigin Energy

LOCATION80km from Roma

CONTRACTLump Sum Fixed Price

CONTRACT VALUE$10 million

START DATEMarch 2008

COMPLETIONDecember 2008

Origin Energy CSG Limited is developing the Spring Gully coal bed methane field situated approximately 80Km north of Roma, Queensland. The ongoing development included the construction of a gas processing plant at Taloona.

Decmil EDE were contracted to supply all labour, material, tools, plant and equipment required to complete the following works:

◻ Supply of all pipes, fittings, consumables and materials for the fabrication of pipe spools.

◻ Supply, manufacture and site installation of compressor canopy shed, structural steel, access platforms, pipe racks and pipe supports.

◻ Installation of sound proof doors within the compressor shed.

◻ Installation of pipe spools, including pig launcher and pig receiver.

◻ Construction, installation and testing of process and utility piping systems

◻ Installation of major equipment including 2 inlet separators, 3 gas compressors, glycol dehydration package, sales gas metering skid, 2 fuel gas heaters, oily water system, 3 air compressors, compressed air receiver, oil storage tanks, dry waste oil tanks, plant water tank and flare tip.

The project achieved 750,000 man hours LTI free.