10
TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone TRF Petrol Pump LP Well Church Overhead Water Tank HighTension Lines Low Tension Line Drain Line Bund Line Track Line Road Line Existing Carriageway Canal Line Retaining Wall Breast Wall Right of Way Railway Track North Symbol Electric Line Fence Line Proposed Centre Line Proposed Carriageway Edge Proposed Shoulder Proposed Toe Line Proposed Drain Proposed Culvert/Bridge/ HT Drain Bund Track Canal RT_Wall BR_Wall ROW EP Electric Pole LT PLAN R- Radius of Curve (m) c- Deviation Angle of Circular Curve (Degree) Lc- Length of Circular Curve (m) Ts- Tangent Length (m) Es- Apex Distance (m) LS- Length of Spiral Curve (m) s- Shift (m) - Deflection Angle (Degree) V- Design Speed (kmph) e- Superelevation (%) HIP- Horizontal Intersection Point TS- Point of change from Tangent to Spiral SC- Point of change from Spiral to Circular Curve PC- Point of Curvature PT- Point of Tangent SC- Point of change from Circular Curve to Spiral ST- Point of change from Spiral to Tangent LEGEND:- L-PROFILE G-Gradent % Lv - Length of Vertical Curve (m) L - Length of Grade (m) R - Radius (m) e - Superelevation (%) D - Straight Length of Horizontal Alignment (m) Lc - Length of Circuler Curve (m) VIP - Point of Vertical Intersection A3 MINISTRY OF EXTERNAL AFFAIRS NEW DELHI,INDIA PROJECT: CLIENT : Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches on Tamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO. Myanmar/TKK/P&P/ TITLE: Plan & Profile for Bridge No. 41 (Ex.Str.No.62/1) At chainage : 98+880 41 MATCH EXISTING Proposed Road Level at Design Centreline Existing Road/Ground Level below Design Centreline

TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge No. 41

(Ex.Str.No.62/1) At chainage : 98+880

41

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 2: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge No. 42

(Ex.Str.No.62/2) At chainage : 99+205

42

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 3: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge No. 43

(Ex.Str.No.63/1)At chainage : 99+575

43

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 4: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile Plan for Bridge No. 44

(Ex.Str.No 64/1)At chainage : 101+425

44

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 5: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge No. 45

(Ex.Str.No 67/1) At chainage : 106+260

45

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 6: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge No. 46

(Ex.Str.No.68/1) At chainage : 107+290

46

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 7: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 47

(Ex.Str.No.68/2) At chainage : 107+930

47

Proposed Road Level at Design CentrelineGround/RoadLevel Below Design Centreline

MAT

CH E

XIST

ING

Page 8: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge No. 48

(Ex.Str.No.71/1) At chainage :112+320

48

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 9: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

MONASTERY

CH

: 115+800

CH

: 115+900

CH

: 116+000

CH

: 116+100

CH

: 116+200

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:

49

Plan & Profile for Bridge No. 49(Ex.Str.No.73/1)At chainage : 116+010

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 10: TAMU KALEWA - Ministry of External Affairs · Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE STONE TRF Petrol Pump LP Well Church Overhead Water Tank HighTension

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 50

(Ex.Str.No.77/1)At Chainage : 121+900

50

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline