1 Cycle improvements along Tanner Street/Druid Street Consultation Report & Responses to Issues Raised December 2018

Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

1

Cycle improvements along Tanner Street/Druid Street

Consultation Report & Responses to Issues Raised December 2018

Page 2: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

2

Contents

Executive summary ..................................................................................................... 3

1. About the proposal .................................................................................................. 3

1.1 Introduction ........................................................................................................ 3

1.2 Purpose .............................................................................................................. 3

1.3 Detailed description ........................................................................................... 4

2. About the consultation ............................................................................................. 7

2.1 Purpose .............................................................................................................. 7

2.2 Potential outcomes ............................................................................................ 7

2.3 Consultation history ........................................................................................... 7

2.4 Who we consulted .............................................................................................. 7

2.5 Dates and duration ............................................................................................. 8

2.6 What we asked .................................................................................................. 8

2.7 Methods of responding....................................................................................... 8

2.8 Analysis of consultation responses .................................................................... 8

3. About the respondents ............................................................................................ 9

3.1 Number of respondents...................................................................................... 9

3.2 How respondents heard about the consultation ............................................. 9

3.3 Equality Monitoring .......................................................................................... 10

4. Summary of all consultation responses ................................................................. 10

4.2 Question: If you have any further comments about our proposals, please write

these in the box below ........................................................................................... 10

4.2 Stakeholder responses .................................................................................... 11

5. Conclusion and next steps .................................................................................... 13

5.1 Conclusion ....................................................................................................... 13

5.2 Next steps ........................................................................................................ 13

6. Response to the main issues raised ...................................................................... 14

Appendix A: Consultation materials .......................................................................... 16

Appendix B: Stakeholder list ..................................................................................... 20

Page 3: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

3

Executive summary

This report outlines the consultation we undertook between 28 September and 19

November 2017 on our proposals to deliver cycle improvements along Tanner

Street/Druid Street. This report details the responses we received, and identifies

how we will respond to issues raised through the consultation process.

1. About the proposal

1.1 Introduction

Between 28 September and 19 November 2017 we consulted on proposals to make

changes to cycling provision along Tanner Street. The following report presents the

outcomes of this consultation and provides detailed responses to the main issues

raised, as well as our next steps.

Our consultation sought views on changes to cycling provision on Tanner Street in

the London Borough of Southwark. As part of the changes, a segregated two-way

cycle track was proposed along the eastern side of Tanner Street to join the

proposed Cycle Superhighway Route 4 (CS4) on the northern edge of Jamaica

Road.

1.2 Purpose

Tanner Street already forms part of Quietway 14, linking Tower Bridge Road to

Canada Water. Quietways are a network of cycle routes throughout London, linking

major destinations and are especially helpful for those who wish to use quieter, low

traffic routes. And included changes for pedestrians, including a new signalised

pedestrian crossing on Druid Street and changes to pavements.

Our proposals support the Mayor of London’s Healthy Streets Approach, which is a

long-term vision to encourage more Londoners to walk and cycle by making

London’s streets healthier, safer and more welcoming.

Page 4: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

4

1.3 Detailed description

Our proposals were explained in detail as follows:

Page 5: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

5

Changes on Tanner Street/Druid Street

Signalised junction at Tanner Street/Druid Street junction

Upgraded traffic signals at the Tanner Street / Druid Street junction. This junction

currently prioritises Tanner Street’s one-way south-westbound traffic over traffic from

Druid Street. Signalising the junction would allow safer two-way cycle movement

between the Tanner Street / Druid Street junction and Jamaica Road. In addition, it

would provide a new signalised pedestrian crossing across Druid Street

Cycle-specific traffic lights

Low-level cycle-specific traffic lights at the junction to permit cycle movements from:

Tanner Street rail tunnel north to Tanner Street / Jamaica Road

Druid Street (south-eastern arm) to Tanner Street rail tunnel

Tanner Street (northern arm) south to Tanner Street rail tunnel.

Widened pedestrian crossing

Widening the current pedestrian crossing across Tanner Street from 2.4 meters to

3.2 meters to allow more people to use it.

New slip lane for cyclists

The introduction of a new slip lane for cyclists for travel eastwards along Druid Street

from Tanner Street north.

Weight restriction introduced for motor vehicles

Introducing a 7-tonne vehicle restriction for traffic wishing to turn left into the Tanner

Street rail tunnel from Druid Street to prevent larger vehicles encroaching on the new

cycle lane.

Proposed changes on Tanner Street to Jamaica Road

Narrowing Tanner Street to one lane

Narrowing width of Tanner Street to one lane to reduce vehicle speeds.

New segregated cycle track

A new, three meter wide, two-way segregated cycle track between Tanner Street /

Druid Street junction and Jamaica Road to make it easier and safer to cycle along

this section of Tanner Street.

New bus stop bypass

Introduce a new three meter wide bus stop bypass to accommodate the two-way

cycle track. People catching a bus or continuing along the footway would need to

cross the cycle track using marked crossing points. The cycle track would bend

around the bus stop in order to provide a three meter wide pedestrian island. The

narrowness of the existing footway and presence of railings meant it was not

Page 6: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

6

possible to retain a continuous footway of sufficient width on the other side of the

new cycle track.

Footway improvements at entrance to the Arnold Estate

Raise the road surface at the entrance to the Arnold Estate to give reduce motor

vehicle speeds. We would also give priority to cyclists on the two-way track over

turning traffic.

Loading bay outside 296 to 301 Tanner Street

A shorter loading bay, reduced from 29 meters to 13.6 meters. Following an

occupancy survey, this reduced length was anticipated to be sufficient for demand.

The loading bay would also be partially inset into the pavement, improving the traffic

flow along Tanner Street.

Improved footway outside shops at 296 to 132 Tanner Street

Align the street furniture and removing the phone box outside the shops to increase

pavement width and improve the street environment

Other sections of this Quietway

The section of Quietway Jamaica Road to Dockhead would run along the proposed

Cycle Superhighway Route 4 (CS4) on Jamaica Road. You can find further details

about CS4 here www.tfl.gov.uk/cs4.

The designs complemented Southwark Council’s proposal to introduce a stepped

contraflow cycle track on a widened pavement underneath the rail bridge between

Maltby Street and Druid Street.

Traffic impacts

We carried out traffic modelling on the proposed scheme and predicted there would

be a negligible impact to traffic and bus services.

Page 7: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

7

2. About the consultation

2.1 Purpose

The objectives of the consultation were:

To give stakeholders and the public easily-understandable information about the proposals and allow them to respond

To understand the level of support or opposition for the change/s for the proposals

To understand any issues that might affect the proposal of which we were not previously aware

To understand concerns and objections

To allow respondents to make suggestions.

2.2 Potential outcomes

The potential outcomes of the consultation were:

Following careful consideration of the consultation responses, we decide to proceed with the scheme as set out in the consultation

Following careful consideration of the consultation responses, we modify the proposals in response to issues raised and proceed with a revised scheme

Following careful consideration of the consultation responses, we decide not to proceed with the scheme.

2.3 Consultation history

The proposed works were related to our plans for CS4 Southwark to Greenwich,

which we consulted on in tandem. The factual report and ‘response to issues raised’

document produced for the CS4 Southwark to Greenwich consultation can be found

on our website here: https://consultations.tfl.gov.uk/roads/cs4/

2.4 Who we consulted

We sent emails and letters to local residents and stakeholders, and those who had

been identified as interested in this scheme. This included Southwark Council,

London TravelWatch, the Police and emergency services, walking, cycling and road

user groups, politicians, and local employers and venues. A copy of our stakeholder

email can be seen in Appendix A – Consultation materials. A list of stakeholders we

consulted can be found in Appendix B – List of stakeholders consulted.

Page 8: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

8

2.5 Dates and duration

The consultation was held for a period of eight weeks from 28 September to 19

November 2017, at the same time as the CS4 consultation period.

2.6 What we asked

Our consultation contained two questions. These were:

“Do you support the proposals for improved cycling provision on Tanner Street and

Druid Street?” and “Do you have any further comments on our proposal?”

The analysis of these results can be found in section 4.

2.7 Methods of responding

People were invited to respond to the consultation using a variety of methods. They

could respond by accessing the online questionnaire; via our freepost address at

FREEPOST TFL CONSULTATIONS; or by email to [email protected].

2.8 Analysis of consultation responses

Analysis of consultation responses was carried out by the TfL Local Communities

and Partnerships team.

In our survey we asked respondents to indicate their level of support for the

proposals, and to provide thoughts and comments through an open comments box.

Comments received were then grouped in general, and by each section of the

proposals where this was specified.

We created a framework to analyse these comments in a consistent way. Once all

comments were logged and issues tagged, we were able to build a picture of what

respondents were concerned about, or talked about in their comments.

Page 9: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

9

3. About the respondents

This section provides more information about who responded to the consultation.

3.1 Number of respondents

We received 174 direct responses to the consultation. Of these, three were

responses from stakeholders representing the local community and interest groups,

and 171 were from individuals, 56 of which described themselves as local residents.

The London Cycling Campaign submitted a statement of support. This can be seen

in section 4.2: Stakeholder responses.

Information about these respondents:

Respondents Total %

Individual responses 164 94

Stakeholder responses 3 2

Not answered 7 4

Total 174 100

3.2 How respondents heard about the consultation

We asked respondents to let us know how they had heard about our consultation;

this allowed us to better understand how our communications methods were utilised.

Out of the 174 individual and stakeholder responses we received, 160 respondents

answered this question as follows:

How respondents heard Total %

Received an email from TfL 23 13

Received a letter from TfL 18 10

Read about in the press 6 3

Saw it on the TfL website 52 30

Social media 42 24

Other (please specify) 19 11

Not Answered 14 8

Page 10: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

10

3.3 Equality Monitoring

We sometimes ask respondents to provide information about themselves to help us

ensure our consultations reach all sections of the community and to help improve the

effectiveness of the way we communicate with our customers.

We asked respondents to tell us about their gender, ethnic group, age, sexual

orientation, faith, health and disability. All questions were optional. Any information

provided was kept confidential and used for analysis purposes only.

4. Summary of all consultation responses

We received 174 responses to consultation, which asked one substantive question,

‘Do you support the proposals for improved cycling provision on Tanner Street and

Druid Street?’ This was followed a text box which asked: If you have any further

comments about our proposals, please write these in the box below’. Ninety

respondents took this opportunity.

4.1 Question: Do you support the proposals for improved cycling provision on Tanner

Street and Druid Street?

Number of responses Per cent

Strongly support 128 74%

Support 11 6%

Neither support nor oppose 2 1%

Oppose 8 5%

Strongly oppose 25 14%

4.2 Question: If you have any further comments about our proposals, please write

these in the box below

We asked respondents to provide thoughts on the proposals through an open

comments box. This allowed us to build a picture of what respondents were

concerned about, or talked about in their comments.

Of the 174 people who responded to this consultation, 90 respondents (52 per cent)

provided comments. Fifty-seven, out of the 90 respondents (63 per cent) provided

broadly positive support for the scheme.

The top ten themes made overall, and the number of times these were raised are

shown in the following table:

Page 11: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

11

Theme No. of comments

Welcomed the scheme/changes and were supportive of them 37

Concerns that the scheme would increase traffic congestion 17

Felt pedestrians/disabled users' needs ignored in favour of cyclists 10

Noted that the scheme needs to join up with CS4 10

The scheme will make safer cycling or improve cycling provision 10

Did not believe that the project represented good value for money 7

That the changes proposed by us would worsen air quality 6

Wanted it built as soon as possible or believed it was long overdue 5

Felt that motorists were being disadvantaged in favour of cyclists 4

Wanted the proposal extend 4

4.2 Stakeholder responses

This section provides the feedback we received from stakeholders.

Stop Killing Cyclists “Stop Killing Cyclists fully support this consultation, and the wider benefits this link will provide in helping create a joined up cycle network in South East London, along with CS4.”

Wheels for Wellbeing

“This is a response from Wheels for Wellbeing, an award-winning London charity supporting disabled people of all ages and abilities to enjoy the benefits of cycling. Cycling can be easier than walking, a way to keep independent, fit and healthy, a mobility aid, and a useful form of everyday transport. Many aren’t aware of the fact that disabled people cycle. Growing numbers do and use standard bicycles, as well as non-standard cycles. This linkage between Cycle Superhighway 4 and Quietway 14 is welcome as part of providing a strong network of routes in London. Whilst we appreciate that providing sufficient width for cycling is behind design decisions relating to the use of the bus stop bypass as continuation of the footway we would question if concern has been given to finding sufficient width by using more existing carriageway space to continue a pavement alongside the bus stop bypass. If the existing bus stop bypass design is continued it would be interesting to see designs which accommodated access to the pedestrian crossing at the junction from the bus stop island to reduce the need for crossing movements.

Page 12: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

12

It is welcome to see that the proposed slip lane from Tanner Street to Druid Street has tactile shown. The slip lane into Druid Street appears rather narrow and we would be cautious that it is ensured that sufficient width is provided for all forms of cycle in it.”

Southwark Cyclists “This response is on behalf of Southwark Cyclists, the London Cycling Campaign Group for the Borough of Southwark. It has been prepared with input from many of our members. Southwark Cyclists are strongly supportive of this scheme. A link from Q14 to CS4 is essential and we are pleased to see this scheme coming to consultation at the same time as CS4.”

London Cycling Campaign

“TfL (in Southwark) Druid Street and Tanner Street junction

20 November 2017 This consultation response is on behalf of the London Cycling Campaign, the capital’s leading cycling organisation with more than 12,000 members and 30,000 supporters. The LCC welcomes the opportunity to comment on proposals. The response is in support of the response from Southwark Cyclists, London Cycling Campaign’s local branch, and was developed with input from LCC’s Infrastructure Advisory Panel.

This scheme is supported, providing a useful link to and from Cycle Superhighway 4 and Quietway 14. That said, design for contra-flow cycling on the one-way sections of both Druid and Tanner Streets must be considered to enable the widest range of people to feel safe cycling along them. And space should be taken from motor vehicles over pedestrians. Given buses on Tanner Street are infrequent, the bus cage should potentially be in the carriageway, enabling pavement to be fully retained on both sides of the street as well as cycle track. Finally, few motor vehicles turn left from Druid into Tanner Street. Banning this turn could be considered to avoid any hook risks, but this should not be considered at the cost of moving this scheme forward for delivery with the rest of Q14 and/or CS4.

General points about cycling schemes:

LCC requires schemes to be designed to accommodate growth in cycling. Providing space for cycling is a more efficient use of road space than providing space for driving private motor vehicles, particularly for journeys of 5km or less. In terms of providing maximum efficiency for space and energy use, walking, cycling, then public transport are key.

Page 13: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

13

As demonstrated by the success of recent Cycle Superhighways and mini-Holland projects etc., people cycle when they feel safe. For cycling to become mainstream, a network of high-quality, direct routes separate from high volumes and/or speeds of motor vehicle traffic is required to/from all key destinations and residential areas in an area. Schemes should be planned, designed and implemented to maximise potential to increase journeys – with links to nearby amenities, residential centres, transport hubs considered from the outset.

Spending money on cycling infrastructure has been shown to dramatically boost health outcomes in an area. Spending on cycling schemes outranks all other transport mode for return on investment according to a DfT study. Schemes which promote cycling meet TfL’s “Healthy Streets” checklist. A healthy street is one where people choose to cycle.

All schemes should be designed to enable people of all ages and abilities to cycle, including disabled people.

LCC wants, as a condition of funding, all highway development designed to London Cycling Design Standards (LCDS), with a Cycling Level of Service (CLoS) rating of 70 or above, with all “Critical Fails” eliminated.”

5. Conclusion and next steps

5.1 Conclusion

We have reviewed all of the comments made during the consultation. We intend to

progress our as originally planned, with the inclusion of some changes to the

pedestrian provision, outlined in section 6.

5.2 Next steps

The following table indicates key dates and activities. Dates are subject to change.

Further updates will be provided on the consultation web page.

Activity Date

On street and local press advertisements notifying

statutory notification period changes to Red Route Traffic

Orders

Spring 2019

Page 14: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

14

Activity Date

Start date for scheme construction Spring 2019

6. Response to the main issues raised

Concerns that the scheme would increase traffic congestion

We do not anticipate that the scheme will have a significant impact on

congestion in the area. We have undertaken traffic modelling of our proposals

and we predict that it would have no significant impact on motor traffic journey

times. As part of the scheme implementation process we will be monitoring

traffic flow in the area. If any issues do arise, these will be addressed

accordingly.

Felt pedestrians/disabled users' needs ignored in favour of cyclists

We have included one new pedestrian crossing, widening of the existing

pedestrian crossing across Tanner Street from 2.4 metres to 3.2 metres and

are including count down facilities on the traffic lights. To access the bus stop

island, we are providing mini zebra crossings, as well as delineating the cycle

track from the footway and decluttering footways.

Additionally during the Road Safety Audit, we identified some aspects of the

design required amending to ensure that there was not a risk to turning

cyclists colliding with pedestrians. As a result we have changed the road

layout on Druid Street junction with Tanner Street to enable cyclists to turn in

right to avoid risk of collision with pedestrians. An additional benefit of

making these changes is that it will link in with the London Borough of

Southwark’s aspiration for the area.

Noted that the scheme needs to join up with CS4

This scheme is linked with CS4 on Jamaica Road and we will ensure that the

delivery of both schemes is joined up to provide maximum benefits and less

disruption to the all stakeholders.

Did not believe that the project represented good value for money

The cost of the scheme is low in comparison to other larger cycling

infrastructure and major schemes and all costs are scrutinised during the

design process. This scheme provides an important connection for Quietway

14 and CS4 cycle route which will benefit significant numbers of cyclists.

Page 15: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

15

That the changes proposed by us would worsen air quality

The traffic modelling for this scheme indicates minor increases in traffic

queueing and congestion as a result of the measures proposed on Tanner

Street and Druid Street. It is not anticipated that this will lead to significant

increases in air pollution. We have a range of measures to tackle air pollution

including the introduction of the Ultra Low Emission Zone (ULEZ) in April

2019.

Felt that motorists were being disadvantaged in favour of cyclists

As part of the Mayor’s Healthy Streets Approach we are trying to prioritise

walking, cycling and public transport to achieve the ambitious target of 80 per

cent of people travelling by sustainable modes by 2041 in London. The

proposals have been subject to traffic modelling and the overall impact on

traffic congestion and vehicle queuing has been shown to be low.

Wanted the proposal extended

The scope of the scheme only extends to the area in which the proposed

Quietway route would use Druid Street and Tanner Street. Unfortunately

extending the scheme beyond the confines of the Quietway would not be

possible due to the financial scope of the project and as this would go beyond

the schemes specified objectives.

Page 16: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

16

Appendix A: Consultation materials

- Letter to local residents:

Page 17: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

17

Distribution area:

Page 18: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

18

Stakeholder email:

From: TfL Consultations Sent: 28 September 2017 10:48 Subject: Have your say on Cycle Superhighway 4 from Tower Bridge to Greenwich Dear Stakeholder

We would like your views on proposals to transform roads in Bermondsey, Rotherhithe, Deptford and Greenwich to make cycling and walking easier, safer and more appealing.

Cycle Superhighway 4 (CS4) would provide a continuous segregated cycle route between Tower Bridge and Greenwich, as well as new pedestrian crossings, better public spaces, and a host of other improvements aimed at creating a more attractive environment for everyone, and accommodating the area’s future growth.

This consultation does not include proposals for Lower Road, which will be consulted on at a later date.

CS4 would form part of London’s expanding network of Cycle Superhighways. These are an

important element of the Mayor’s draft Transport Strategy and Healthy Streets Approach, which

aim to encourage walking, cycling and public transport and make London greener, healthier and

more pleasant.

Our proposals include:

Two-way segregated cycle track on Tooley Street, Jamaica Road, Evelyn Street and Creek Road, providing dedicated space for anyone who wants to cycle

Five new signal-controlled pedestrian crossings and upgrades to over 20 existing pedestrian crossings, making it easier and safer to cross the road

Building on the recent short-term improvements at Rotherhithe Roundabout by redesigning the roundabout to improve safety as part of our Safer Junctions programme

A new eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout, giving buses priority at the roundabout and providing better bus access into Lower Road

New and improved public spaces at Deptford High Street and Rotherhithe Roundabout, including new paving and trees

New traffic restrictions, including banned turns on some side roads along Jamaica Road and at Deptford High Street

Changes to some bus stop layouts and locations, including new bus stop bypasses for cyclists

For more information and to give us your views, please visit tfl.gov.uk/cs4. You have until Sunday 19 November 2017 to respond.

We will be holding public events where staff involved in the project will be available to answer your questions. See the website for details of times and locations.

Yours faithfully

Jay Daisi Consultation Team Transport for London

Page 19: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

19

Webpage introduction:

Page 20: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

20

Appendix B: Stakeholder list

Stakeholders we consulted included:

Local Authorities, statutory and advisory bodies

Greater London Authority

London Borough of Havering

London Borough of Southwark

London Councils

London TravelWatch

South Gloucestershire Council

The Royal Parks

Accessibility groups and charities

Access in London

Action for Blind People

Action on disability

Action on hearing loss

Age UK

Alzheimers society

Anxiety care

Aspire

Brains trust

Carers information services

Change London Climate

Disability Rights UK

Disability Rights uk

Disabled Go

Dyslexia Action

Friends of the Earth

Guide Dogs

Hearing Dogs for the Death

Institute for Sustainability

Leonard Cheshire

Living Streets

Look Ahead

Lupus Trust

Mencap

MS Society

Muscular Dystrophy UK

National Autistic Society

No Panic

Organisation of Blind Africans and Caribbean’s

Parkinson’s UK

Royal Society for Blind Children

Scope

Page 21: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

21

Solutions Included

The Ehlers-Danlos Support UK

The Power of Dogs

Thomas Pocklington Trust

Time and talents

Vision UK

Whizz Kidz

Education

The Bosco Centre

Tyssen Community School & Children's Centre

Emergency services and healthcare

London Ambulance Service

London Fire Brigade

Metropolitan Police

New Mill Street Surgery

NHS Southwark Clinical Commissioning group

The Grange Road Practice

Government departments, parliamentary bodies and politicians

Councillor Peter John OBE, Leader of the Council, Southwark

Councillor Ben Johnson, Southwark

Councillor Damian O'Brien, Southwark

Councillor Ian Wingfield, Southwark

Councillor Lucas Green, Southwark

Rt Hon Harriet Harman, Member of Parliament for Camberwell and Peckham

Helen Hayes Member of Parliament for Dulwich and West Norwood

Neil Coyle Member of Parliament for Bermondsey and Old Southwark

Parliamentary Advisory Council for Transport Safety

Department for Transport

Association of Town and City Management

Business and community

Addison Lee

Alive in Space

Better Bankside

Big bus Tours

British Land

Brunel Museum

Carey

CBI

Future inclusion

GMB

Page 22: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

22

Golden Tours

Institute of Civil Engineers

London Bubble

London Bus Tours

London City Mission

London First

Planning Design

Puzzle Focus

South Bank

Southwark Pensioners Centre

Space Syntax

St Mary Magdalen Bermondsey

Tall Stories

Team London Bridge

Tesco

Thamesmead Business Services

The Anderson Travel Group

The Guilford Partnership

The Most Holy Trinity Church, Dockhead

The Original Tour

This Place Works

Uber

Urban Movement

Walk London

Transport organisations, business and user groups

Arriva

Bikeworks

BikeXcite

British Cycling

British Motorcycling Federation

Campaign for Better Transport

Central London CTC

Cycle Confident

Cycle Embassy of Great Britain

Cycle Experience

Cycle Systems

Cycle Training UK

Cycletastic

Cycling Instructor

Freight Transport Association

Go Ahead London

Heathrow

I am Road Smart

Licensed Taxi Drivers Association

London Bike Hub

London Cab Drivers Club

Page 23: Tanner Street/Druid Street Consultation Report · 2018-12-12 · Druid Street. Signalising the junction would allow safer two-way cycle movement between the Tanner Street / Druid

23

London Cycling Campaign

Metroline

Mode Transport Planning

National Express

National Express

On your Bike Cycle Training

Ortegalink Ltd

Rail Delivery Group

RMT London Taxi Drivers’ Branch

Road Haulage Association

Road Peace

Royal Automobile Club

Royal Institute of British Architects

Royal Institute of Charted Sprayers

Southwick Cyclists

Spoke Cycling Instruction

Sustrans

The Alliance of British Drivers

The Confederation of Passenger Transport UK

Transport Focus

Transport for All

Vandome Cycles

Wheels for Wellbeing

Utilities

Royal Mail

UK Power Networks