    Protection

    RED 670 is not available in any panel

    P545 is schnider make model no.- 545

  • 8/16/2019 Tantransco FAT

    2/15

  • 8/16/2019 Tantransco FAT

    3/15

  • 8/16/2019 Tantransco FAT

    4/15

  • 8/16/2019 Tantransco FAT

    5/15

  • 8/16/2019 Tantransco FAT

    6/15

  • 8/16/2019 Tantransco FAT

    7/15

  • 8/16/2019 Tantransco FAT

    8/15

  • 8/16/2019 Tantransco FAT

    9/15

  • 8/16/2019 Tantransco FAT

    10/15

    Loic !or "

    $hen !eed

    %

    &

    '

    4

    5

    6

    7

  • 8/16/2019 Tantransco FAT

    11/15

    #torecloser

    er in normal

    $hen (ain & "R in service )check !or internal "R initiation internally

    *heck "R +ith e,ternal inp#t

    *heck !or (#ltiphase % !a#lt "R locko#t and 6")/ operation

    ! (ain */ is not healthy then "R shall be blocked and 6")6/ operation shall be per!ormed

    *heck !or "R locko#t condition reset

    n case o! breaker not ready prepare 'ph trip inp#t ro relays !rom main and 1E /*2 shall be +i

    3o+ %ph L// to /* breaker +ill start +hen !eeder is on trans!er and %phase "R starts )beca#se

    nce a#toreoser has started i! there is &nd initiation )"R locko#t sho#ld happen

    ! D#rin recloser period i! "R healthy sta#s removed then +hether "R cycle +ill be per!ormed

    check !or 6")6/ operation o! /* relays only +hen !eeder is on trans!er

    n case o! carrier !ail relay operation shall be shi!ted to distance !#nction

     

  • 8/16/2019 Tantransco FAT

    12/15

    P545 re#ires brekaer open and close stat#s !or per!ormin "R)3eremain /* breaker sinals are taken thro#h oose.

     1o consider /* breaker sinals)!eeder on trans!er inp#t +ill be re#iredmay be via oose)

    8o +hen relay receives trip commandinternally or e,ternally )andsim#ltaneo#sly breaker pole is open then only sinle ph action +ill beper!ormed

  • 8/16/2019 Tantransco FAT

    13/15

    %

    &

    %&

    '

    4

    %

    &'

    '

    4

  • 8/16/2019 Tantransco FAT

    14/15

    9ollo+in Points are to be taken care be!ore 9"1

    *on:#ration o! RED 670 relay !or protection !#nctions)"#torecloser !#nction and a#torecloser

    ;oose comm#nication bet+een RED670 and P545 !or (ain and 1/* breaker stat#s

    D#rin 9"1

    /( checkin +irin veri:cation as per scheme dra+ins

    e#ipment loics checkinapart !rom oose sinals re#ired !rom other bays

    ED protection !#nction testin

    "ctivities to be carriedo#t d#rin commissioinin at site

    Establishment o! E*6%50 comm#nication o! 8chnider panel ED8 +ith ;E s#bstations ED8

    Recon:#ration o! e#ipmnet interlockin

  • 8/16/2019 Tantransco FAT

    15/15

      e#irement

    r sim#lations