PROJECT MAUNGA REPORT TO BOARD TARANAKI BASE HOSPITAL REDEVELOPMENT 10 FEBRUARY 2011 New Plymouth

TARANAKI BASE HOSPITAL REDEVELOPMENTstatic2.stuff.co.nz/files/TDHB.pdf · TARANAKI BASE HOSPITAL REDEVELOPMENT 10 FEBRUARY 2011. ... Nurse Call system ... Future stages enabled by

Embed Size (px)

Citation preview

PROJECT MAUNGA

REPORT TO BOARD

TARANAKI BASE HOSPITAL REDEVELOPMENT

10 FEBRUARY 2011New Plymouth

Design Process

Aerial Photo – Building Site

construction site

Site Plan – Taranaki Base Hospital

Project Maunga Objectives 3

Modernise inpatient facilitiesImproved infection control

1-bed rooms increase from 15% to 47%PPE baysHand washing facilitiesNegative pressure isolation rooms - from 1 to 5

Improved patient privacy, dignity and comfortEnsuites increase from 10% to 100%No 6 bed rooms - 4 bed maximumPotential for patient TVComfortable temperature in wardLarge windows, low sill, great outlookPrivate travel to theatres and from ED

1 Bed Room

Four Bedroom

Project Maunga Objectives 4

Improved patient safetyBetter bathroom designBariatric rooms - 11 in totalSecure access control

Improved facilities for disabled and rehabilitation

Disabled friendly toilets and showersBifold, double action doorGym and ward co-locatedNew rehabilitation gardenPurpose built ADL facilities

Project Maunga Objectives 5

Modern IT EnvironmentImproved access to clinical information – lab and x-rayImproved communication between health care workers, service providers and patientsElectronic medication prescribing and recordingWireless and cabled network Nurse Call system - monitoringVideo conference capacity“Digital Theatre” – display of video images within the theatre

Improve Staff SatisfactionUser consultation in design and mock upReduce staff back injury - patient lifting track

Project Maunga Objectives 6

Future Proof Shell for angiography / theatreFuture plant spaceBed & theatre capacityBasement space Future stages enabled by Site Master PlanRFID tracking

Project Maunga – Scope 1

Acute Services Building (working title)4 patient occupied floorsEach clinical floor linked to existing buildingsPlant-rooms in basement and roof11,000 m2 area6 Operating Theatres 2 Procedure Rooms 172 Inpatient Beds1 shell angiography room

Project Maunga – Scope 2

BasementPlant and Waste Management

Level 1Operating Theatres - x6Endoscopy and Procedure Rooms - x2Sterile ServicesDay Stay SuiteNew Entry, Café and Atrium & mobility garden

Project Maunga – Scope 3

Level 2Older Person and Rehab Inpatient Unit (IPU) - 30 bedAllied Health / Rehab facilities and Gymnasium Paediatric Inpatient Unit - 20 bed

Level 3Surgical Inpatient Unit - 30 bed Orthopaedic Inpatient Unit - 30 bed

Level 4Medical Inpatient Unit - x2 30 bed wards

Perspective 1

Perspective 2

Perspective 3

Link & Lobby