19
Task Force on Kai Tak Harbourfront Development Kai Tak Development Progress Report as of April 2016 (Paper No. TFKT/04/2016)

Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Task Force onKai Tak Harbourfront Development

Kai Tak DevelopmentProgress Report as of April 2016

(Paper No. TFKT/04/2016)

Page 2: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Planning Vision/ Themes/ Initiatives

Planning Vision

2

Planning Themes/ Initiatives

A distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour

Heritage, green, sports and tourism hub of Hong Kong

Quality living environmentGreen web for sustainable development

Help regenerate adjacent old districts under Energizing Kowloon East initiatives

Page 3: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

3

San Po Kong

Kwun Tong

Kowloon City

Kowloon Bay

Kwun Tong Typhoon Shelter

CommercialComprehensive Development AreaResidential (Group A) 

Residential (Group B)

Residential (Group C)

Government, Institution or Community

Open Space

Other Specified Uses

Other Specified Uses (Amenity Area)

Legend : Kai Tak Land Use Zoning

Basic information:

Site Area : ~ 320 ha

Open Space : ~ 100 ha

Waterfront : ~ 11 km

Infrastructure works

Total cost : more than HK$100B

Gross Floor Area- Non-domestic : ~ 2.3M sqm- Domestic : ~ 2.2M sqm

Kai Tak Outline Zoning Plan

Page 4: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Major Supporting Infrastructure and Related Works Project

九龍城Kowloon City

啟德發展區Kai Tak Development

4

Stage 3A Infrastructure Works at North Apron (2017)

Stage 1 & 2 Infrastructure Works at North Apron (2013 & 2015)

Shatin to Central Link (2019)

Stage 4 Infrastructure Works at North Apron

(2017)

Stage 2 Infrastructure Works For Developments at Southern Part of Former Runway

(2019)

Stage 3 Infrastructure Works For Developments at Southern Part of Former Runway

(2019)

Completed

Under Construction 

Legend:Remaining Dredging Works for 2nd berth (2015)

Reconstruction and Upgrading of Kai Tak Nullah

(2018)

新蒲崗San Po Kong

Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 1)

(2014)

九龍灣Kowloon Bay

觀塘Kwun Tong觀塘避風塘

Kwun Tong Typhoon Shelter

馬頭角Ma Tau Kok

Advanced Infrastructure Works for KTCT (2013)

Page 5: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Major Supporting Infrastructure and Related Works Project

九龍城Kowloon City

啟德發展區Kai Tak Development

5

Stage 5A Infrastructure Works at North Apron

Route 6 (Trunk Road T2)

Stage 3B Infrastructure Works at North Apron 新蒲崗San Po Kong

Route 6 (Central Kowloon Route)

九龍灣Kowloon Bay

觀塘避風塘Kwun Tong Typhoon Shelter

觀塘Kwun Tong

馬頭角Ma Tau Kok

Road D3 (Metro Park Section)

Local Roads at South Apron

Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 2)

Projects under Active Planning

To start construction in 2016

Legend:

Stage 5B Infrastructure Works at North Apron

Page 6: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

連接於前南面停機坪的基礎設施工程To Connect with Infrastructure Works at Former South Apron Area

6

Stage 2 Infrastructure Works at the Former Runway

Page 7: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

7

CURVILINEAR NOISE BARRIER

8m

3m6m

Presented to TFKT on 20‐Feb‐2014

Contractor’s Proposed Design

Stage 2 Infrastructure Works at the Former Runway

Page 8: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Presented to TFKT on 20‐Feb‐2014

Contractor’s Proposed Design

8

Stage 2 Infrastructure Works at the Former Runway

Page 9: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

九龍灣Kowloon Bay

觀塘Kwun Tong

馬頭角Ma Tau Kok

九龍城Kowloon City

新蒲崗San Po Kong

觀塘避風塘Kwun Tong Typhoon Shelter

9

Trade and Industry Tower (2015)

Major G/IC Buildings / Facilities and Development Sites

Kai Tak Cruise Terminal (2013 & 2014)

Public Rental Housing (2013)

Completed

Under Construction 

Projects under Active Planning

Legend:

Kai Tak Fire Station cum Ambulance Depot (2013)

Page 10: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

馬頭角Ma Tau Kok

九龍城Kowloon City

10

Hong Kong Children’s Hospital (2017)

2 Primary Schools (2015)

Major G/IC Buildings / Facilities and Development Sites

Completed

Under Construction 

Projects under Active Planning

Legend:

SHK Holy Cross Primary School

Po Leung Kuk Stanley Ho Sau Nan Primary School

Artist’s Impression

Artist’s Impression

Public Rental Housing (2013)

Hong Kong Children’s Hospital

Artist’s Impression

Residential Development sites

Trade and Industry Tower (2015)

新蒲崗San Po Kong

九龍灣Kowloon Bay

觀塘Kwun Tong

觀塘避風塘Kwun Tong Typhoon Shelter Kai Tak Cruise Terminal

(2013)

Kai Tak Fire Depot (2013)

Page 11: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

九龍城Kowloon City

11

Hong Kong Children’s Hospital (2017)

Major G/IC Buildings / Facilities and Development Sites

Residential Development sites

Kai Tak Cruise Terminal (2013)

Public Rental Housing (2013)

Kowloon East Regional Headquarters & Operational Base cum Ngau Tau Kok Divisional

Police Station (2019)

Multi-purpose Sports Complex

Inland Revenue Tower

Kai Tak New Acute Hospital

2 Primary Schools (2015)

Trade and Industry Tower (2015)

新蒲崗San Po Kong

九龍灣Kowloon Bay

觀塘Kwun Tong

觀塘避風塘Kwun Tong Typhoon Shelter

Completed

Under Construction 

Projects under Active Planning

Legend:

Artist’s Impression

Multi‐purpose Sports Complex (MPSC)

Kai Tak Fire Depot (2013)

Secondary School

Page 12: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Runway Park Phase 1

Avenue Park Phase 1

Sung Wong Toi Park

Station Square

Waterfront Promenade adjacent to HKCH

Hoi Sham Park Extension

Major Open Space and Recreational Projects

Completed

Under Design Stage(TF consulted)

Projects under Active Planning

Legend:

KTCT Park

12

LTSB Preservation Corridor

Kwun Tong Promenade Stages 1 and 2

Page 13: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Kai Tak Fantasy

Kai Tak 2.0: Healthy Lift Off

• Planning and Urban Design Review for Developments at Runway Tip (commenced in Dec 2015)• Planning and Engineering Study on Kwun Tong Action Area  (commenced in Mar 2016)• Inviting EOI for the development of Tourism Node  (invitation closed on 8 Dec 2015)

13

Page 14: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

14

Revitalizing Ex‐fireboat PierEx-fireboat Pier

Kwun Tong – Kai Tak Kaito Ferry Service (9 April 2016)

Page 15: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

• The Government has gradually implementedthe proposed mitigation measures in theapproved EIA report for KTD

• Recent water quality of KTTS has generallymet the water quality requirement forsecondary contact water recreational use(such as rowing and dragon boat events)

Improved Water Quality of KTTS and Water Sports Activities

15

KTTS

KwunTong

Kowloon Bay

Kwun Tong Water Sports Festival 2016 on 26‐27 March 2016

Page 16: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Objectives:• A public event under the Public Creatives concept

• Promotion of sense of ownership

Scope:• 10 pedestrian streets within Grid Neighborhood

Adoption of Winning Entries:• At full discretion of Government

Latest Status• The prize presentation ceremony was held on 8th March 2016 at Kai TakCommunity Hall

Public Creatives – Pedestrian Street Naming

16

Page 17: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Environmental Friendly Linkage System (EFLS)

• Detailed feasibility study commenced in October 2015• Evaluate most suitable green public transport mode(s)• Formulate integrated multi-modal linkage system• Examine financial viability, environmental acceptability and technical

feasibility of EFLS• Target to complete in phases by end 2017

17

Artist’s Impression

Page 18: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Proposed Cycle Track Extension –Exchange Meeting

Legend:

Access Point to KTD

KTD  Site Boundary                     

Cycle Track in PODP

Proposed Cycle Track Extension Loop

Access Point  ‐ with Additional Width Reserved for Future Cycle Track Provision

Proposed Bicycle Rental Facilities

Scenic Spots/Historical & Cultural Interest/Tourism Attractions

觀塘Kwun Tong

九龍灣Kowloon Bay

九龍城Kowloon City

土瓜灣To Kwa Wan

新蒲崗San Po Kong 彩虹

Choi Hung

馬頭圍Ma Tau Wai

Cycle track running along Kwun Tong Transportation Link

Legend:

啟德發展區邊界KTD  Site Boundary                     

分區計劃大綱圖說明書中的單車俓(走綫由詳細設計硏究)Cycle Track in ES of Kai Tak OZP                                (Alignment subject to detailed design)

建議延長網絡 (走綫由未來發展及詳細設計硏究)Proposed Cycle Track Extension Network (Alignment subject to future development and detailed design)

Cycle Track Network in Kai Tak Development

18

• Feasibility study commenced in November 2015• Review alignment and connections with adjacent districts• Develop schematic design with ancillary facilities including rental &

parking provision• Examine implementation approach and management options

Page 19: Task Force on Kai Tak Harbourfront Development2016/06/01  · 9 Trade and Industry Tower (2015) Major G/IC Buildings / Facilities and Development Sites Kai Tak Cruise Terminal (2013

Thank You