# Project # Task Description S
1 epmp Owning Unit problem
It seems that some values are not accepted and the
owning unit field clears out when you move past it.
The corresponding field unit XXXF is accepted.
(ECP,ECPF),(NCP,NCPF),(WEP,WEPF),(SCP,SCPF)
In Pr
2 User Request :Bickford, Sandy
Documents attached to old epmps 37629 are from
path
http://camdocweb1:8080/dmwebdav/files/epmp/36
345/WO #10.pdf
In P
3 ePMP to Enrolled status
users not able to Enroll ePMP's. After clearing the
temp internet files, opened and closed the browser
and then user was able to Enroll this ePMP
o
4 ePMP date Issue during pmp creationdate of ePMP created always default to 9/2004. Need
o
5 User Request :Wing maher MarieClient name need to be updated. Client
o
6 HR changes for PM role
Mastery Level Project/Program/Construction
Management Roles . Need to check its not affecting completed/prod
7 ePMP - Client DuplicationNeed to find a solution to stop duplication of client,
o
1 HR changes for PM role
Mastery Level Project/Program/Construction
Management Roles . Need to check its not affecting completed/prod
2 User Request:Plagens, Michael A.client contact details are not correct. Need to check on
this. Need to check and test in test environment.o
3 Closeouts for WSAclients details are missing when eCloseout created for
WSA projects.o
1Error while moving members from one
subdiscipline to anotherCompleted and tested in stage
details(Old
Emp#),Update sc
2 Update for 6 digit employee number Co
1 DMS Anal tics
2 Sitema XML Module Create Sitema XML
3Report on keywords and phrase
entered for search in cdmsmith.com
4
Modify Rebrand API to Update
MetaTag Keyword field for all Items in Moved t
5
Page not Found Error in ProductionMoved t
6
CDMSmith.com updates for newCo
7
Itunes RSS feed not showing
8 Lo in o tion for CDMSmith.com In P
ITS Global portal webpart 1SharePoint 2010 Web Part for ITS
New UpdatesCompleted./Wait
1Locator Search resumes for SharePoint
2010
Update Locator to Search resume in SP 2010
repositoryCo
2 Job search page Update the job code search link in Job search pageIn Testing/ Waiti
R
1 Multiple Role Assignment Work on to Update the Role to have multiple values Moved t
2 For CED,Early Termination for DM RoleUpdate the Workflow , to handle Early termination for
Moved t
h kfl
ePMP
Discipline
eCloseout
CDMSmith.Com
Job Search
FWO W kfl
7/22/2019 Tasks Status Chennai TeamAugust16th12
2/6
SNo Task Name Report Name
1 New Requirements for HR COBRA Report
Cyempl
EEO Report Requirement
2 Federal reports FSG Indirect Expense Detail Rpt
3 CDM Reports Workcell changes
4 German Reports 106
5 German Reports 110
6 Federal Reports RE: FSG Charge Number Status Rpt
7 German reports 118
8 Inc Reports LOA Report
9 German Reports 100r
10 German reports Update Role names
11 CCI Reports CCI Employee UT Summary - WTD,MTD,YTD
12 Inc Reports Contract Analysis Rewrite
13 German Reports German UT report
14 Federal reports FSG AR Aging Report
15 Inc Discoverer Reports Deltek Discoverer Reports16 Inc Reports Expenses Direct Deposit Confirmation
17 German Reports PM profit report
18 German Reports 59 iR
19 Inc Reports Oracle UT report - needed for SPARS
20 Deltek Reports Deltek for DE & EU - New Discoverer Report
21 CCI Reports CCI: Labor Hours Report
22 CCI JVReports CCI JV Project Overview Report Missing Invoices
23 INC HR HR Discoverer Reports
24 INC HR HR Discoverer Reports
25 German Reports 117Summary status of the work & Availability
of the developer(s)Busy till
Isaac Roosevelt 14_Aug-2012
Vairavan Ambika 14_Aug-2012
G N Raja 14_Aug-2012
Subramanian Rajalakshmi 14_Aug-2012
STATUS SHARING REPORT
https://team.cdm.com/eRoom/cdmi/MISAssignments/0_18666https://team.cdm.com/eRoom/cdmi/MISAssignments/0_186667/22/2019 Tasks Status Chennai TeamAugust16th12
3/6
Description of the Project / Report GROUP
Requirement is to to add the addition of a Wrk Grp Name column, to the right of
existing Wrk Grp column. So the request includes this and the multi month
requirement.
oracle
Changes to the email text and the total charges column and Disable an ability to
modify the work cell number from Caf responsibilityoracle
Changes on the report - removal of location Parameter and the role changes oracle
Changes on the report - removal of location Parameter and the role changes oracle
changes to Direct Projects sheet andf new Indirect project sheet oracle
Addttional parameters to the Report oracle
Report to capture Employee Leave Types oracle
Addition of new columns and rearrangement of columns oracle
Update the role names for project Manager and Assistant Project Manager as it
affets the Project enrollmentoracle
Modifications of an existing report oracle
convert legacy Pro COBOL Contract analysis report to a BI Publisher report oracle
Summarised version with Division wise totals oracle
Address the credit memo grouping by bill number oracle
Deltek Discoverer Reports for Tracking oraclechanges to the test of the notification oracle
BI Publisher report showing details per PM oracle
Add net-hours calculations to the I version of the 59 report oracle
Chargeable hours shown doubled oracle
Timesheet Status Tracking Report (Missing/Open oracle
new bug while testing oracle
Miising Invoices-Bill to date and Received to date oracle
Additional Fields to DISCOVERER oracle
Additional Fields to DISCOVERER oracle
The report considers the wrong period where previous period is to be considered .
Issue fixed oracle
Free From
16_Aug-2012
16_Aug-2012
16_Aug-2012
16_Aug-2012
HR reports/Enhancements oracle
7/22/2019 Tasks Status Chennai TeamAugust16th12
4/6
Priority Status / ActionBusiness
UnitTechnology
Assigned By/Business
contact
MED working FED Oracle Reports Visser Gerrit
High working INC Oracle Reports Kapoor Nitin
MED completed Germany Oracle Reports Thomas Bott
MED Completed Germany Oracle Reports Thomas Bott
MED working FED Discoverer Report Visser Gerrit
MED completed Germany Oracle Reports Thomas Bott
MED completed INC Discoverer Reports Kapoor Nitin/Tom
MED Completed INC Oracle Reports Thomas Bott
MED working Germany Oracle Reports Thomas Bott
MED completed CCI Oracle Reports Loring Jon/Sam
MED completed Inc Reports Kapoor Nitin
MED completed Germany Reports Thomas Bott
MED Hold FED Reports Kapoor Nitin
MED completed Inc Reports Kapoor NitinMED completed Inc Reports Kapoor Nitin
MED working Germany Reports Kapoor Nitin
MED working Germany Reports Thomas Bott
MED completed Inc Reports Kapoor Nitin
MED Assigned Germany Reports Kapoor Nitin
MED Assigned CCI Reports Kapoor Nitin
MED Assigned CCI Reports Kapoor Nitin
MED Assigned INC Discoverer Report Kapoor Nitin
MED Assigned INC Discoverer Report Kapoor Nitin
MED completed Germany Oracle Reports Thomas Bott
MED working INC Oracle Forms Tom/Bernadette
7/22/2019 Tasks Status Chennai TeamAugust16th12
5/6
Assigned To Assigned DateExpected time to
Complete
G N Raja
9/11/2011
14_Aug-2012
Ambika/Raji2/9/2012
completed
Issac/Raji2/15/2011
completed
Issac/Raji2/15/2011
completed
Raja/Raji 3/28/2012 14_Aug-2012
Issac/Raji 3/19/2012 completed
Raja/Raji4/16/2012
completed
Issac/Raji 7/10/2012 completed
Issac/Raji5/16/2012
14_Aug-2012
Issac/Raji 5/24/2012 completed
Ambika/Raji 6/7/2012 completed
Issac/Raji 6/20/2012 completed
Ambika/Raji 7/5/2012 Hold
Raja/Raji 7/10/2012 completedAmbika/Raji 7/17/2012 completed
Ambika/Raji 7/23/2012 14_Aug-2012
Issac/Raji 7/19/2012 14_Aug-2012
Ambika 1/8/2012 completed
Raja/Raji 7/30/2012 14_Aug-2012
Issac/Raji 8/8/2012 14_Aug-2012
Issac/Raji 8/8/2012 14_Aug-2012
Issac/Raji 8/8/2012 14_Aug-2012
Issac/Raji 8/8/2012 14_Aug-2012
Subramanian
Rajalakshmi 2/2/2012 completed
Subramanian
Rajalakshmi8/26/2011 Hold
7/22/2019 Tasks Status Chennai TeamAugust16th12
6/6
COMMENTS EROOM #
working on the performance issues
completed the Priority 1 portion and is under testing 1812
completed and is under testing 1901
completed and is under testing 1901
working on the new spec 1785
User testing 1662
Completed 1804
Promoted to Prod 1758
Completed Priority 1 and 2 reports 1901
Code Promo sent 1850completed, under testing 1895
Completed/ testing 1898
Hold 1738
Testing 1876code Promo sent 1897
working 1909
Working 1912
Code Promo submitted 1917
Working 1886
working 1907working 1922
working 1885
working 1906
User testing 1784
Expecting more requirements from the users