    # Project # Task Description S

    1 epmp Owning Unit problem

    It seems that some values are not accepted and the

    owning unit field clears out when you move past it.

    The corresponding field unit XXXF is accepted.

    (ECP,ECPF),(NCP,NCPF),(WEP,WEPF),(SCP,SCPF)

    In Pr

    2 User Request :Bickford, Sandy

    Documents attached to old epmps 37629 are from

    path

    http://camdocweb1:8080/dmwebdav/files/epmp/36

    345/WO #10.pdf

    In P

    3 ePMP to Enrolled status

    users not able to Enroll ePMP's. After clearing the

    temp internet files, opened and closed the browser

    and then user was able to Enroll this ePMP

    o

    4 ePMP date Issue during pmp creationdate of ePMP created always default to 9/2004. Need

    o

    5 User Request :Wing maher MarieClient name need to be updated. Client

    o

    6 HR changes for PM role

    Mastery Level Project/Program/Construction

    Management Roles . Need to check its not affecting completed/prod

    7 ePMP - Client DuplicationNeed to find a solution to stop duplication of client,

    o

    1 HR changes for PM role

    Mastery Level Project/Program/Construction

    Management Roles . Need to check its not affecting completed/prod

    2 User Request:Plagens, Michael A.client contact details are not correct. Need to check on

    this. Need to check and test in test environment.o

    3 Closeouts for WSAclients details are missing when eCloseout created for

    WSA projects.o

    1Error while moving members from one

    subdiscipline to anotherCompleted and tested in stage

    details(Old

    Emp#),Update sc

    2 Update for 6 digit employee number Co

    1 DMS Anal tics

    2 Sitema XML Module Create Sitema XML

    3Report on keywords and phrase

    entered for search in cdmsmith.com

    4

    Modify Rebrand API to Update

    MetaTag Keyword field for all Items in Moved t

    5

    Page not Found Error in ProductionMoved t

    6

    CDMSmith.com updates for newCo

    7

    Itunes RSS feed not showing

    8 Lo in o tion for CDMSmith.com In P

    ITS Global portal webpart 1SharePoint 2010 Web Part for ITS

    New UpdatesCompleted./Wait

    1Locator Search resumes for SharePoint

    2010

    Update Locator to Search resume in SP 2010

    repositoryCo

    2 Job search page Update the job code search link in Job search pageIn Testing/ Waiti

    R

    1 Multiple Role Assignment Work on to Update the Role to have multiple values Moved t

    2 For CED,Early Termination for DM RoleUpdate the Workflow , to handle Early termination for

    Moved t

    h kfl

    ePMP

    Discipline

    eCloseout

    CDMSmith.Com

    Job Search

    FWO W kfl

  • 7/22/2019 Tasks Status Chennai TeamAugust16th12

    2/6

    SNo Task Name Report Name

    1 New Requirements for HR COBRA Report

    Cyempl

    EEO Report Requirement

    2 Federal reports FSG Indirect Expense Detail Rpt

    3 CDM Reports Workcell changes

    4 German Reports 106

    5 German Reports 110

    6 Federal Reports RE: FSG Charge Number Status Rpt

    7 German reports 118

    8 Inc Reports LOA Report

    9 German Reports 100r

    10 German reports Update Role names

    11 CCI Reports CCI Employee UT Summary - WTD,MTD,YTD

    12 Inc Reports Contract Analysis Rewrite

    13 German Reports German UT report

    14 Federal reports FSG AR Aging Report

    15 Inc Discoverer Reports Deltek Discoverer Reports16 Inc Reports Expenses Direct Deposit Confirmation

    17 German Reports PM profit report

    18 German Reports 59 iR

    19 Inc Reports Oracle UT report - needed for SPARS

    20 Deltek Reports Deltek for DE & EU - New Discoverer Report

    21 CCI Reports CCI: Labor Hours Report

    22 CCI JVReports CCI JV Project Overview Report Missing Invoices

    23 INC HR HR Discoverer Reports

    24 INC HR HR Discoverer Reports

    25 German Reports 117Summary status of the work & Availability

    of the developer(s)Busy till

    Isaac Roosevelt 14_Aug-2012

    Vairavan Ambika 14_Aug-2012

    G N Raja 14_Aug-2012

    Subramanian Rajalakshmi 14_Aug-2012

    STATUS SHARING REPORT

    https://team.cdm.com/eRoom/cdmi/MISAssignments/0_18666https://team.cdm.com/eRoom/cdmi/MISAssignments/0_18666
  • 7/22/2019 Tasks Status Chennai TeamAugust16th12

    3/6

    Description of the Project / Report GROUP

    Requirement is to to add the addition of a Wrk Grp Name column, to the right of

    existing Wrk Grp column. So the request includes this and the multi month

    requirement.

    oracle

    Changes to the email text and the total charges column and Disable an ability to

    modify the work cell number from Caf responsibilityoracle

    Changes on the report - removal of location Parameter and the role changes oracle

    Changes on the report - removal of location Parameter and the role changes oracle

    changes to Direct Projects sheet andf new Indirect project sheet oracle

    Addttional parameters to the Report oracle

    Report to capture Employee Leave Types oracle

    Addition of new columns and rearrangement of columns oracle

    Update the role names for project Manager and Assistant Project Manager as it

    affets the Project enrollmentoracle

    Modifications of an existing report oracle

    convert legacy Pro COBOL Contract analysis report to a BI Publisher report oracle

    Summarised version with Division wise totals oracle

    Address the credit memo grouping by bill number oracle

    Deltek Discoverer Reports for Tracking oraclechanges to the test of the notification oracle

    BI Publisher report showing details per PM oracle

    Add net-hours calculations to the I version of the 59 report oracle

    Chargeable hours shown doubled oracle

    Timesheet Status Tracking Report (Missing/Open oracle

    new bug while testing oracle

    Miising Invoices-Bill to date and Received to date oracle

    Additional Fields to DISCOVERER oracle

    Additional Fields to DISCOVERER oracle

    The report considers the wrong period where previous period is to be considered .

    Issue fixed oracle

    Free From

    16_Aug-2012

    16_Aug-2012

    16_Aug-2012

    16_Aug-2012

    HR reports/Enhancements oracle

  • 7/22/2019 Tasks Status Chennai TeamAugust16th12

    4/6

    Priority Status / ActionBusiness

    UnitTechnology

    Assigned By/Business

    contact

    MED working FED Oracle Reports Visser Gerrit

    High working INC Oracle Reports Kapoor Nitin

    MED completed Germany Oracle Reports Thomas Bott

    MED Completed Germany Oracle Reports Thomas Bott

    MED working FED Discoverer Report Visser Gerrit

    MED completed Germany Oracle Reports Thomas Bott

    MED completed INC Discoverer Reports Kapoor Nitin/Tom

    MED Completed INC Oracle Reports Thomas Bott

    MED working Germany Oracle Reports Thomas Bott

    MED completed CCI Oracle Reports Loring Jon/Sam

    MED completed Inc Reports Kapoor Nitin

    MED completed Germany Reports Thomas Bott

    MED Hold FED Reports Kapoor Nitin

    MED completed Inc Reports Kapoor NitinMED completed Inc Reports Kapoor Nitin

    MED working Germany Reports Kapoor Nitin

    MED working Germany Reports Thomas Bott

    MED completed Inc Reports Kapoor Nitin

    MED Assigned Germany Reports Kapoor Nitin

    MED Assigned CCI Reports Kapoor Nitin

    MED Assigned CCI Reports Kapoor Nitin

    MED Assigned INC Discoverer Report Kapoor Nitin

    MED Assigned INC Discoverer Report Kapoor Nitin

    MED completed Germany Oracle Reports Thomas Bott

    MED working INC Oracle Forms Tom/Bernadette

  • 7/22/2019 Tasks Status Chennai TeamAugust16th12

    5/6

    Assigned To Assigned DateExpected time to

    Complete

    G N Raja

    9/11/2011

    14_Aug-2012

    Ambika/Raji2/9/2012

    completed

    Issac/Raji2/15/2011

    completed

    Issac/Raji2/15/2011

    completed

    Raja/Raji 3/28/2012 14_Aug-2012

    Issac/Raji 3/19/2012 completed

    Raja/Raji4/16/2012

    completed

    Issac/Raji 7/10/2012 completed

    Issac/Raji5/16/2012

    14_Aug-2012

    Issac/Raji 5/24/2012 completed

    Ambika/Raji 6/7/2012 completed

    Issac/Raji 6/20/2012 completed

    Ambika/Raji 7/5/2012 Hold

    Raja/Raji 7/10/2012 completedAmbika/Raji 7/17/2012 completed

    Ambika/Raji 7/23/2012 14_Aug-2012

    Issac/Raji 7/19/2012 14_Aug-2012

    Ambika 1/8/2012 completed

    Raja/Raji 7/30/2012 14_Aug-2012

    Issac/Raji 8/8/2012 14_Aug-2012

    Issac/Raji 8/8/2012 14_Aug-2012

    Issac/Raji 8/8/2012 14_Aug-2012

    Issac/Raji 8/8/2012 14_Aug-2012

    Subramanian

    Rajalakshmi 2/2/2012 completed

    Subramanian

    Rajalakshmi8/26/2011 Hold

  • 7/22/2019 Tasks Status Chennai TeamAugust16th12

    6/6

    COMMENTS EROOM #

    working on the performance issues

    completed the Priority 1 portion and is under testing 1812

    completed and is under testing 1901

    completed and is under testing 1901

    working on the new spec 1785

    User testing 1662

    Completed 1804

    Promoted to Prod 1758

    Completed Priority 1 and 2 reports 1901

    Code Promo sent 1850completed, under testing 1895

    Completed/ testing 1898

    Hold 1738

    Testing 1876code Promo sent 1897

    working 1909

    Working 1912

    Code Promo submitted 1917

    Working 1886

    working 1907working 1922

    working 1885

    working 1906

    User testing 1784

    Expecting more requirements from the users