Kiewit-Shea Constructors, AJV TBM Tunneling under High Water Pressures Rondout West Branch Bypass Tunnel 2019 TUNNELING SHORT COURSE 12 th Annual Breakthroughs in Tunneling Short Course September 9-11, 2019

TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

  • Upload
    others

  • View
    40

  • Download
    1

Embed Size (px)

Citation preview

Page 1: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

TBM Tunneling under High Water PressuresRondout West Branch Bypass Tunnel

2019 TUNNELING SHORT COURSE12th Annual Breakthroughs in Tunneling Short Course September 9-11, 2019

Page 2: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

NYC Water Supply System

• 3 Upland watershed systems• Delaware (50% total supply)• Catskill (40% total supply)• Croton (10% total supply)

• 3 Aqueducts• Delaware• Catskill• New Croton

• 4 Tunnels• City Tunnel No. 1• City Tunnel No. 2• City Tunnel No. 3• Richmond Tunnel

50% 40%

10%

Project Overview – NYC Water Supply

Page 3: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVProject Overview – RWBT Leaks

Wawarsing Crossing

Roseton Crossing

RWBT Currently leaking between 15 MGD and 35 MGD in 2 locations:• Roseton Crossing

• ~1030 ft in length• Wawarsing Crossing

• ~600 ft in length

• In service since 1944• 13.5’ Finished ID• Depth of 300-2300 ft

below surface• Crosses Hudson ~600 ft

below surface of water• Maximum capacity of 900

MGD• Average yearly utilization

of 600 MGD• 11 shafts along alignment

Page 4: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVProject Overview – Existing Tunnel

Page 5: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

Project: Rondout-West Branch Bypass TunnelContract: BT-2Owner: NYC Department of Environmental ProtectionContract Type: Lump Sum/Unit PriceContract Value: $706.6MBid March 27, 2015Start Work June 2016

Project Overview

Page 6: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

Page 7: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVProject Overview – Bypass Tunnel Layout

Project Plan View

Page 8: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

• Structural components– Collar mounted base frame

structure– Muck head frame– Supply head frame– Muck and supply back legs– Twenty-eight person personnel

cage– Muck car bails and muck cars– Movable 140-ton shaft cover

• Structural weight over 625 US tons

8

Shaft 5B Hoist & Headframe

Page 9: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

9

Shaft 5B Hoist & Headframe

Page 10: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

10

Shaft 5B Site Layout

Page 11: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVShaft 5B Muck Dump

Page 12: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVShaft 5B – Drill& Shoot: Bell Out, Starter and Tail Tunnel

Summary of Work:Location Length QtyShaft 43’-10” 50 VF 2,571 CYGantry Chamber 45’ HS 50 LF 2,691 CYTail Tunnel 25’ HS 30 LF 620 CYStarter Tunnel 25’ HS 300 LF 6,120 CYWest Connection 20’ HS 160 LF 2,116 CY

TOTAL: 14,118 CY

Page 13: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVShaft 5B – Bell Out, Starter and Tail Tunnel

Page 14: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

Tunnel Reaches• Reach 1 - 2,560lf – Shale (Normanskill Formation)• Reach 2 - 3,900lf – Limestone & Dolomite (Wappinger Formation)• Reach 3 – 3,500lf – Limestone & Dolomite (Wappinger Formation)• Reach 4 – 2,540lf – Shale (Mount Merino Formation)

Project Overview – TBM Tunnel Geology

Page 15: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

• Groundwater Head• Ranges from 675 ft to 875 ft

• Max. Heading InflowsUngrouted

• TBM: 250 – 1300 gpm• D&S: 100 – 500 gpm

• Solution Cavities 3 – 30 lf, 5 – 30 Cy of flowing material

• Reach 2: 3ea• Reach 3: 6ea

Maximum AverageReaches 1 and 4 34,000 10,000Reaches 2 and 3 54,000 35,000

UCS

Project Overview – TBM Tunnel Geology

Page 16: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVRock Cores

Page 17: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

• Robbins Single Shield TBM w/ Precast rebar reinforced 6 pcs segments

TBM Tunnel Quantities:Excavation – 12,419LF Exc. Diam. – 21.7ftReinforced Precast Liner – Width= 5ft; ID/OD=18’-2”/20’-4” Annulus Grout – 20,600NCyMuck –170,000BCy

Robbins Tunnel Boring Machine

Page 18: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

• Delivery of Cutterhead Support

TBM Assembly

Page 19: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Assembly

Page 20: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Carrier

• Moved TBM sections under hoist

The picture can't be displayed.

TBM Assembly

Page 21: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Assembly

Page 22: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVProject Overview – Tunnel Segments

Page 23: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Tunneling under High Water Pressures

Groundwater Control• Risks

– High Water Pressure – Flush Flows– Water Bearing Feature – Wash Out Annulus

Grout • Tools for two stages of

work– Preemptive Tools – Reactive Tools

Old Faithful

Page 24: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVPre-emptive Tools

• Original Project Data • Probe Drilling • Geo-physical Look Ahead • Pre-Excavation Grout

Page 25: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVOriginal Project Data

The picture can't be displayed.

Page 26: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJV

Section 31 71 19 TBM Excavation• Probe holes overlapped minimum of 20 feet. • Probe holes outside the tunnel perimeter shall be

backfilled with grout• Probe holes shall be monitored and recorded by the

Contractor

TBM Probeholes

1. Hole ID; 2. Start/end time for each drill rod; 3. Water inflows encountered by hole depth; 4. Rod drop or rapid advancement due to voids or open apertures; 5. Bound or stuck drill steel and depth of occurrence; 6. Plugged steel; 7. Collapsing hole; 8. Flowing ground.

Page 27: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVProbe Hole Drilling

• 2 each drills capable of drilling through Cutterhead (CHD)

• 8 + 8 drilling ports in CHD

• 1 each drill to drill through front shield

• 14 drilling ports in shield

• Mobile drill for relief holes& cut-off grouting

Page 28: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVProbe Hole Drilling – cont’d

Specifications state:• Probe holes must overlap 20

feet• 2 probe holes in Reach 1& 4• 4 probe holes in Reach 2 & 3

Drilling Equipment• Down Hole Hammers

– Ideal for drilling in water environment

– Straighter drilling compared to top hammer drilling

• Blowout Preventers • Stand Pipe/Collar Pipe

Page 29: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Drilling Positions

Page 30: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVGeophysics Look Ahead

• Use Ground Penetrating Radar (GPR) through our probe drill holes

Page 31: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVPre-Excavation Grout (PEG)

Definition: • Grout before excavation of

the ground to control water inflow and solidify the mass

Specifications state:• Trigger:

– 0.3gpm/ft.-probe– 30gpm/feature

Page 32: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM PEG Equipment

Hany Agitator HRW1200

Hany Grout Pump ZMP 726V

Hany Mixer HCM 610

Page 33: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVReactive Tools

• TBM Dewatering Equipment• Bullflex Ring / Stage II Grout / Chem Grout• TBM Bulkhead (Sealing Machine)

Page 34: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Carrier

• Moved TBM sections under hoist

So How Did We Do?TBM Launch 1/8/2018

Page 35: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Carrier

• Moved TBM sections under hoist

TBM Mining Operations

Page 36: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Carrier

• Moved TBM sections under hoist

TBM Mining Operations

Page 37: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Carrier

• Moved TBM sections under hoist

TBM Mining Operations

Page 38: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVPre-Excavation Grout

• First round of PEG Ring 1513• Last round of PEG Ring 1852• PEG 1,700lf/12,500lf or just under 15% of

drive • 16 Rds of PEG Grout • 180,000lbs of Type III cement consumed

Page 39: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVGrout Packers

Page 40: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVSingle Use Inflatable Packers

Page 41: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Carrier

• Moved TBM sections under hoist

TBM Grouting Operations

Page 42: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVPEG Grouting Operation

Page 43: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM Tunnel Dewatering • TBM 800gpm + 1700gpm emergency dewatering• 8”+10” Tunnel discharge lines• Shaft Bottom pumps – 2x800hp -2,500gpm/ea• Max 350gpm during TBM drive – Most of the water inflow from drain

holes thru liner behind the TBM

Page 44: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVHi-Pressure Water

Page 45: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVStage II Grout / Chem Grout

Page 46: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVTBM CarrierTBM Hole Thru 8/13/2019

Page 47: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVRight Now: TBM DemobeTo help protect your privacy, PowerPoint has blocked automatic download of this picture.

Page 48: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVSo How Did We Do?

TBM TunnelingSchedule:• TBM Launch 1/8/2018• Hole Thru 8/13/2019

TBM Performance:• Best Shift 35ft• Best Day 90ft• Best Week 360ft

Page 49: TBM Tunneling under High Water Pressures Rondout West ......Kiewit-Shea Constructors, AJV • Groundwater Head • Ranges from 675 ft to 875 ft • Max. Heading Inflows Ungrouted •

Kiewit-Shea Constructors, AJVRemaining Work

• Welded Steel Pipe Liner 9,200 LF 16-ft. ID x 1-in. thick• Cellular Concrete Backfill between steel liner and

segments• Reinforced Concrete Liner - 14’Ø (finished ID) x

12,500 LF • Tie-in Phase