Start Below is a flowchart describing 40 CFR Part 60, Subpart IIII. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to 40 CFR Part 60, Subpart IIII (1 of 103) §60.4200(a)(2), §60.4200(a)(3) §60.4200(b) No Can you request an exemption for national security purposes? §60.4200(d) Are you an owner/operator of a stationary compression ignition (CI) internal combustion engine (ICE) that commenced construction or modified/reconstruction after 07/11/2005? 40 CFR Part 60 Subpart IIII does not apply Is the CI ICE being tested at an engine test cell/stand? Yes No Is the CI ICE acting as a temporary replacement and located at a stationary source for < 1 year and properly certified to standards applicable to such engines under appropriate nonroad provisions? No §60.4200(e) Yes Yes Yes No 1 End Are you commencing construction? No §60.4200(a)(3) Yes 2 3 06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014 These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

TCEQ - 40 CFR Part 60, Subpart IIII; Flowchart; April 29, … CFR Part 60, Subpart IIII (2of 103) 2 Is the emergency CI ICE a fire pump engine? Was the emergency fire pump CI ICE manufactured

  • Upload
    trantu

  • View
    223

  • Download
    2

Embed Size (px)

Citation preview

Start

Below is a flowchart describing 40 CFR Part 60, Subpart IIII. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to

40 CFR Part 60, Subpart IIII (1 of 103)

§60.4200(a)(2),§60.4200(a)(3)

§60.4200(b)

No

Can you request an exemption for national security

purposes?

§60.4200(d)

Are you an owner/operator of a

stationary compression ignition (CI) internal combustion engine (ICE) that

commenced construction ormodified/reconstruction

after 07/11/2005?

40 CFR Part 60 Subpart IIII does not

apply

Is the CI ICE being tested at an engine

test cell/stand?

Yes

No

Is the CI ICE acting as a temporary replacement

and located at a stationary source for < 1 year and properly certified to standards

applicable to such engines under appropriate nonroad

provisions?

No

§60.4200(e)

Yes

Yes

Yes

No

1

End

Are you commencing construction?

No

§60.4200(a)(3)

Yes 2

3

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(2 of 103)

2

Is the emergency CI

ICE a fire pump engine?

Was the emergency fire pump CI ICE manufactured after

07/01/2006?

End

§60.4217

NoComply with the following:

Standard§60.4217

Yes

§60.4200(a)(2)(i)

§60.4200(a)(2)(i)

§60.4200(a)(2)(ii)

§60.4200(a)(2)(ii)

3

For purposes of 40 CFR 60 Subpart IIII: Fire pump engine is defined as an

emergency engine certified to National Fire Protection

Association (NFPA) requirements that is used to

provide power to pump water for fire suppression or

protection.

Is the CI ICE a non-emergency

engine?

No

Was the CI ICE manufactured after

04/01/2006?

Yes

Yes

No

No

No

Yes

Is the CI ICE using diesel

fuel?

Yes

1

4

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

4

Is the CI ICE a non-emergency

engine?

No

Is the displacement

of the CI ICE < 10 liters per cylinder?

Is the displacement

of the CI ICE > 10 and< 15 liters per cylinder?

The displacement of the non-emergency CI ICE must be > 30 liters per cylinder.

Yes

No

No

Yes

YesNo

Yes Yes

Yes

No

Is the displacement

of the CI ICE > 15 and< 20 liters per

cylinder?

Is the displacement

of the CI ICE > 20 and< 25 liters per

cylinder?

Is the displacement

of the CI ICE > 25 and< 30 liters per

cylinder?

No

40 CFR Part 60, Subpart IIII(3 of 103)

§60.4204 §60.4204§60.4201

§60.4204§60.4201

§60.4204§60.4201

§60.4204§60.4201

§60.4204§60.4201

92

5

24

27

29

31

22

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

5

Is the CI ICE < 8 KW?

Is the CI ICE > 8 KW and

< 37 KW?

No

Is the CI ICE a pre-2007 model year?

Yes

Is the CI ICE < 8 KW?

Is the CI ICE a 2007 model

year?

No

Yes

No

Yes

NOxEmission limit =

9.2 g/KW-hr

HC

Comply with the following:Standard

§60.4204(a)-Table 1|4

Emission limit = 1.3 g/KW-hr

CO

Comply with the following:Standard

§60.4204(a)-Table 1|8

Emission limit = 11.4 g/KW-hr

PM

Comply with the following:Standard

§60.4204(a)-Table 1|11

Emission limit = 0.54 g/KW-hr

Comply with the following:Standard

§60.4204(a)-Table 1|3

Is the CIICE > 37 KW and

< 130 KW?

Yes

Yes

No

No

No

Yes

§60.4204(a)

§60.4204(a)

§60.4204(a)

§60.4201(a)

§60.4201(a)

§60.4204(a)

40 CFR Part 60, Subpart IIII(4 of 103)

14

6

11

10

7

8

8

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

Comply with the following:Standard

§60.4204(a)-Table 1

NMHC+NOx

Emission limit = 9.5 g/KW-hr

CO

Emission limit = 6.6 g/KW-hr

Comply with the following:Standard

§60.4204(a)-Table 1

Is the CI ICE

< 19 KW?CO

Comply with the following:Standard

§60.4204(a)-Table 1

Emission limit = 5.5 g/KW-hr

No

Comply with the following:Standard

§60.4204(a)-Table 1

NMHC+NOx

Emission limit = 10.5 g/KW-hr

CO

Emission limit = 8.0 g/KW-hr

Comply with the following:Standard

§60.4204(a)-Table 1

PM

Emission limit = 1.0 g/KW-hr

Comply with the following:Standard

§60.4204(a)-Table 1

6 7

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4204(a)-Table 1

Yes

§60.4204(a)

40 CFR Part 60, Subpart IIII(5 of 103)

8

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

8Comply with the following:

Standard§60.4206

§60.4207(b)§60.4218

§60.4209(b)

§60.4204(e)

Is the CI ICE being modified/

reconstructed?

Comply with the following:Standard

§60.4204(e)§60.4211(e)

All of the following questions/requirements

will apply to each individual pollutant that

has been picked up.

§60.4214

Is the CIICE equipped with a diesel particulate

filter?

Comply with the following:Monitoring/Testing

§60.4209(b)Recordkeeping§60.4214(c)

Yes

No

Yes

No

§60.4214

Yes

NoNo

Are you demonstrating

compliance by purchasing, or otherwise owning/operating

a certified engine?

Is theCI ICE > 10 liters per

cylinder?

Comply with the following:Standard

§60.4211(e)(1)

End

Comply with the following:Standard

§60.4204(d)Monitoring/Testing

§60.4211(e)(2)[G]§60.4212

Comply with the following:Recordkeeping

[G]§60.4214(a)(2)Reporting

[G]§60.4214(a)(1)

Is the CI ICE > 130 KW?

Yes

Yes

No

40 CFR Part 60, Subpart IIII(6 of 103)

9

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

§60.4211(b)(1)

You must demonstrate compliance according to oneof the following methods:

9

Comply with the following:Standard

§60.4211(b)

§60.4214(a)

Is the CI ICE > 10 liters per

cylinder?

Is the CI ICE > 10 liters per

cylinder?

By purchasing a certified engine?

Is the CI ICE > 2237

KW?

Comply with the following:Recordkeeping

[G]§60.4214(a)(2)Reporting

[G]§60.4214(a)(1)

Is the CI ICE > 130

KW?

Comply with the following:Standard

§60.4211(b)(1)

Comply with the following:Recordkeeping

[G]§60.4214(a)(2)Reporting

[G]§60.4214(a)(1)

End

Yes

No

Yes

Yes

No

§60.4214(a)

No

No

Yes

Yes

No

§60.4214(a)

§60.4214(a)

40 CFR Part 60, Subpart IIII(7 of 103)

175

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

§60.4211(b)(2)

§60.4211(b)(3)

§60.4211(b)(4)

Comply with the following:Standard

§60.4204(d)Monitoring/Testing

§60.4211(b)(5)[G]§60.4212

175

By keepingrecords of test

results on a similar engine?

Comply with the following:Recordkeeping§60.4211(b)(2)

By keeping records of

manufacturer data?

Comply with the following:Recordkeeping§60.4211(b)(3)

Comply with the following:Recordkeeping§60.4211(b)(4)

By keeping records of control device vendor

data?

Yes

No

No

Yes

Yes

No

End

40 CFR Part 60, Subpart IIII(8 of 103)

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

NMHC+NOx

Emission limit = 7.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

CO

Emission limit = 8.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.80 g/KW-hr

NMHC+NOx

Emission limit = 7.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

COEmission limit =

8.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PM

Emission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

1110

Is the CI ICE a 2014 model year or

earlier?

Comply with the following:Standard§1039.101

Comply with the following:Standard§1039.102

No

Yes

172

The following question will apply to each individual pollutant that has been previously picked up.

§60.4201(a)

40 CFR Part 60, Subpart IIII(9 of 103)

176

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

12

§60.4209(b)

§60.4204(e)

Comply with the following:Standard

§60.4211(e)(1)

Are you demonstrating

compliance by purchasing, or otherwise owning/operating

a certified engine?

§60.4211(e)(1)Comply with the following:

Standard§60.4204(d)

Monitoring/Testing§60.4211(e)(2)[G]§60.4212

End

Comply with the following:Standard

§60.4204(e)§60.4211(e)

Comply with the following:Standard§60.4206

§60.4207(b)§60.4218

Opacity

Emission limit = 20% (acceleration)

15% (lugging) 50% (peak acceleration/

lugging)

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Is the CI ICE equipped with a diesel particulate

filter?

Comply with the following:Monitoring/Testing

§60.4209(b)Recordkeeping§60.4214(c)

Is the CI ICE being modified/

reconstructed?

No Yes

All of the following questions/requirements will apply to all individual pollutants that have been

picked up. 15

Is the CI ICE a

2007 model year?

Comply with the following:Standard

§1039.105(b)(1)-(3)

Comply with the following:Standard

§89.113(a)(1)-(3)Yes

No

Yes

No

YesNo

§60.4201(a)

40 CFR Part 60, Subpart IIII(10 of 103)

13

177

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

13Comply with the following:

Standard§60.4211(c)

Is the CI ICEand control device

installed, configured, operated, and maintained according

to manufacturer’s emission-related instructions?

End

Yes

§60.4211(g)

Is the CI ICE < 75

KW?

Is the CI ICE > 75 KW and

< 368 KW?

Comply with the following:Standard

§60.4204(d)§60.4211(g)

Monitoring/Testing[G]§60.4212

No

Comply with the following:Standard

§60.4211(g)(1)Monitoring/Testing

§60.4211(g)(1)Recordkeeping§60.4204(g)(1)

Comply with the following:Standard

§60.4211(g)(2)Monitoring/Testing

§60.4211(g)(2)Recordkeeping§60.4211(g)(2)

Comply with the following:Standard

§60.4211(g)(3)Monitoring/Testing

§60.4211(g)(3)Recordkeeping§60.4211(g)(3)

Yes

No

No

§60.4211(g)(1)

§60.4211(g)(2),(g)(3)

40 CFR Part 60, Subpart IIII(11 of 103)

Comply with the following:Standard

[G]§60.4211(a)

Yes

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

14Is the

CI ICE > 8 KW and < 19 KW?

Is the CI ICE a 2007 model

year?Yes

Is the CI ICE > 19 KW and

< 37 KW?

No

Is the CI ICE a 2007 model

year?

No

Yes Yes

Yes

Is the CI ICE > 37 KW and

< 56 KW?

No

Is the CI ICE a 2007 model

year?Yes Yes

Is the CI ICE a 2008-2012 model

year?

No

Yes

No

No

Is the CI ICE a 2008-2012 model

year?

No

Yes

No

40 CFR Part 60, Subpart IIII(12 of 103)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

33

32

34

35

37

38

39

18

36

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(13 of 103)

Is the CI ICE a 2007 model

year?

18

Is the CI ICE > 56 KW and

< 75 KW?

Is the CI ICE a 2008-2011 model

year?

No

Is the CI ICE a 2012-2013 model

year?

Yes Yes

No

Yes

Yes

Is the CI ICE > 75 KW and

< 130 KW?

No

Is the CI ICE a 2007-2011 model

year?Yes Yes

Is the CIICE a 2012-2013 model

year?

No

Yes

No

No

No

§60.4201(a) §60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

42

43

45

46

37

44

19

41

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(14 of 103)

19

Is the CI ICE > 130 KW and

< 560 KW?

Is the CI ICE a

2007-2010 model year?

No

Is the CI ICE a

2011-2013 model year?

Yes Yes

Yes

No

Is the CI ICE > 560 KW and

< 900 KW?

No

Is the CIICE a 2007-2010 model

year?Yes Yes

Is the CI ICE a 2011-2014 model

year?

No

Yes

Isthe CI ICE a generator-set

engine?

For purposes of 40 CFR 60 Subpart IIII: Generator-set engine is defined

as an engine used primarily to operate an electrical generator/

alternator to produce electric power for other applications.

No

Yes

No

No

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)§60.4201(a)

49

51

47

50

48

20

53

52

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(15 of 103)

20

Is the CI ICE > 900 KW and <

2237 KW?

Is the CI ICE a 2007-2010 model

year?

Is the CI ICE a 2011-2014 model

year?

Yes

No

Yes

Is the CI ICE a generator-set

engine?

For purposes of 40 CFR 60 Subpart IIII: Generator-set engine is defined as an engine used primarily to operate an

electrical generator/alternatorto produce electric power for

other applications.

No

Yes

Is the CI ICE a 2011-2014 model

year?

The CI ICE must be > 2237 KW

No

No

No

Yes

Yes

§60.4201(a) §60.4201(a)

§60.4201(a)

§60.4201(a)

§60.4201(a)

54

50

5355

21

52

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(16 of 103)

21

Is the CI ICE a 2011-2014 model

year?

No

Isthe CI ICE a generator-set

engine?

For purposes of 40 CFR 60 Subpart IIII: Generator-set engine is defined

as an engine used primarily to operate an electrical generator/

alternator to produce electric power for other applications.

No

Is the CI ICE a 2011-2014 model

year?

Yes

Yes

Is the CI ICE a 2007-2010 model

year?Yes

No

Yes

No

§60.4201(b)

§60.4201(c)

§60.4201(c)

57

59

58

56

60

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

22

40 CFR Part 60, Subpart IIII(17 of 103)

Is the CI ICE a

2007-2012 model year?

Is the CI ICE < 600 KW?

No

Is the CI ICE a 2013 model

year?

Is the CI ICE a pre-2007

model year?No Yes

Yes

Is the CI ICE > 600 KW and

< 1400 KW?

No

Is the CI ICE a

2013-2016 model year?

Yes

Is the CI ICE

> 1400 KW and < 2000 KW?

No

Is the CI ICE a 2013-2015 model

year?Yes

Is the CI ICE

> 2000 KW and < 3700 KW?

No

No

Yes

No

No

Yes

§60.4204(a) §60.4201(d)(1)

§60.4201(e)(1), §60.4201(e)(2)

§60.4201(e)(1), (e)(2) §60.4201(e)(1),

(e)(2)

§60.4201(e)(1), (e)(2)

§60.4201(e)(1), (e)(2)

§60.4201(e)(1), (e)(2)

§60.4201(e)(1), (e)(2)

Yes

Yes

Yes

No

61

63

65

66

64

68

67

23

69

70

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(18 of 103)

The CI ICE must be > 3700 KW

23

Is the CI ICE a 2013 model

year?

Is the CI ICE < 3300 KW?

Is the CI ICE a

2014-2015 model year?

Is the CI ICE

> 600 KW and < 1400 KW?

24

Yes

Yes

No

Is the CI ICE a pre-2007

model year?

Is the CI ICE a

2007-2013 model year?

Yes

No

No

Yes

No

Is the CI ICE

< 600 KW?

No

YesNo

Is the CI ICE a

2014-2016 model year?

Is the CI ICE

> 1400 KW and < 2000 KW?

Yes

No

Yes

No

Yes

No

§60.4201(d)(2)

§60.4201(e)(2)

§60.4204(a)

§60.4204(d)(1), (d)(3) §60.4204

(d)(1), (d)(3)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

Yes

72

71

73

61

7475

76

77 66

25

26

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(19 of 103)

2625

Is the CI ICE a

2014-2015 model year?

Is the CI ICE

> 2000 KW and < 3700 KW?

Yes

No

Yes

No

The CI ICE must be > 3700 KW

Is the CI ICE a

2014-2015 model year?

Yes

No

27Is the

CI ICE a pre-2007 model year?

Yes

Is the CI ICE a

2007-2013 model year?

Yes

Is the CI ICE

< 600 KW?

No

Is the CI ICE

> 600 KW and < 1400 KW?

Is the CI ICE a

2014-2016 model year?

No

No

Yes

No

Yes

No

Yes

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4204(a)

§60.4204(d)(1), (d)(3)

78

68

70

79

73

61

80

81

82

66 28No

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(20 of 103)

28Is the CI ICE

> 1400 KW and < 2000 KW?

Is the CI ICE a

2014-2015 model year?

Yes Yes

Is the CI ICE

> 2000 KW and < 3700 KW?

No

YesThe CI ICE must be > 3700 KW

No

Is the CI ICE a

2014-2015 model year?

No

Yes

29Is the

CI ICE a pre-2007 model year?

Yes

Is the CI ICE a

2007-2013 model year?

No

Is the CI ICE

< 600 KW?

No

Yes

Is the CI ICE a

2014-2016 model year?

Is the CI ICE

> 600 KW and < 1400 KW?

NoYes

Yes

No

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2) §60.4201(e)(2)

§60.4201(e)(2)§60.4201(e)(2)

§60.4204(a) §60.4204(d)(1), (d)(3)

§60.4201(e)(2)

No

68

83

79

73

61

85

84

30

66

86

70

Yes

No

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(21 of 103)

30

Is the CI ICE a

2014-2015 model year?

Yes

No

Yes

Is the CI ICE

> 1400 KW and < 2000 KW?

Is the CI ICE a

2014-2015 model year?

Yes

No

Is the CI ICE

> 2000 KW and < 3700 KW?

No

The CI ICE must be > 3700 KW

No

Yes

31

Was the CI ICE installed prior to

01/01/2012?

Yes

No

Yes

No

Was the CI ICE installed on or after 01/01/2012 and before

01/01/2016?

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4201(e)(2)

§60.4204(c)(1)

§60.4204(c)(2)

79

87

73

70

68

88

89

90

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

NMHC+NOx

40 CFR Part 60, Subpart IIII(22 of 103)

NMHC+NOx

32 33

Emission limit = 7.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

CO

Emission limit = 6.6 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.80 g/KW-hr

Emission limit = 7.5 g/KW-hr

CO

Emission limit = 6.6 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PM

Emission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Comply with the following:Standard

§60.4204(b)§60.4201(a)

172

176

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(23 of 103)

34 35NMHC+NOx

Emission limit = 7.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

CO

Emission limit = 5.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.60 g/KW-hr

NMHC+NOx

Emission limit = 7.5 g/KW-hr

CO

Emission limit = 5.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Emission limit = 0.30 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

176

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(24 of 103)

36NMHC+NOx

Emission limit = 4.7 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

CO

Emission limit = 5.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Emission limit = 0.03 g/KW-hr

NMHC+NOx

37

Emission limit = 7.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.40 g/KW-hr

No

The following question will apply to each individual pollutant that has been previously picked up.

§60.4201(a)

177

Is the CI ICE a 2014 model year or

earlier?

Comply with the following:Standard§1039.102

Comply with the following:Standard§1039.101

Yes

176

178

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(25 of 103)

38NMHC+NOx

Emission limit = 4.7 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Emission limit = 0.30 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

39NMHC+NOx

Emission limit = 4.7 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Emission limit = 0.03 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

176 178

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(26 of 103)

41NMHC+NOx

Emission limit = 4.7 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

42NMHC+NOx

Emission limit = 4.7 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Emission limit = 0.02 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Opacity

Comply with the following:Standard

§60.4204(b)§60.4201(a)

§89.113(a)(1)-(3)

Emission limit = 20% (acceleration)

15% (lugging) 50% (peak acceleration/

lugging)Comply with the following:

Standard§60.4206

§60.4207(b)§60.4218

All of the following questions/requirements will apply to all individual pollutants that have been

picked up.

173

15

179180

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(27 of 103)

43 NMHCEmission limit = 0.19 g/KW-hr

NOxEmission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

COEmission limit =

5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PMEmission limit = 0.02 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

178

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(28 of 103)

44NMHC+NOx

Emission limit = 4.0 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.30 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

45NMHC+NOx

Emission limit = 4.0 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Emission limit = 0.02 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

179 180

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

46

40 CFR Part 60, Subpart IIII(29 of 103)

NMHCEmission limit = 0.19 g/KW-hr

NOxEmission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

COEmission limit =

5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PMEmission limit = 0.02 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

178

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(30 of 103)

47NMHC+NOx

Emission limit = 4.0 g/KW-hr

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.20 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

48NMHC+NOx

Emission limit = 4.0 g/KW-hr

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Emission limit = 0.02 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

179 177

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(31 of 103)

49 NMHCEmission limit = 0.19 g/KW-hr

NOxEmission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

Comply with the following:Standard

§60.4204(b)§60.4201(a)

PMEmission limit = 0.02 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)

178

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(32 of 103)

50NMHC+NOx

Emission limit = 6.4 g/KW-hr

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

PM

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

Emission limit = 0.20 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§89.112(a)

51 NMHC

Emission limit = 0.40 g/KW-hr

NOx

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PMEmission limit = 0.10 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

179

176

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(33 of 103)

53

52 NMHCEmission limit = 0.19 g/KW-hr

NOx

Emission limit = 0.67 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

PM

Emission limit = 0.03 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

NMHCEmission limit = 0.19 g/KW-hr

NOxEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

PM

Emission limit = 0.04 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.101

177

177

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(34 of 103)

55

54 NMHCEmission limit = 0.40 g/KW-hr

NOx

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Emission limit = 0.10 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

NMHCEmission limit = 0.40 g/KW-hr

NOxEmission limit = 0.67 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

PM

Emission limit = 0.10 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(a)§1039.102

176

176

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(35 of 103)

56 HCEmission limit =

1.3 g/KW-hr

NOxEmission limit =

9.2 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(b)

COEmission limit = 11.4 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(b)

Comply with the following:Standard

§60.4204(b)§60.4201(b)

PMEmission limit = 0.54 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(b)

174

Opacity

Comply with the following:Standard

§60.4204(b)§1039.105(b)(1)-(3)

Emission limit = 20% (acceleration)

15% (lugging) 50% (peak acceleration/

lugging)

62

15

Is the

CI ICE a constant speed

engine?All of the following

questions/requirements will apply to all individual

pollutants that have been picked up.

No

Comply with the following:Standard

§60.4201(c)§60.4206

§60.4207(b)§60.4218

Recordkeeping[G]§60.4214(a)(2)

Reporting [G]§60.4214(a)(1)

181

Yes

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

§89.113(c)(3)§1039.105(a)(2)

40 CFR Part 60, Subpart IIII(36 of 103)

Comply with the following:Standard§60.4206

§60.4207(b)§60.4218

All of the following questions/requirements

will apply to each individual pollutant that

has been picked up.

Is the CI ICE a 2007-2010

model year?

Is the CI ICE > 2237

KW?

Is the displacement of the CI ICE < 10 liters per

cylinder?

Comply with the following:Recordkeeping

[G]§60.4214(a)(2)Reporting

[G]§60.4214(a)(1)

Yes

62

Yes

No

Comply with the following:Recordkeeping

[G]§60.4214(a)(2)Reporting

[G]§60.4214(a)(1)No

No

Yes

§60.4204(a)

§60.4214

§60.4201(c)

12

15

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(37 of 103)

58

57 NMHCEmission limit = 0.40 g/KW-hr

NOx

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.102

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.102

Comply with the following:Standard

§60.4204(b)§1039.102

PM

Emission limit = 0.10 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.102

NMHCEmission limit = 0.40 g/KW-hr

NOxEmission limit = 0.67 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.102

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.102

Comply with the following:Standard

§60.4204(b)§1039.102

PM

Emission limit = 0.10 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.102

174

174

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(38 of 103)

60

59 NMHCEmission limit = 0.19 g/KW-hr

NOx

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.101

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.101

Comply with the following:Standard

§60.4204(b)§1039.101

PM

Emission limit = 0.04 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.101

NMHCEmission limit = 0.19 g/KW-hr

NOxEmission limit = 0.67 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.101

COEmission limit =

3.5 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.101

Comply with the following:Standard

§60.4204(b)§1039.101

PM

Emission limit = 0.03 g/KW-hr

Comply with the following:Standard

§60.4204(b)§1039.101

181

181

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(39 of 103)

61

NOx

Emission limit = 17.0 g/KW-hr (test speed < 130 rpm), 45.0 x N-0.20 (test speed > 130 and

< 2000 rpm), 9.8 g/KW-hr (test speed > 2000 rpm)

Comply with the following:Standard

§60.4204(a)§94.8(a)(1)(i)-(iii)

63Emission limit =

7.8 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

PMEmission limit = 0.27 g/KW-hr

THC+NOx

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1)§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1)§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1)§94.8(a)(2)

62

8

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(40 of 103)

64HC+NOx

Emission limit = 6.2 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

65HC+NOx

Emission limit = 6.2 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

PM

Emission limit = 0.14 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(41 of 103)

HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.04 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

HC+NOx

Emission limit = 6.2 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

PM

Emission limit = 0.14 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1), (e)(2)

§1042.101

66

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

67

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(42 of 103)

62

HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.04 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

HC+NOx

Emission limit = 7.8 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1)

§1042.101

PM

Emission limit = 0.14 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(1)

§1042.101

68

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

69

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(43 of 103)

HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.04 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

THC+NOx

Emission limit = 7.8 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(2)§94.8(a)(2)

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(2)§94.8(a)(2)

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(2)§94.8(a)(2)

70

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

71

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(44 of 103)

73

72 HCEmission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

COEmission limit =

5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

PM

Emission limit = 0.12 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

HCEmission limit = 0.19 g/KW-hr

NOxEmission limit =

1.8 g/KW-hr

COEmission limit =

5.0 g/KW-hr

PM

Emission limit = 0.06 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(45 of 103)

Emission limit = 8.7 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

THC+NOx

Emission limit = 9.8 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

74

CO

Emission limit = 5.0 g/KW-hr

75THC+NOx

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(46 of 103)

Emission limit = 7.0 g/KW-hr

PM

Emission limit = 0.34 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

THC+NOx

Emission limit = 7.0 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

PM

Emission limit = 0.34 g/KW-hr

76

CO

Emission limit = 5.0 g/KW-hr

77HC+NOx

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(47 of 103)

Emission limit = 7.0 g/KW-hr

PM

Emission limit = 0.34 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

78

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

HC+NOx

79HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.25 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(48 of 103)

80

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

HC+NOx

Emission limit = 9.8 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

81THC+NOx

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(49 of 103)

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

82

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

HC+NOx

83HC+NOx

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(50 of 103)

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

84

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(d)(1), (d)(3)

§94.8(a)(2)

THC+NOx

85HC+NOx

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(51 of 103)

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

86

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

HC+NOx

87HC+NOx

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4204(b)§60.4201(e)(2)

§1042.101

62

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(52 of 103)

88

NOx

Emission limits = 17.0 g/KW-hr (test speed < 130 rpm),

45.0 x N-0.20 (test speed > 130 and < 2000 rpm), 9.8 g/KW-hr

(test speed > 2000 rpm)

Comply with the following:Standard

[G]§60.4204(c)(1)Monitoring/Testing

§60.4213(e)

PM

89

NOx

Emission limits = 14.4 g/KW-hr (test speed < 130 rpm),

44.0 x N-0.23 (test speed > 130 and < 2000 rpm), 7.7 g/KW-hr

(test speed > 2000 rpm)

Comply with the following:Standard

[G]§60.4204(c)(2)Monitoring/Testing

§60.4213(e)

90

NOx

Emission limits = 3.4 g/KW-hr (test speed < 130 rpm),

9.0 x N-0.20 (test speed > 130 and < 2000 rpm), 2.0 g/KW-hr

(test speed > 2000 rpm)

Comply with the following:Standard

[G]§60.4204(c)(3)Monitoring/Testing

§60.4213(e)

Are you choosing

to reduce PM emissions by 60% or more?

PMEmission limit = 0.15 g/KW-hr

No

Comply with the following:Standard

§60.4204(c)(4)Monitoring/Testing

[G]§60.4213(d)

Comply with the following:Standard

§60.4204(c)(4)Monitoring/Testing

§60.4213(f)

§60.4204(c)(4)

Yes

91

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(53 of 103)

91

§60.4209(b)

§60.4204(e)

Comply with the following:Standard

§60.4211(e)(1)

Are you demonstrating

compliance by purchasing, or otherwise owning/operating

a certified engine?

Comply with the following:Monitoring/Testing

§60.4211(e)(2)

Comply with the following:Standard

§60.4204(e)§60.4211(e)

Is the CI ICE equipped with a diesel particulate

filter?

Comply with the following:Monitoring/Testing

§60.4209(b)Recordkeeping§60.4214(c)

Is the CI ICE being modified/

reconstructed?

All of the following questions/requirements will

apply to each individual pollutant that has been picked

up.

Comply with the following:Standard

§60.4211(d)Monitoring/Testing§60.4211(d)(1), (d)(3)

Recordkeeping[G]§60.4211(d)(2)

Reporting[G]§60.4211(d)(2)

Comply with the following:Standard§60.4206

§60.4207(d)§60.4218

Monitoring/Testing§60.4213(a), (b), (c)

Recordkeeping[G]§60.4214(a)(2)

Reporting[G]§60.4214(a)(1)

No

Yes

No

YesEnd

Yes

No

§60.4211(e)(1)

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(54 of 103)

92 Is the displacement

of the emergency CI ICE > 30 liters per

cylinder?

94

NOx

Emission limits = 17.0 g/KW-hr (test speed < 130 rpm),

45.0 x N-0.20 (test speed > 130 and < 2000 rpm), 9.8 g/KW-hr

(test speed > 2000 rpm)

Comply with the following:Standard

[G]§60.4205(d)(1)Monitoring/Testing

§60.4213(e)

PM

NOx

Emission limits = 14.4 g/KW-hr (test speed < 130 rpm),

44.0 x N-0.23 (test speed > 130 and < 2000 rpm), 7.7 g/KW-hr

(test speed > 2000 rpm)

Comply with the following:Standard

[G]§60.4205(d)(2)Monitoring/Testing

§60.4213(e)

93

Comply with the following:Standard

§60.4205(d)(3)Monitoring/Testing

§60.4213(f)

§60.4205(d)

Was the CI ICE installed prior to

01/01/2012?

No

Yes

No

Yes

§60.4205(d)(1) §60.4205(d)2)

Emission limit = 0.40 g/KW-hr

All of the following questions/requirements

will apply to each individual pollutant that

has been picked up.

Comply with the following:Standard§60.4206

§60.4207(d)[G]§60.4211(f)

§60.4218Monitoring/Testing§60.4213(a), (b), (c)

Reporting[G]§60.4214(d)

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(55 of 103)

93

§60.4204(e)

Comply with the following:Standard

§60.4211(e)(1)

Are you demonstrating

compliance by purchasing, or otherwise owning/operating

a certified engine?

Comply with the following:Monitoring/Testing

§60.4211(e)(2)

Comply with the following:Standard

§60.4205(f)§60.4211(e)

Comply with the following:Monitoring/Testing

§60.4209(a)Recordkeeping§60.4214(b)

Is the CI ICE being modified/

reconstructed?

Comply with the following:Standard

§60.4211(d)Monitoring/Testing

§60.4211(d)(1)Recordkeeping

[G]§60.4211(d)(2)Reporting

[G]§60.4211(d)(2)

End

Does the emergency CI ICE

meet standards applicable to non-emergency

engines?

No

§60.4209(a)

Yes

Yes

Yes

No

No

§60.4211(e)(1)

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(56 of 103)

94

For purposes of 40 CFR 60 Subpart IIII: Fire pump engine is defined as an

emergency engine certified to National Fire Protection Association (NFPA) requirements that is used to provide

power to pump water for fire suppression or protection.

Is the emergency CI ICE a fire pump

engine?Yes

No

Is the CI ICE > 8 KW and

< 19 KW?

Is the CI ICE

< 8 KW?

Is the CI ICE a 2010 model year or

earlier?

Yes

Yes

No

No

Is the CI ICE a 2010 model year or

earlier?

Yes

Yes

No

Is the CI ICE > 19 KW and

< 37 KW?

No

Is the CI ICE a 2010 model year or

earlier?

Yes Yes

NoNo

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

97

111

110

109

112

11395

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(57 of 103)

95

YesIs the CI

ICE > 37 KW and < 75 KW?

Is the CI ICE a 2010 model year or

earlier?

Yes

Is the CI ICE a 2011-2013

model year and has a rated speed of > 2650

rpm?

Are you choosingto alternatively comply with the emission limits for a 2010

model year?

Yes

No

Yes

Is the CI ICE > 75 KW and

< 130 KW?

No

Is the CI ICE a 2009 model year or

earlier?

Yes

Is the CI ICE a 2010-2012

model year and has a rated speed of > 2650

rpm?

Are youchoosing to alternatively

comply with the emission limits for a 2009 model

year?

No

No

No

Yes

No

Yes

No No

Yes

§60.4205(c)

§60.4205(c)§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c) §60.4205(c)

114

115

116

96

117

118 119

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(58 of 103)

96

Is the CI ICE > 130 KW and

< 450 KW?

Is the CI ICE a 2008 model year or

earlier?

Yes Yes

Is the CI ICE a 2009-2011

model year and has a rated speed of > 2650

rpm?

Are youchoosing to alternatively

comply with the emission limits for a 2008 model

year?

Yes

No

Yes

No

No

Is the CI ICE > 450 KW and

< 560 KW?

Is the CI ICE a 2008 model year or

earlier?

No

Yes

Yes

No

The CI ICE must be > 560 KW

No

Is the CI ICE a 2007 model year

or earlier?Yes

No

§60.4205(c)§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

§60.4205(c)

120

120

123

121

124

121

122

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(59 of 103)

97

Is the displacement of the CI

ICE < 10 liters per cylinder?

Is the displacement

of the CI ICE > 10 and< 15 liters per cylinder?

The displacement of the emergency CI ICE must be > 30 liters per cylinder.

No

Is the displacement

of the CI ICE > 15 and< 20 liters per

cylinder?

Is the displacement

of the CI ICE > 20 and< 25 liters per

cylinder?

Is the displacement

of the CI ICE > 25 and< 30 liters per

cylinder?

No

Is the CI ICE a pre-2007

model year?

Yes

Yes

No

No

Is the CI ICE < 8 KW?

Is the CI ICE > 8 KW and

< 37 KW?

Yes

Yes

No

Yes

No

YesYes

No

No

§60.4205(a), (b)

§60.4205(a) §60.4205(a)

§60.4205(a), (b)

§60.4205(a) §60.4205(b)

§60.4205(a), (b)

§60.4205(a) §60.4205(b)

§60.4205(a) §60.4205(b)

107

108

106

92

105

9899

100

103

Yes

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(60 of 103)

98

Comply with the following:Standard

§60.4205(a)-Table 1

NMHC+NOx

Emission limit = 10.5 g/KW-hr

CO

Emission limit = 8.0 g/KW-hr

Comply with the following:Standard

§60.4205(a)-Table 1

PM

Emission limit = 1.0 g/KW-hr

Comply with the following:Standard

§60.4205(a)-Table 1

Comply with the following:Standard

§60.4205(a)-Table 1

NMHC+NOx

Emission limit = 9.5 g/KW-hr

CO

Emission limit = 6.6 g/KW-hr

Comply with the following:Standard

§60.4205(a)-Table 1

Is the CI ICE

< 19 KW?CO

Comply with the following:Standard

§60.4205(a)-Table 1

Emission limit = 5.5 g/KW-hr

No

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4205(a)-Table 1

Yes

99

101

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(61 of 103)

100 NOxEmission limit =

9.2 g/KW-hr

HC

Comply with the following:Standard

§60.4205(a)-Table 1

Emission limit = 1.3 g/KW-hr

CO

Comply with the following:Standard

§60.4205(a)-Table 1

Emission limit = 11.4 g/KW-hr

PMComply with the following:

Standard§60.4205(a)-Table 1

Emission limit = 0.54 g/KW-hr

Comply with the following:Standard

§60.4205(a)-Table 1

Is the CI ICE > 37 KW and

< 130 KW?

Yes

No

NOx

Emission limit = 17.0 g/KW-hr (test speed < 130 rpm),

45.0 x N-0.20 (test speed > 130 and < 2000 rpm), 9.8 g/KW-hr

(test speed > 2000 rpm)

Comply with the following:Standard

§60.4205(a)§94.8(a)(1)(i)-(iii)

140

§60.4205(a)

101

101

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(62 of 103)

Comply with the following:Standard§60.4206

§60.4207(b)[G]§60.4211(f)

§60.4218Reporting

[G]§60.4214(d)

§60.4204(e)

§60.4211(e)(1)

All of the following questions/requirements

will apply to each individual pollutant that

has been picked up.

101

Comply with the following:Monitoring/Testing

§60.4209(a)Recordkeeping§60.4214(b)

Does the emergency CI ICE

meet standards applicable to non-emergency

engines?

No

§60.4209(a)

Is the CI ICE being modified/

reconstructed?

Yes

Comply with the following:Standard

§60.4205(f)§60.4211(e)

Comply with the following:Standard

§60.4211(e)(1)

No

Yes

Are you demonstrating

compliance by purchasing, or otherwise owning/operating

a certified engine?

No

YesEnd

Comply with the following:Standard

§60.4205(e)Monitoring/Testing

§60.4211(e)(2)[G]§60.4212

102

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(63 of 103)

§60.4211(b)(1)

§60.4211(b)(2)

§60.4211(b)(3)

§60.4211(b)(4)

102Comply with the following:

Standard§60.4211(b)

You must demonstrate compliance according to oneof the following methods:

By purchasing a certified

engine?

End

Comply with the following:Standard

§60.4211(b)(1)

By keepingrecords of test

results on a similar engine?

Yes

No

Comply with the following:Recordkeeping§60.4211(b)(2)

Yes

By keeping records of manufacturer

data?

No

Comply with the following:Recordkeeping§60.4211(b)(3)

Yes

By keeping records of control device vendor

data?

No

Comply with the following:Recordkeeping§60.4211(b)(4)

Yes

Comply with the following:Standard

§60.4205(e)Monitoring/Testing

§60.4211(b)(5)[G]§60.4212

No

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(64 of 103)

Is the CI ICE < 8 KW?

103

Is the CI ICE a 2007 model

year?Yes Yes

No

Is the CI ICE > 8 KW and

< 19 KW?

No

Is the CI ICE a 2007 model

year?Yes Yes

No

Is the CI ICE > 19 KW and

< 37 KW?

No

Is the CI ICE a

2007 modelyear?

Yes Yes

No

Is the CI ICE > 37 KW and

< 75 KW?

No

Is the CI ICE a

2007 modelyear?

Yes Yes

No

No

§60.4202(a) §60.4202(a)

§60.4202(a) §60.4202(a)

§60.4202(a)§60.4202(a)

§60.4202(a) §60.4202(a)

132

133

134

104

128

127

130

131

129

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(65 of 103)

Is the CI ICE > 75 KW and

< 130 KW?

Is the CI ICE a 2007-2010 model

year?

No

Yes

Is the CI ICE > 130 KW and

< 560 KW?Yes

Is the CI ICE > 560 KW and

< 2237 KW?

No

Yes

The emergency CI ICE that is < 10 liters per cylinder

must be > 2237 KW

No

Yes

No

104

§60.4202(a)

§60.4202(a)

§60.4202(a)

§60.4202(b)

136

135

139

137

138

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(66 of 103)

105

Is the CI ICE a pre-2007 model year?

Is the CI ICE a 2007-2012

model year?No

Is the CI ICE < 600

KW?

Is the CI ICE

> 600 KW and < 1400 KW?

Is the CIICE a 2013-2016

model year?

No

Yes

Is the CI ICE

> 1400 KW and < 2000 KW?

Is the CI ICE a 2013-2015

model year?

Yes

No

No

No

Yes

Yes

Yes

NoIs the CI ICE

> 2000 KW and < 3700 KW?

No

Is the CI ICE a 2013 model year?

Yes

The CI ICE must be > 3700 KW

No

Yes

§60.4205(a)§60.4202(e)(1)

§60.4202(f)(1)

§60.4202(f)(1)

§60.4202(f)(1)

§60.4202(f)(1)

§60.4202(f)(1)

§60.4202(f)(1)

§60.4202(f)(1)

Yes Yes

No

141140

147

146145

143

142

149

144

148

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(67 of 103)

106

Yes

Yes

Is the CI ICE a pre-2007

model year?

Is the CI ICE a 2007-2012

model year?No

Is the CI ICE a 2013 model year?

Is the CI ICE < 3300 KW?

No

Yes

No

Is the CI ICE < 600 KW?

No

Is the CI ICE

> 600 KW and < 1400 KW?

Is the CI ICE a 2014-2016

model year?

No

Yes

No

Is the CI ICE

> 1400 KW and < 2000 KW?

Is the CI ICE a 2014-2015

model year?

Is the CI ICE

> 2000 KW and < 3300 KW?

No

Yes

Yes

No

The CI ICE must be

> 3300 KW

Yes

No

Yes

Yes

No

§60.4205(a) §60.4202(e)(1)

§60.4202(e)(3)§60.4202(e)(3)

§60.4202(f)(2)§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(e)(4)

Yes

151

155

158

152156

144

150

140

146

153

154

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(68 of 103)

107

No YesIs the

CI ICE a pre-2007 model year?

Yes

Is the CIICE a 2007-2013

model year?

Is the CI ICE < 600

KW?

Is the CI ICE > 600 KW and

< 1400 KW?

Is the CI ICE a 2014-2016

model year?

Yes

No

Yes

Yes

No

Is the CI ICE > 1400 KW and

< 2000 KW?

No

Is the CI ICE a 2014-2015

model year?

Yes

Yes

No

The CI ICE must be > 2000 KW

No

No

§60.4202(e)(1), (e)(3)

§60.4202(f)(2)

§60.4205(a)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

162

161

144

164

163

146

159

140

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(69 of 103)

108

No

Yes

Is the CI ICE a pre-2007

model year?

Yes

Is the CI ICE a 2007-2013

model year?

Is the CI ICE < 600 KW?

Is the CI ICE > 600 KW and

< 1400 KW?

Is the CI ICE a 2014-2016

model year?

Yes

No

Yes

Yes

No

Is the CI ICE > 1400 KW and

< 2000 KW?

No

Is the CI ICE a 2014-2015

model year?

Yes

Yes

NoThe CI ICE must be > 2000 KW

No

No§60.4202(e)(1), (e)(3)

§60.4205(a)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

§60.4202(f)(2)

166

167

144

169

168

146

165140

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(70 of 103)

109

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 1.0 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.40 g/KW-hr

CO

Emission limit = 8.0 g/KW-hr

110NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(71 of 103)

111

Emission limit = 9.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 9.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

CO

Emission limit = 6.6 g/KW-hr

112NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

CO

Emission limit = 5.5 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

101

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(72 of 103)

113

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.30 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

114NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(73 of 103)

115

Emission limit = 4.7 g/KW-hr

PM

Emission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

116NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4-fn1

Comply with the following:Standard

§60.4205(c)-Table 4-fn1

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4-fn1

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(74 of 103)

117

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 4.0 g/KW-hr

PM

Emission limit = 0.30 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

118NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(75 of 103)

119

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4-fn2

NMHC+NOx

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.54 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

120NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4-fn2

Comply with the following:Standard

§60.4205(c)-Table 4-fn2

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

101125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(76 of 103)

121

Emission limit = 4.0 g/KW-hr

PM

Emission limit = 0.20 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.54 g/KW-hr

122NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4-fn3

Comply with the following:Standard

§60.4205(c)-Table 4-fn3

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4-fn3

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(77 of 103)

123

Emission limit = 10.5 g/KW-hr

PM

Emission limit = 0.54 g/KW-hr

Comply with the following:Standard

§60.4205(c)-Table 4

NMHC+NOx

Emission limit = 6.4 g/KW-hr

PM

Emission limit = 0.20 g/KW-hr

CO

Emission limit = 3.5 g/KW-hr

124NMHC+NOx

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

Comply with the following:Standard

§60.4205(c)-Table 4

125

101

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(78 of 103)

125

§60.4204(e)

§60.4211(e)(1)

All of the following questions/requirements

will apply to each individual pollutant that

has been picked up.

Comply with the following:Monitoring/Testing

§60.4209(a)Recordkeeping§60.4214(b)

Does the emergency CI ICE

meet standards applicable to non-emergency

engines?

No

§60.4209(a)

Is the CI ICE being modified/

reconstructed?

Yes

Comply with the following:Standard

§60.4205(f)§60.4211(e)

Comply with the following:Standard

§60.4211(e)(1)

No

Yes

Are you demonstrating

compliance by purchasing, or otherwise owning/operating

a certified engine?

126 No

YesEnd

Comply with the following:Standard

§60.4205(e)Monitoring/Testing

§60.4211(e)(2)[G]§60.4212

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

Comply with the following:Standard§60.4206

§60.4207(b)[G]§60.4211(f)

§60.4218Reporting

[G]§60.4214(d)

126Comply with the following:

Standard§60.4211(c)

Is the CI ICE and control device installed, configured,

operated, and maintained according to manufacturer’s emission-

related instructions?

End

Yes

§60.4211(g)

Is the CI ICE < 75 KW?

Is the CI ICE > 75 KW and

< 368 KW?

Comply with the following:Standard

§60.4211(g)Monitoring/Testing

[G]§60.4212

No

Comply with the following:Standard

§60.4211(g)(1)Monitoring/Testing

§60.4211(g)(1)Recordkeeping§60.4211(g)(1)

Comply with the following:Standard

§60.4211(g)(2)Monitoring/Testing

§60.4211(g)(2)Recordkeeping§60.4211(g)(2)

Comply with the following:Standard

§60.4211(g)(3)Monitoring/Testing

§60.4211(g)(3)Recordkeeping§60.4211(g)(3)

Yes

No

No

§60.4211(g)(1)

§60.4211(g)(2),(g)(3)

40 CFR Part 60, Subpart IIII(79 of 103)

Comply with the following:Standard

[G]§60.4211(a)

Yes

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(80 of 103)

127

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

NMHC+NOx

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.40 g/KW-hr

CO

Emission limit = 8.0 g/KW-hr

128NMHC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

CO

Emission limit = 8.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

170 125

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(81 of 103)

129

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.80 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

NMHC+NOx

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.40 g/KW-hr

CO

Emission limit = 6.6 g/KW-hr

130NMHC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

CO

Emission limit = 6.6 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

170

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(82 of 103)

131

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.60 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

NMHC+NOx

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.30 g/KW-hr

CO

Emission limit = 5.5 g/KW-hr

132NMHC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(i)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

CO

Emission limit = 5.5 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

Comply with the following:Standard

§60.4205(b)§60.4202(a)(1)(ii)

§60.4202(a)(1)(ii)-Table 2

170 125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(83 of 103)

133

Emission limit = 7.5 g/KW-hr

PM

Emission limit = 0.40 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

NMHC+NOx

Emission limit = 4.7 g/KW-hr

PM

Emission limit = 0.40 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

134NMHC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

170

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(84 of 103)

135

Emission limit = 4.0 g/KW-hr

PM

Emission limit = 0.30 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

NMHC+NOx

Emission limit = 4.0 g/KW-hr

PM

Emission limit = 0.20 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

136NMHC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

CO

Emission limit = 3.5 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

170

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(85 of 103)

Emission limit = 6.4 g/KW-hr

PM

Emission limit = 0.20 g/KW-hr

137

CO

Emission limit = 3.5 g/KW-hr

NMHC+NOx

138HC

Emission limit = 1.3 g/KW-hr

NOx

Emission limit = 9.2 g/KW-hr

PM

Emission limit = 0.54 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(b)(1)-Table 1

CO

Emission limit = 11.4 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(a)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(b)(1)-Table 1

Comply with the following:Standard

§60.4205(b)§60.4202(b)(1)-Table 1

Comply with the following:Standard

§60.4205(b)§60.4202(b)(1)-Table 1

170125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

139

Emission limit = 6.4 g/KW-hr

PM

Emission limit = 0.20 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(b)(2)

§89.112(a)

CO

Emission limit = 3.5 g/KW-hr

NMHC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(b)(2)

§89.112(a)

Comply with the following:Standard

§60.4205(b)§60.4202(b)(2)

§89.112(a)

40 CFR Part 60, Subpart IIII(86 of 103)

157

Comply with the following:Standard

§60.4202(f)(1)

Comply with the following:Standard

§60.4202(f)(2)

Is the displacement

of the CI ICE > 10 and< 15 liters per cylinder?

Yes

No

160

Comply with the following:Standard

§60.4202(e)(3)

Comply with the following:Standard

§60.4202(e)(1)

Is the CI ICE a 2013 model

year?Yes

No

§60.4202(f)(1)§60.4202(f)(2)

§60.4202(e)(1)§60.4202(e)(3)

125

125

170

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(87 of 103)

141

Emission limit = 7.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(1)§94.8(a)(2)

HC+NOx

Emission limit = 6.2 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

142THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(1)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(1)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(88 of 103)

Emission limit = 6.2 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

143

CO

Emission limit = 5.0 g/KW-hr

HC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

144 HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.04 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

157125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(89 of 103)

Emission limit = 6.2 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

145

CO

Emission limit = 5.0 g/KW-hr

HC+NOx

146 HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.04 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

Comply with the following:Standard

§60.4205(b)§1042.101

157125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(90 of 103)

Emission limit = 7.8 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

147

CO

Emission limit = 5.0 g/KW-hr

HC+NOx

148 HC

Emission limit = 0.19 g/KW-hr

NOx

Emission limit = 1.8 g/KW-hr

PM

Emission limit = 0.04 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(1)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

149Emission limit =

7.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(2)§94.8(a)(2)

CO

Emission limit = 5.0 g/KW-hr

THC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(e)(2)§94.8(a)(2)

40 CFR Part 60, Subpart IIII(91 of 103)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(2)§94.8(a)(2)

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(92 of 103)

150

Emission limit = 8.7 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(1)§94.8(a)(2)

THC+NOx

Emission limit = 8.7 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

151THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(1)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(1)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(3)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(3)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(3)§94.8(a)(2)

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(93 of 103)

152

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(3)§94.8(a)(2)

THC+NOx

Emission limit = 8.7 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

153THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(3)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(3)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(94 of 103)

154

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

HC+NOx

Emission limit = 6.2 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

155THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(95 of 103)

156

Emission limit = 6.2 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

HC+NOx

Emission limit = 7.8 g/KW-hr

PM

Emission limit = 0.14 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

158HC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(96 of 103)

159

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4205(b)§94.8(a)(2)

HC+NOx

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

161THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101160

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(97 of 103)

162

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

HC+NOx

Emission limit = 9.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

163THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(98 of 103)

164Emission limit =

9.8 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

HC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(99 of 103)

165

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

Comply with the following:Standard

§60.4205(b)§94.8(a)(2)

THC+NOx

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.50 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

166THC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

Comply with the following:Standard

§60.4205(b)§60.4202(e)(4)§94.8(a)(2)

160 125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(100 of 103)

167

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

HC+NOx

Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

CO

Emission limit = 5.0 g/KW-hr

168HC+NOx

CO

Emission limit = 5.0 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(101 of 103)

169Emission limit = 11.0 g/KW-hr

PM

Emission limit = 0.27 g/KW-hr

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

CO

Emission limit = 5.0 g/KW-hr

HC+NOx

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

Comply with the following:Standard

§60.4205(b)§60.4202(f)(2)

§1042.101

125

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(102 of 103)

170

Opacity

Emission limit = 20% (acceleration) 15% (lugging) 50% (peak acceleration/lugging)

Comply with the following:Standard

§60.4205(b)

Is the CI ICE a 2007 model

year?

Comply with the following:Standard

§60.4202(a)(1)(i)§89.113(a)(1)-(3)

Comply with the following:Standard

§60.4202(a)(1)(ii)§1039.105(b)(1)-(3)

Is the CI ICE

< 37 KW?

Comply with the following:Standard

§60.4202(a)(2)

§60.4202(a)(1)

§60.4202(a)(1)(i)

125

Is the CI ICE a constant speed

engine?

Yes

§89.113(c)(3)§1039.105(a)(2)

Is the CI ICE > 2237 KW?

§60.4202(b)

Comply with the following:Standard

§60.4202(b)(2)

No

Yes

Comply with the following:Standard

§89.113(a)(1)-(3)No

Yes

No

No

Yes

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***

40 CFR Part 60, Subpart IIII(103 of 103)

Is the

CI ICE a constant speed

engine?

176

177

12

Yes

No

Is the

CI ICE a constant speed

engine?

179

180

173

Yes

No

§89.113(c)(3)§1039.105(a)(2)

§89.113(c)(3)§1039.105(a)(2)

06/20/2016 From 40 CFR Part 60, Subpart IIII, Amended 02/27/2014These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***