TCS-1-Raised Median without Service Road Fig-2.4 Manual From To Lengt h From To Lengt h 0+000 1+400 1400 37+52 5 38+65 0 1125 2+500 3+300 800 41+21 6 42+80 6 1590 5+100 5+800 700 52+92 5 57+30 3 4378 6+400 9+184 2784 58+06 0 59+46 0 1400 10+38 5 16+85 0 6465 60+26 2 61+77 4 1512 17+95 0 32+40 0 14450 63+70 5 65+34 4 1639 33+75 0 35+34 7 1597 70+45 8 71+61 4 1156 36+20 0 36+80 0 600

TCS

Embed Size (px)

DESCRIPTION

TCS

Citation preview

Page 1: TCS

TCS-1-Raised Median without Service Road Fig-2.4 Manual

From To Length From To Length0+000 1+400 1400 37+525 38+650 11252+500 3+300 800 41+216 42+806 15905+100 5+800 700 52+925 57+303 43786+400 9+184 2784 58+060 59+460 140010+385 16+850 6465 60+262 61+774 151217+950 32+400 14450 63+705 65+344 163933+750 35+347 1597 70+458 71+614 115636+200 36+800 600

TCS-2-Raised Median without Service Road at realignment (1.5 m median) (Fig-2.4 Manual)

From To Length

1+400 2+500 1100

Page 2: TCS

TCS-3- Underpass including Approaches without Service Road (Fig-7.2B Manual)

From To Length

3+300 5+100 1800

TCS-4- Raised Median without Service Road (Concentric Widening) (Fig-2.6-Manual)

From To Length From To Length5+800 6+400 600 57+303 58+060 75732+400 33+750 1350 59+460 60+262 80235+347 36+200 853 61+774 63+705 193136+800 37+525 725 67+605 68+089 48438+650 39+185 535 69+656 70+458 802

Page 3: TCS

TCS-5- Realignment of Right Carriageway and Reconstruction on existing left CW (Fig-2.2 Manual)

From To Length

9+184 9+540 356

9+540 10+005 465

TCS-6- Realignment of Right Carriageway and Reconstruction on existing left CW (with one side service road)-Fig-2.2 Manual

From To Length

10+005 10+385 380

Page 4: TCS

TCS-7- Underpass including approaches without Service Road (Concentric Widening)-Fig-7.2B Manual

From To Length

16+850 17+500 650

TCS-8- Bypass Sections Fig-2.4 Manual

From To Length From To Length39+185 40+000 815 52+554 52+925 37140+740 41+216 476 65+344 66+150 80643+082 43+680 598 66+904 67+605 70143+880 45+680 1800 68+089 68+620 53145+880 46+420 540 68+820 69+656 83650+004 51+754 1750

Page 5: TCS

TCS-9- Grade Separated Structure including approaches Fig-7.8 Manual

From To Length40+000 40+740 74043+680 43+880 20045+680 45+880 20046+420 46+687 26746+687 47+140 45351+754 52+554 80066+150 66+904 75468+620 68+820 200

TCS-10- Underpass including approaches with Service Road on both sides (Concentric Widening)

From To Length

17+500 17+950 450

Page 6: TCS

TCS-11- Bypass With one side Service Road

From To Length42+806 43+082 27647+140 47+751 61149+922 50+004 82

TCS-12- ROB/Flyover including Approaches

From To Length47+751 48+657 90648+657 49+119 46249+119 49+427 30849+427 49+922 495