Revision: Date: NOTES: Issue: Date: Drawing No. Drawing Name: Consultant Team: Job Title: Drawn by: Date: Revision: Scale: NOTE: It is the responsibility of the contractor to verify all dimensions on site prior to commencing all work. Do not scale off drawings. The contractor is to ensure that all work complies with the New Zealand Building Code, all ammendments thereof and all relevant New Zealand Standards. All proprietry items and materials shall be fixed and applied in strict accordance with manufacturers specifications. TAYLORED architecture & environments Ltd under no circumstances accepts responsibility for payment of any products or services specified. 1:200 @ A1 BUILDING CONSENT ISSUE G E N E R A L: THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE SPECIFICATION AND ASSOCIATED CONSENT DRAWINGS INCLUDING RESOURCE CONSENT. CONFIRM SET OUT AND DIMENSIONS ON SITE PRIOR TO COMMENCING WORK OR MANUFACTURING ANY OR ALL ITEMS AS DOCUMENTED. AT ALL TIMES, CARE AND CONSIDERATION SHALL BE GIVEN TO ENSURE MINIMAL DISTURBANCE AND CONVENIENCE TO ALL NEIGHBOURING PROPERTIES DURING EXCAVATION AND THROUGHOUT THE BUILDING PROCESS. ANY DISCREPENCIES BETWEEN DOCUMENTS MUST BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. C O N S T R U C T I O N: ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBER FRAMING AND CONCRETE WORK. ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOF CLADDING AND ALUMINIUM JOINERY IN ACCORDANCE WITH NZBC: E2/AS1 - SITUATION 1 TAYLORED architecture & environments Ltd www.tayloredstudio.co.nz +649 4185260 private bag 93010 new lynn auckland 0600 NORTH client: Chalmers Property Group site: Te Rapa Industrial Park, Hamilton Te Rapa Development BC ISSUE 18/11/16 A02 18/11/16 18/11/16 PROPOSED SITE PLAN 1 2 BC issue WT/ZT A 1 3 2 5 7 A A B B C C F F G G H H E E D D 6 4 X X 1 3 2 5 7 6 4 6,600 23,400 6,500 14,505 6,500 14,505 30,000 21,005 21,005 15,000 6,500 7,000 10,165 7,000 6,500 15,000 21,500 24,165 21,500 225 150 439 8,692 6,276 5,664 3,542 3,023 72,010 4,019 225 1,525 2,804 6,600 23,400 6,500 14,505 6,500 14,505 150 30,000 21,005 21,005 72,010 A R T HUR P O R T E R DRIVE canopy 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 31 30 29 28 27 26 24 16 25 18 19 20 21 17 canopy canopy 22 23 32 33 34 35 36 37 38 39 40 31.0 31.0 31.0 32.0 3 32.0 32.0 32.0 32.0 32 32.0 30.6 30.6 30.8 30.8 31.2 31.2 31.2 31.4 31.4 31.4 31.6 31.6 31.6 31.8 31.8 31.8 31.8 32.2 32.2 2.2 32.2 32.2 32.2 canopy canopy canopy site sign forecourt D01 A32 31.90 31.57 32.02 32.02 32.02 32.02 32.02 32.02 31.90 32.00 32.00 31.90 NK 31.95 31.85 32.00 31.90 32.00 31.90 32.02 32.02 NK NK NK 31.90 32.00 31.92 31.82 32.00 31.93 31.95 32.00 32.02 32.02 32.00 31.95 31.85 31.90 32.02 32.00 31.90 NK 32.00 31.90 31.90 32.02 32.00 32.02 32.00 31.90 31.92 32.00 32.02 NK NK NK 32.02 32.00 31.95 31.93 31.65 31.60 EXISTING SWMH EXISTING SSMH 31.94 31.87 31.94 31.75 SW 300 Ø BURIED STORMWATER DETENTION AREA RL 30.90 SW 225 Ø SW 225 Ø SS 100 Ø SS 100 Ø CONNECT TO EXISTING SW PIPE IN WINGWALL SW 225 Ø 31.60 NEW CP NEW CP NEW CP 31.67 31.78 31.85 SS LINE 1 SS LINE 2 DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP EXISTING SSMH DP 2 storey office 49 m 2 + 2 storey office 49 m 2 + 2 storey office 49 m 2 + 2 storey office 49 m 2 + PROPERTY INFORMATION: Subdivision: Te Rapa Gateway Industrial Park, Hamilton Infrastructure: Lot 15, Arthur Porter Drive site area: 2755m 2 Lot 16, Arthur Porter Drive site area: 2509m 2 total area: 5264m 2 COVERAGE SUMMARY: total build: 3150m 2 / 60% canopies: 186m 2 soft landscape: 454m 2 / 9% hard landscape: 202m 2 / 3% landscape total: 656m 2 impermeable: 1458m 2 / 28% (vehicle circulation) site contours existing SW line existing SS line proposed SW line proposed SS line NOTE: refer to civil engineers documentation for all site levels, civil design, and information beyond the line of the buildings. all concrete party walls to be a minimum 150mm off the legal boundary. warehouse 411 m 2 warehouse 409 m 2 warehouse 600 m 2 2 storey office 57 m 2 + 43 m 2 43 m 2 2 storey office 57 m 2 + 42 m 2 42 m 2 42 m 2 42 m 2 warehouse 409 m 2 warehouse 602 m 2 warehouse 409 m 2 01 02 03 05 04 RD 4.2W x 4.8H RD 4.2W x 4.8H 06 RD 4.2W x 4.8H RD 4.2W x 4.8H RD 4.2W x 4.8H RD 4.2W x 4.8H BDY 227°27'00" 80.86m BDY 47°40'00" 74.97m BDY 137°40' 34.94m BDY 132°17' 34.78m BDY 133°06' 33.00m BDY 227°40'00" 77.60m BDY 137°40' 32.90m F.F.L 32.17 F.F.L 32.17 F.F.L 32.17 F.F.L 32.17 F.F.L 32.17 F.F.L 32.17 SCALE 1:200 @ A1 PROPOSED SITE PLAN

Te Rapa Development - Chalmers Propertieschalmersproperties.co.nz/assets/Uploads/Gateway...01 02 03 05 04 RD 4.2W x 4.8H RD 4.2W x 8H 06 RD 4.2W x 4.8H RD 4.2W x 8H RD 4.2W x 4.8H

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    1:200 @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A02

    18/11/16

    18/11/16

    P R O P O S E D S IT E PL A N

    1

    2

    BC issue

    WT/ZTA

    1 32 5 7

    A A

    B B

    C C

    F F

    G G

    H H

    E E

    D D

    64

    X X

    1 32 5 764

    6,600 23,400 6,500 14,505 6,500 14,50530,000 21,005 21,005

    15,0

    006,

    500

    7,00

    010

    ,165

    7,00

    06,

    500

    15,0

    00

    21,5

    0024

    ,165

    21,5

    0022

    5

    150

    439

    8,692

    6,276

    5,664

    3,542

    3,023

    72,010

    4,019

    225

    1,52

    5

    2,804 6,600 23,400 6,500 14,505 6,500 14,505 15030,000 21,005 21,005

    72,010

    AR

    TH

    UR

    PO

    RT

    ER

    DR

    IV

    E

    c a no p y

    01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

    31 30 29 28 27 26 24

    16

    25

    18 19 20

    21

    17

    c a no p yc a no p y

    2223323334353637383940

    31.0

    31.0 31.0

    32.0 32.0

    32.0

    32.0

    32.0

    32.0

    32.0

    32.0

    30.6

    30.630.8

    30.8

    31.2

    31.2 31.2

    31.4

    31.4

    31.4

    31.6

    31.6

    31.6

    31.8

    31.8

    31.8

    31.8

    32.2

    32.2

    32.2

    32.2

    32.2

    32.2

    c a no p yc a no p yc a no p y

    s ite s ign

    f orecour t

    D01A32

    31.9031.57

    32.0232.02

    32.02 32.02 32.02 32.02

    31.90 32.0032.00 31.90NK

    31.95

    31.85

    32.00 31.90

    32.00

    31.90

    32.02 32.02

    NK NK NK31.90 32.0031.92

    31.82

    32.00 31.93 31.95

    32.0032.0232.02

    32.00

    31.95

    31.85

    31.90

    32.0232.00

    31.90NK

    32.00

    31.90 31.90

    32.0232.00

    32.0232.00

    31.90 31.92

    32.0032.02

    NK NK NK

    32.0232.00

    31.9531.93

    31.65

    31.60

    EXISTINGSWMH

    EXISTING SSMH

    31.94

    31.87

    31.94

    31.75

    SW 300 Ø

    BURIED STORMWATER DETENTION AREARL 30.90

    SW 225 Ø

    SW 225 Ø

    SS 100 Ø

    SS 100 Ø

    CONNECT TO EXISTINGSW PIPE IN WINGWALL

    SW 2

    25 Ø

    31.60

    NEW CP NEW CPNEW CP

    31.67 31.78

    31.85

    SS L

    INE

    1

    SS L

    INE

    2

    DP

    DP

    DPDP

    DP

    DPDP

    DP

    DP

    DP

    DP

    DP

    DP

    DPDP

    DP

    DPDP

    DP

    DP

    EXISTINGSSMH

    DP

    2 storeyoffice

    49 m2 +

    2 storeyoffice

    49 m2 +

    2 storeyoffice

    49 m2 +

    2 storeyoffice

    49 m2 +

    PROPERTY INFORMATION:

    Subdivision:Te Rapa Gateway Industrial Park, Hamilton

    Infrastructure:Lot 15, Arthur Porter Drivesite area: 2755m2

    Lot 16, Arthur Porter Drivesite area: 2509m2

    total area: 5264m2

    COVERAGE SUMMARY:

    total build: 3150m2 / 60% canopies: 186m2

    soft landscape: 454m2 / 9% hard landscape: 202m2 / 3% landscape total: 656m2

    impermeable: 1458m2 / 28%(vehicle circulation)

    site contours existing SW line existing SS line proposed SW line proposed SS line

    NOTE:refer to civil engineers documentation for all sitelevels, civil design, and information beyond theline of the buildings.all concrete party walls to be a minimum 150mmoff the legal boundary.

    warehouse411 m2

    warehouse 409 m2

    warehouse600 m2

    2 storeyoffice

    57 m2 +43 m2

    43 m2

    2 storeyoffice

    57 m2 +42 m2 42 m2

    42 m2 42 m2

    warehouse 409 m2

    warehouse602 m2

    warehouse409 m2

    01 02 03

    05 04

    RD 4.2W x 4.8H

    RD 4.2W x 4.8H

    06

    RD 4.2W x 4.8H

    RD 4.2W x 4.8H

    RD 4.2W x 4.8H

    RD 4.2W x 4.8H

    BDY 227°27'00" 80.86m

    BDY 47°40'00" 74 .97m

    BD

    Y 1

    37°4

    0' 3

    4 .94

    m

    BD

    Y 132°17 ' 34 .78m

    BD

    Y 133°06 ' 33.00m

    BDY 227°40'00" 77.60m

    BD

    Y 1

    37°4

    0' 3

    2.90

    m

    F.F.L 3 2 .17 F.F.L 3 2 .17 F.F.L 3 2 .17

    F.F.L 3 2 .17 F.F.L 3 2 .17 F.F.L 3 2 .17

    SCALE 1:200 @ A1PROPOSED SITE PLAN

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    1:200 @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A05

    18/11/16

    18/11/16

    P R O P O S E D O V E R A L LG R O U N D F L O O R PL A N

    1

    2

    BC issue

    WT/ZTA

    UP

    123456789101112

    13

    14 15 16 17 18 19

    UP

    123456789101112

    13

    14 15 16 17 18 19

    UP

    123456789101112

    13141516171819

    UP

    123456789101112

    13

    141516171819

    UP

    123456789101112

    13 14 15 16 17 18 19

    UP

    123456789101112

    13 14 15 16 17 18 19

    1 32 5 7

    A A

    B B

    C C

    F F

    G G

    H H

    E E

    D D

    64

    X X

    1 32 5 764

    67,1

    65

    21,5

    00

    30,000 21,005 21,0056,600 23,400 6,500 14,505 6,500 14,505

    6,50

    015

    ,000

    21,5

    00

    15,0

    006,

    500

    8,692 150

    439

    225

    169

    6,600 23,400 6,500 14,505 6,500 14,50530,000 21,005 21,0052,804 150

    S02A18

    S01A18

    S03A19

    S04A19

    S05A20

    S05A20

    S06A20

    S06A20

    S13#LayID

    E05A16

    E06A16

    E04A16

    E07A33

    AR

    TH

    UR

    PO

    RT

    ER

    DR

    IV

    E

    RD 4.2W x 4.8H

    S S S

    war ehouseF.F.L 3 2 .17

    RD 4.2W x 4.8H

    S S S

    war ehouse war ehouse war ehouse

    off ice of f ice of f ice

    of f ice of f ice of f ice

    RD 4.2W x 4.8H RD 4.2W x 4.8H

    RD 4.2W x 4.8H RD 4.2W x 4.8H

    war ehouseF.F.L 3 2 .17

    war ehouseF.F.L 3 2 .17

    F.F.L 3 2 .17 F.F.L 3 2 .17 F.F.L 3 2 .17

    c a no p yc a no p yc a no p y

    c a no p yc a no p y c a no p y

    S

    NOTE:

    all water check meters to be locatedwithin garden berms out front ofbuilding.

    all pedestrian pathways accross theroller door entry access are to complywith NZBC D1/AS1 and provide amaximum 20mm change in finishedpaving level.

    fall all warehouse entry thresholds1:50 away from building. ensure allslab rebates allow for all door +window thresholds.

    all concrete party walls to be aminimum 150mm off the legalboundary.

    refer civil engineers designdocumentation for all informationbeyond the external line of thebuildings.

    all external pathways and transitionsto comply with nzbc d1/as1

    site s ign

    D//A//

    B01A07

    B02A08

    B03A09

    B06A12

    B05A11

    B04A10

    E02A15

    E03A15

    E01A15

    BDY 227°27'00" 80.86m

    BDY 47°40'00" 74 .97m

    BD

    Y 1

    37°4

    0' 3

    4 .94

    m

    BD

    Y 132°17 ' 34 .78m

    BD

    Y 133°06 ' 33.00m

    BDY 227°40'00" 77.60m

    BD

    Y 1

    37°4

    0' 3

    2.90

    m

    GROUND FLOOR GIA SUMMARY:

    BUILDING 01warehouse 587.5 m2office 23 m2facilities + stair 18.5 m2

    BUILDING 02warehouse 399.5 m2office 23 m2facilities + stair 18.5 m2

    BUILDING 03warehouse 399.5 m2office 23 m2facilities + stair 18.5 m2

    BUILDING 04warehouse 399.5 m2office 23 m2facilities + stair 18.5 m2

    BUILDING 05warehouse 399.5 m2office 23 m2facilities + stair 18.5 m2

    BUILDING 06warehouse 587.5 m2office 23 m2facilities + stair 18.5 m2

    01 02 03

    05 0406

    SCALE 1:200 @ A1PROPOSED OVERALL GROUND FLOOR PLAN

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    1:200 @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A06

    18/11/16

    18/11/16

    P R O P O S E D O V E R A L LF IR S T F L O O R PL A N

    1

    2

    BC issue

    WT/ZTA

    UP

    123456789101112

    13

    14 15 16 17 18 19

    UP

    123456789101112

    13

    14 15 16 17 18 19

    UP

    123456789101112

    13141516171819

    UP

    123456789101112

    13

    141516171819

    UP

    123456789101112

    13 14 15 16 17 18 19

    UP

    123456789101112

    13 14 15 16 17 18 19

    1 32 5 7

    A A

    B B

    C C

    F F

    G G

    H H

    E E

    D D

    64

    X X

    1 32 5 764

    S02A18

    S01A18

    S03A19

    S04A19

    S05A20

    S05A20

    S06A20

    S06A20

    S13#LayID

    E05A16

    E06A16

    E04A16

    67,1

    65

    21,5

    00

    30,000 21,005 21,005

    6,600 23,400 6,500 14,505 6,500 14,505

    6,50

    015

    ,000

    21,5

    00

    15,0

    006,

    500

    150

    225

    439

    1508,692

    6,600 23,400 6,500 14,505 6,500 14,505

    30,000 21,005 21,005

    warehouse warehouse

    off iceF.F.L 35.47

    warehouse

    warehouse warehouse warehouse

    AR

    TH

    UR

    PO

    RT

    ER

    DR

    IV

    E

    off iceF.F.L 35.47

    off iceF.F.L 35.47

    off iceF.F.L 35.47

    off iceF.F.L 35.47

    off iceF.F.L 35.47

    c a no p yc a no p yc a no p y

    c a no p yc a no p y c a no p yB01A07

    B02A08

    B03A09

    B06A12

    B05A11

    B04A10

    E02A15

    E03A15

    E01A15

    01 02 03

    05 0406

    BDY 227°27'00" 80.86m

    BDY 47°40'00" 74 .97m

    BD

    Y 1

    37°4

    0' 3

    4 .94

    mBD

    Y 132°17 ' 34 .78m

    BD

    Y 133°06 ' 33.00m

    BDY 227°40'00" 77.60m

    BD

    Y 1

    37°4

    0' 3

    2.90

    m

    FIRST FLOOR GIA SUMMARY:

    BUILDING 01office 47.5 m2stairs 7.5 m2

    BUILDING 02office 40 m2stairs 7.5 m2

    BUILDING 03office 40 m2stairs 7.5 m2

    BUILDING 04office 40 m2stairs 7.5 m2

    BUILDING 05office 40 m2stairs 7.5 m2

    BUILDING 06office 47.5 m2stairs 7.5 m2

    SCALE 1:200 @ A1PROPOSED OVERALL FIRST FLOOR PLAN

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    1:125 @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A15

    18/11/16

    18/11/16

    P R O P O S E DEL EV A T IONS

    1

    2

    BC issue

    WT/ZTA

    01

    08

    01

    08

    15,000 6,500 7,000 0 5,082 5,083 0 7,000 6,500 15,000

    R O O F P IT C H 3.5º R O O F P IT C H 3.5º

    F.F.L 32.17

    F.F.L 35.47

    W01WT07

    W06

    W07

    WT07

    W19WT08 WT08

    A B C D X E F G H

    2,60

    02,

    600

    5,90

    08,

    450

    S06A20

    S05A20

    E01 S O UT H EL EV A T IONA 04 A R T HUR P O R T E R D R IV E - S T RE E T V IE W

    WT05

    RT01

    WT06

    WT01

    RT05RT03

    RT02

    RT03

    RT01

    WT05 WT06

    WT01

    RT05RT03

    RT02

    RT03

    8,45

    0

    6,865 7,425 215 6,500 75 6,790 7,425 215 6,500 75 7,500 7,425 7,425 975 6,600

    F.F.L 32.17

    WT01 WT05

    RT01

    7 6 5 4 3 2 1S01A18

    S02A18

    S03A19

    S04A19

    B U I L D I N G 0 1B U I L D I N G 0 2B U I L D I N G 0 3

    E02 W E S T EL EV A T IONA 0 4

    2,60

    02,

    600

    5,90

    08,

    450

    R O O F P IT C H 3.5º R O O F P IT C H 3.5º

    F.F.L 32.17

    F.F.L 35.47

    BH G F E X D C AS05A20

    S06A20

    E03 NO R T H EL EV A T IONA 0 4

    WT01

    RT05RT03

    RT02

    RT03

    WT01

    RT05RT03

    RT02

    RT03

    m a i n n o t e sroof:

    Roof: 0.55 BMT Dimond BB900 profiledCOLORSTEEL roofing with ENDURA finish overselected THERMAKRAFT roofing underlay oversafety mesh on roof structure. Office roof cavityinsulated with AUTEX greenstuf insulation toachieve min. R3.0

    External gutter: 0.55 BMT box gutter withCOLORSTEEL ENDURA finish fixed with hiddenbrackets to manufacturers specification.

    Parapet / apron roof flashings: 0.55 BMT machinefolded flashings with COLORSTEEL ENDURAfinish.

    Warehouse roof skylight: AMPELITE SLtranslucent sheet roofing to match profile of rooffixed over THERMKRAFT safety mesh on roofstructure - to provide 15% daylighting towarehouse space.

    Canopy roof: 0.55 BMT Dimond BB900 profiledCOLORSTEEL roofing with ENDURA finish overroof structure and to underside of soffit to providebird proofing.

    ceiling:

    Internal office ceiling: USG DONN DX suspendedceiling grid system with selected 1200x600mineral fibre ceiling tiles SLT edged.

    Internal ceiling: 13mm GIB AQUALINE ceilinglining fixed to ex75x40mm SG8 timber battens at600 centres to timber frame.

    Underside of stairs: 16mm GIB FYRLINE lining tounderside of timber stair structure in accordancewith GIB spec - GBFC60. FR 60/60/60 fire ratedlining to extend through to fire rated wall structure

    walls:

    150mm FR 180/180/180 thick pre-cast concretepanel walls - refer structural and fire engineersdocumentation. 

    office fire walls: FR 60/60/60 ex100x50 SG8 wallframing with studs at 300 centres lined with10mm GIB FYRLINE lining to both sides inaccordance with GIB specification - GBTL60.Walls to extend to underside of roof above.

    external walls: FR 60/60/60 ex150x50 SG8 wallframing with studs at 600 centres lined with10mm GIB FYRLINE to inside in accordance withGIB specification - GBTL60. Walls to extend tounderside of roof above.

    Internal walls: ex100x50 SG8 wall framing withstuds at 600 centres lined with 10mm standardGIB board lining to interior. 10mm GIB AQUALINEto be used in wet areas. Where vinyl is continuedup wall WPS water proofing membrane to beused in strict accordance with manufacturersspecification. Face of office walls to warehousefinished with 9.5mm selected plywood to a heightof 2.4m above finished floor level.

    Office cladding: METALCRAFT KAHU claddingwith COLORSTEEL ENDURA finish fixedhorizontally over 20mm cavity battens overTHERMKRAFT building wrap on ex150x50 SG8wall framing with studs at 600 centres. Insulatedcavity with AUTEX insulation min R2.5

    Warehouse wall cladding: METALCRAFTKAHU cladding with COLORSTEEL ENDURAfinish fixed vertically over 20mm cavity battensover THERMAKRAFT building wrap on precastconcrete panel walls. 

    Joinery: VANTAGE external window 135FLUSHGLAZE suite in seismic frames withpowder coated finish.

    Joinery: VANTAGE 40 external window METROsuite with powder coated finish.

    Roller door: METALBILT motorised roller shutterdoor powder coated finish on windsocks all withmetal chain and manual back-up.

    Mesh screens: selected architectural mesh panelswith selected powdercoat finish. refer structuralengineers documentation for all fixings andstructural information.

    Internal strapped walls: ex50x50 SG8 timberstrapping at 600 centres with 10mm standardGIB board lining to interior. 10mm GIB AQUALINEto be used in wet areas. AUTEX batt insulation toprovide min. R2.5

    floors:

    Warehouse floor: 150mm thick reinforcedconcrete slab foundation on DPM and sandblinding on minimum 150mm thick compactedhard fill - refer structural engineers documentationfor all structural information.

    Office ground floor: 150mm thick reinforcedconcrete slab foundation on DPM and sandblinding on minimum 150mm thick compactedhard fill - refer structural engineer.

    Office first floor: FRR 60/60/60 150mm thickXLAM CL5/150 cross-laminated timber flooring -refer structural engineer.

    Selected commercial grade vinyl flooring overWPS water proofing membrane in strictaccordance with manufacturers specification.

    structural:

    Structural framing - refer structural engineerdocumentation for all structural detail.

    note:

    All materials, fittings, fixtures, and finishes to beestablished in strict accordance withmanufactures specification.

    This architectural documentation is to be read in conjunction with all engineering designdocumentation and reports. Refer all engineeringinformation for all engineering requirements.

    fire design requirements:

    All precast concrete panel walls to provide FR 180/180/180 (150 thick). Ground floor officeto be fire rated and separate to the first floor firecell - all fire rated FR 60/60/60. All supportingstructure, stairs and underside of floors to be firerated FR 60/60/60.

    FD = fire door. Refer fire report for all fire designrequirements.

    Window joinery - Refer D & W schedule

    Refer finishes plans for floor, wall & ceiling finishes

    ST01

    WT02

    CT01

    FT01

    WT03

    WT04

    WT06

    RT03

    WT07

    WT08

    WT05

    RT04

    RT02

    RT01

    WT01

    FT02

    CT03

    FT03

    CT02

    RT05

    FT04

    WT09

    FD

    03

    WT10

    WT11

    RISK FACTOR LOW MED HIGH VERY-HIGH SUB TOTALwind zone 0 0 0 1 2 0number of storeys 0 1 1 2 4 1roof/wall intersection 0 1 1 3 5 1eaves width 0 1 2 5 5 5envelope complexity 0 0 1 3 6 0deck design 0 0 2 4 6 0

    TOTAL RISK FACTOR: 7

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    1:125 @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A16

    18/11/16

    18/11/16

    P R O P O S E DEL EV A T IONS

    1

    2

    BC issue

    WT/ZTA

    1 2 3 4 5 6 7

    8,450

    6,600 23,400 6,500 14,500 6,500 14,500

    F.F.L 32.17

    WT01WT05

    RT01

    E04 E A S T EL EV A T IONA 0 4

    B U I L D I N G 0 4B U I L D I N G 0 5B U I L D I N G 0 6

    1,275245

    1,275245F.F.L 32.17

    F.F.L 35.47

    WT01UNIT 01

    W08

    D07

    D08 UNIT 02

    W10

    WT01

    D16

    D15 UNIT 03

    W12

    WT01

    D24

    D23FAP 02 FAP 03FAP 01

    1,175245

    WT08

    1 2 3 4 5 6 7

    8,450

    1,500 350

    1,500 350

    1,500 350

    6,600 23,400 6,500 14,505 6,500 14,505

    S01A18

    S02A18

    S03A19

    S04A19

    B U I L D I N G 0 1 B U I L D I N G 0 2 B U I L D I N G 0 3

    WT05

    RT01

    WT06

    RT03

    RT02

    WT07

    WT09

    RT01

    WT05 WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    RT01

    WT05 WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    E05 INT E R NA L E A S T EL EV A T IONA 0 4

    F.F.L 32.17

    F.F.L 35.47

    WT01 UNIT 06

    W18

    D42

    D41UNIT 05

    W16

    WT01

    D33

    D34UNIT 04

    W14

    WT01

    D25

    D26FAP 05FAP 04 FAP 06

    2451,175

    WT08

    7 6 5 4 3 2 1

    8,450

    1,500350

    1,500350

    14,505 6,500 14,505 6,500 23,400 6,600

    1,500350

    3451,225

    3451,230

    B U I L D I N G 0 4 B U I L D I N G 0 5 B U I L D I N G 0 6

    WT05

    RT01

    WT06

    RT03

    RT02

    WT07

    WT09

    RT01

    WT05WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    RT01

    WT05WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    E06 INT E R NA L W E S T EL EV A T IONA 0 4

    m a i n n o t e sroof:

    Roof: 0.55 BMT Dimond BB900 profiledCOLORSTEEL roofing with ENDURA finish overselected THERMAKRAFT roofing underlay oversafety mesh on roof structure. Office roof cavityinsulated with AUTEX greenstuf insulation toachieve min. R3.0

    External gutter: 0.55 BMT box gutter withCOLORSTEEL ENDURA finish fixed with hiddenbrackets to manufacturers specification.

    Parapet / apron roof flashings: 0.55 BMT machinefolded flashings with COLORSTEEL ENDURAfinish.

    Warehouse roof skylight: AMPELITE SLtranslucent sheet roofing to match profile of rooffixed over THERMKRAFT safety mesh on roofstructure - to provide 15% daylighting towarehouse space.

    Canopy roof: 0.55 BMT Dimond BB900 profiledCOLORSTEEL roofing with ENDURA finish overroof structure and to underside of soffit to providebird proofing.

    ceiling:

    Internal office ceiling: USG DONN DX suspendedceiling grid system with selected 1200x600mineral fibre ceiling tiles SLT edged.

    Internal ceiling: 13mm GIB AQUALINE ceilinglining fixed to ex75x40mm SG8 timber battens at600 centres to timber frame.

    Underside of stairs: 16mm GIB FYRLINE lining tounderside of timber stair structure in accordancewith GIB spec - GBFC60. FR 60/60/60 fire ratedlining to extend through to fire rated wall structure

    walls:

    150mm FR 180/180/180 thick pre-cast concretepanel walls - refer structural and fire engineersdocumentation. 

    office fire walls: FR 60/60/60 ex100x50 SG8 wallframing with studs at 300 centres lined with10mm GIB FYRLINE lining to both sides inaccordance with GIB specification - GBTL60.Walls to extend to underside of roof above.

    external walls: FR 60/60/60 ex150x50 SG8 wallframing with studs at 600 centres lined with10mm GIB FYRLINE to inside in accordance withGIB specification - GBTL60. Walls to extend tounderside of roof above.

    Internal walls: ex100x50 SG8 wall framing withstuds at 600 centres lined with 10mm standardGIB board lining to interior. 10mm GIB AQUALINEto be used in wet areas. Where vinyl is continuedup wall WPS water proofing membrane to beused in strict accordance with manufacturersspecification. Face of office walls to warehousefinished with 9.5mm selected plywood to a heightof 2.4m above finished floor level.

    Office cladding: METALCRAFT KAHU claddingwith COLORSTEEL ENDURA finish fixedhorizontally over 20mm cavity battens overTHERMKRAFT building wrap on ex150x50 SG8wall framing with studs at 600 centres. Insulatedcavity with AUTEX insulation min R2.5

    Warehouse wall cladding: METALCRAFTKAHU cladding with COLORSTEEL ENDURAfinish fixed vertically over 20mm cavity battensover THERMAKRAFT building wrap on precastconcrete panel walls. 

    Joinery: VANTAGE external window 135FLUSHGLAZE suite in seismic frames withpowder coated finish.

    Joinery: VANTAGE 40 external window METROsuite with powder coated finish.

    Roller door: METALBILT motorised roller shutterdoor powder coated finish on windsocks all withmetal chain and manual back-up.

    Mesh screens: selected architectural mesh panelswith selected powdercoat finish. refer structuralengineers documentation for all fixings andstructural information.

    Internal strapped walls: ex50x50 SG8 timberstrapping at 600 centres with 10mm standardGIB board lining to interior. 10mm GIB AQUALINEto be used in wet areas. AUTEX batt insulation toprovide min. R2.5

    floors:

    Warehouse floor: 150mm thick reinforcedconcrete slab foundation on DPM and sandblinding on minimum 150mm thick compactedhard fill - refer structural engineers documentationfor all structural information.

    Office ground floor: 150mm thick reinforcedconcrete slab foundation on DPM and sandblinding on minimum 150mm thick compactedhard fill - refer structural engineer.

    Office first floor: FRR 60/60/60 150mm thickXLAM CL5/150 cross-laminated timber flooring -refer structural engineer.

    Selected commercial grade vinyl flooring overWPS water proofing membrane in strictaccordance with manufacturers specification.

    structural:

    Structural framing - refer structural engineerdocumentation for all structural detail.

    note:

    All materials, fittings, fixtures, and finishes to beestablished in strict accordance withmanufactures specification.

    This architectural documentation is to be read in conjunction with all engineering designdocumentation and reports. Refer all engineeringinformation for all engineering requirements.

    fire design requirements:

    All precast concrete panel walls to provide FR 180/180/180 (150 thick). Ground floor officeto be fire rated and separate to the first floor firecell - all fire rated FR 60/60/60. All supportingstructure, stairs and underside of floors to be firerated FR 60/60/60.

    FD = fire door. Refer fire report for all fire designrequirements.

    Window joinery - Refer D & W schedule

    Refer finishes plans for floor, wall & ceiling finishes

    ST01

    WT02

    CT01

    FT01

    WT03

    WT04

    WT06

    RT03

    WT07

    WT08

    WT05

    RT04

    RT02

    RT01

    WT01

    FT02

    CT03

    FT03

    CT02

    RT05

    FT04

    WT09

    FD

    03

    WT10

    WT11

    RISK FACTOR LOW MED HIGH VERY-HIGH SUB TOTALwind zone 0 0 0 1 2 0number of storeys 0 1 1 2 4 1roof/wall intersection 0 1 1 3 5 1eaves width 0 1 2 5 5 5envelope complexity 0 0 1 3 6 0deck design 0 0 2 4 6 0

    TOTAL RISK FACTOR: 7

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    1:50, 1:125 @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A17

    18/11/16

    18/11/16

    P R O P O S E DEL EV A T IONS W IT HS C R E E N S

    1

    2

    BC issue

    WT/ZTA

    1,275245

    1,275245F.F.L 32.17

    F.F.L 35.47

    WT01UNIT 01

    W08

    D07

    D08 UNIT 02

    W10

    WT01

    D16

    D15 UNIT 03

    W12

    WT01

    D24

    D23FAP 02 FAP 03FAP 01

    1,175245

    WT08

    1 2 3 4 5 6 7

    8,45

    0

    1,50

    0 350

    1,50

    0 350

    1,50

    0 350

    6,600 23,400 6,500 14,505 6,500 14,505

    S01A18

    S02A18

    S03A19

    S04A19

    B U I L D I N G 0 1 B U I L D I N G 0 2 B U I L D I N G 0 3

    WT05

    RT01

    WT06

    RT03

    RT02

    WT07

    WT09

    RT01

    WT05 WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    RT01

    WT05 WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    E05aA34

    WT10

    E05 INT E R NA L E A S T EL EV A T IONA 0 4

    F.F.L 32.17

    F.F.L 35.47

    WT01 UNIT 06

    W18

    D42

    D41UNIT 05

    W16

    WT01

    D33

    D34UNIT 04

    W14

    WT01

    D25

    D26FAP 05FAP 04 FAP 06

    2451,175

    WT08

    7 6 5 4 3 2 1

    8,45

    0

    1,50

    0350

    1,50

    0350

    14,505 6,500 14,505 6,500 23,400 6,600

    1,50

    0350

    3451,225

    3451,230

    B U I L D I N G 0 4 B U I L D I N G 0 5 B U I L D I N G 0 6

    WT05

    RT01

    WT06

    RT03

    RT02

    WT07

    WT09

    RT01

    WT05WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    RT01

    WT05WT06

    RT03

    RT02

    WT08

    WT07

    WT09

    E06aA34

    WT10

    E06 INT E R NA L W E S T EL EV A T IONA 0 4

    01

    08

    01

    08

    15,000 6,500 7,000 0 5,082 5,083 0 7,000 6,500 15,000

    R O O F P IT C H 3.5º R O O F P IT C H 3.5º

    F.F.L 32.17

    F.F.L 35.47

    W01WT07

    W06

    W07

    WT07

    W19WT08 WT08

    A B C D X E F G H

    2,60

    02,

    600

    5,90

    08,

    450

    S06A20

    S05A20

    E01 S O UT H EL EV A T IONA 04 A R T HUR P O R T E R D R IV E - S T RE E T V IE W

    WT05

    RT01

    WT06

    WT01

    RT05RT03

    RT02

    RT03

    RT01

    WT05 WT06

    WT01

    RT05RT03

    RT02

    RT03

    E01aA34

    E01bA34

    WT10 WT10

    m a i n n o t e sroof:

    Roof: 0.55 BMT Dimond BB900 profiledCOLORSTEEL roofing with ENDURA finish overselected THERMAKRAFT roofing underlay oversafety mesh on roof structure. Office roof cavityinsulated with AUTEX greenstuf insulation toachieve min. R3.0

    External gutter: 0.55 BMT box gutter withCOLORSTEEL ENDURA finish fixed with hiddenbrackets to manufacturers specification.

    Parapet / apron roof flashings: 0.55 BMT machinefolded flashings with COLORSTEEL ENDURAfinish.

    Warehouse roof skylight: AMPELITE SLtranslucent sheet roofing to match profile of rooffixed over THERMKRAFT safety mesh on roofstructure - to provide 15% daylighting towarehouse space.

    Canopy roof: 0.55 BMT Dimond BB900 profiledCOLORSTEEL roofing with ENDURA finish overroof structure and to underside of soffit to providebird proofing.

    ceiling:

    Internal office ceiling: USG DONN DX suspendedceiling grid system with selected 1200x600mineral fibre ceiling tiles SLT edged.

    Internal ceiling: 13mm GIB AQUALINE ceilinglining fixed to ex75x40mm SG8 timber battens at600 centres to timber frame.

    Underside of stairs: 16mm GIB FYRLINE lining tounderside of timber stair structure in accordancewith GIB spec - GBFC60. FR 60/60/60 fire ratedlining to extend through to fire rated wall structure

    walls:

    150mm FR 180/180/180 thick pre-cast concretepanel walls - refer structural and fire engineersdocumentation. 

    office fire walls: FR 60/60/60 ex100x50 SG8 wallframing with studs at 300 centres lined with10mm GIB FYRLINE lining to both sides inaccordance with GIB specification - GBTL60.Walls to extend to underside of roof above.

    external walls: FR 60/60/60 ex150x50 SG8 wallframing with studs at 600 centres lined with10mm GIB FYRLINE to inside in accordance withGIB specification - GBTL60. Walls to extend tounderside of roof above.

    Internal walls: ex100x50 SG8 wall framing withstuds at 600 centres lined with 10mm standardGIB board lining to interior. 10mm GIB AQUALINEto be used in wet areas. Where vinyl is continuedup wall WPS water proofing membrane to beused in strict accordance with manufacturersspecification. Face of office walls to warehousefinished with 9.5mm selected plywood to a heightof 2.4m above finished floor level.

    Office cladding: METALCRAFT KAHU claddingwith COLORSTEEL ENDURA finish fixedhorizontally over 20mm cavity battens overTHERMKRAFT building wrap on ex150x50 SG8wall framing with studs at 600 centres. Insulatedcavity with AUTEX insulation min R2.5

    Warehouse wall cladding: METALCRAFTKAHU cladding with COLORSTEEL ENDURAfinish fixed vertically over 20mm cavity battensover THERMAKRAFT building wrap on precastconcrete panel walls. 

    Joinery: VANTAGE external window 135FLUSHGLAZE suite in seismic frames withpowder coated finish.

    Joinery: VANTAGE 40 external window METROsuite with powder coated finish.

    Roller door: METALBILT motorised roller shutterdoor powder coated finish on windsocks all withmetal chain and manual back-up.

    Mesh screens: selected architectural mesh panelswith selected powdercoat finish. refer structuralengineers documentation for all fixings andstructural information.

    Internal strapped walls: ex50x50 SG8 timberstrapping at 600 centres with 10mm standardGIB board lining to interior. 10mm GIB AQUALINEto be used in wet areas. AUTEX batt insulation toprovide min. R2.5

    floors:

    Warehouse floor: 150mm thick reinforcedconcrete slab foundation on DPM and sandblinding on minimum 150mm thick compactedhard fill - refer structural engineers documentationfor all structural information.

    Office ground floor: 150mm thick reinforcedconcrete slab foundation on DPM and sandblinding on minimum 150mm thick compactedhard fill - refer structural engineer.

    Office first floor: FRR 60/60/60 150mm thickXLAM CL5/150 cross-laminated timber flooring -refer structural engineer.

    Selected commercial grade vinyl flooring overWPS water proofing membrane in strictaccordance with manufacturers specification.

    structural:

    Structural framing - refer structural engineerdocumentation for all structural detail.

    note:

    All materials, fittings, fixtures, and finishes to beestablished in strict accordance withmanufactures specification.

    This architectural documentation is to be read in conjunction with all engineering designdocumentation and reports. Refer all engineeringinformation for all engineering requirements.

    fire design requirements:

    All precast concrete panel walls to provide FR 180/180/180 (150 thick). Ground floor officeto be fire rated and separate to the first floor firecell - all fire rated FR 60/60/60. All supportingstructure, stairs and underside of floors to be firerated FR 60/60/60.

    FD = fire door. Refer fire report for all fire designrequirements.

    Window joinery - Refer D & W schedule

    Refer finishes plans for floor, wall & ceiling finishes

    ST01

    WT02

    CT01

    FT01

    WT03

    WT04

    WT06

    RT03

    WT07

    WT08

    WT05

    RT04

    RT02

    RT01

    WT01

    FT02

    CT03

    FT03

    CT02

    RT05

    FT04

    WT09

    FD

    03

    WT10

    WT11

  • Revision: Date:

    NOTES:

    Issue: Date:

    Drawing No.

    Drawing Name:

    Consultant Team:

    Job Title:

    Drawn by: Date:

    Revision: Scale:

    NOTE:It is the responsibility of the contractor to verify all dimensions onsite prior to commencing all work. Do not scale off drawings.

    The contractor is to ensure that all work complies with the NewZealand Building Code, all ammendments thereof and all relevantNew Zealand Standards.

    All proprietry items and materials shall be fixed and applied in strictaccordance with manufacturers specifications.

    TAYLORED architecture & environments Ltd under nocircumstances accepts responsibility for payment of any productsor services specified.

    @ A1

    BU

    ILD

    ING

    CO

    NS

    EN

    T I

    SS

    UE

    G E N E R A L:

    THESE DRAWINGS ARE TO BE READ IN CONJUNCTIONWITH THE SPECIFICATION AND ASSOCIATED CONSENTDRAWINGS INCLUDING RESOURCE CONSENT.

    CONFIRM SET OUT AND DIMENSIONS ON SITE PRIORTO COMMENCING WORK OR MANUFACTURING ANY ORALL ITEMS AS DOCUMENTED.

    AT ALL TIMES, CARE AND CONSIDERATION SHALL BEGIVEN TO ENSURE MINIMAL DISTURBANCE ANDCONVENIENCE TO ALL NEIGHBOURING PROPERTIESDURING EXCAVATION AND THROUGHOUT THE BUILDINGPROCESS.

    ANY DISCREPENCIES BETWEEN DOCUMENTS MUSTBE BROUGHT TO THE ARCHITECTS ATTENTIONIMMEDIATELY.

    C O N S T R U C T I O N:

    ENSURE APPROVED DPC IS USED BETWEEN ALL TIMBERFRAMING AND CONCRETE WORK.

    ENSURE ALL FLASHINGS ARE FITTED FIRMLY OVER ROOFCLADDING AND ALUMINIUM JOINERY IN ACCORDANCEWITH NZBC: E2/AS1 - SITUATION 1

    T A Y L O R E Darchitecture & env ir onments L td

    www.tayloredstudio.co.nz +649 4185260private bag 93010 new lynn auckland 0600

    NORT

    H

    client: Chalmers Property Groupsite: Te Rapa Industrial Park, Hamilton

    Te R a pa De v e lopme nt

    BC ISSUE

    18/11/16

    A35

    18/11/16

    18/11/16

    3 D V IE W S

    1

    2

    BC issue

    WT/ZTA

    T0424_TeRapa_181116A02 PROPOSED SITE PLANA05 PROPOSED OVERALL GROUND FLOOR PLANA06 PROPOSED OVERALL FIRST FLOOR PLANA15 PROPOSED ELEVATIONSA16 PROPOSED ELEVATIONSA17 PROPOSED ELEVATIONS WITH SCREENSA35 3D VIEWS