  • Team Tie-Master Brittany Ballard Cam Leslie Steve May Tie-down Finishing Machine
  • Slide 2
  • Current Situation: Surface of aluminum tracks finished by-hand Burrs on edges from milling Chips from milling can get lodged in the channel of the track Outer surface of the track is inconsistent Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 3
  • Current Issues: Manual surface finish is time consuming May pose health hazards Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 4
  • Design, fabricate, and test a machine that will automatically finish, de-burr, and clear debris from several different tie-down track profiles Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 5
  • Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 6
  • Conceptual Design Broken into specific areas: Creating the Grain and De-burring Removing Debris Track Movement Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 7
  • Creating the Grain and De-burring Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 8
  • Stresses were calculated w/ various increasing loads until failure predicted at 300 lbf. FEA with ABAQUS Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 9
  • Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 10
  • Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 11
  • This is the final design. The overall length is 4ft. The case footprint is 14.5x14 Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 12
  • Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 13
  • Milling and welding were the two processes most used for this project Many parts were ordered from manufacturers This will allow for easy replacement Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 14
  • Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 15
  • Systems were tested separately Each system met specs when tested separately Systems are currently being integrated Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 16
  • ItemCost Testing Materials$ 300 Materials for Prototypes$ 100 Materials for Final Product$ 1,500 Machine Shop Infrastructure$1,000 Travel Expenses$ 450 Other Materials$ 150 Total cost $ 3,500 Initial Budget of $ 4,000 Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 17
  • Using the current setup, there are 2-6 pads and 4-5.6 pads in the finishing wheel stack Cost of each pad is $2.58 ea The pad stack can be used for approximately 200 ft of track, depending on the length of individual tracks Media cost = $15.48 for 200 ft of track = $0.08 per ft of track Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 18
  • Work DescriptionDuration Conceptual and Detailed Design432 Hrs Testing75 Hrs Machine Shop (Fabrication)375 Hrs Computer-Aided Design30 Hrs Paperwork60 Hrs TOTAL972 Hrs These hours include time for all group members (3) This equates to approximately 15.5 hrs of work per week, per person on this project
  • Slide 19
  • Kaizen Projects Make finishing pads last longer Layout of Macs shop Other Features Adding a debris separator to funnel Future use on other aluminum parts Change placement of finishing pads for improved grain Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A
  • Slide 20
  • Questions? Project Problem Project Goal Specifications Conceptual Design Detailed Design Manufacturing Processes Final Product Cost Future Adaptations Q & A