TECH 50800 Project Measure Phase QC Throughput Rate Improvement

TECH 50800 Project Measure Phase QC Throughput Rate Improvement

Embed Size (px)

Citation preview

  • Slide 1
  • Slide 2
  • TECH 50800 Project Measure Phase QC Throughput Rate Improvement
  • Slide 3
  • Project Review Productivity is the KPI at our facility. So if productivity is increased the cost decreases. No project has been done for the AWCC Quality productivity (KPI). Since the repair department is being transferred to another facility, need is to understand the productivity expectations.
  • Slide 4
  • SIPOC
  • Slide 5
  • CTQ Tree QCd Phone Labelers Kitters Final QC check Associates Overall repaired phone Manpower Functional test Components ICE Customers CTQ KPOV KPIVs
  • Slide 6
  • Process Map
  • Slide 7
  • Process observation worksheet Check sheets Spaghetti diagram
  • Slide 8
  • Data Collection Plan Historical data Process owner Excel file attached with the presentation
  • Slide 9
  • Graphical Representation
  • Slide 10
  • Graphical Representation (haroldo)
  • Slide 11
  • Graphical Representation (gloria)
  • Slide 12
  • Mean, Median, Mode, Standard deviation, Range
  • Slide 13
  • Slide 14
  • Slide 15
  • SWOT StrengthsWeakness Dedicated manpower Equipment 55 units/8 hours/person OpportunitiesThreats Increase production to 60 units/8 hrs/person Increased customer satisfaction Increase in soft savings Associates reluctant to change Might not understand LSS approach
  • Slide 16
  • Tollgate Review I Concur that the Measure phase was successfully completed on 10/22/2013 I concur the project is ready to proceed to next phase: Analyze Anil Nair Champion/MBB Greg Malone Process Owner
  • Slide 17
  • Thank You