12
Technical And Commercial Proposal SOLAR 1 KWp STAND ALONE, BIDIRECTIONAL, ROOF TOP SYSTEM For With 3-4 hrs back up PRESENTED BY PRACHI SOLAR SOLAR DIVISION SAMAYPUR, NEW DELHI, INDIA

Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

Technical And Commercial Proposal

SOLAR 1 KWp STAND ALONE, BIDIRECTIONAL,

ROOF TOP SYSTEM

For

With 3-4 hrs back up

PRESENTED BY

PRACHI SOLAR

SOLAR DIVISION

SAMAYPUR, NEW DELHI, INDIA

Page 2: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

1. Introduction:

The proposal is prepared to give an overview of design supply, installation and commissioning

of.

1. Solar Power backup system with 1000 Wp solar PV modules and 3-4 hours of backup

with grid charging option, at the roof top – stand alone system.

Pay back period – with DG set Less than 4 yrs

Area required on top of the roof top 10 Sq mtrs

Life of the SPV Panels 25 Years

Co2 emission saved per annum 600 Kg

Power generated from the system per annum 1800 units

Warrantee on inverters and charge controllers 2 yrs

Warrantee on Batteries 18 months.

Warrantee on Modules 10 yrs.

2. Company Profile:

PRACHI SOLAR is the leading Power Back-up Solution provider in India, with its consistent

focus on technological innovation, has attained heights unheard of, in the largely unorganized

industry. Having a clear technological edge, creating new benchmarks and upgrading

standards for the industry, comes naturally to Prachi Solar.

Page 3: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

SOLAR RADIATION AND RADIATION MAP:

The position of the sun in the sky is critical in order to ensure system design which maximizes

energy output. It can be seen that majority of the time the sun is in the southerly direction,

hence we should orient the PV modules to the south, so that we can utilize majority of solar

radiation and achieve higher output. Based on seasons and solar position, the number of

daylight hours available also varies by the month.

3. System Block Diagram:

The system block diagram shown in figure.1 consists of the following components:

1. PV Array of the required Capacity:

Page 4: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

Module Specification

SL.N PARTICULARS SPECIFICATIONS

1 MODULE Prachi solar 12/ 100

2 PEAK POWER 100 Wp

3 POWER TOLERANCE 100 ± 3%

4 Voc 21.60 V

5 Isc 5.17 A

6 Vpm 17.82 V

7 Ipm 5.81 A

8 MAX. SYSTEM POWER 100 Wp

9 SERIES FUSE RATING 15 A

13 OPERATION TEMPERATURE RANGE 20°C to 90°C

Page 5: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

2. Solar Power Conditioning unit :

Page 6: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

3. Batteries :

TECHNICAL SPECIFICATIONS OF TUBULAR BATTERY

BATTERY TYPE SBT 1500 SBT 1800

CAPACITY (AH) 20HR (REF) 150 AH 180 AH

Volts 12 12

CHARGING CURRENT (AMPS) 9 11

Maximum Dimension (mm)

L / W / H 503 /191 /410 503 /191 /410

4. AC cabling and protection devices : As per company and IS standards.

5. Module mounting structures: powder coated Ms angle with all IS standards.

Page 7: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

Single line diagram of the solar system :

Page 8: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

Fig.1 Basic Block Diagram of Solar PV Stand alone Bi directional System.

Page 9: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

PROPOSED LOAD DETAILS

4. Assumptions for Design:

The Solar Radiation Data’s are based on standard books & simulation software. The Mean

hourly Radiation Data between 8AM and 4PM is considered. The PV Power Plant is

bidirectional solar system. Module mounting structure will be mounted on top of the terrace.

Bill of Materials for 1000 VA solar hybrid bidirectional system as follows:

S.No Description Unit Quantity

1 Solar PV Array capacity 1000 Wp -250 Wp X 4 Nos. Set 1

2 Power condition unit -1000 VA Pce 1

3 Battery 12v 180 ah Pce 6

5 Module Mounting Structure Set 1

6 Cables and accessories Set 1

S.NO Capacity of Solar

inverter

Load WATTAGE QTY HOURS OF

Backup

Required

Total Watt hrs

Assured

1 1000 VA 800 WATTS 1 3-4 hrs 1440 TO 1800

WHRS/Annum

Page 10: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

Commercials :

Under Section 32 of Income Tax Act, profit making industrial, commercial and urban

establishments can avail an accelerated depreciation of 80% on Solar Power Generating

Systems and Solar PV Modules.

Additionally, incentives in the form of capital subsidy are available from the Ministry of New

and Renewable Energy, Government of India as per the scheme for Abatement of Diesel

Generation in Industrial Installations. These incentives are Rs 90/Wp upto a maximum of 30%

of equipment cost.

The net payback period is 4-5 years with the capital subsidy and 10 years without it. After the

completion of the payback period, the generation of power is free and all the power

generated from PV becomes power saved.

Prachi Solar will assist you to process the subsidy application with MNRE for this project.

Pay back period calculations:

Baseline Commercial Assumptions

for 1000Wp Parameter

Capacity of PV Installation 1 KWp

Operating Life 25 Years

O&M & Insurance 2.00% Per annum

Diesel Price Rs 44/-

Diesel Generation Cost/unit Rs 16/ kWh

Inflation in Diesel Price 5%

Total Capital Cost of PV System Rs. 2.40 Lakhs

Depreciation in 1st year at 80% Rs. 1.92Lakhs

Income Tax Savings at 30% Rs. 0.58 Lakhs

Capital Subsidy at 30% of PV equipment cost Rs. 0.72 Lakhs

Effective Capital Cost of PV System Rs. 1.10 lakhs

Units produced per year from solar system - 5 to 6 units x 30 days x 12 months

1440 to 1800kWh/year

Diesel, oil, maintenance and skilled technician expenses /annum Rs30000/PA

Pay back 1.10lakh/0.30 lakh

Payback period from solar when compared to DG set

LESS THAN 3.6YRS

Page 11: Technical And Commercial Proposal2.imimg.com/data2/JO/EE/MY-3954320/solar-power-plant.pdf · 2019. 11. 6. · The proposal is prepared to give an overview of design supply, installation

6. Commercial Offer:

S.NO Description QTY Price (INR)

1

SolarPower backup 1000 Wp System

with 3 hour backup and with grid

charging option.

1

2,40,000.00

In words : Two lakhs forty thousand only.

Note : subsidy amount Rs.72,000/- will come to customer, directly after installation and

commissioning and sanctioning from MNRE and nodal state agency.

Customer has to pay full invoice amount by A/C payee cheque to Prachi Solar, while signing PO.

7. General Terms and Conditions:

1. These prices are inclusive of Vat/CST.

2. All products are manufactured as per Prachi Solar design guidelines.

3. 100% advance payment along with confirmed purchase order.

4. Prices of the mentioned products are Valid for 30 Days.

5. Installation charges Rs.10,000/- per KWp are extra, and fabrication work to mount

modules as per customer choice is extra as applicable.

6. Entry tax/ octroi shall be charged extra.

7. Delivery shall be made either with ex-stock or within 4-5Weeks after the confirmation of