Technical aspects . for implementing the guideline . on c ontaminated soil monitoring . 2011. 11. 30. Ⅰ. Scopes. Ⅱ. Ⅲ. Recommendations. Future Works. CONTENTS. 1. I. Scopes. 2. 1. Scopes. - PowerPoint PPT Presentation

Citation preview

Page 1: Technical aspects

2011. 11. 30

Page 2: Technical aspects

Ⅰ Scopes

Ⅱ Recommendations

Ⅲ Future Works

CONTENTS

2

Page 3: Technical aspects

3

Page 4: Technical aspects

1. Scopes

4

Review of technical issue for implementing the draft guideline on contaminated soil monitoring

Recommendations for future works to improve the legal framework on Vietnam’s contaminated soil monitoring system

Review of draft technical guideline in view of implementation

Page 5: Technical aspects

5

Page 6: Technical aspects

2-1. Organizational issue(1/5) Who(or which organization) conducts this survey?

6

Survey implementation system in Korea

Control Tower

KMOE(Korea Ministry of Environment)

Survey-conducting bodies

Organizations designated by KMOE on the base of legal system

Page 7: Technical aspects

2-1. Organizational issue(2/5)

7

Qualification Criteria for survey-conducting bodies in Korea(minimum)

1) Laboratory area : more than 180 ㎡

2) Technical experts

Grade Numberwith Ph.D degree or P.E. >= 1 person

F.E.(1st Grade) >= 1 personF.E.(2nd Grade) >= 2 people

University or College graduates >= 4 people

Page 8: Technical aspects

2-1. Organizational issue(3/5)

8

3) Equipments(minimum)

Equipment Name QuantityUV/Vis Spectrophotometer 1

Atomic Absorption Spectrophotometer or Inductively Coupled Plasma 1

Purge and Trap 1GC/ECD 1GC/MSD 1GC/FID 1

Ultrasonic Disruptor 1GeoProbe( minimum over 6m of drilling

depth using Direct Push or Rotary) 1

Others If necessary

Page 9: Technical aspects

Contaminated Soil Survey

(a)

(b)

(c)

9

Page 10: Technical aspects

PID

10

Page 11: Technical aspects

2-1. Organizational issue(4/5)

11

Types of survey-conducting bodies in Korea - Local branches of KMOE and other ministry related

to environmental issues - National or public research institutes - Universities or Colleges - Non-profitable private organizations with

qualification * excluding profitable private organizations

Number of certified survey-conducting bodies : 65 (2011.5)

Page 12: Technical aspects

2-1. Organizational issue(5/5)

12

Soil monitoring network Organization

Sampling : Every March and April(Field) or May and June(the other area) Procedure of soil measuring network

Ministry of Environment

7 Local Environment Office

Han River Basin Nakdong River Basin Geum River Basin

Wonju Office Daegu Office Jeonju Office

Youngsan River Basin

Soil sampling0 ~ 15 cm below ground level(Field, Paddy field etc.)

Sampling at the depth of contamination source placed

Record all about sampling(Location number, sampling depth, date etc.)

Analysis and Report the results ※ Samples must be kept for 1 year at laboratories

Page 13: Technical aspects

2-2. Expert training issue(1/2)

13

Running various training systems - regular education program in university(or college) - specialized short-period training programs * KEITI is running two specialized programs 1) ET project : Project to support financially the

experts training program at graduate school 2) Soil & Groundwater expert training program (6 months program) - Implementation of regular expert retraining - Providing the various On-line education programs

(taking a education program through the ubiquitous internet system)

Page 14: Technical aspects

14

Page 15: Technical aspects

2-2. Expert training issue(2/2)

15

Management of NQCS(National Qualification Certification Scheme)

- P.E./F.E.(I)/F.E.(II) - Anyone(without educational degree) can take a

exam if he/she has hands-on experiencesConsideration for cultivating the experts

- Long term, High cost * especially, the experts for field survey and

analysis (needs for development of educational program and

supports from government)

Page 16: Technical aspects

2-3. Other technical issues(1/3)

16

Establishment of implementation system for monitoring

- Planning, Conducting the survey, Analysis, Reporting the survey results, Organizing and Keeping the Data etc.

- Needs for specifying institution or agency’s role in legal system

Page 17: Technical aspects

2-3. Other technical issues(2/3)

17

Establishment of infrastructure for instrumental analysis

- reagent/glasses supply system (i.e., carrier gas in GC analysis)

- Analytical instrument maintenance system - Energy Supplying System - Preparation for SOP(standard operation Procedure)

of each chemical and analytical instrument * Bench marking for ISO system or ASTM * In case of Korea, operating SOP of each chemical

and analytical instrument in legal system

Page 18: Technical aspects

2-3. Other technical issues(3/3)

18

Funding system for contaminated soil monitoring - PPP(Polluter’s Pay Principle) - Financial support of Government (If polluters can not be identified)

Page 19: Technical aspects

19

Page 20: Technical aspects

3-1. Development of cooperation program

Possible areas for developing cooperation program - Experts network for contaminated soil monitoring - Developing pilot study for contaminated soil

monitoring - Support for developing expert-training program - Support for soil contamination management master

plan * Previous conducted project in Vietnam(2007~ 2008):

Air and Water quality, Solid waste, Marine pollution and Mine pollution etc.

20

Page 21: Technical aspects

3-2. Support of environmental R&DKEITI: General institution of national environmental R&D programs

SEC(Soil Environment Center): Implementing soil and groundwater R&D program

- Developing the on-site automated remote monitoring technologies

* Three groundwater monitoring technologies were previously presented in Seoul, Korea (May 2011).

Development of joint R&D program in monitoring area between Korea and Vietnam

21