    Technical Documents of Contract No.CRC2012B1/C155DG4

    List of Main Technical Datum of CFB Boiler and Matching

    Equipment

    No. Name Specification Qty.

    1

    Body of

    the Boiler

    Model SHXF15-2.5-AI 1set

    Construction of the Body All Membrance

    Wall Steel Construction

    Measurement of the Body (LxWxH) 9000x6000x17000mm

    Rated Evaporation 15 t/h

    Rated Steam Pressure 2.5 MPa

    Rated Steam temperature 225

    Water Flow temperature 104

    Primary Air Temperature 80

    Secondary Air Temperature 20

    Water Volume of Boiler Body 14.5M3

    Heated

    Surface

    Area

    Radiation 124M2

    Convection 100M2

    Economizer 334M2

    Air pre-heater 280M2

    Fluidized Bed Area 2.29M2

    Coal Consumption(Standard coal) 1702Kg/h

    Design heat efficiency 89.4%

    Exhaust Smoke Temperature 150

    Combustion Method Circulation Fluidized Combustion

    Required Fuel+ Soft coal + Straw

    Calorific Value: Qnet,v,ar = 5500cal/Kg

    Size of Fuel:013mm(02mm 20%)

    Anti-Seismic intensity

    VII ( accord with Chinese Standard)

    2 1st Blowing Fan

    Model 9-26 7.1D 1pc. Wind volume 14643 M3/h

    Air Pressure 12078 Pa

    Motor Power 90 Kw

    Rotate Speed 2900 r/min.

    3 2nd Blowing Fan

    Model 9-19 9D 1pc.

    Wind volume 9233 M3/h

    Air Pressure 4297 Pa

    Motor Power 22 Kw

    Rotate Speed 1450 r/min. Model Y6-41 NO11.2D 1pc.

  • 7/29/2019 Technical Documents of the Boiler

    2/20

    4 Induced Blowing Fan

    Wind volume 43405 M3/h

    Air Pressure 5611 Pa

    Motor Power 132 Kw

    Rotate Speed 1450 r/min.

    5 Feed Water Pump

    Model DG20-50*7 2pcs.

    Flow rate Q=15-30M3 /h Pump Lift H=350 m

    Motor Power 55 Kw

    Rotate Speed 2900 r/min.

    6 Economizer Steel Tube & Fin Slice type 1set

    Length 2500 mm

    7 Electric Cabinet Model LXK-15(Routing Control) 1set

    8 Coal Feeder Model LS-200Spiral Type 1pc.

    Motor Power 4 Kw

    Rotate Speed 125-1250 r/min.9 Valve & Instrument

    F15 matching, executing according to the random chart

    1set

    10 Deaerator

    Nominal Output 15 t/h 1pc.

    Working Pressure 0.02 Mpa

    Operating

    Temperature

    104

    Inflow Water Pressure 0.2 MPa

    Inflow Water

    Temperature

    30

    11 Pump for Deaerator

    Model IS65-40-200 2pcs.

    Flow Rate 25 M3/h

    Pump Lift 50 m

    Motor Power 7.5 Kw

    Rotate Speed 2900 r/min.

    12

    Control System of Deaerator

    Matching Deaerator 1pc.

    13 Sampler Diameter 273mm 2pcs.

    Working Pressure 2.5 MPa

    Operating

    Temperature

    225

    14

    Continuous Blowdown

    Expander

    Model LP-1.5 1pc.

    Diameter 800 mm

    Working Pressure 0.7 Mpa

    Operating

    Temperature

    170

    Volume 1.5 M3

    15

    Model DP-3 1pc.

    Diameter 1200mm Working Pressure 0.15 Mpa

  • 7/29/2019 Technical Documents of the Boiler

    3/20

    Regular Blowdown Expander Operating

    Temperature

    170

    Volume 3M3

    16 Sub-Cylinder

    Diameter DN500 1pc.

    Construction One intake valve and

    four exhaust valve Working Pressure 2.5 MPa

    Operating

    Temperature

    225

    17 Bag Filter

    Model PPC96-7 1set

    Discharged Smoke Temperature

    170

    Discharged Smoke Density

    60 g/NM3

    Collection Efficiency 99.7%18 Thionizer Smoke Volume 40000 M3/h 1set

    19

    Fireproofing Material

    According to the design, the area of fluidized bed, cyclone

    separator, return-feeder will be poured by Corundum fireproof

    material

    202ton

    20

    Soot Blowing System15t/h: 6, Matching to 15t/h CFB

    boilers: Evaporation tube bundle, Economizer, totally 6 points,

    Sound waves.

    1pc.

    Detailed Description of the Boiler and matching Equipment1DHX15-2.5 CFB Boiler Model DHX15-2.51.1 Main Performance parameter of the Boiler

    Name Specification Model SHXF15-2.5-AI

    Construction of the Body All Membrance

    Wall Steel Construction

    Measurement of the Body (LxWxH) 9000x6000x17000mm

    Rated Evaporation 15 t/h

    Rated Steam Pressure 2.5 MPa

    Rated Steam temperature 225

    Water Flow temperature 104

    Primary Air Temperature 80 Secondary Air Temperature 20

    Water Volume of Boiler Body 14.5M3

  • 7/29/2019 Technical Documents of the Boiler

    4/20

    Heated

    Surface

    Area

    Radiation 124M2

    Convection 100M2

    Economizer 334M2

    Air pre-heater 280M2

    Fluidized Bed Area 2.29M2

    Coal Consumption(Standard coal) 1702Kg/h Design heat efficiency 89.4%

    Exhaust Smoke Temperature 150

    Combustion Method Circulation Fluidized Combustion

    Required Fuel+ Soft coal + Straw

    Calorific Value: Qnet,v,ar = 5500cal/Kg

    Size of Fuel:013mm(02mm 20%)

    Anti-Seismic intensity

    VII ( accord with Chinese Standard)

    1.2 Detailed Description for the construction of Boiler ( omitted)1.3 Material & Standard of the main part of the Boiler

    No. Name Specification

    Chinese Standard CodeMaterial

    U.S.A Standard CodeMaterial

    1 Drum 1400*22 GB713Q245R ASTMA516Gr55 OK

    2

    Membrance water cooled wall

    51*5

    GB308720

    DEBE SER TUBOS DE

    CALDERA ITEM 2-8-10

    ESTE ULTIMPO NO

    MANDATORIO PERO

    RECOMENDABLE

    ASTM1020

    ESTE ES ACERO

    ESTRUCTURAL SOLO

    APLICACIN

    ESTRUCTURAL

    3

    Water cooled collecting box

    219*10

    273*12

    4 Downtake 108*4

    5 Steam Pipe 89*4

    6

    Control of Evaporator

    42*3.5

    7

    Collecting box of Evaporator

    325*12

    8

    Fin type Economizer

    32*3.5

    9

    Collecting box of Economizer

    159*8

    10 Air pre-heater 50*1.5

    GBQ235-A ASTMA570GrA

    11

    Steel structural shape and plate

    according

    to deign12 Out color casing

    13

    Fluidizer bed cowl GBZG4Cr26Ni6Mn3NRe ASTMZG4Cr26Ni6Mn3NRe

    14 Center drum

    15 Expansion joint

    Metal &Nonmetal

    16 Slagging pipe GB1cr18Ni9Ti ASTM1cr18Ni9Ti

  • 7/29/2019 Technical Documents of the Boiler

    5/20

    1.4 Structure chart of the Boiler

    1.4.1 Elevation of the Boiler

    1.4.2 Plan view of the Boiler

    2 1st Blowing Fan 110,

    1st Blowing Fan System consists of 1 set of centrifuge fan of 110% volume which can

  • 7/29/2019 Technical Documents of the Boiler

    6/20

    satisfy boiler operation under full load. After heated by Air pre-heater, primary air enter intohot air-way, and then into air plenum of boiler. The 1st Blowing fan is of high operatingefficiency, well economy and easy examine and repair.

    Qty. 1pc. Type 9-26 7.1D

    Wind volume 14643 M3/h Air Pressure 12078 Pa Motor Capacity 90 Kw Rotate Speed 2900 r/min

    photo ofAir Blower

    3 2nd Blowing Fan 110 ,

    , 2nd Blowing Fan consists of 1set of high pressure centrifuge fan of 110% volume which

    can satisfy boiler operation under full load. Secondary air from nozzle of 2nd blowing fandirectly enter into boiler so that to supply oxygen to enhance combustion efficiency.

    Qty. 1pc. Type 9-19 9D Wind volume 9233M3/h Air Pressure 4297Pa Motor Capacity 22 Kw Rotate Speed 1450 r/min

    Photo ofSecondary Air Fan

  • 7/29/2019 Technical Documents of the Boiler

    7/20

    4 Induced Blowing Fan

    Induced Blowing Fan is installed between Bag Filter and Chimney. Smoke aftercombustion are filtered by bag filter, and then injected into atmosphere by induced blowingfan. Induced blowing fan consists of centrifugal fan. Blades of induced blowing fan arespecial treated to increase wear-resisting and prolong performance period.

    Qty. 1pc. Type Y6-41 NO11.2D Wind volume 43405 M3/h Air Pressure 5611Pa Motor Capacity 132 Kw Rotate Speed 1450 r/min

    Photo of induced Blowing Fan

    5 Feed Water Pump 2

    Feed Water Pump consists of 2pcs. of motor-driven multistage pump,

    one for use and one for standby. Qualified water after deoxidize will be

    send to boiler by Feed Water Pump.

    Qty. 2pcs. Model DG20-50*7

    Flow rate Q=15-30M3 /h

    Pump Lift H=350 m

    Motor Power 55 Kw

    Rotate Speed 2900 r/min.

    Photo of Feed Water Pump

  • 7/29/2019 Technical Documents of the Boiler

    8/20

    6 Economizer Please refer to the List foregoing7 Electric Control System

    The Control System of the Boiler includes 2sets of Power Cabinet, 1set of

    Instrument Cabinet and 1set of Stokehole Instrument Cabinet. Details are

    as follows:

    Program of Control System of the Boiler( )

    No. Name Model & Specification Qty.

    1. Water Level of Boiler Barrel ()a Left Water

    Level

    Floater Sensor() HUGG-440 1

    Liquid Level Adjustor

    ()

    SZD-S-4 1

    Control Valve() ZAZP-DN40/PN64 1

    b Right Water Level

    Electrode Sensor( )

    UDZ-SX-15Q 1UDZ-SX-15Q-Z 1

    c Water Level Guarder

    ()

    14 color display and Vidicon

    (14/+ 1 )

    1

    2. Air Door adjustment (), including induced air, primary air and secondary airOperator () DFD-09 3

    Angle Actuator () DKJ-310 3

    3. Adjustment for Coal Feeder ()Manual Operator() JD1A-40 1

    4. Pressure

    a Vapor Pressure

    Transmitter () PMC-800 1

    Digital readout () HR-WP-C803 1

    b Pressure of feed water ( )

    Transmitter () PMC-800 1

    Digital readout () HR-WP-C801 1

    c Air Pressure

    ()

    Including Combustion chamber pressure, Air chamber pressure,

    Combustion Chamber outlet pressure and Rear smoke pressure of

    Economizer

  • 7/29/2019 Technical Documents of the Boiler

    9/20

    Transmitter () DFY 5

    Digital readout () HR-WP-C801 5

    5. Temperature

    a Temperature in boiling layer ( ) Left and Right

    Thermocouple ( ) WRN-330N 2

    Digital readout () HR-WP-C803 2b Temperature of Return-Feeder () Left and Right

    Thermocouple ( ) WRN-330N 1

    Digital readout () HR-WP-C801 1

    c Water Temperature in inlet & outlet of

    economizer ( )

    Thermal Resistance( ) WZP-280 2

    Digital readout () HR-WP-C801 2

    d Ejected smoke temperature ()

    Thermal Resistance( ) WZP-230 1Digital readout () HR-WP-C801 1

    6.Power Control System ( ), including induced air,132KW,star-triangle; primary air,90KW,star-triangle; secondary air,22KW,star-triangle; feed pump,22KW,star-triangle and coal

    supply,3KW, straight rise ( 132KW - 90KW -

    22KW- 22KW- 3KW)

    6.1 Induced Air Air Switch () NM-225 200A 1

    A.C. contactor () CJ20-160 2

    CJ20-100 1

    Protector (

    ) JR20-160 1Mutual Inductor () LMZ1-0.5 200/5 1

    Time Relay () JS14-1A 60S 1

    6.2 Primary Air same as the above

    6.3 Secondary

    Air

    Air Switch () DZ47-63 60A 1

    A.C. contactor () CJ20-63 2

    CJ20-40 1

    Protector () JR20-63 1

    Mutual Inductor () LMZ1-0.5 75/5 1

    Time Relay () JS14-1A 60S 1

    6.4 Feed Pump Air Switch () DZ47-63 50A 1

    A.C. contactor () CJ20-63 2

    CJ20-40 1

    Protector () JR20-63 1

    Mutual Inductor () LMZ1-0.5 75/5 1

    Time Relay () JS14-1A 60S 1

    6.5 Coal Supply Air Switch () DZ47-63 15A 1

    A.C. contactor () CJ20-16 1

    Protector () JR20-16 1

    6.6 Knife Switch () XD12-400/31 2

    7. Cabinet ()

  • 7/29/2019 Technical Documents of the Boiler

    10/20

    Instrument Cabinet ( ) KGF-331 1

    Power Cabinet ( ) GGD 2

    Stokehold Cabinet () 1

    Photo of Electric Instrument Cabinet Photo of Power Cabinet

    8 Spiral Coal Feeder

    On bottom of Bunker there is a Spiral Coal Feeder (not including Coal-Supply System).Details are as follows:

    Model LS-200Spiral Type

    Motor Power 4 Kw

    Rotate Speed 125-1250 r/min.

    Photo ofSpiral Coal Feeder

    9 List of Valve and InstrumentNo. Name Model/Specificatio Qty.

    1 Plate-type Fluviograph PN4.0 DN25 1pc.2 Sluice Valve PN4.0 DN25 6pcs.

    3 Sto Valve PN4.0 DN80 9 cs.4 Check Valve PN4.0 DN80 2pcs.5 Stop Valve PN4.0 DN25 2pcs.

  • 7/29/2019 Technical Documents of the Boiler

    11/20

    6 Throttle Valve PN4.0 DN25 2pcs.7 Sto Valve PN4.0 DN15 1 c.8 1.5 0-4.0 MPa 1 c.9 Three-wa Valve PN10 DN15 3 cs.10 Sto Valve PN4.0 DN20 2 cs.11 Spring Safety Valve PN4.0 DN40 1pc.

    12 Electric Control Valve PN4.0 DN40 1 c.13 Stop Valve PN4.0 DN40 1pc.

    14 Sluice Valve PN4.0 DN40 8pcs.

    15 Rapid Blow-off Valve PN4.0 DN40 8pcs.

    16 Two-Tone Fluviograph PN4.0 DN25 1pc.

    17 Sluice Valve PN4.0 DN150 1pc.

    18 1.5 Pressure Gage 1.5 Grade 0-4.0 MPa 2pcs.

    19 Stop Valve PN4.0 DN15 3pcs.

    20 Spring Safety Valve PN4.0 DN80 2pcs.

    10~11 Heating Power Deaerator

    Deaerator will make feeding water atomized and mixed with hot steam

    so that the water heated up to saturation temperature and non-dissolved

    oxygen and other non-condensing gases in the water are removed so the

    feeding water reaches required standard.

    Performance parameter of Deaerator: Nominal Output 15 t/h

    Working Pressure 0.02 Mpa

    Operating Temperature 104

    Inflow Water Pressure 0.2 MPa

    Inflow Water Temperature 30

    Photo of Pump for Deaerator

  • 7/29/2019 Technical Documents of the Boiler

    12/20

    Drawing of Deaerator for referance

  • 7/29/2019 Technical Documents of the Boiler

    13/20

    12 Control System of Deaerator: Matching Deaerator13 Sampler: Please refer to the List foregoing14 Continuous Blowdown Expander

    CBE will continuously discharge water with high concentrate of

  • 7/29/2019 Technical Documents of the Boiler

    14/20

    salinity nearby the water surface in steam pocket out of boiler which will

    make content of salt, silicon and other grain slag in water not too high so

    that boiler is not hurt. Amount of discharged high salinity water can be

    adjusted according to analysis result of the water. Secondary steam from

    CBE will return to Deaerator for recycle. Cooled sewerage will enter into

    sewer through cooling well. Specification of CBE:

    Model LP-1.5

    Diameter 800 mm

    Working Pressure 0.7 Mpa

    Operating Temperature 170

    Volume 1.5 M3

    Drawing of Continuous Blowdown Expanderfor reference

  • 7/29/2019 Technical Documents of the Boiler

    15/20

    15 Regular Blowdown Expander

    RBE will regularly discharge water in boiler from nadir of boiler

    (normally nadir is nether water box of water cooled wall)which will

    remove grain slag and other sediments.

    Specification of RBE:

    Model DP-3

    Diameter 1200mm

    Working Pressure 0.15 Mpa

    Operating Temperature 170

    Volume 3M3

    Drawing of Regular Blowdown Expander for reference

  • 7/29/2019 Technical Documents of the Boiler

    16/20

    16 Sub-Cylinder: Please refer to the List foregoing17 Bag Filter17.1 Main Specification of Bag Filter

    No. Item Units 15t/h CFB Boiler

    1

    Smoke Discharge amount of boiler

    m3/h 45000

    2 Qty. of Bag Filter set 1

    3 Smoke Temperature 165

    4 Discharged Dust Density of boiler g/Nm3 30

    5 Dust Emission Index g/Nm3 50

    17.2 Introduce of Bag Filter ( Omitted)

    17.3 Main parameter of Bag Filter 1 Parameter

  • 7/29/2019 Technical Documents of the Boiler

    17/20

    1.1 Model PPC96-7

    1.2

    Filtered Smoke Amount

    m3/h 45000

    1.3 Inlet temperature 165

    1.4

    Inlet dust density

    g/Nm

    3

    1.5

    Exit dust density

    mg/N

    m3

    30

    1.6 Efficiency of

    Collecting dust

    % >99.9

    1.7 Filtering Area M2 672

    1.8

    Air speed when filtering

    m/mi

    n

    1.0~1.2

    1.9

    Running resistance

    Pa 1500

    1.10

    Pressure on housing

    Pa 6000

    1.11

    Used compressed air

    m3/m

    in

    2.1

    1.12

    Normal working pressure

    of

    MPa 0.40.6

    1.13 Ratio of air leak % 3

    2 Constructionof the Bag Filter

    2.1

    Characteristic

    Air-box type pulse blowing

    2.2 Amount of box 7 boxes

    2.2.1 Material Q235 steel

    2.2.2 thickness mm 4 card 5 rib

    2.2.3 Service time 30years

    2.3 Dust hopper type cone hopper

    2.3.1

    Angle of cone hopper

    60

    2.3.2 Amount of cone pcs. 3

    2.3.3 Material Q235 steel

    2.3.4 thickness mm 4

    2.3.5 Service time year 30

    2.4

    Structural support

    2.4.1 Total height

    of landing leg

    M according to

    Technological requirements

  • 7/29/2019 Technical Documents of the Boiler

    18/20

    2.4.2 Material of

    landing leg

    Q235 Joist steel

    2.4.3 Auxiliary

    supporting material

    Q235 angle steel

    2.5 Railing & Q235 steel

    2.6 Thermal insulationmaterial

    Rock wool + color

    3

    Electrical control

    3.1

    Instrument & meter

    3.2

    Overall dimension of

    Control cabinet

    mm LWH=2505001250

    3.3 Control System Pulse controller & circuit of

    secondary wire

    3.4 Pulse Controller

    3.4.1 Element S7200PLC

    Programmable controller

    3.4.2 DCS Port According to the

    requirement of user

    3.4.3 Soft ware T T-type drawing

    3.4.4 Output point DC24V Passive

    3.5 Circuit of

    secondary wire

    3.5.1 Element Relay

    3.5.2 Output point According to the

    requirement of user

    3.5.3 Control mode

    Concentrate-adjacency-

    manual operation4 Main element4.1 Pulse valve

    made in Shanghai

    4.1.1 Model SCG353A060

    4.1.2 Specification 2.5# Right angle

    4.1.3 Number pc. 7

    4.1.4 Service time 100

    Blowing 1000000time

    4.1.5 Device of

    Blowing control

    PLC PLC control

  • 7/29/2019 Technical Documents of the Boiler

    19/20

    4.2

    Lift valve(cylinder)

    made in Shanghai

    4.2.1 Model SCD100250

    4.2.2 Specification 100250mm

    4.2.3 Number pc. 7

    4.3 Filter-bag

    4.3.1 Type of Filter bag Cylinder bag

    4.3.2 Material of bag PPS FMS PPS or

    4.3.3 Size of bag mm 1302480

    4.3.4 Weight of bag g/ 540

    4.3.5 Number of bag 672

    4.3.6 Service time 2 normally 2 years

    4.4 Cage

    4.4.1 Material of cage Q195 Surface

    treated by organosilicon

    4.4.2 Type of cage Round

    4.4.3 Size of cage mm 1202450

    4.4.4 Number of Pcs. 672

    17.4 Drawing of Bag Filter for referance

  • 7/29/2019 Technical Documents of the Boiler

    20/20

    18 Thionizer: Please refer to the List foregoing19 Fireproofing Material:

    Please refer to other introduction20 Soot Blowing System: Please refer to the List foregoing