14
1 Technical Specification for Interoperability Telematic Applications for Freight (RAIL) E-Freight Conference 17 th February 2009 Brussels John Lutz, TAF-TSI Deployment Manager

Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

1

Technical Specification for Interoperability

Telematic Applications for Freight (RAIL)

E-Freight Conference17th February 2009

Brussels

John Lutz, TAF-TSI Deployment Manager

Page 2: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

22

Agenda

• Introductions• What is the TAF ?• SEDP and Commitments from the Stakeholders

– The TAF-TSI Functions– The SEDP Timetable

• Achievements in Respect of the SEDP Calendar• Next Steps

Page 3: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

33

TAF – TSI Overview

• Goals– Improve service reliability and efficiency – Help deliver the critical attributes of a

successful freight service - the ability to keep track of consignments & determine when deliveries to customers will be made

• Context– Is an open data layer across all rail actors– Is Compulsory– Became a Regulation on 18th January 2006– Implementation commitment of the rail

actors is documented in the Strategic European Deployment Plan (SEDP), submitted to the EC in January 2007

Page 4: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

44

What is to gain?

� �������������������������������� � � � � � � � � � �� � � �� � � �� � � �� � ��� ����� ����� ����� �� � � � � �� ��� ���� ��� ���� ��� ���� ��� �� �� �� ���� �� ���� �� ���� �� �� � ���� � ���� � ���� � ���� � ��������� � � � � �� � �� � �� � �� � �� � ���� �� � ���� �� � ���� �� � ��� �� � � ��� � � ��� � � ��� � � ������ �� � �� � �� � �� � �� � �� � �� � �� � ���� ���� ���� ��� ���� ���� ���� ���� � ��������� � � � � � � � � �� � �� � �� � �� � �� � � ���� �� � � ���� �� � � ���� �� � � ��� �� �� �� �� � �� � �� � �� � �� ��� �� �� ���� �� �� ���� �� �� ���� �� �� �� � �� �� �� � ����� � � � � � � � � � � � � �� � � ���� �� � � ���� �� � � ���� �� � � ��� �� �� �� �� ����� �� �� �� �� ����� �� �� �� �� ����� �� �� �� �� ����� � � ��� � � � ��� � � � ��� � � � ��� � � � � � � � � � ����

� �� ���� �� ���� �� ���� �� ���� � ����� ���� ����� ���� ����� ���� ����� ��� �� �� � ������ �� � ������ �� � ������ �� � ���� � ���� ��� � ��� ��� � ���� ��� � ��� ��� � ���� ��� � ��� ��� � ���� ��� � ��� ��� � ��� �� � �� ��� �� � �� ��� �� � �� ��� �� � �

� � �� � ��� ! � �� � � � �� � ��� ! � �� � � � �� � ��� ! � �� � � � �� � ��� ! � �� � """" # � ��� �# � ��� �# � ��� �# � ��� � �� ��� ��� �� ��� ��� �� ��� ��� �� ��� ��� $ �� � �� $ �� � �� $ �� � �� $ �� � �� � � � � % �� ��� ��% �� ��� ��% �� ��� ��% �� ��� �� � � � &� � � &� � � &� � � &

Page 5: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

55

E-Solutions Needed for RegulatoryCompliance

� ����������

� ���������

� �� ���� ���� ��

� ������� ���� ��

� ������� ������ ��� ���� ��

� ������������ �������

Page 6: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

66

TAF TSI Functions by Effort

Wagon movement; 8%

Train Running; 1%

Common interface; 6%

Service Disruption; 1%

Train Enquiries; 2%

Train Forecast; 1%

Reference Files; 2%

Path Request; 15%IRN; 3%

ETA; 23%

Consignment; 8%WIMO; 15%

Train Preparation; 15%

Page 7: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

77

TAF-TSI Legal Framework

• The Regulation defines ‘What’ is to be implemented

• Chapter 7 – The ‘Strategic European Deployment Plan’defines ‘How’ the TAF is to be implemented with the following objectives

Page 8: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

88

SEDP and Commitments by Stakeholders

• SEDP Deliverable 5 – acceptance by the Commission in June, 2007

Page 9: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

99

Relationship and Interoperability with other TSIs

MaintenanceMaintenance

ControlCommandControl

CommandInfra-

structureInfra-

structureRollingStock

RollingStock

EnergyEnergy

TelematicsPassengers

TelematicsPassengers

TelematicsFreight

TelematicsFreight

Operation &Traffic

Management

Operation &Traffic

Management

Technology

Operation

Services

TAF TSI

Page 10: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

1010

TAF-TSI Common Components

• First Milestone in SEDP – the Secure communications

• CCG was created to Fund the development and operationsof the Components

European Rail Freight Industry TAF TSI Strategic European Deployment Plan

0%10%20%30%40%50%60%70%80%90%

100%

2008 2009 2010 2011 2012 2013 2014

Implementation Year

TAF

TSI F

unct

iona

lity

%

Railway Undertakings

Infrastructure Managers

Page 11: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

1111

OrganisationCommon Components Group

• Over 80% of the industy is represented

• Open to any Stakeholder

• Funding and governance is assured

Page 12: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

1212

Transparency

• CCG is piloting a project of Common Interest and has Commission Oversight

• CCG is open to any person with legal personality who willparticipate in the TAF-TSI

• CCG is caqrrying out actions which concern all actors – bethey public or private

• CCG membership will be re-opened so that rollout can becoordinated

Page 13: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

1313

Commission Funding

• Two applications for TEN-T funding

– Common Components– RNE – IM Project for Path

Request and Train Monitoring

• Proposals are being reviewedand negotiated

• Must show coherence of the projects within the scope of the SEDP and TAF-TSI

Other92%

Reference Files2%

Common interface6%

Service Disruption1%

Train Enquiries2%

Train Forecast1%

Train Running1%

Other80%

Path Request15%

Page 14: Technical Specification for Interoperability Telematic ... · 13 13 Commission Funding • Two applications for TEN-T funding – Common Components – RNE – IM Project for Path

1414

Questions?

John Lutz ([email protected])Jan Sundling ([email protected])