Upload
vutruc
View
213
Download
0
Embed Size (px)
Citation preview
General specificationsLength 23,85 m
Beam 5,00 m
Draft 1 - 1,20 m
Height 3,45 - 3,75 m
Water displacement 80 - 95 t (flexible water ballast)
Usable floor area 105 m2
Deck area 35 m2
Cruising speed 6 knots
Maximum speed 8,5 knots
Ballast 30 t steel + 4(four) integrated steel coated ballast tanks approximately 3000 liters each. Electronic valves with touchscreen handling in pilot house.
Hull material Grade A steel, sandblasted, frame distance 500mm10 mm - 8 mm - 6 mm - 5 mm plates (bottom to roof)
Welding Hull has been welded continuous on both sides. Superstructure has been welded continuous on the outside and tack welded on the inside. Not all weldings are grinded smoothly on the outside of the ship for practical (= stronger) and esthetic reasons (= industrial look).
CE certification The Qrooz 3 has been built according to rules set by the European Authorities and will be delivered with a CE-certificate. The ship is designed according to category C. OFFSHORE: Designed for offshore voyages where conditions up to, and including, wind force 6 and significant wave heights up to, and including, 2m may be experienced.
Diesel 2 integrated steel diesel tanks approximately 1500 liters each, electronic and visual measurement.
Fresh water 1 integrated steel fresh water tank approximately 6000 liters. Pump with pressure tank 8L,flow rate 10 L/min Shurflo 12v. Electronic measurement on touchscreen in pilot house.
Waste water BEVER combi Compact version 2. 3 tanks diameter 815 mm with a height of 1057mm.These will be connected with PVC pipes.The Bever Combi Compact is a decentralized wastewater treatment system for biodegradable domestic wastewater coming from homes, holiday homes, office locations and operating locations. The system works with the activated sludge process and is controlled by a single aeration unit. The Bever Combi Compact can be used in situations ranging from 1 to 12 p.e. (pollution equivalent) which is the average pollution of one person per day. This is approximately 135 liter domestic wastewater per day.
Black water This tank is situated before the IBA tanks.Stainless steel 316 L, integrated bulkheads and inspection hatch+/- 100 LitersLevel meter and hose fittings for cleaning tank Breather and “No smell filter” hoses Homa cutting pump 230 V, and for back up Rheinstrom cutting pump 24V
Conservation The whole ship has been sandblasted and degreased before the paint system is applied.Underwater Epoxy primer Hempel`s – Hempadur - 410mU DFTAntifouling Hempel`s – OlympicHull side Epoxy primer Hempel`s – Hempadur – 310 mU DFTEpoxy Filler Hempel`s – ProFillerFinishing primer Hempel`s – HempadurTop Coating Hempel`s – TopcoatSuperstructure Epoxy primer Hempel`s – Hempadur – 200mU DFT Epoxy Filler Hempel`s – ProFillerFinishing primer Hempel`s – HempadurTop Coating Hempel`s – TopcoatInterior steel+Engine rooms/fore peak Epoxy primer Hempel`s – Hempadur –100 mU DFTFresh water Epoxy Primer Hempadur Multi Strength- 300mU DFTHull color: RAL 5009
Glass Aluminium ship windows, powder coated in RAL 9005 black 70%. Welded corners.The windows on starboard and port side are glazed with the special structural glazing Stopsol Super Silver glass, isolated formation 8-12-6 mm, toughened quality in total 14 pieces.The backside is provided in a clear glazed type extra isolated glass 8-12-6 mm toughened quality. Provided is a sliding door with the dimensions of 2600 x 2200 mm.In the hull there are provided 10 windows with isolated glass 10-10-6mm, outside sheet grey tinged, inside sheet clear, toughened quality. Provided is a hinged door with the dimensions 750 x 1865 mm.
Insulation thermo All outside walls, 2 layers of Merford Polyester wool. 1 layer of 25 mm covering everything including frames and 40 mm in between frames on top.
Insulation sound Isolated with 40 mm Merford Polyester wool
Steering positions Double steering positions: in the pilot house and outside on the sun deck
General specifications (2)
Propulsion specificationsEngines 2 x Steyr M0114, 110HP, 81kW
Electronic transmission, 3300 rpm, 4 cylinders Hydraulic reverse gear ZF 45-1Aqua-drive CVB 21.10, thrust bearing
Bow thruster 20 kW, 300 kg/f Electric 96 V Proportional Driven 410 x 8 mm tube
Shafts 2 x 50 mm stainless steel propellor shafts, water lubricated by an internal circuit.
Motor control 2 x Electronic motor control (EMC) by Hydronautica for inside and outside steering position
propellors 2 x EP 4B, bronze, 21 inch, 83%, 4 blades
Rudder 70mm St.Steel rudder stock2 x Steel double plated rudder, shaped as a fish taleRudder tube steel with roll bearing on top and below railco cylinder bearing.Hydraulic Steering cylinders with 60 / 80- degree angle.
Steering 2 x manual helm stock
Steering installation Proportional load sensing pump plus proportional back-up pump for emergency steering
Electric installationGeneral 3 main supplies
400 Volts AC230 Volts board system24 Volts board systemShore connection 230 Volts 25m Cable15 groups service panel
Generator Mitsubishi S4L2, 13,5 kVA, 1500 rpm, 230/400V Stamford generator
Wall power 25 meter cable
Monitor 15 inch screen (shared. 2 15 inch screens total)
Chargers 2 combi charger / inverters 48V, 3000 watts, 50 A1 back-up charger, 75 amp
Inverter / charger 2 Battery combi charger/inverter Studer 24V/1 phase 140A, 10.000 watts
Batteries Set Main batteries 24V 1350 A C202 Start battery 12V 200Ah, loaded with 24 V 80 A dynamo on 1 main engine
Bow thruster battery 16 pieces 6V (96V) 350Ah C20 type Rolls back up 48 V system 2 x 350 Ah.
Solar panels 6 x Suntech STP200, 9m2, max. 1000 kW yearly, 42.000 Ah loading 24V batteries
Outside lighting 16 x Philips Markers, build-in on all 3 decks and swimming platformInside lighting 42 x Philips EcoHaloElectric sockets All over the ship 44 pieces. Mostly double socketsLight switches 3 “hotel switches”
Equipment specificationsAnchor Stainless steel Pool anchor 75 kg, stainless steel anchor plate.
Anchor chain 30 meter, 13 mm
Fender Trelleborg fender on the sides and round the back of the ship, 100 x 100 type CF-A (rubber with hard polyurethane top)
Fenders 4 cylinders, 300 * 900 mm, blackRopes 4 * 25 m, 20 mm polyester
Anchor whinch Lofrans Titan A
Horn Electric
Wipers 2 wind shield wipers
Navigation lights Hella LED, according to CE
Deck wash pump Koshi 24V - 100 l/minBilge pumps 2 Electric pumps with level switches (Jabsco) one in the engine room, one in the front space.
2 Manual pump (Jabsco) fixed in the engine room and fore peak space in case the electric pumps do not work.
Bath room pump Sanivite silence
ballast pump Ulex 400V - 310 l/min.
Depth meter 2 x Raymarine
Mast Aluminium foldable mast with anchor light and antenna's
Bolders 4 on the aft deck, 4 on the front deck
Drinkwater filter UV-filter
Electric crane Turnable by hand with an 24V electric winch, max 300 KGFire protection 3(three) automatic system Fire Pro +/- 4 kg each in engine room
2(two) manual 2Kg extinguishers in kitchen and owners cabin, or as much mandatory by our surveyor for CE.
Wash/dryer Connections for dryer and washing machine in downstairs hallway
Radiators build-in convectors
Boiler Daaldrop 80 liter 400/230 V - 5250W/1500W – powered by engine and shore connection
Boiler installation Kabola HR500, 19,5 kW, with use of cooling elements on engines.
Cooling in progress
Ventilation 2 Itho ventilation units
Upstairs interiorCabinets All furniture (as shown on the layout) in Birch Plywood. Veneer optional. All cabinets open (except in pilot house: partly doors / partly open).
Floor Cork according to specs De Gier. Underfloor: 18 mm plywood on 10 mm elastic absorber on steel plates. Provisional sum 50 Euro/m2 incl. labor.
Ceilings All ceilings will be finished smoothly with glass fiber and painted white.
Walls All ceilings will be finished smoothly with glass fiber and painted white.
Pilot house chair Type Hollex (black), adjustable height, back and loin, with arm and feet rests
Pilot house The ship will have a helmsmen place with installed the following nautical equipment:- A helm stock for manoeuvring the vessel- A joystick for handling the bow thruster- A river radar- An electronic chart display- Operating module of the engines- Electronic motor control- A data system for operating the ballast valves automatically, and information sheet for tank levels.
wardrobe Starboard kitchen cabinet, floor to ceiling. Closed off by a white door.
Also see “kitchen” and “electric - light plan”
Downstairs interiorBedframes 2 x 80 x 200 cm (masterbedroom)
2 x 80 x 200 cm (Guestroom)2 x 80 x 200 cm (staple bed)
mosquitto nets all opening windows with mosquito netting
Floor Cork on all inside floors (except bath rooms) , according to specs De Gier. Provisional sum 50 Euro/m2 incl. labor.
Ceilings All ceilings will be finished smoothly with glass fiber and painted white.
Doors 6 white doors downstairs, 2 locked from inside
Cabinets The cabinets / storage spaces in the rooms downstairs will be closed of by doors. All timber work in natural plywood. Optional Veneer.
Walls All ceilings will be finished smoothly with glass fiber and painted white.
Floors Cork floor. Provisional sum 50 Euro/m2 incl. labor.
Walls Royal Mosa "colors" collection
sink 2 x Duravit Vero 50 cmWater taps 2 x Grohe essenceShower 2 x Grohetherm 3000Shower tray 1 x Duravit Starck 90 x 90
1 x Duravit Starck 80 x 80Shower door 2 x hardened clear glass WC 2 Electric toilets, silent with cutter pump
Toilet trough pump to black water tank
Sanitary specifications (2 bath rooms)
Options Cooling InvestigatedWindow decoration Luxaflex on all side windows upstairs (14 windows), type “Mega view” 25 mm, white.Intercom Communication between pilot house an aft deck.Timber work All timber cabinets in Oak veneerSpud poles 2 x telescopic poles, 4 meters under ship’s hull.outside cushions Sun deck cushionsWeather station Cresta Weather stationCamera system 1 camera to the rearCamera system 4 camera’sAlarm system “Woonveilig” basic alarm syteem Digital compass Furuno (advised as unnecessary)Dry exhaust system Hopper cooling underneath the ship’s hull plus dry exhaustRiver pilot 2X River pilots instead of helm stockHydraulic generator On main engine by PTOKitchen B3 as agreed, offer 4485Beamer preparation Wire preparation for beamer, socket in ceiling for screen and beamer, a cove to hide the screen.cooling water by pass cooling elements on enginesDeck covering Marinedeck, 9 mm hard pressed cork on all 3 outside decks and swimming platform (35 m2).Cork floors Provisional sum for all inside floors including labor