GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 1 of 23
GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.
SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA – 390 007.
TECHNICAL SPECIFICATIONS
FOR
220KV, 4400Pf CVT WITH COMPOSITE
HOLLOW INSULATOR
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 2 of 23
SPECIAL INSTRUCTIONS TO BIDDER
Please read following instructions carefully before submitting your bid.
1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc.,
in AutoCAD format and manuals in PDF format, for offered item shall be
submitted. Also the hard copies as per specification shall be submitted.
2. The bidder shall submit Quality Assurance Plan for manufacturing
process and Field Quality Plan with the technical bid.
3. The bidder shall have to submit all the required type test reports for the
offered item. In case of non-submission of the type test reports with the
offer, the bid shall be liable to be rejected.
4. The bidder must fill up all the point of GTP for offered item/s. Instead of
indicating “refer drawing, or as per IS/IEC”, the exact value/s must be
filled in.
5. All the points other than GTP, which are asked to confirm in technical
specifications must be submitted separately with the bid.
6. The bidder is required to impart training in view of manufacture,
assembly, erection, operation and maintenance for offered item, at his
works, to the person/s identified by GETCO, in the event of an order, free
of cost. The cost of logistics will be bear by GETCO.
7. Please note that the evaluation will be carried out on the strength of
content of bid only. No further correspondence will be made.
8. The bidder shall bring out all the technical deviation/s only at the
specified annexure.
9. The bidder should indicate manufacturing capacity by submitting latest
updated certificate of a Chartered Engineer (CE).
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 3 of 23
QUALIFYING REQUIREMENT DATA (For Supply)
Bidder to satisfy all the following requirements.
1) The bidder shall be Original Equipment Manufacturer (OEM). The
offered equipment have to be designed, manufactured and tested as
per relevant IS/IEC with latest amendments.
2) The minimum requirement of manufacturing capacity of offered
type, size and rating of equipment shall be 3 times tender / bid quantity. The bidder should indicate manufacturing capacity by
submitting latest updated certificate of a Chartered Engineer (CE).
3) Equipment proposed shall be of similar or higher rating and in
service for a minimum period of THREE (3) years and satisfactory
performance certificate in respect of this is to be available and
submitted.
4) The bidder should clearly indicate the quantity and Single Value
Contract executed during last FIVE (5) years, for the offered
equipment. Bidder should have executed one single contract during
last five years for the quantity equivalent to tender / bid.
The details are to be submitted in following format,
SR.
NO
ITEMS
SUPPLIED
TO
ORDER
REFERENCE
NO. & DATE
ITEMS
QUANTITY
ORDER
FULLY
EXECUTED
YES/NO
STATUS, IF
ORDER
UNDER
EXECUTION
REMARK
5) Equipment offered shall have Type Test Certificates from
accredited laboratory (accredited based on ISO/IEC Guide 25 /
17025 or EN 45001 by the National accredition body of the
country where laboratory is located), as per IEC / IS / technical
specifications not older than FIVE (5) years and shall have validity
till expiry of validity of technical bid.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 4 of 23
1. REQUIREMENT :
The equipment offered shall be highly reliable suitable to operate
satisfactorily in hot humid and polluted climate. The equipments offered
shall work satisfactorily within temperature range of 0C to 50C and
relative humidity of 95% non-condensing. It shall be suitable for satisfactory
working in normally polluted atmosphere.
2. SPECIFICATION :
The equipment is required for 220KV system. The system data is given as
under:
2.1 SYSTEM PARTICULARS
Line Voltage ………………………………………….. 220 kV
Max. System Voltage ………………………………… 245 kV
Rated Power Frequency ………………………………. 50 Hz
Rated system continuous current ……………………. 1250 A
Maximum Thermal short
Current for 1 Sec. …………………………………….. 31.5 kA
Dynamic Limiting Current ……………………………. 38.5 kA
2.2 STANDARDS :
The equipment shall meet the following ISS and IEC standards with latest
amendment:
IS: 3156 - Specification for voltage transformer.
IEC: 61462 - Composite Hollow Insulators
IS : 335 - Insulation Oil for transformers and switch Gears.
IEC : 186 & - Specification for voltage transformers.
IEC : 186 A
IEC : 270 - Partial Discharge Measurement
IEC : 358 - Coupling capacitors and capacitor Dividers.
IEC : 60044-5 - Capacitor Voltage transformer
IEC : 61869-1 - Instrument transformer- Part 1: General requirements
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 5 of 23
Unless otherwise stated elsewhere in the specification, the rating as well as
performance & testing of the instrument transformer shall confirm but not
limited to the latest revision and amendments available at the time placement
of order of all relevant standards listed above.
The design, manufacture and performance of the equipment shall comply
with all currently applicable standards, regulation and safety codes in the
locality where the equipment will be installed. Nothing in this specification
shall be construed to relieve the supplier of his responsibility.
2.3 G E N E R A L :
The 220KV CVTs are required for PLCC, station metering, synchronisation
and protection of 220KV Transmission Lines. The equipment is required for
connecting high frequency equipment to high voltage line. It shall be
suitable for operating from 40 KHz to 500 KHz. It shall have high frequency
capacitance of 4400pF. HF terminal shall be provided for connecting PLCC
equipment.
2.4 CONSTRUCTION :
CVT shall comprise of a capacitor divider unit and an electromagnetic unit
so designed and interconnected that the secondary voltage of electromagnetic
unit is substantially proportional to and in phase with the primary voltage
applied to the capacitor divider units. If a carrier frequency coupling device
is introduced into the earth lead of intermediate voltage capacitor the error
introduced by this device shall be negligible at rated frequency in relation to
the errors of CVT. The dielectric material shall be mixed type i. e. paper and
polypropylene material. The material and construction and assembly of CVT
shall be such that capacitance does not change with time and the effect of
temperature is minimum.
The live metal surface, nuts and bolts used for the connection of two
capacitor stacks shall be either of brass or tinned copper to provide good
electrical connection. Corona shield and high voltage terminal studs shall be
of copper/Aluminum.
The intermediate electromagnetic circuit of CVT shall be provided with
necessary device like, series choke coil or reactance unit to minimise the
draining of carrier signal through the electromagnetic unit. It will be
provided with an over voltage suppressor to protect the electromagnetic unit.
The HF terminal of CVT shall be brought out through a bushing rated for 11
kV-class minimum.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 6 of 23
The internal insulation level of CVT shall be higher compared to external
insulation to prevent damage to internal insulation. Material used in the
insulation and assembly of the winding shall be insoluble, non-catalytic, and
chemically inactive in hot transformer oil and shall not be subjected to a
shrinking and seasoning process to avoid further shrinking during service.
The capacitor stacks and windings shall be suitably supported and
permanently secured at frequent intervals so that no shifting occurs due to
dynamic forces developed by short circuit and that during transportation. All
the winding shall be of electrolytic copper.
CVTs shall be hermetically sealed with non-breathing type of bellow
arrangement with first filling insulating oil confirming to latest IS: 335 or
better quality of oil. Suitable arrangements shall be provided for expansion
and contraction of oil due to operating temperature variations, without
affecting property of insulating materials, oil etc. In case, inert gas sealing is
used, pressure relief device shall be provided. The arrangement provided
shall be described in details.
All exposed ferrous parts like tank, expansion chamber, terminal box etc.,
shall be of high quality steel, and shall be hot dip galvanized confirming to
IS: 2633. Steel surface coming in contact with oil shall be coated with oil
resisting varnish. All fasteners shall be hot dip galvanised. The construction
of the tank including fitting of capacitor unit shall be such that there shall not
be any oil leakage. In case of any leakage, it should be possible to attend it
on site.
The Composite hollow insulators for CVTs shall confirm to IEC 61462-
2007-02. This composite hollow insulator shall consist of a load-bearing
insulating tube made of resin impregnated fibres, a housing (outside the
insulating tube) made of elastomeric material (silicone or ethylene-
propylene) and metal fixing devices at the ends of the insulating tube. The
loads shall be transmitted to the tube by metal fittings. External insulating
part of composite hollow insulator shall provide necessary creepage distance
and protects tube from environment. Composite hollow insulators are
intended for use with CVT filled with insulating oil for outdoor installation
suitable for operation under following tropical conditions, with high
temperature, humidity and rainfall.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 7 of 23
The climatic and isoceraunic conditions at site are given below:
a. Maximum ambient temperature in shade. (◦C) 50
b. Minimum ambient temperature in shade. (◦C) 04
c. Maximum average ambient temperature. (◦C) 40
d. Maximum yearly average ambient temp. (◦C) 30
e. Maximum relative humidity. (%) 95
f. Average rainfall per annum. (Cm) 150
g. Average number of thunder storm days per annum 15
h. Height above Sea level. (Meters) Not exceeding 1000
i. Maximum wind pressure. (Kg / m2 ) 150
j Earthquake acceleration. (g) 0.08 x 2 g
The equipment offered shall be suitable for continuous operation at their full
rated capacity under the above conditions.
Since the sub-station may be near the sea-shore and/or in an industrial area, the
equipment offered shall be suitable for heavily polluted atmosphere.
The design of composite hollow insulator shall be defined by materials of
fittings, jointing, materials of insulating body and end fittings with method of
attachment, housing layer thickness over insulating tube.
A type of an insulating pressurized enclosure shall be considered as appropriate
for intended use only after the electrical equipment of which it is a part has
satisfactorily passed the type tests called for by the particular standards with
which the equipment must comply.
FRP tube which is being used for manufacturing composite hollow insulator,
the quality of impregnation of the FRP tube shall be checked by methods, “Dye
penetration” and “water diffusion” of IEC 62217. In addition, the minimum
design value of the glass transition temperature, Tg, of the FRP tube shall be
verified by using the Tg measurement method as per IEC 61006.
The equipment manufacturer shall specifies the mechanical loads for the
composite hollow insulator on the basis of weighted stresses arising from
various service loads viz.. Terminal loads, wind loads, ice loads, short-circuit
loads and seismic loads. CVT with voltage terminal shall withstand static test
load of 1250 N in any direction when applied to primary terminal.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 8 of 23
Electrically the insulator type shall be defined by its arcing distance, creeepage
and housing profile, while mechanically, by its length, tube/core diameter, its
material & design and method of attachment.
Imported insulator meeting electrical and mechanical characteristics will be
accepted if only they are offered against suppliers import license and the transit
breakages if any, are also covered by the supplier for replacement of material
from their stock.
The successful bidder shall indicate all relevant dimensions and values
necessary for identifying and testing the insulator in accordance with applicable
standard. Each insulator shall be marked with the name or trademark of the
manufacturer, the year of manufacture, Maximum Mechanical Load (MML),
Maximum Service Pressure (MSP), Specified Mechanical Load (SML) and
Specified Internal Pressure (SIP). These markings shall be legible and indelible.
The transport, storage and installation shall be in line with IEC 62217.
Relation of mechanical loads, i.e. “Mechanical Loads from outside applied to
the insulator” and “Pressure applied to the insulator” shall meet requirements as
follows.
Table-1- Mechanical loads applied to the insulator
Load Relation Tube is in:
Maximum mechanical load
(MML) which is the design load
for the equipment manufacturer
= 1.0 x MML Reversible elastic phase
Damage limit ˃ 1.5 x MML Reversible elastic phase
Type test SML (Specified
Mechanical Load) bending load
= 2.5 x MML Irreversible plastic phase
Failure bending load ˃ 2.5 x MML Irreversible plastic phase
Table-2- Pressures applied to the insulator
Load Relation Tube is in:
Maximum service Pressure (MSP)
which is the design pressure for the
equipment manufacturer
= 1.0 x MSP Reversible elastic phase
Routine test pressure = 2.0 x MSP Reversible elastic phase
Damage limit ˃ 2.0 x MSP Reversible elastic phase
Type test pressure = 4.0 x MSP Irreversible plastic phase
Specified internal pressure (SIP) ≥ 4.0 x MSP Irreversible plastic phase
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 9 of 23
The terminals for external connections shall be so mounted as to enable easy
connection and disconnection.
CVTs including composite hollow insulators shall be sufficiently strong to
withstand external stresses due to wind pressure, earthquake, short-circuit
and conductors pull at the terminals. The minimum creepage distance for
insulator housing shall be as per IEC: 358 for very heavy polluted
atmosphere (i.e. 31mm/KV). CVTs shall be suitable for hotline washing.
Secondary terminals of CVTs shall be brought out in a weather proof
outdoor terminal box having enclosure protection of minimum IP-55 as per
IS: 2147. The terminal box shall be provided with blank gland plates of
adequate size. The secondary terminal box of CVT shall include necessary
HRC fuses for protection of secondary circuits. For purpose of fuse
supervision, both the sides of the fuse shall be terminated on terminal block.
The terminals for metering core shall be brought out in separate sealable
compartment/box.
Each CVT winding shall be provided auxiliary terminals on terminal block
complete with necessary incoming connections.
HF Auxiliary bushing shall be provided suitably so that HF connection can
be made without affecting main bushing. The arrangement for taking HF
connection shall be described.
CVT s shall be provided with two secondary windings i.e. one for metering
and one for protection, each having following particulars:
Winding Purpose Burden Accuracy Primary
Voltage
Secondary
Voltage
No. 1 Metering 50 VA 0.2 220 kV
3
110 V
3
No. 2 Protection. 50 VA 3 P 220 kV
3
110 V
3
The Simultaneous burden shall be 100VA at 0.2/3P class of accuracy.
The voltage factor shall be 1.2 for continuous and 1.5 for 30 Seconds rating.
CVTs shall be provided with necessary clamps complete in all respect
for Single ACSR Moose Conductor for connecting to high voltage line.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 10 of 23
CVT shall be fully protected against high voltage oscillations and lightening
surges. The bidder shall provide complete write up for protection provided.
Steel pedestal for mounting the CVT if ask to supply for the Quantity shown
in the Schedule, then the same shall be offered as per the technical
specification of the structure and the drawing for given details of Base Plan,
Top View & Foundation bolt . The pedestal shall have facility to mount
Coupling Devices and Protective Device. The detailed drawing shall be
furnished.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 11 of 23
3. TESTING
3.1 TYPE TESTS
3.1.1 TYPE TESTS FOR CVT:
The Bidder shall have to submit report from NABL laboratory for following
type tests performed on CVT with the tender bid.
1. Temperature rise test on EMU
2. Lightning impulse voltage withstand test
3. Chopped impulse withstand voltage test (Wet)
4. Power frequency withstand voltage test (Before & After SC)
5. Capacitance & dielectric dissipation factor measurement before and after
HV test
6. Capacitance & dielectric dissipation factor measurement (Before & After SC)
7. Partial discharge test (Before & After SC)
8. Ferro resonance test (Before & After SC)
9. Short circuit withstand capability test
10. Transient response test
11. High frequency capacitance & equivalent series resistance test
12. Test for determination of Temperature coefficient (For Model capacitor
to be used for offered CVT)
13. RIV
14. Visual corona
15. Accuracy Test (Before & After SC)
16. Discharge test
17. Measurement of stray capacitance & stray conductance
18. IP55 test on secondary terminal Box.
19. Tightness test on EMU
20. Tightness test of liquid filled capacitor voltage divider (Before & After SC)
21. Verification of terminal marking
22. Power frequency withstands test on electromagnetic unit (Before & After SC)
23. Power frequency withstands test on secondary terminals (Before & After SC)
24. Seismic & Mechanical withstand test (Special Test)
3.1.2 TYPE TESTS FOR CARRIER FREQUENCY ACCESSORIES
When a carrier frequency accessory is connected by the manufacturer into the earth
lead of the intermediate voltage capacitor, it should be type tested for following
tests.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 12 of 23
1. Type tests for drain coil
a. Impulse voltage test
b. Voltage withstand test
2. Type test for voltage limitation device
a. Impulse voltage test
3.2 TESTING REQUIREMENT FOR COMPOSITE HOLLOW INSULATOR:
The bidder shall clearly state in their tender whether they have in their factory
adequate facilities for carrying out type tests and routine tests as specified in
related IS & IEC and its latest amendments. Offers of those firms who have
necessary equipment in their factory for carrying out type tests will be preferred.
Bidder shall submit along with the bid all the reports of design tests, type tests,
Sample tests and routine tests in line with IEC 61462: 2007 amended up to date
from the NABL laboratory. The reports shall not be older than Five years from
the date of validity of offer. If the reports are not available from NABL
laboratory, bidder shall submit confirmation for carrying out the same in the
event of an order, free of cost to GETCO, before commencement of supply,
without affecting delivery schedule.
3.2.1 LIST OF DESIGN TESTS:
1. Reference dry power frequency flashover test (Cl. 7.2.2)
2. Thermal-mechanical pre-stressing test (Cl. 7.2.3)
3. Water immersion pre-stressing test (Cl. 7.2.4)
4. Steep-front impulse voltage test (Cl. 7.2.5.2)
5. Dry power frequency voltage test (Cl. 7.2.5.3)
6. Internal pressure- stage 1- gas leakage test (Cl. 7.2.5.4.1)
7. Internal pressure- stage 2- water leakage test (Cl. 7.2.5.4.2)
8. Tests on shed and housing material (Cl. 7.3)
9. Tests on the tube material (Cl. 7.4)
3.2.2 LIST OF TYPE TESTS:
1. Internal pressure test- stage 1 (Cl. 8.4.1.1)
2. Internal pressure test- stage 2 (Cl. 8.4.1.2)
3. Internal pressure test- stage 3 (Cl. 8.4.1.3)
4. Bending test – stage 1 (Cl. 8.5.1.1)
5. Bending test – stage 2 (Cl. 8.5.1.2)
6. Bending test – stage 3 (Cl. 8.5.1.3)
7. Bending test – stage 4 (Cl. 8.5.1.4)
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 13 of 23
3.2.3 LIST OF SAMPLE TESTS:
1. Mechanical test – stage 1 (Cl. 9.4.1.1)
2. Mechanical test – stage 2 (Cl. 9.4.1.2)
3. Mechanical test – stage 3 (Cl. 9.4.1.3)
4. Galvanizing test (Cl. 9.5)
5. Check of the interface between fittings/housing (Cl. 9.6)
3.2.4 LIST OF ROUTINE TESTS:
1. Routine pressure test (Cl. 10.3)
2. Routine mechanical test (Cl. 10.4)
3. Routine tightness test (Cl. 10.5)
The equipment offered must have been type tested after manufacture in India.
Equipment shall be again type tested if required by the purchaser in presence of
purchaser or/and any third party. Measurement of HF capacitance and
equivalent series resistance within the frequency range 40 to 500 kHz should
have been carried out and it should meet IEC 358 Clause: 10. If required this
test will be carried out again. The test report for high frequency measurement
shall be enclosed with technical bid.
3.3 FACTORY ROUTINE TESTS
3.3.1 FACTORY ROUTINE TESTING REQUIREMENT FOR CVT
Each unit of CVT‟s lot shall be tested for following tests before offering it
for acceptance testing.
1. Capacitance and dielectric dissipation factor measurement before and after
HV tests
2. Power frequency voltage withstands test
3. Partial discharge test
4. Power frequency voltage with stands test on NHF terminal
5. Power frequency voltage withstands test on secondary winding of EMU
6. Power frequency voltage withstands test on primary winding of EMU
7. Ferro resonance test (three times at 0.8 Um and three times at 1.5 Um)
with wave form results
8. Sealing tests
9. Measurement of ratio and phase angle error
9.1 Metering winding (0.2 accuracy class) : For 25%, 100% &
Simultaneous burden at each 80%, 100% and 120% of rated voltage
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 14 of 23
9.2 Protection winding (3P accuracy class) : For 25%, 100% &
Simultaneous burden at each 5 %, 100% and 150% of rated voltage
10. Measurement of coupling capacitance and dielectric dissipation factor for
both capacitor dividers as well as for CVT completely assembles with
EMU. The corresponding values measured for complete CVT shall be
incorporated rating plate as CC= XXXX PF and Tan δ (With EMU in
GST mode)
11. Terminal marking & polarity verification
3.3.2 FACTORY ROUTINE TESTING REQUIREMENT FOR CARRIER
FREQUENCY ACCESSORIES
1. Routine tests for drain coil
a. Measurement of impedance at power frequency
b. AC test
2. Routine test for voltage limiting devices
a. Measurement of the spark-over voltage with power frequency
(Air-gap arrester)
b. AC test with the continuous rated withstand voltage
3.4 ACCEPTANCE TESTING REQUIREMENT FOR CVT :
All the tests mentioned at 3.3 above shall be carried out, on selected samples of
CVT as per approved MQP, in presence of purchaser's representative and/or
any third party as decided by the purchaser.
4 DRAWINGS :
The following drawings indicating all the dimensions and weight etc. with
complete technical details shall be enclosed together with technical bid:
1. General Arrangement Drawing
2. Rating & Diagram Plate for 245KV CVT
3. Secondary terminal Box having separate sealable compartment with
locking arrangement for metering core having class of accuracy 0.2
4. Sectional view for 245KV CVT
5. Terminal connector suitable for Single moose ACSR conductor
6. Composite hollow insulator with detail of all dimensions and technical
parameters
The offer without the above drawings and insufficient technical data, will not be
considered to evaluate the bid technically
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 15 of 23
CD for the softcopy of the same shall be provided with the tender bid.
5. OIL LEAKAGE AND OIL FILLING :
The bidder shall indicate clearly whether oil leakage problem can be attended at
site and topping of oil carried out.
In case of oil leakage during guarantee period, supplier shall attend the
same free of cost. If CVT will require to be taken to works, supplier shall
do so at his cost and arrange for replacement CVT if required by the user.
6. PACKING :
The CVTs shall be dispatched properly packed so that there is no damage
during transportation. All warning and instruction shall be in Red Bold letters
on outside of packing for handling the CVT during transportation. The rest of
warning and instruction etc. shall be on CVT tank in Red Colour.
7. INSTRUCTION MANUAL :
One Erection and Commissioning Manual shall be provided for each CVT and
shall be dispatched together with CVT. Two copies of instruction Manual with
CD for soft copy shall be provided with the tender bid.
8. SCOPE OF SUPPLY :
The following items are included in the scope.
(i) CVT complete in all respect with composite hollow insulator.
(ii) Clamps & connectors
(iii) Pedestal structures for mounting CVT ( if required)
(iv) O&M Manual along with drawings
The manufacturer's scope of supply covers design, manufacture, assembly,
stage inspection, testing at supplier's works, packing for shipment and delivery
of equipment to the store in safe condition in accordance with this specification.
The Bidder shall have to provide all the „Guaranteed Technical Particulars‟ as
per Schedule-A (GTP) & details of „Technical documents /Type tests for CVT/
Type tests including Design tests, Sample tests and Routine tests reports for
composite hollow insulator to be submitted‟ as per Schedule-B.
The GTP submitted by the bidder in the offer, if not found as per the Schedule-
A & if any of the type tests report for CVT and type tests report including
design tests report, sample tests report & routine tests report for composite
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 16 of 23
hollow insulator from the list given above found to be more than 5 Years old on
the date of opening of the tender, then offer will be rejected without any prior
confirmation. Also if any report from stated above not submitted then it shall be
indicated clearly by the bidder in the schedule of deviation.
9. SPECIAL CONDITIONS
The following information shall invariably be furnished by the tenderer along
with the tender, if the same is not furnished along with the tender, the offer may
be ignored without making correspondence.
a. Name and full address of the manufacturer of composite hollow insulators
to be used with CVT
b. Make and Electrical & Mechanical characteristics of composite hollow
insulator.
c. Testing facilities available with the factory for carrying out Design tests,
type tests, Sample tests and routine tests.
d. Dimensional drawings with full particulars.
e. The list of orders executed by the manufacturer of the composite hollow
insulator giving full details such as voltage, type, quantity etc.
f. Bidder shall furnish, MQP and FQP along with technical bid.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 17 of 23
SCHEDULE – A (Part-1 & Part-2)
GUARANTEED TECHNICAL PARTICULARS FOR CVT (part-1)
( To be submitted with the tender)
Sr. No. D e s c r i p t i o n Details
GENERAL
1. Manufacturer's name & address
2. Model No.
3. Mounting
4. Type
5. Installation
6. Suitable system Frequency
7. Applicable standards
8. Rated Primary voltage kV (rms)
9. Highest voltage kV (rms)
10. Maximum temperature rise above :
ambient temperature of 50 C
11. Type of dielectric material :
CAPACITOR DIVIDEER
1. Capacitance values at rated frequency
And at rated temperature for:
High voltage capacitor 'C1' pF
Intermediate voltage capacitor 'C2' pF
Total Equivalent capacitance pF
Rated temperature at which above
values are indicated C
Capacitance temperature coefficient
2. 1.2x50 micro sec. Lightning impulse
With stand test voltage for capacitor
unit kVp
3. 1 minute power frequency withstand
voltage kV (rms)
4. Radio interference voltage (max)
at 156 kV (rms) volts
5. Visual corona extinction voltage kV
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 18 of 23
6. Variation in capacitance of total
rated capacitance over entire range
of carrier frequency
7. Tan delta value of capacitor unit
8. Total creepage distance of insulator mm.
9. Rated intermediate voltage kV
10. Equivalent series resistance over
entire range of carrier frequency ohms
11. Partial discharge level at rated voltage pico col.
ELECTROMAGNTIC UNIT
1. Rated primary voltage kV
2. Rated secondary voltages
First winding volts
Second winding volts
3. Rated voltage factor
continuous
short time
Duration sec.
4. Rated burden of secondary winding
First winding VA
Second winding VA
Simultaneous VA
Rated power factor of burden
5. Accuracy class of secondary
First winding
Second winding
Phase angle error
6. Insulation withstand test voltages
Rated voltage class of primary kV
Capacitor divider unit kV
Earth terminal of capacitor
Voltage device kV
Primary winding of electromagnetic
unit kV
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 19 of 23
7. Whether the earth terminal of the
voltage divider provided Yes/No
If yes, the rated voltage
1 minute power frequency
Withstand voltage kV
8. Whether series reactance/choke/
Compensating coil provided Yes/No
If yes, Rated voltage kV
1 minute power frequency test voltage kV
9. Terminal box details
@ Degree of protection as per IS: 2147
@ Whether cable glands provided Yes/No
10. Class of insulation.
11. Rated intermediate voltage kV
12. Rated primary voltage of Electro-
Magnetic unit. kV
13. Insulation withstand test voltages for kV
Electromagnetic unit
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 20 of 23
GUARANTEED TECHNICAL PARTICULARS FOR COMPOSITE
HOLLOW INSULATOR (Part-2)
( To be submitted with the tender)
Sr.
No.
Description Unit Guaranteed
Value
1 Highest System Voltage KV
2 Manufacturer of composite hollow insulator
3 Manufacturer of electrical equipment utilizing
composite hollow insulator
4 Overall length of unit from flange face to face
of end fitting mm
5 Applicable standard
6 Material of tube of insulator
7 Diameter of tube mm
8 Material of housing
9 Thickness of housing mm
10 Housing profile
a) Shed overhang
b) Shed thickness
c) Shed spacing
d) Shed inclination
e) Shed repetition
11 Damage limit of the composite insulator
under mechanical stress
N
12 Specified mechanical load (SML) N
13 Maximum mechanical load (MML) N
14 Type test SML bending load N
15 Deflection under bending load mm
16 Failing Load N
17 Residual deflection
18 Specified internal pressure (SIP) MPa
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 21 of 23
Sr.
No.
Description Unit Guaranteed
Value
19 Maximum service pressure (MSP) MPa
20 Routine test pressure MPa
21 Damage limit of the composite hollow
insulator when pressure applied to insulator
MPa
22 Type test pressure MPa
23 Specified temperature ◦C
24 Eccentricity (e) mm
25 Parallelism (p) mm
26 Coaxiality mm
27 Concentricity mm
28 a) Power frequency external flashover
voltage (Dry) (Uref)
b) Power frequency flashover voltage (Wet)
KV
KV
29 Steep-front impulse high voltage
(Positive/ Negative)
KV/µs
30 Dry power frequency voltage KV
for 30
min
31 Power frequency punctures voltage KV
32 Visible discharge voltage KV
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 22 of 23
SCHEDULE-B
‘Technical documents /Type test reports submitted’
( To Be filled up by Bidder & to be submitted with tender)
Sr.No. Particulars YES NO Remarks
1 Certificate of OEM attached
2 Fresh certificate of chartered
Engineer indicating manufacturing
capacity submitted
3 List of order with details of Qty,
value of the Order and Order No.
Compulsory with date (Executed
during last 5 years)
a) For same rated equipment supplied
to GETCO
b) For higher rated equipment than
offered to GETCO
c) Same rated equipment supplied to
other utility with performance
certificate
4 All Type Tests report for CVT and
Type tests report including Design
tests report, Sample tests report and
Routine tests report submitted are as
per list given in TS & not more than 5
years old.
5 List of performance certificate along
with copy of performance certificate
submitted.
6 Set of drawings as per the list given
in TS along with the CD of Soft copy
submitted.
GETCO/E/TS-220KV CVT with CHI 0802A/R0 Jun15
Sign & Seal of Bidder
Page 23 of 23
Sr.No. Particulars YES NO Remarks
7 Copy of the technical specification
submitted with the seal of OEM &
sign of CE
8 QAP Submitted for Offered
equipment
9 GTP Provided as per Schedule-A
10 In case of oil leakage during
guarantee period supplier shall
attend the same free of cost & if
require supplier shall have to take
the CVT to works at his cost. (To
be confirmed by bidder)
11 Your offer fully complies to meet
all the requirements as per TS &
documents to be submitted as
above.
I ____________________________, the authorized signatory here by
confirmed that the details pertain to Sr. No. 1 to 11 of Schedule-B
submitted herewith the tender is correct in all respect and as per
corporation’s requirements. If any detail there in found incorrect or
inadequate/insufficient by corporation then decision of corporation will be
acceptable to us without any further clarification.
Signature of Authorized representative of Company
NAME: _______________________
STATUS: ______________________