Copyright of Shell International Technology for Ormen Lange Phase 3 FFU Seminar 2019-01-31 Jan-Olav Hallset Technology Lead OLP3, A/S Norske Shell January 2019 Technology for OLP3

Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

  • Upload
    others

  • View
    6

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Technology for Ormen Lange Phase 3

FFU Seminar 2019-01-31

Jan-Olav HallsetTechnology Lead OLP3, A/S Norske Shell

January 2019Technology for OLP3

Page 2: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Jan-Olav Hallset, CV

1992: PhD, NTNU, Dept. of Engineering Cybernetics.

1993 - 2014: Oceaneering, Hitec, Poseidon, Siemens

2014 - 2017: Norske Shell - Team Lead for Subsea

Controls & Umbilicals.

2017 - now: Norske Shell – Technology Qualification Lead

Ormen Lange Phase 3

January 2019Technology for OLP3

Page 3: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Presentation ContentOrmen Lange Phase 3 is a project

investigating concepts for increasing total

production from the Ormen Lange gas field.

All concepts are based on an offshore

compression facility installed along the two 30”

pipelines from the Ormen Lange field to

Nyhamna, either floating or subsea

This presentation will describe key concepts

and technologies evaluated for the project.

January 2019Technology for OLP3

Page 4: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

What is Ormen Lange Phase 3?

Ormen Lange is a Mature asset; 19

producing wells w/ declining production

120km subsea to beach development,

~1000m water depth, 2*30’ flowlines w/

wet gas from 4 templates

High performing asset, 98.8% reliability

Nyhamna

Kristiansund

Linnorm

Ormen Lange

Aasta Hansteen

Zidane

Draugen

Norway

Ormen Lange Infield Compression

(OLIC) stopped in 2014 due to high

costs

Ormen Lange Phase 3 started to

Make most out of existing

infrastructure

Reduce/simplify scope

Leverage technologies

Learn from others

January 2019Technology for OLP3

UK, 1200 km

Page 5: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Offshore Compression – Extend Technology in Use and Simplify

AS Norsk Shell

Åsgard Dry Gas System(40 km step-out)

Gullfaks Wet Gas System(15 km step-out)

Subsea Power Development (ABB and Siemens)

January 2019Technology for OLP3

Unmanned Facilities(Walk to Work)

WET TOLERANT GAS COMPRESSION

LONG STEP OUT POWER (120 km @ 1000 meters)

UNMANNED SPAR

SPAR Hulls

USE

Page 6: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

OLIC to OL Phase 3 Key Developments;

Cost reduced by more than 60% since 2014

Volumes increased due to subsurface and flow assurance

Cost effective solutions and technologies, such as

Eliminate new infield flowline system, unmanned platform,

wet gas compression, subsea VSD/onshore VSD,

Early Vendor Engagement has shown significant value

January 2019Technology for OLP3

Page 7: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Offshore Compression – Shortlisted Concepts

2. Subsea Compression

Station

Power Grid

OFFSHORE ORMEN LANGE

ONSHORENYHAMNA

1. CTC SPAR (Floater)

Onshore VSDs3. Subsea

Compression Station

Subsea VSDs

POWER CABLE120 km

January 2019Technology for OLP3

Page 8: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

VSD for Dummies: - The VSD Controls Compressor Speed- Gas Flow and Pressure Depend on Speed

January 2019Technology for OLP3

2 x VSD (Variable Speed Drive)

Onshore Power Supply & Control

2 x Gas Compressor

Onshore Gas Processing Plant

Ormen Lange Gas Wells

POWER CABLE120 km

2 x GAS PIPELINES120 km

Page 9: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of A/S Norske Shell RESTRICTED

• Semi-submersible or Spar hull

• Unmanned

• Walk-to-Work & Heli-deck

• 2 x 25MW compression

• 4x24’’ Steel Catenary Risers

Topside Compression

January 2019Technology for OLP3

Page 10: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

POWER SYSTEM:

• Power Buoy with Dry VSDs

• 4/6 x Subsea VSDs

• Onshore Dry VSDs

• Subsea Wet Gas Compression

• Subsea Dry Gas Compression

• Wet Tolerant Compressor

Subsea Compression

January 2019Technology for OLP3

Page 11: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Subsea Compression Selected – Two Remaining Options

A. Subsea Compression

StationPower Grid

OFFSHORE CONCEPTS:

ONSHORE NYHAMNA

Onshore VSDsB. Subsea

Compression Station

Subsea VSDs

POWER CABLE120 km

January 2019Technology for OLP3

WET TOLERANT GAS COMPRESSION

LONG STEP OUT POWER (120 km @ 1000 meters)

UNMANNED

Page 12: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Subsea Compression - Preliminary Layout

January 2019Technology for OLP3

• Liquid Tolerant Gas Compression

• Power & Controls from shore by 120km cable(s)

• Subsea or onshore Variable Speed Drives (VSD)

• Tie-in to 30” pipelines with PRS/remote welding system

• Modular system optimised for efficient intervention

• Unmanned (offshore)

Page 13: Technology for Ormen Lange Phase 3 Compression - Preliminary Layout Technology for OLP3 January 2019 • Liquid Tolerant Gas Compression • Power & Controls from shore by 120km cable(s)

Copyright of Shell International

Subsea Compression – Going Forward

The partnership will now further evaluate and then choose between

the two remaining options for subsea compression.

The choice of subsea concept is expected later in 2019, followed by

investment decision in the Ormen Lange license with Shell (operator),

Petoro, Equinor, ExxonMobil and INEOS.