Technology that moves the world

Efacec DC Fast Chargers

Page 2: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

EFACEC USA OPERATIONS

Norcross, GA Rincon, GA

Efacec Worldwide:

• $1.5 Billion dollar Portuguese conglomerate. Founded in 1948 and headquartered in Porto City, Portugal.

• Present in the USA since 2001.

• Present in over 65 countries on 5 continents.

• Employs around 4,500 people.

Page 3: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Rincon, GA Norcross, GA

EFACEC USA OPERATIONS

Transformers

Mobile Substations

SCADA & SmartGrid

EV Chargers

Page 4: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Current Charging Technologies

Level 1 Level 2 DC Fast Charging

120 Volts / 15 Amps

LEAF Charging Time:

• 0%-100% = 20 hrs

• 50%-100% = 6-8 hrs

240 Volts / 15-30 Amps 480 Volts / 100 Amps

2012 LEAF Charging Time:

• 0%-100% = 7.2 hrs

• 50%-80% = 2.2 hrs

LEAF Charging Time:

• 0%-80% = 25-30 mins

• 50%-80% = 10-15 mins

2013 LEAF Charging Time:

• 0%-100% = 4 hrs

• 50%-80% = 1.1 hrs

Spark Charging Time:

• 5%-100% = 30 mins

• 50%-80% = 10-15 mins

Page 5: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

US PEV charging standards

L1 L2

5

DC

480V @ 100 Amps

20 kw - 50 kw

Applications:

Industrial/Commercial Only

Shopping, Retailers

Gas Stations, Restaurants

Page 6: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Nissan LEAF Charging Ports

6

CHAdeMO SAE J1772

Page 7: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Universal combined charging system

7

Page 8: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

SAE J1772 combo port & connector

Combines L1/L2 and DC Fast Charge

8

**Available on the

Chevy Spark EV &

BMW i3

Page 9: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

As of 7/1/13 there are 2,827 CHAdeMO DC Quick

chargers installed: Japan: 1,716 | Europe: 815 | USA: 284 | Other: 12

PEV sales are strongly correlated with the availability of a

charging infrastructure network

Recent research estimates that by 2020 PEV sales will

reach 3 Million globally, with 900K in Japan. (Pike Research, 2013)

Currently over 49,000 charging stations globally. 94% of

these are AC and 5% are DC. (Pike Research, 2013)

EV Market facts and forecasts

9

Page 10: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Charging infrastructure drivers

10

Page 11: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Infrastructure Opportunities

Focus Primary Secondary Tertiary

Distance Short 35+ miles

Suburban

60+ miles

Urban

Charging

Type

Home Destination Charging Pathway Charging

Charger

Type

Normal (L1 or L2)

DCFC

Charging

Site Home / Community

Super market, Mall,

Grocery, Gym, Gas

Station

Major roads,

Highways, Rest

Areas, Gas Stations

Normal

DCFC

Page 12: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Efacec QC50 DC Fast Charger (1 piece)

12

Input Voltage:

• 480 v, 3 ph, 60 Hz • 3ph + Grd + Neutral

• 100 Amp service

• 79 FLA

Output:

• 62.5 KW Max

• Up to 500 VDC

• Up to 125 Amps

Charge Time = 15-30 min**

**Depends on vehicle and

battery state of charge.

Dimensions:

•31.5” x 31.5” x 82” tall

•1,760 lbs.

Page 13: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

13

Power Unit

QC50 DC Fast Charger

(2 piece: 1 Power Unit + 1 Kiosk)

Power Unit and kiosk up to 65 ft. apart. Unlimited distance with fiber optic cabling.

Kiosk (SAE Combo

prepared + CHAdeMO)

(customizable)

Kiosk (CHAdeMO)

(customizable)

Kiosk (CHAdeMO)

(customizable)

Page 14: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

14

Efacec DC Combined

Fast Charging Station

SAE Combo port

(L2 + DC charging)

CHAdeMO port

(DC charging)

1st EV Charger Manufacturer to obtain ETL Certification on

SAE/CCS charging standard.

Page 15: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Efacec Dual Connector

DC Fast Charger Supports

Both SAE and CHAdeMO

SAE Combo CHAdeMO

15

Page 16: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

27 QC50s installed in the US

• 26 in the Chicago, IL, Metro Area

• Whole Foods, Walgreens, Chicago Midway

cell phone parking lot; Chicago Tollway oasis;

7-11 & Citgo gas stations

• 1 in Palo Alto, CA

• Stanford shopping mall

• 4 coming soon to the Sacramento Area

•Dual connectors for both CHAdeMO & SAE

Combo electric vehicles

16

Page 17: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

17

QC50s installed in Chicago Metro Area

Page 18: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Power cabinet in the back

Central controller and user interface in the front

Chicago Midway Airport

Page 19: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Chicago, IL – O’hare Tollway Oasis

A total of 8 DC Fast Chargers at 4 Tollway Oases around Chicago

Page 20: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Palo Alto, CA – Stanford Mall

Page 21: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Madeira Island (Portugal)

QC50

Page 22: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

22

First DC Fast Charger Upgradeable

to the SAE Combo (Belgium)

Page 23: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Installation Concerns

• Sites with poor network signal – Chargers installed within underground parking garages may experience

communication problems

– If antennae cannot be extended far enough, the cellular router has to be installed

outside the parking garage in a NEMA 4 enclosure in order to access cellular

signals, running CAT5 or CAT6 ethernet cable back to the kiosk. The NEMA 4

enclosure would also need to include power for the router.

• Distance between the power unit and the kiosk in

retail urban locations – 65 ft. max with copper CANBus (RS485) communication wires

– Unlimited distance with fiber optic communication with an increase in equipment

and installation cost

• Average costs of installation – $12K - $20K for a normal installation.

– $25K - $40K if an isolation transformer is required to step up from 208 v, 3 ph

23

Page 24: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Electrical Infrastructure Concerns

3 phase 480 V availability

– 480V, 3 ph is not commonly

available in non industrial

/commercial areas in the USA.

– On sites where 480 V service

is not available, a step-up

transformer must be installed

to bring voltage up from 208 to

480.

24

Page 25: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Operating issues

– More education and information on how a DC

Fast Charger operates are needed.

Example:

• With the LEAF on DCFC, the battery only charges

up to 80% - 85% of its capacity. After reaching that

threshold, the charging session is automatically

shut off by the vehicle.

• With the Spark EV & BMW i3, the battery will

charge all the way to 100% on DCFC.

– Connectors operate differently than L2

25

Page 26: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

Charging Infrastructure Architecture

Chargers standalone installed

Chargers installed in a network

With energy storage infrastructure

Without energy storage infrastructure

26

Page 27: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

EV Charging Infrastructure Management

EV User Portal • Portal that provides public information about the charging stations

• Available for desktop computers

27

Page 28: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

– Device monitoring • EV charging stations (CS) and satellites

– Infrastructure Management • Charging station management

(add / remove CS or satellite, etc.)

• Visual representation of CS on map

• Alarm management

• Control CS

(abort charges, reset, etc.)

• Energy and use monitoring

• Network performance indicators

– User Public Portal • CS location and availability

• Find CS on a trip route

• Reserve CS

• User/Card management

(customer association, activation, blocking, cancelation, etc.)

• Notification management

(news, end of charge, upcoming reservation, etc.)

• Reporting

(station usage, energy sold, etc.)

28

EV Charging Infrastructure Management

Page 29: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC

• A cooperative purchasing organization with approx.

4,000 members nationwide including utilities,

municipalities, universities, police & fire depts., etc.

• See member list at:

http://www.hgacbuy.org/program/endusers/default.aspx

• HGAC members can purchase Efacec DC Fast

Chargers, as well as the MConverge network

management package without the need for a formal or

public bidding process.

• Efacec has been awarded this contract for two years

beginning Oct. 1, 2012.

Page 30: Technology that moves the world · DCFC Charging Site Home / Community Super market, Mall, Grocery, Gym, Gas Station Major roads, Highways, Rest Areas, Gas Stations Normal DCFC