Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Pilot Projects Proceedings
Teenergy School | High energy efficiency schools in Mediterranean Area
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta
Arch. Carola Arrivas Bajardi
Trapani
Marsala
Salemi
Alcamo
Partanna
Pilot Projects
Benchmarks
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Pilot Project N 1 - Secondary School for the Study of Umanities “D’Agguire”
B
A
Foto A
General informations
Municipality: Salemi
Location: MOUNTAIN
Year of construction: 1988
Altitude: 446 m
Latitude: 37.49 N
Longitude: 12.48 E
Climatic zone: C
Degree day: 1203
Foto B
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Building Functions
Total floor area: 2656 m2
Ground floor area: 1478 m2
First floor area: 1178 m2
Halls and corridors 32%
19% ClassroomsN° of teachers: 20
N° of students: 220
Other employes: 14
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Building Description: the external walls
External walls in reinforced concrete
Area-weighted average U: 1,82 W/m²K
N Description of wall layers Thickness
1 glass blocks 0,162 cellular concrete 0,3
3 Lime cement plaster 0,02
U limit for zone C: 0,40 W/m²K
DLgs 311/2006, transposing the Directive 2002/91/EC, Energy Performance of Buildings (EPBD).
General data
Thickness: 0,48 m
Surface mass: 556,00 kg/m²
Resistance: 2,69 m²K/W
Transmittance: 0,37 W/m²K
Attenuation factor: 0,04
Offset: 19h 56'
Dynamic parameters
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
General data
Thickness: 0,32 m
Surface mass: 370,00 kg/m²
Resistance: 0,60 m²K/W
Transmittance: 1,65 W/m²K
Attenuation factor: 0,3046
Offset: 8h 44'
Dynamic parameters
General data
Thickness: 0,22 m
Surface mass: 112,00 kg/m²
Resistance: 1,23 m²K/W
Transmittance: 0,81 W/m²K
Attenuation factor: 0,62
Offset: 5h 36'
Dynamic parameters
Building Description: the roof
U limit for zone C: 0,38 W/m²K
(DLgs 311/2006, transposing the Dir.
2002/91/EC, Energy Performance of Buildings (EPBD))
N Description of Roof (A) layers Thickness
1 tiles 0,01
2 Cement mortar 0,05
3 Brick based slab 0,24
4 Plaster of lime and gypsum 0,02
Roof A
A
B
N Description of Roof (B) layers Thickness
1 Bitumen polymer 0,004
2 Cement plaster 0,2
3 Plaster of lime and gypsum 0,02
Roof B
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Building Description: the windows and the skylights
Aluminium frame window with double glass:6,1 W/m2K
U limit, zone C: 2,6 w/m2k(DLgs 311/2006, Dir.2002/91/EC)
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
ORIENTATION FLOOR N. OF WINDOWS WINDOWS (m2) TOTAL (m2)
F0 80 96F1 113 251F0 2 14F1 2 14F0 48 78F1 105 252F0 3 16F1 - -
S 347
E 29
N 330
O 24
N
O
S
E
Electrical and natural illumination
The 58 % of the building’s total floor area
(central corridor, gymnasium, halls) don’t
need the lights turned on for most of the
time.
The 1,4% of the building’s total floor
area (lateral corridor, vestibule) need
continuous electrical lighting.
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Gas consumption _Year 2008/2009
0
500
1000
1500
2000
2500
3000
Sep
tem
ber
Octobe
r
Nove
mbe
r
Dicem
ber
Janu
ary
Febru
ary
Mar
chApr
il
May
June
July
Aug
ust
m3
Electricity consumption _Year 2008/2009
0
1000
2000
3000
4000
5000
6000
Sep
tem
ber
Octobe
r
Nove
mbe
r
Dicem
ber
Janu
ary
Febru
ary
Mar
chApr
il
May
June
July
Aug
ust
kWh
Energy consumption:
Year: 2008/2009
Gas: 7385 m3
Electricity: 59604 kWh
The heating season
in Zone C begins in
15th of November
and ends in the 31th
of March (10h/day),
as the DPR 412/93
Heating system:
central gas heater
used 9h/day
Cooling system:
split units
Energy Profile of the building:
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Year 2008-2009
S/V: 0,6
Total Heated Floor Area: 1324 m2
Total Heated Gross Volume: 6051 m3
Critical aspects of actual energy use and sector that needs improvement:
Operating assessment
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
E nerg y cons umption for electric ity 10 kWh/m3 year
45 kWh/m2 year
E nerg y cons umption for heating 13 kWh/m3 year
58 kWh/m2 year
E nerg y P erformance Index for heating E pi 11,2 kWh/m3 year
42 kWh/m2 year
Building insulation - to be installed
Shading devices – to be installed
Passive cooling and ventilation - to be improoved
Energy efficient lighting – to be improoved
Building’s Management System – to be implemented
Occupants’ awareness – not present
Energy consumption for heating: Epi (kWh/m3 year)= 13 kWh/m3 year
Energy Performance Index Epi_Lim_CE: 11,27 kWh/m³ year
OPERATING ASSESSMENT (YEAR 2008-2009)
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
ENERGY CLASS SIMULATION (SOFTWARE TERMUS)
Software Termus:
• 24h/d * 137d/yr= 3288h/yr
• 15 November - 31 March
(UNI TS 11300, Zone C)
School heating:
• about 9h/d * 103 d/yr= 927h/yr
15 November - 31 March
For this reason the Termus
result is about 2,7 times more
than the operating results.
41,9 / 3,5 = 12 kWh/m3 year
Pilot Project N 2 - Secondary School for Educational Studies “Rosina Salvo”
A
Foto A
Municipality: Trapani
Location: COASTAL
Year of construction: 1950/55
Altitude: 273 m
Latitude: 38 1'1"56 N
Longitude: 12 32'43"08 E
Climatic zone: B
Degree day: 810
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Building Functions
Total floor area: 3627 m2
Ground floor area: 1190 m2
First floor area: 1258 m2
Second floor area: 1196 m2
Occupants
N° of teachers: 36
N° of students: 795
Other employes: 22
% of building floor area
38% Classrooms
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Thickness: 0,55 m
Surface mass: 1240,00 kg/m²
Resistance: 0,76 m²K/W
Transmittance: 1,30 W/m²K
Attenuation factor: 0,022
Offset: 19h 29'
General data
Dynamic parameters
Building Description: the external walls
U limit for zone B: 0,48 W/m²KDLgs 311/2006, Dir. 2002/91/EC (EPBD).
Calcareous sandstone
(local quarries).
Excellent characteristics
of thermal inertia, suited
to Mediterranean climate.
N Description of wall B layers Thickness
1 Lime cement plaster 0,02
2 Blocks of calcareous sandstone 0,5
3 Lime cement plaster 0,03
Problems related tothe esternal walls:
rising dump
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
ORIENTATION FLOOR NUMBER AREA (m2) TOTAL (m
2)
F0 12 33
F1 16 37
F2 13 37
F0 10 31
F1 7 38
F2 12 38
F0 20 58
F1 19 75
F2 22 75
F0 19 49
F1 22 68
F2 20 61
N 107
S 108
O 209
E 178
Building Description: the windows
Aluminum frame without thermal break
double glaze: U: 4,5 w/m2k
U limit, zone B: 3 w/m2k
(DLgs 311/2006, Dir.2002/91/EC)
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Energy consumption:
Year: 2008/2009
Gas: 7983 m³
Electricity: 63.365 kWh
Heating system:
Central gas heater
Cooling system:
Split units
Energy Profile of the building:
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Year 2008-2009
Total Heated Floor Area:
1324 m2
Total Heated Gross Volume:
6051 m3
S/V: 0,4
Critical aspects of actual energy use and sector that needs improvement:
Operating Assessment
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
Building insulation - to be installed
Passive cooling and ventilation - to be installed
Energy efficient lighting – to be improoved
Building’s Management System – to be implemented
Occupants’ awareness – not present
Energy consumption for electricity 3,8 kWh/m3 year
18,1 kWh/m2 year
Energy consumption for heating 4,9 kWh/m3 year
23,7 kWh/m2 year
Energy Performance Index for heating Epi 5,5 kWh/m3 year
20,9 kWh/m2 year
Energy consumption for heating: Epi (kWh/m3 year)= 4,9 kWh/m3 year
Energy Performance Index Epi_Lim_CE: 4,35 kWh/m³ year
OPERATING ASSESSMENT (YEAR 2008-2009)
February 25th 2009 | Palermo| International Workshop
Arch. Sabrina Buttitta - Arch. Carola Arrivas Bajardi
REGIONAL ENVIRONMENTAL PROTECTION AGENCY OF SICILY
ENERGY CLASS SIMULATION (SOFTWARE TERMUS)
Software Termus:
• 24h/d *121 d/yr= 2904 h/yr
• 1 December - 31 March
(UNI TS 11300, Zone B)
School heating:
• about 5h/d *91 d/yr=455 h/yr
• 1 Dicember- 31 March
For this reason the Termus
result is about 5 times more
than the operating results.
26,2 / 5,8 = 4,5 kWh/m3 year