Upload
maronnam
View
220
Download
0
Embed Size (px)
Citation preview
8/9/2019 Tekomar Performance Evaluation SW
1/17
Tekomar Performance Evaluation
Main Engine Performance Evaluation
Software for Chief Engineers, Superintendents
and Fleet Managers
2012-11-06 Tekomar 1
8/9/2019 Tekomar Performance Evaluation SW
2/17
8/9/2019 Tekomar Performance Evaluation SW
3/17
Systems to support
Planned Maintenance System (PMS) Optimize regular maintenance
Alarm and Monitoring System (AMS)
Optimize incident detection, initiate troubleshooting
Wear / Vibration Measurement System (Intelligent sensors, CBM)
Turn regular into condition based maintenance
Torsiometer / Flowmeter / etc. (Special sensors)
Measure exactly
Main Engine Performance?
Optimize consumption
Simplify inspection and assessmentNeed to handle this!
2012-11-06 Tekomar 3
M/E
PMS
CBMAMS
8/9/2019 Tekomar Performance Evaluation SW
4/17
Our strength
Tekomar has in depth knowledge for 2-stroke engines Thermodynamics
Interrelation of settings
Impact on emissions, consumption, component lifetime and ship efficiency
Developed a complex calculation framework
Compare actual with reference data (shop test, sea trial)
All latest ISO corrections implemented
Using static and dynamic normal values for
various sensors / measurements
Using distinct reference data for low load range
Auxiliary blower on / off
Turbo cut on / of
2012-11-06 Tekomar 4
8/9/2019 Tekomar Performance Evaluation SW
5/17
Tekomar Performance Evaluation Software
Implements existing calculation framework
Program features
Clean and intuitive user interface
Engine specific reading form
Instant calculation
Evaluation and report
System requirements
Can run on any Windows computer
Standalone application without the need for database or server
configuration File based data can be exchanged using E-mail systems or storage devices
2012-11-06 Tekomar 5
8/9/2019 Tekomar Performance Evaluation SW
6/17
Ship
data
Flowchart
2012-11-06 66
Data input
Manage data
Evaluation
and
Benchmarking
Reporting
Fleet ComparisonFleet Comparison
Calculations and comparison with fixed and dynamic limits
Logical combination of deviations
Engine EvaluationEngine Evaluation
All ships’
data
Superintendent officeSuperintendent office
V e
s s e l / C / E
V e
s s e l / C / E
Automated ReportAutomated Report
Tekomar
8/9/2019 Tekomar Performance Evaluation SW
7/17
Module: Data Collection
Data input Engine specific, customized form
Printout for manual recording
Field validation
Instant calculation / evaluation
2012-11-06 Tekomar 7
8/9/2019 Tekomar Performance Evaluation SW
8/17
Module: Performance Curves
Curve Sheet All values ISO corrected
Each unit’s value displayed
Colours indicate the status
Tool tip
Zoom and pan
Copy to clipboard
2012-11-06 Tekomar 8
8/9/2019 Tekomar Performance Evaluation SW
9/17
Module: ISO / baseline calculation
Calculation Input
Baseline reference data from shop test and sea trial
Ambient conditions
Other related measurements
Output
ISO corrected baseline (1) ISO corrected readings (2)
Limits dependent on type of measurement
Dynamic limits (load dependent, etc.)
Static limits
Determination and classification of deviation
Green (ok), Orange (critical), Red (alert)
From baseline (3)
Compared to other units (deviation)
2012-11-06 Tekomar 9
2
y
xMeasured ISO corrected
1
3 Baseline
(Shop test)
Reading
8/9/2019 Tekomar Performance Evaluation SW
10/17
8/9/2019 Tekomar Performance Evaluation SW
11/17
Module: Engine Evaluation
Engine Evaluation Main performance indications
For all included readings
Other indications
All deviating in the most recent
reading
Comments / recommendations
Optimization potential for:
Fuel oil consumption Thermal load (Exh. gas temp.)
Cylinder lub oil consumption
2012-11-06 Tekomar 11
8/9/2019 Tekomar Performance Evaluation SW
12/17
Module: Fleet Comparison
Fleet comparison Using classified the values of the calculation
Compare engines of different types / makes
All ISO corrected, any ambient influence or different load eliminated
Drill down to see details
Normalized statusfor each engine
2012-11-06 Tekomar 12
8/9/2019 Tekomar Performance Evaluation SW
13/17
Aspect: Data Management
Data storage Local file system
(single user)
Network location
(multi user)
*.tpr files containing
encrypted xml data
Data exchangebetween locations
Send E-mail using
client program
Export data to
defined path
Read directly from
storage location
2012-11-06 Tekomar
C/E
Users
E-Mail client(e.g. MS Outlook)
Export to
monitored folder
Send reading
by E-mail
E-mail Server E-mail Server
R u l e
File server
providing data
storage location
Other solution
Importing
readingsEvaluate
readings
SHIP OFFICE
O p e n / I m p o r t
Optional:
Send using SMTP
server
13
8/9/2019 Tekomar Performance Evaluation SW
14/17
Module: Reporting
Report
Automated PDF report
Includes:
Performance indicators, status
Curve sheets, data sheets
Optimization potential
2012-11-06 Tekomar 14
8/9/2019 Tekomar Performance Evaluation SW
15/17
Online Download and install .msi installer from Tekomar webserver
Automatic, instant activation by License Key
Download of prepared installation template from webserver (built in function)
Application updates and installation template updates from webserver
Offline
Send the .msi installer to ship by E-mail (optionally split into chunks of allowed size)
Send installation template to ship by E-mail
Activation by E-mail to Tekomar
Import installation template
Aspects: Setup
2012-11-06
TekomarProgram + Configuration
Ship / Office
Activation License KeyXXXX-XXXX-XXXX-XXXX
Tekomar
Program + Configuration
Ship
Activation License KeyXXXX-XXXX-XXXX-XXXX
Activation Request E-mail
Activation Response E-mail
Office
Online Activation
Download
Download
Tekomar 15
8/9/2019 Tekomar Performance Evaluation SW
16/17
Online “Check for updates” will install application updates
“Download installation from Tekomar server” will check available (updated)
installation for download / updated
Offline
Get updater .msi / new installer .msi from Tekomar
Get updated installation template from Tekomar
Send to ships
Aspects: Update
2012-11-06
TekomarShip / Office
Tekomar
Program update + ConfigurationShip
OfficeDownload
Tekomar 16
8/9/2019 Tekomar Performance Evaluation SW
17/17
Initial configuration / Services by Tekomar
Tekomar initial configuration Customize template for particular engine
Prepare baseline for dynamic limits
Set static limits and allowable deviation
Full performance assessment at beginning of contract recommended
For determination of engine condition and deviations from new builtcondition
We are available for further consulting services
2012-11-06 Tekomar 17