BASIC REQUIREMENTS
DATA REQUIREMENTS
MATERIAL REQUIREMENT
2
OVERVIEW OF :
INSTALLATION PROCEDURE
QUALITY CHECK POINTS
DISCUSSBRIEFLY ABOUT :
INTRODUCTION
TECH VIDYA
8/12/2019 Telecom Training and Placement
3/28
INDEX
A. Basic Requirements
1) Data Requirementsa) RF plan
2) Material Requirements
a)GSM / Panel antenna
b)Feeder cable
c)Feeder cable Accessories:
(i)Surge arrestor
(ii)RF connectors
(iii)RF clamps
(iv)Jumper cable(v)Earthing kit
(vi)Weatherproofing kit
(vii)ROXTEC
3TECH VIDYA
8/12/2019 Telecom Training and Placement
4/28
3) List of other Items
a)Grounding cableb)Lugs
c)Cable ties
d)Nuts and bolts
e)Label set
B. Installation Procedure Of :
1) GSM Antenna
2) Antenna Line
4
INDEX
TECH VIDYA
8/12/2019 Telecom Training and Placement
5/28
(A) BASIC REQUIREMENTS
5TECH VIDYA
8/12/2019 Telecom Training and Placement
6/28
6
(a) RF Plan
Site Name: Tech - Vidya
Site ID: RJTV1234Address: Plot No. 97-98-99, 2nd Floor, NMC Complex,
Ram Nagar Shopping Centre, Shastri Nagar, Jaipur-302016
S No Particulars Sector A Sector B Sector C1 Azimuth 60 90 150
2 Height 20 m 45 m 30 m
3
Mechanical
Tilt 2 0 0
4 Electrical Tilt 0 2 5
5
Type Of
Antenna XYZ123 XWE412 JKI589
1. DATA REQUIREMENTS
TECH VIDYA
8/12/2019 Telecom Training and Placement
7/28
8/12/2019 Telecom Training and Placement
8/28
(b) Feeder Cable
Inner core
Outer core
Soft Insulation
Outer
Aluminium
Core
Copper Aluminium
2. MATERIAL REQUIREMENTS
8TECH VIDYA
Outer Hard BlackInsulation
Outer Core
Soft Insulation
Inner Core
Inner Core
filled with Softinsulation
Outer HardBlack Insulation
Outer Copper
Core
8/12/2019 Telecom Training and Placement
9/28
Specification:
1. Inner corePure copper
cylindrical tube of
inches.
2. Outer corePure copper
cylindrical tube of 7/8inches.
3. Soft InsulationWhite
soft foam.
4. Hard outer insulationBlack insulation material.
5. Impedance50.
6. Flexibility- More.
1. Inner core Pure copper
cylindrical tube of inches
filled with soft insulation.
2. Outer core Pure Aluminium
cylindrical tube of 5/4 incheswith thin layer of silver foil.
3. Soft Insulation White soft
foam.
4. Hard outer insulation Blackinsulation material.
5. Impedance 50.
6. Flexibility- Manageable.
Copper Aluminium(b) Feeder Cable
9TECH VIDYA
8/12/2019 Telecom Training and Placement
10/28
(i) Surge Arrestor
(ii) RF Connectors
7/8
Male
7/8
female
7/8
L- Male
2. MATERIAL REQUIREMENTS(c) Feeder Cable Accessiories
10TECH VIDYA
8/12/2019 Telecom Training and Placement
11/28
(iii) RF Clamp
1 - Way 2 -Way 3 - Way 6 - Way
(iv) Jumper Cable
Specification:
1. Size - inches..
2. Soft InsulationWhite soft
foam.3. Impedance50.
4. Flexibility- High.
5. Length- 1m ,1.5m, 2m, 2m.5m,3m, 5m, 7 m,10m, 15m.
(c) Feeder Cable Accessiories
11TECH VIDYA
8/12/2019 Telecom Training and Placement
12/28
(v) Earthing Kit
Specification:
1. Strip - Pure Copper.2. Grounding cableApprox. 0.5m ,
10 sq. mm Black color.
3. Lug- Ring type , 10 sq. mm.
4. Fixed below the jumper cable at a
distance 11.5 m.5. It is fixed on the outer core of the
feeder cable.
(vi) Weather Proofing Kit
Here in weatherproofing kit we usethree type of tape :
1. Butyl tape
2. Rubber tape
3. Pvc tape
(c) Feeder Cable Accessiories
12TECH VIDYA
8/12/2019 Telecom Training and Placement
13/28
(vii) Roxtex
Roxtec plate with Rubber boots
7/8
Rubber boot
rubber boot
Roxtec installation on the shelter.
(c) Feeder Cable Accessiories
13TECH VIDYA
8/12/2019 Telecom Training and Placement
14/28
1414
(b) Lugs
(a) Grounding Cable
35 mm2Yellow Green
CABLE LUGS (RING/HOLE TYPE)
TECH VIDYA
3. LIST OF OTHER ITEMS
8/12/2019 Telecom Training and Placement
15/28
15
(c) Cable Ties
(d) Nuts & Bolts
3. LIST OF OTHER ITEMS
TECH VIDYA
8/12/2019 Telecom Training and Placement
16/28
16
(e) Label Set
3. LIST OF OTHER ITEMS
TECH VIDYA
8/12/2019 Telecom Training and Placement
17/28
17
(B) INSTALLATION PROCEDURE
TECH VIDYA
8/12/2019 Telecom Training and Placement
18/28
18
1. GSM ANTENNA
TECH VIDYA
8/12/2019 Telecom Training and Placement
19/28
19
1. GSM ANTENNA
TECH VIDYA
8/12/2019 Telecom Training and Placement
20/28
20
2. ANTENNA LINEFeeder Cable Installation
Firstly measure the length of the feeder cable from therequired height where it has to be connected with jumper
cable on the tower to a certain point inside the shelter 5m
from the roxtec by using a measuring tape.
RF clamps are then fixed with the cable tray at adistance symmetrical to the edges of the tray.
For VCT- 1.5m between two RF clamps
For HCT- 0.6 between two RF clamps.
Cut the six RF cables and insulate the cable openings
temporarily.
Assemble the RF connecter on ground and again put
the temporary insulation on all the connector openings.
TECH VIDYA
8/12/2019 Telecom Training and Placement
21/28
21
Give the proper bend VCT to
HCT corner in RF cable.
Lay the RF cable on HCT.
Provide the dummy clamp at
the bend
Give the proper way S-loop in RF
cable and insert it in shelter through
the roxtec (firstly loose the metallic tieover rubber boot of roxtec.
Major the half meter through the
roxtec and leaf a mark on the cable by
marker
Feeder Cable Installation
TECH VIDYA
8/12/2019 Telecom Training and Placement
22/28
Take out all cable from roxtec
Cut the RF cable from mark point by RF cutter and again make
the RF connector on all the cable and again insert all the cable
through roxtec inside the shelterSeal the roxtec properly
Again lay the RF cable properly over RF clamp near the shelter
Make the earthing kit between the shelter and tower
Feeder Cable Installation
22TECH VIDYA
8/12/2019 Telecom Training and Placement
23/28
23
And crimp the lugs on
EGB properly by
crimping toolWeather proofing
properly wrapped upon
the all earthing kit
Nearly shelter earthing
kit connect with EGB
by 16 sq mm G.C. lugs
Feeder Cable Installation
TECH VIDYA
8/12/2019 Telecom Training and Placement
24/28
24
Come inside shelter and connect the surge arrestor with all jumper
cable and RF cable .by (30-32) no spanner
Feeder Cable Installation
TECH VIDYA
When connect the earthing kit with tower body firstly remove
the tower paint by the help of flat file
After connect the c-clamp at the tower body properly by (12-13)no spanner
For six cables use a three c-clamp
So connect two cable earthing kit one c-clamp this process apply
all the cable
Again weather proofing properly wrapped upon the all earthingkit
C i
8/12/2019 Telecom Training and Placement
25/28
25
Surge arrestor G.C. connect with
IGB by lugs and crimp the lugs
by crimping tool
Now go to the tower cut cable tie
and lay the properly with RF
clamp
CABLE TIES
Feeder Cable Installation
TECH VIDYA
8/12/2019 Telecom Training and Placement
26/28
26
* Provide the loop and connect the
RF connector with jumper
connector by(30-32) no spannerand provide the PBC tape only
OK Not OK
*Now again comes inside the
shelter and connect the jumper
connector with BTS by (30-32) nospanner
Feeder Cable Installation
TECH VIDYA
8/12/2019 Telecom Training and Placement
27/28
27
Finally weather
proofing wrapped all
the RF connector* Do the labeling of antenna
line(on jumper cable near BTSport, on jumper near RF connector,
RF cable near OD jumper
connector, at the band HCT-VCT,
outside the roxtec, on RF cable
inside the shelter, on both of the
end of ID jumper near BTS port)
Feeder Cable Installation