Dear Mr. Yamaguchi, Mr. Hasegawa, Mr. Miyaoka
Tel Fence
The attachment is the pictures of fence foundation and
communication cable as informed by telephone.
DVIZ Letter
This matter was highlighted last year and we received from DVIZ
the letter that they are not crashed.
Fence
We tried to excavate 7 places before actual construction and one
crashing point with cable and three crashing points with pits were
found.
DVIZ rDVIZ Propaty HAI-PHONG
TELECOM
We informed to DVIZ and confirmed this cable and pit are notDVIZ's property but HAIPHONG TELECOM's.
HAI-PHONG TELECOM
Today, we , JVC, DVIZ and HAI-PHONG TELECOM , had a meeting.
Letter
PitFence
TELECOM
We wished HAI=PHONG TELECOM to construct JX fence on the pits
because we received last time the letter that there is no crash
point.
The HAI-PHONG TELECOM person would reply to this matter in 2-3
days.
JX
JX
Please inform this matter to JX because I don't know a JX person in
charge.
yamaguchi.osamu@jg
c.co.jp
Mar 6 (5 days ago)
to hiromu.nakano, koichi.nakada, toshiaki.nagas.,kazumasa.imai, hasegawa.zenji, hasegawa.hisas.,miyaoka.shuichi, me, kosakai.yasufu., nguyenthi.minh.,vuvan.tu, uryu.yoshihiro
JX Nippon Oil & Energy CorporationAttention: Messrs. Nakano and Nakada
Regarding the captioned subject, please find the attached photosand refer
to the attached MOM (M-JVC-DVIZ-002), Item 7. The existence oftelephonepipes under the location of JX fence.
As described in the below e-mail, written in Japanese, a meetingwas heldamong DVIZ, Hai-Phong Telecom and JVC at site on Mar.6th,'13,today and itwas turned out that the cable and the pits of the cable joint belongtoHai-Phong Telecom.
JVC expressed that the JX fence will be installed on the cables andthe
7/28/2019 Telephone Pipestele
2/2
pits according to the drawing, however, Hai-Phong Telecomrequested to stopthe work for a few days for their decision about the futuremaintenance forthis underground system.
JVC would hope this issue will not affect on the fence design, plotplan
and the construction schedule.Best Regards,