85
MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION TENDER DOCUMENT TENDER FOR Name of Work : CC - KRUSHNUR (CENTRAL GOVERMENT GROWTH CENTER)...Krushnoor Indl.Area…M & R to water supply scheme...Providing Painting to LLR with minor repairs at Krushnoor I/A.

TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

  • Upload
    vudung

  • View
    219

  • Download
    1

Embed Size (px)

Citation preview

Page 1: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

TENDER DOCUMENT

TENDER FOR

Name of Work : CC - KRUSHNUR (CENTRAL GOVERMENT GROWTHCENTER)...Krushnoor Indl.Area…M & R to water supplyscheme...Providing Painting to LLR with minor repairs atKrushnoor I/A.

Page 2: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Short Tender Notice1 1 1

Detailed Tender Notice2 2 4

SCOPE OF WORK3 5 5

DIRECTIONS FOR FILLING THE TENDER4 6 6

CLAUSE FOR PAYMENT OF STAMP DUTY5 7 7

CLAUSE FOR REIMBURSEMENT OF TAXES/DUTIES6 8 8

CLAUSE FOR PERFORMANCE SECURITY7 9 9

CLAUSE FOR RECOVCERY OF LABOUR CESS8 10 10

PRICE VARIATION CLAUSE9 11 19

ADDITIONAL CONTRACT CONDITIONS10 20 23

Value Added Tax (VAT) Act and Contract Labour, Income Tax Clause11 24 25

STANDARD CEMENT CONSUMPTION STATEMENT12 26 30

CEMENT VARIATION CLAUSE13 31 31

DECLARATION14 32 32

INSURANCE Clause of Work15 33 33

SERVICE TAX CLAUSE (For maintenance, labour oriented and consultancy works)16 34 34

SERVICE TAX CLAUSE (For other than maintenance, labour oriented and consultancy works)17 35 35

COMMON CONDITIONS AND ADDITIONAL CONTRACT CONDITIONS18 36 42

SPECIAL CONDITION FOR ROYALTY PAYMENT19 43 43

QUALITY AUDIT CLAUSE20 44 44

MAINTENANCE GUARANTEE CLAUSE DURING DEFECT LIABILITY PERIOD.21 45 45

List of Defects Required to be observed and Rectified by the Contractor during the Defect Liability Period22 46 48

List of approved makes of various equipments & materials23 49 49

Certificate From Contractor24 50 50

DECLARATION FOR NON-EMPLOYMENT OF EX-MIDC EMPLOYEE25 51 51

B-1 Tender Form26 52 75

Schedule B27 76 81

• Note : The Amendment’s details for any Tender document are displayed immediately after that document. Thelist of all such Amendments is available at the end of the document.

Item Wise Specification28 83 111

Index

Sr.No.

Particulars PageFrom

PageTo

Work Name : CC - KRUSHNUR (CENTRAL GOVERMENT GROWTH CENTER)...Krushnoor Indl.Area…M & R to watersupply scheme...Providing Painting to LLR with minor repairs at Krushnoor I/A.

Page 3: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

E tenders are invited for the work “Krushnoor Indl.Area…M & R to water supply scheme...Providing Painting toLLR with minor repairs at Krushnoor I/A.” having estimated cost of Rs. 9,22,575.60 from the contractorregistered with PWD, Govt, of Maharashtra, CPWD, MES, Railways, CIDCO, MJP in appropriate class.

The blank tender forms are available on E Tendering module on MIDC's website ,<www.midcindia.org>. The

Tenderers are requested to download the entire tender document from MIDC's website. The last date of

submission of E Tender documents duly filled in shall be 24/04/2017 upto 11:00 Hrs. and shall be opened on

the same day if possible. For further details please see detail tender notice on MIDC's website.

Right to reject any or all tenders without assigning any reason there of is kept reserved by the competentauthority.

--------------NOTICE ENDS HERE--------------

TENDER NOTICE NO. 1/9 of 2017/2018 Kushnoor Paintingwork / 2017-2018

Suprintending Engineer

Circle Aurangabad

Page 1 / 83 Executive EngineerContractor

Page 4: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

DETAILED TENDER NOTICE NO. 1/9 of 2017/2018 KushnoorPainting work

E tenders are invited from eligible contractors for the following work. The details of tender are givenbelow.An amount given below towards Earnest Money Deposit (EMD) & cost of blank tender & applicationsupport amount should be paid online and online payment for errection of Asphalt plant with in 30 Km (ifApplicable).Scanned copy of D.D. towards Performance Security if applicable as per Performance SecurityClause shall be uploaded at the appropriate location in Envelope No. 2.The tender will be considered only if the enclosures are in proper order.The EMD will be forfeited in case, afterthe acceptance of the tender, the contractor refuses to pay the Security Deposit as noted below, within thespecified time limit. Otherwise it will be refunded. The work is to be completed within the stipulated time asnoted below.

1. Name of Work

CC - KRUSHNUR (CENTRAL GOVERMENT GROWTHCENTER)...Krushnoor Indl.Area…M & R to water supplyscheme...Providing Painting to LLR with minor repairs atKrushnoor I/A.

2. Rs 9,22,576.00Estimated Cost

Earnest Money Deposit3.

Pay Rs 9,300.00 online

4. Application Support Amount

Rs. 1000/- pay online (Non-refundable)

5. Security Deposit

Pay Initial security deposit Rs 27,700.00 or 3.00% of tendered costwhichever is higher. S. D. in the form of BG will be accepted whenamount of S.D. is more than Rs.50,000

Rs 46,200.00 or 5.00% of tendered cost whichever is higher to bededucted through bills.

Cost of Blank Tender Form6.Rs 1,000.00 pay online (Non Refundable)

Not Required,Rs 0Deposit for Asphalt Plant7.

Demand Draft of Nationalized Bank / Scheduled Bank/ Bankapproved by Government of Maharashtra towardsPerformance Security if applicable as per PerformanceSecurity Clause payable at Nanded in favour of ExecutiveEngineer, MIDC Division, Nanded.

Performance Security8.

Time Period9.2 Months Including monsoon

10. Availability of blank tender form10/04/2017 To 24/04/2017 (to be downloaded from the MIDC Etendering site www.midcindia.org).

Page 2 / 83 Executive EngineerContractor

Page 5: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

11. Queries of contractorWill be received by E tendering upto 11/04/2017 11:00 AM

12. Reply to queries & MIDC clarificationWill be published on the website on 13/04/2017 08:00 PM

Last date of submission of Tender13.24/04/2017 upto 11:00 AM hrs. @ MIDC website.

Date of opening of PQ & tender

Place of Tender Opening14.

24/04/2017 12:00 PM hrs. (if possible)

15. Class of registerationVII

16. Eligibility

Experienced certificate for any type of civil work during last5 years executed in Govt. Deptt./ semi Govt./Local bodiessuch as MIDC/ CIDCO/ MJP Local bodies costing not lessthan Rs.4.62 lakh issued by the officer not below the rank ofExecutive Engineer.

Compensation17.Rs 500.00 per day for delay in work execution/ completion ofwork.

Validity of offer18.180 days from the date of opening of the tender. (Fromopening of First Envelope)

1. Important Note: A. The information regarding the tender & PQ form (if applicable) & the facility todownload it, will be available on MIDC E tendering portal on website www.midcindia.org. The downloaded &duly completed tender form shall be submitted online (by eligible contractors only) without making anychange in the script of tender document. If after submission of tender, it is noticed that the tender script ismodified in any manner whatsoever, the tender will be summarily rejected. Contractors may upload theirqueries before expiry of query period. The replies to the queries received before the due date, will bepublished on the website along with MIDC clarification (if any) which should be downloaded by the tenderer.The document of reply to the queries of the contractor and MIDC clarification (if any) will form part & parcel ofthe tender document & the clarifications given in the document will supercede the provisions of the tender.After the tender is accepted & offer letter is issued to the contractor, agreement shall be executed with thecontractor on the tender copy prepared/printed by MIDC

B. Contractor must pay online:- a. EMD amount. b. Cost of Blank tender form. c. Application support amount. d. Deposit for erection of asphalt machinery within 30 Kms (if applicable) in absence of certificate and location plan uploaded at appropriate place.

2. The tenderer shall upload scanned copy / copies,of the following documents at appropriate place

Envelope No.1 shall contain (i.e. in 1(a) and 1(b)):

(i) Certificate and location plan of Asphalt plant within 30 Kms. (If applicable) (In absence of Certificate andlocation plan of Asphalt plant pay the deposit online.) (ii) Attested copy of valid Registration Certificate in appropriate class issued by PWD (GoM)/ CIDCO/ Railways/MJP/ MES/ CPWD.

Page 3 / 83 Executive EngineerContractor

Page 6: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Circle Aurangabad

Suprintending Engineer

MJP/ MES/ CPWD. (iii) Professional Tax Registration Certificate for employees in E category for tenders without PQ and both i.e.'E' & 'R' category for tenders where PQ is applicable. (iv) Registration Certification with Sales Tax Deptt. under VAT Act 2002, of Govt. of Maharashtra. (v) Certified copy of PAN card. (In case of Joint Venture PAN Card of the Lead Partner) (vi) Experience certificate for single similar work during last 5 financial years executed in Govt. Deptt. semiGovt. / Local bodies such as MIDC/ CIDCO/ MJP local bodies etc. as specified elsewhere OR PQ form dulycompleted with supporting documents and specified therein (if applicable). The updation of value work will bedone at 10% per annum (Compound) by multiplying the values with applicable factor i.e. 1.1,1.21,1.33,1.46 &1.61 as the case may be. (vii) Reply to queries of the contractor and MIDC clarification (if any). (viii) If tenderer desires to form JV, the notarized MOU of JV shall be uploaded as per format enclosed (ifapplicable). (ix) In case of final asphalting work i.e. BM/AC/DBA/SDBC/PSS works included in composite work or singlework, if the asphalt work costs Rs.100 lakhs and above, the details of plant and machinery as per form No. 'A'of PQ form. (x) The photo copies duly attested, of the above certificates will have to be uploaded in Envelope No.1.Original shall be produced in the office of for verification on the day of opening of the tender as mentionedelsewhere. (xi) Service tax Registration.

Envelope No.2 shall contain : (i) Price Bid (ii) Scanned copy of D.D. towards Performance Security if applicable as per Performance Security Clause shallbe uploaded at the appropriate location.

Important Conditions -1. The Submission of tender shall be done in the manner prescribed by MIDC only.2. If the contents of Envelope No.1(a) and 1 (b) are not found as per the requirements of MIDC, theEnvelope No.2 will not be opened at all & the tender shall be summarily rejected.3. Tenderer should digitally sign wherever required.4. The tenderer shall be bound to keep open the offer upto 180 Days from the date of opening of thetender. (i.e. from opening of First Envelope of tender)5. The acceptance of the tender rests with the competent authority which does not bind itself to accept thelowest tender & reserves the right to reject any or all tenders without assigning any reason thereof.6. The notes & conditions stipulated in this notice & elsewhere in the tender shall form the part of theagreement.7. If it is found that the information submitted is misleading/ false or if it is found that certain information ishidden, then the contractor will be disqualified during any stage of tender process & even after opening oftender.8. If any tenderer discloses/try to discloses in any manner whatsoever his offer in any other place thanenvelope No.2, his tender will be summerarily rejected.

Page 4 / 83 Executive EngineerContractor

Page 7: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

SCOPE OF WORK

Name Of Work :- Krushnoor Indl.Area…M & R to water supply scheme...Providing Painting to LLR with minor repairs at Krushnoor I/A.

MIDC has established 13.50 MLD water supply scheme for catering the water demand of plot holders inNanded and Krushnoor Indl. Area. The raw water is lifted from jack well constructed at bank of Vishnupuri Dam atAsarajan village through 450 mm dia. M.S. Rising main up to W.T.P. in Nanded Indl. Area. Pure water is pumpedfrom WTP Nanded for Krushnoor industrial area through 28 km length MS pipeline of dia. 500 mm dia.Pure water isreceived at LLR and further it is pumped to HSR through which the water is supplied by gravity system to KrushnoorI/A.

The scope of work includes as follows

A) Providing painting to LLR with minor repairs.

The scope covers the work of providing painting to LLR, which includes removing and rubbing down the existingpaint,providing and applying two coats of exterior acrylic paint of standard approved make (IS specified) includingapplying primer coat as per manufacturers specifications, providing and applying oil bound distemper conforming toIS:428-1993 of approved colour & shade to old and new surface, removing and scrapping oil paint from ironwork,wood work, providing and applying synthetic super enamel paint. and providing minor repairs required at LLR.The contractor at all time has to remain readiness with material and labour required for the work.

B) Providing paver blocks,UCR Masonary,Chain link fencing, CD work pipeThe scope covers the work of providing and fixing paver blocks in LLR premises, Dismantling the existinguncoursed rubble masonary and erecting new UCR masonary.The scope also includes providing of chain link fencingover the UCR masonary of LLR Compund wall and CD work pipe below the compound wall of LLR.The suitablerubble from dismantled UCR Masonry which is approved by Engineer-In-Charge may be allowed to use forconstruction work of new UCR masonry.The recovered chain link fence shall be the property of contractor.

THE CONTRACTORS SHOULD SPECIFICALLY NOTE THAT, THE QUANTITIES OF ANY ITEMUNDER SCHEDULE “ B” OF TENDER AGREEMENT MAY VARY TO ANY EXTENT ANDCONTRACTORS WILL NOT BE ENTITLED TO CLAIM UNDER CLAUSE 41 OF TENDERAGREEMENT BUT IF THE QUANTITIES EXCEDED BEYOND 125%, THE NECESSARY APPROVALFROM COMPETENT AUTHORITY SHALL BE OBTAINED.

Page 5 / 83 Executive EngineerContractor

Page 8: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

DIRECTIONS FOR FILLING THE TENDER

1. The tenderer should quote the percentage/rate in words & in figures.

1. The tenderer should carefully note the unit for each item. No change in this unit is to be made. In case ofany doubt, the tenderer should get the matter clarified from the concerned Executive Engineer well inadvance so that the submission is made before the specified date & time.

2. All works proposed to be executed by contract shall be notified in a form of invitation to tender put up on a boardhung up in the office of the Exe. Engineer & signed by Exe. Engineer. This form will state the work to be carried out,the date for submitting & opening tenders, the time allowed for carrying out the work, the amount of earnest moneyto be deposited with tender, the amount of security deposit to be deposited by the successful tenderer & thepercentage, if any, to be deducted from bills. It will also state whether a refund of quarry fees, royalties, octroi &ground rents will be granted. Copies of the specifications, designs, drawings, estimated & scheduled rates & anyother documents required in connection with the work shall be signed by the Exe. Engineer for the purpose ofidentification & shall also be open for inspection by contractors at the office of Exe. Engineer during office hours.

Where the works are proposed to be executed according to the specification recommended by a contractor & approved

by a competent authority on behalf of MIDC such specifications, designs & drawings shall form part of the accepted tender.

1. The tenderer shall fill up the printed form, stating at what percentage above/below the rates specified in Schedule B(Memorandum showing items of work be carried out) he is willing to undertake the work. Only one rate or suchpercentage on all the Estimated rates/Scheduled rates shall be entered. Tenders, which propose any alteration inthe specifications in the said form of invitation to tender, or in the time allowed for carrying out the work, or whichcontain any other conditions, will be liable to rejection.

2. No receipt for any payment alleged to have been made by a contractor in regard to any matter relating to thistender or the contract shall be valid & binding on MIDC unless it is signed by the Exe. Engineer.

3. The Memorandum of work to be tendered for & the Schedule of Materials to be supplied by MIDC & their rates shallbe filled in & completed by office of Exe. Engineer before the tender form is uploaded.

4. All the work shall be measured net by standard measure & according to the rules & customs of MIDC withoutreference to any local custom.

5. The contractor is allowed to change his bid till last date of time of the submission of the tender. Only the last bid willbe saved in the system which will be considered for evaluation if the contractor is found eligible for opening of pricebid.

Page 6 / 83 Executive EngineerContractor

Page 9: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Govt of Maharashtra Undertaking)

CLAUSE FOR PAYMENT OF STAMP DUTY

As per Article 63 of Schedule – I of Bombay Stamp Act 1958, stamp duty charges shall be as follows:Works contract that is to say a contract for works and labour or services involving transfer of property in goods(whether as goods or in some other form) in its execution and includes sub-contract.

a) Where the amount or value setforth in such contract does notexceed Rs.10 lakhs

Rs.500/- (Five hundred rupees)

b) Where it exceeds Rs.10 lakhs Five hundred rupees plus 0.1 percent of the amount above rupees tenlakhs subject to maximum of rupeestwenty five lakhs

The contractor whose offer will be accepted will be called for execution of the agreement and shallonly be liable to pay the stamp duty applicable thereon. The payment of stamp duty of required amount shall bedone by the contractor through Government Receipt Accounting System (GRAS) to the State Govt.

Contractor Executive Engineer

Page 7 / 83 Executive EngineerContractor

Page 10: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

CLAUSE FOR REIMBURSEMENT OF TAXES/DUTIES

While submitting the tender, the contractor shall consider the prevailing taxes & duties on the dateof submission. In case there is statutory increase in the taxes/duties, the contractor shall submitdocumentary evidence for the payment of the same. On verification of the documents, the reimbursementwill be made if there is increase. In case there is reduction in the statutory taxes/duties, deduction will beeffected. It may also be noted that this clause is not applicable if there is increase in the octroi duringexecution of the work.

=======================================

Page 8 / 83 Executive EngineerContractor

Page 11: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION(A Government of Maharashtra Undertaking)

Udyog Sarathi, Mahakali Caves Road, Andheri (East) Mumbai-93.

CLAUSE FOR RECOVERY OF PERFORMANCE SECURITY FOR THE TENDERS RECEIVED BELOW THE ESTIMATEDCOST AND ADDITIONAL SECURITY DEPOSIT FOR THE QUANTITIES EXCEEDING 125% AND EIRLs

A) Clause for Recovery of Performance Security for the tenders received below theestimated cost

1)In case the contractor has quoted the offer for tender below the estimated cost, then the contractor shall have to pay PerformanceSecurity in the form of DD of the amount as mentioned below:a)No performance security deposit will have to be paid if the tender offer is received up to 1% below the estimated cost, however ifthe offer quoted is 1.01 to 10% below the estimated cost, then the Performance Security amount shall be 1% of the estimated cost.b)If the offer quoted is more than 10% below the estimated cost, then the performance security deposit shall be equal to the amountof percentage more than 10% below + the amount as per (a) above. (For example, if the tender received at 14% below, the performancesecurity shall be – up to 10% = 1% + (14%-10%) = 1 + 4 = Total 5% of the estimated cost). c)The DD towards performance Security shall be drawn in favour of the Executive Engineer concerned. 2)The contractor has to submit scanned copy of the DD in envelope No.2. Appropriate provision in E tendering system is made.3)The contractor shall submit the original DD in sealed Envelope within 5 working days from the due date of submission of tender.The name of work and tender notice number shall be mentioned on the envelope. 4)It is mandatory to have MICR and IFSC code of the Bank on the DD.5)Contractors whose papers/DD towards performance security are found false and if he fails to submit the DD within prescribed timelimit, then all such contractors shall be banned for submitting the tenders in MIDC for a period of one year & the EMD of such contractorsshall be forfeited.6)The performance security shall be refunded to the contractor within 3 months from the date of satisfactory completion of the workas per tender conditions.

B) Clause for Recovery of Additional Security Deposit for the quantities exceeding125% and Extra Item Rate List (EIRL)

It shall also be noted that security deposit for the quantities exceeding 125% of tendered quantities and/or EIRL, shall also bededucted at the % to be recovered through bills (i.e. in cash) as mentioned in the tender text. The security deposit so recovered in above events shall be refunded after satisfactory completion of defect liability period.

--------------------

Page 9 / 83 Executive EngineerContractor

Page 12: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

CLAUSE FOR RECOVERY OF LABOUR CESS

The Govt. of Maharashtra vide its decision dated 17/06/2010 has decided to recover Labour cess on allthe construction works undertaken by Govt., Public sector undertaking and Municipal Corporation, MunicipalCouncils, Gram Panchayat etc.

The contractors are therefore requested to note that labour cess at 1% of the cost of construction (excludingland cost) arrived at after deducting amount of compensation if any paid to the workers or their relatives underworkers compensation Act 1923 will be recovered from them. The recovery of labour cess at 1% shall be made fromthe payment due for each bill to be paid to the contractor.

Page 10 / 83 Executive EngineerContractor

Page 13: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

ACCOMPANIMENT TO THE GOVERNMENT RESOLUTION

PUBLIC WORKS DEPARTMENT NO. CAT/06/04/148 DT 16.5.2005

PRICE VARIATION CLAUSE

1. If during the operative period of the contract as defined in condition (i) below,there shall be any variation in theConsumer Price Index (New Series) for Industrial workers for MUMBAI Centre as per the Labour Gazette publishedby the Commissioner of Labour, Govt.of Maharashtra &/or in the Wholesale Price Index for all commoditiesprepared by the Office of Economic Adviser, Ministry of Industry, Govt. of India, or in the price of petrol/oil &lubricants & major construction materials like bitumen, cement, steel, various types of metal pipes etc, then subjectto the other conditions mentioned below, price adjustment on account of

i) Labour component

ii) Material component

iii) Petrol, oil & lubricant components

iv) Bitumen component

v) HYSD & mild steel component

vi) Cement component

vii) CI & DI pipes component

Page 11 / 83 Executive EngineerContractor

Page 14: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

calculated as per the formula hereinafter appearing, shall be made. Apart from these, no other adjustment shall bemade to the contract price for any reason whatsoever. Component percentage as given below are as of the total costof work put to tender. Total of labour, material & POL components shall be 100 & other components shall be as per

actual's,

i) Labour component (Kl) 30 %

ii) Material component (K2) 65 %

iii) Petrol, Oil & Lubricantcomponents

(K3) 5 %

iv) Bitumen component

v) HYSD & mild steel component vi) Cement component

vii) CI & DI pipes component

Note: if cement, steel, bitumen, CI & DI pipes are supplied on Schedule-A, then respective component shall not beconsidered. Also, if particular component is not relevant, same shall be deleted.

1) Formula for Labour components :

V1 = 0.85 P x K1 x M1 -M0

_____ ______ 100 M0

Where

V1= Amount of price variation in Rupees to be allowed for labour component P= Cost of work done during thequarter under consideration minus the cost of cement, HYSD & mild steel, bitumen, CI & DI pipes calculated at the

Page 12 / 83 Executive EngineerContractor

Page 15: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

basic star rates as applicable for the tender, consumed during the quarter under consideration. Star rates:

K1= Percentage of LABOUR component as indicated above.

L0= Basic Consumer Price Index for MUMBAI centre shall be average consumer price index for the quarterpreceding the month in which the last date prescribed for receipt of tender falls.

L1= Average Consumer Price Index for MUMBAI centre for the quarter under consideration.

2) Formula for Materials components :

V2 = 0.85 P x K2 x M1 -M0

_____ _______ 100 M0

Where

V2= Amount of price variation in Rupees to be allowed for material component P= Same as worked out for labourcomponent K2= Percentage of Material component as indicated above.

M0= Basic Wholesale Price Index shall be average wholesale price index for the quarter preceding the month inwhich the last date prescribed for receipt of tender falls.

M1= Average Wholesale Price Index for the quarter under consideration.

3) Formula for petrol, oil & lubricant components :

Page 13 / 83 Executive EngineerContractor

Page 16: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

V3 = 0.85 P x K3 x P1 -P0

_____ _______ 100 P0

Where

V3= Amount of price variation in Rupees to be allowed for POL component

P= Same as worked out for labour component

K3= Percentage of petrol, oil & lubricant component as indicated above.

P0= Average Price of HSD at MUMBAI, during the quarter preceding the month in which the last date prescribed forreceipt of tender falls.

P1= Average Price of HSD at MUMBAI, during the quarter under consideration.

Page 14 / 83 Executive EngineerContractor

Page 17: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

4) Formula for Bitumen Component:

V4 = QB (B1 - B0)

Where

V4= Amount of price variation in Rupees to be allowed for bitumen component

QB= Quantity of bitumen (Grade ) in Metric Tonnes used in the permanent works & approved enabling works duringthe quarter under consideration.

B1= Current, average ex-refinery price per metric tonne of bitu men (Grade ) under consideration including taxes(octroi,

excise, sales tax/VAT etc) during the quarter under consideration.

B0= Basic rate of bitumen in Rupees per metric tonne as considered for working out value of P or average ex-refinery price in Rupees per metric tonne including taxes (octroi, excise, sales tax/VAT) of bitumen for the grade ofbitumen under consideration during prevailing quarter preceding the month in which the last date prescribed forreceipt of tender falls whichever is higher.

5) Formula for HYSD & mild steel component:

V5 = SO x (SI1 - SI0) x T

________ SI0

Page 15 / 83 Executive EngineerContractor

Page 18: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Where

V5= Amount of price variation in Rupees to be allowed for HYSD/ mild steel component SO= Basic rate ofHYSD/mild steel in rupees per metric tonne as considered for working outvalue of P. SI1= Average Steel Index asper RBI Bulletin during the quarter under considerationSI0= Average of Steel Index as per RBI Bulletin for thequarter preceding the month in which the last date prescribed for receipt of tender falls. T= Tonnage of steel used inthe permanent works for the quarter under consideration.

6) Formula for cement component :

V6 = CO x (CI1 - CI0) x T

________

CI0

Where

V6= Amount of price escalation in Rupees to be allowed for cement component CO= Basic rate of cement in rupeesper metric tonne as considered for working out value of P. CI1= Average Cement Index published in the RBIBulletin for the quarter under consideration. CI0= Average of Cement Index published in the RBI Bulletin for thequarter preceding the month in which the last date prescribed for receipt of tender falls. T= Tonnage of cement usedin the permanent works for the quarter under consideration.

Page 16 / 83 Executive EngineerContractor

Page 19: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

7) Formula for CI/DI pipe Component: V7 = QD x (D1 - D0)

Where

V7= Amount of price escalation in Rupees to be allowed for CI/DI pipe component D0= Pig iron basic price inRupees per tonne considered for working out value of P. D1= Average pig iron price in Rupees per tonne during thequarter under consideration (Published by IISCO). QD= Tonnage of CI/DI pipes used in the works during the quarterunder consideration.

The following conditions shall prevail:

b) The operative period of the contract shall mean the period commencing from the date of the work order issued tothe contractor & ending on the date on which the time allowed for the completion of work specified in the contractfor work expires, taking into considering the extension of time, if any, for completion of the work granted byEngineer under the relevant clauses of the Conditions of Contract in cases other than those where such extension isnecessitated on account of default of the contractor. The decision of Engineer as regards the Operative Period of thecontract shall be final & binding on the contractor. Where any compensation for liquidated damages is levied on thecontractor on account of delay in completion or inadequate progress under the relevant contract provisions, the priceadjustment amount for the balance of work from the date of levy of such compensation shall be worked out bypegging the indices L1, M1, C1, P1, B1, SI1, CI1 to levels corresponding to the date from which such compensationis levied. ii) This price variation clause shall be applicable to all contracts in B1 & B2 forms but shall not apply topiece works. The price variation shall be determined during each quarter as per formula given above in this clause.iii) Price variation under this clause shall not be payable for the extra items required to be executed during thecompletion of the work & also on the excess quantities of items payable under the provision of Clause 14/41 of thecontract form B1 & B2. Since the rates payable for the extra items or the extra quantities under Clause 14/41 are tobe fixed as per the current DSR or as mutually agreed to yearly revision till completion of such work. In other words,when the completion/execution of extra items as well as extra quantities under Clause 14/41 of the Contract Form B1& B2 extends beyond the operative date of the DSR, then rates payable for the same beyond that date shall be revisedwith reference to the current DSR prevalent at that time on year to year basis or revised in accordance with mutualagreement thereon, as provided for in the contract, whichever is less. iv) This clause is operative both ways ie.if theprice variation as calculated above is on the plus side, payment on account of the price variation shall be allowed tothe contractor & if it is on the negative side, MIDC shall be entitled to recover the same from the contractor & theamount shall be deductible from any amounts due & payable under the contract. v) To the extent that fullcompensation for any rise or fall in costs to the contractor is not entirely covered by the provisions of this or otherclauses in the contract, the unit rate & price included in the contract shall be deemed to include amount to cover thecontingency of such other actual rise or fall in costs.

Page 17 / 83 Executive EngineerContractor

Page 20: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

vi) Calculation for working out escalation payment on account of material, labour & POL will be restricted to 2digits only.

Where V5= Amount of price variation in Rupees to be allowed for HYSD/ mild steel component SO= Basic rate ofHYSD/mild steel in rupees per metric tonne as considered for working out value of P. SI1= Average Steel Index asper RBI Bulletin during the quarter under consideration. SI0= Average of Steel Index as per RBI Bulletin for thequarter preceding the month in which the last date prescribed for receipt of tender falls. T= Tonnage of steel used inthe permanent works for the quarter under consideration.

8) Formula for CI/DI pipe Component: V7 = QD x (D1 - D0)

Where V7= Amount of price escalation in Rupees to be allowed for CI/DI pipe component D0= Pig iron basic pricein Rupees per tonne considered for working out value of P. D1= Average pig iron price in Rupees per tonne duringthe quarter under consideration (Published by IISCO).

QD= Tonnage of CI/DI pipes used in the works during the quarter under consideration.

The following conditions shall prevail: b) The operative period of the contract shall mean the period commencingfrom the date of the work order issued to the contractor & ending on the date on which the time allowed for thecompletion of work specified in the contract for work expires, taking into considering the extension of time, if any,for completion of the work granted by Engineer under the relevant clauses of the Conditions of Contract in casesother than those where such extension is necessitated on account of default of the contractor. The decision ofEngineer as regards the Operative Period of the contract shall be final & binding on the contractor. Where anycompensation for liquidated damages is levied on the contractor on account of delay in completion or inadequateprogress under the relevant contract provisions, the price adjustment amount for the balance of work from the date oflevy of such compensation shall be worked out by pegging the indices L1, M1, C1, P1, B1, SI1, CI1 to levelscorresponding to the date from which such compensation is levied.

ii) This price variation clause shall be applicable to all contracts in B1 & B2 forms but shall not apply to pieceworks. The price variation shall be determined during each quarter as per formula given above in this clause.

iii) Price variation under this clause shall not be payable for the extra items required to be executed during thecompletion of the work & also on the excess quantities of items payable under the provision of Clause 14/41 of thecontract form B1 & B2. Since the rates payable for the extra items or the extra quantities under Clause 14/41 are tobe fixed as per the current DSR or as mutually agreed to yearly revision till completion of such work. In other words,when the completion/execution of extra items as well as extra quantities under Clause 14/41 of the Contract Form B1& B2 extends beyond the operative date of the DSR, then rates payable for the same beyond that date shall be revisedwith reference to the current DSR prevalent at that time on year to year basis or revised in accordance with mutual

Page 18 / 83 Executive EngineerContractor

Page 21: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

agreement thereon, as provided for in the contract, whichever is less. iv) This clause is operative both ways ie.if theprice variation as calculated above is on the plus side, payment on account of the price variation shall be allowed tothe contractor & if it is on the negative side, MIDC shall be entitled to recover the same from the contractor & theamount shall be deductible from any amounts due & payable under the contract.

v) To the extent that full compensation for any rise or fall in costs to the contractor is not entirely covered by theprovisions of this or other clauses in the contract, the unit rate & price included in the contract shall be deemed toinclude amount to cover the contingency of such other actual rise or fall in costs.

vi) Calculation for working out escalation payment on account of material, labour & POL will be restricted to 2digits only.

STAR RATE.

The following shall be the basic price (Star rate) for mild steel, HYSD, DI pipes, Cement, VG-10 & VG-30 grade bitumen etc. including all taxes. (the necessary price adjustment as completed in above para)

1. Cement Rs. 6,200/- per MT

2. Tor Steel Rs.48,000/- per MT

Page 19 / 83 Executive EngineerContractor

Page 22: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

ADDITIONAL CONTRACT CONDITIONS

Name Of Work : Krushnoor Indl.Area…M & R to water supply scheme...Providing Painting to LLR with minorrepairs at Krushnoor I/A.

ADDITIONAL CONTRACT CONDITIONS-I

1.The Contractor shall employ an authorized all time agent on this work capable of handling and guiding the workand understanding the Specifications. He shall take orders as will be given by the Executive Engineer or hisrepresentatives and shall be responsible for carrying them out. This agent shall not be changed without priorintimation to the Executive Engineer and his representative on the work site.2.The contractor shall take all the precautions during the execution of work so as not to cause any damage to anyproperty and shall be responsible to make it good as directed.3.The metered water supply from MIDC water supply distribution line shall be made available to the contractor, ifpossible and the water consumed shall be recovered at current industrial water rate existing at Nanded IA orwhichever is applicable from time to time. In case the water meter goes out of order or because of any other reason ifunmetered water supply is made to the contractor recovery at 1% cost of cement consuming item as well as as perrequirement of water for watering and consolidation will be made.4.If in the opinion of the Engineer-in-charge any building material brought by the contractor is defective, improper,unsuitable or not as per the specifications the same shall be removed within 24 hours from the receipt of the writteninstructions from the Engineer-in-charge, otherwise the same shall be disposed off by the department at risk and costof the contractor and no claim shall be entertained on this ground.

Page 20 / 83 Executive EngineerContractor

Page 23: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

ADDITIONAL CONTRACT CONDITIONS-II

1. COMMON CONDITIONS :-1.1 Extra charges for any item of work shall not be allowed unless the work to which it relates is clearly without thespirits and meaning of the Specification or unless such work ordered in writing by the Engineer-in charge and areclaimed for in the specified manner before the work is taken in hand.1.2 The contractor shall bear all the expenses for making all necessary provisions for housing, water supply andsanitary arrangements for his employees and shall pay directly to the concerned authorities, all rates, taxes, royaltiesand other charges to the Health Department of the concerned Municipality.

2. MATERIALS :-

2.1 Unless otherwise specifically provided for whether in the item or in the Schedule “A” or in Specifications forsupply of the materials by the Department, all item in the tender are inclusive of the cost of all material. The materialas are not stipulated to be supplied by department as per Schedule “A” shall be provided by the contractor ofapproved type and make only.

2.2 All the materials used in the work shall be of quality as per samples got previously approved and any materialsrejected shall be removed by the contractor from the site of work within 24 hours failing which the same will be gotremoved by the department at his cost.2.3 The contractor shall have to use departmental material if supplied by department at the rate mentioned inSchedule “A”. The materials so supplied shall be used for the work in tender only. The contractor shall maintain aregular account of the receipt and the use of such materials to the satisfaction of the Engineer-in-charge and submitmonthly statement thereof. He shall keep the account of such material in suitable books, which will be available forthe inspection to the Engineer-in-charge whenever, demanded. The contractor will be responsible for a properhandling and safe custody of all materials delivered to him by the department. He shall make a proper and economicuse of all materials supplied by the department whether free of cost or on payment for utilization in the execution ofthe contract. All the surplus materials from those supplied by the department to the contractor free of charge shall bereturned to the department at places as directed and if any shortages are noticed or found in damaged orunserviceable condition the cost thereof as fixed by the Executive Engineer will be recovered from the contractor.All the surplus materials from those supplied by department on payment shall neither be disposed of nor removed bythe contractor without obtaining permission of the Engineer-in-charge to that effect as the Engineer-in-charge shallhave the option to take over of such surplus materials at the issue rates.2.4 The contractor shall give at the time of taking delivery receipts for all the materials, pipes and specials etc. issuedto him when those issued free of cost to the safeguard specially against wrong debit being raised by the contractor.2.5 The contractor should not be entitled to claim compensation from the department on account of delay by thedepartment in supply of materials entered in Schedule “A”.In case of such delay the department shall however,grant such extension of time limit for the completion of work as may appear reasonable to the Engineer-in-charge

Page 21 / 83 Executive EngineerContractor

Page 24: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

and his decision shall be final and shall be accepted by the contractor.

3. WORKS :-

3.1 The contractor shall have no claim for compensation on account of reasonable variation in the depth offoundations for trenches.3.2 Any Item not covered in the Schedule “B” of this tender but required to be executed shall be carried out by thecontractor at the MIDC schedule of rates or the rate approved by the competent authority if the item are not foundincluded in the schedule.

3.3 The layout of all the work shall be marked by the contractor on site with permanent pillars as directed.Thenecessary levels shall be given by the MIDC officials. The contractor must however provide the necessary labour andmaterials for making out the ground and keep all the references levels and lining pegs sealed in cementconcrete andexecute the work in accordance with those levels for which he shall be responsible through out the whole period ofthe contract.

4. CARTING :-

4.1 The contractor shall provide his mode and conveyance for carrying for pipes, specials and other materialsrequired for the execution of the work.4.2 The contractor shall provide diversion to the affected existing road, if required, as directed by the Engineer-incharge at his own cost.

Page 22 / 83 Executive EngineerContractor

Page 25: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

5. TIME LIMIT :-

The time limit for the completion of work covered shall be 2 calendar months from the date of work order inclusiveof Monsoon.

6. GENERAL :-

6.1 The contractor shall be deemed to be thoroughly conversant with the local conditions such as the availability ofall construction materials, skilled and unskilled labour and to have based his rates accordingly for this work. He shallalso be deemed to have carefully studied all the specifications and drawings and followed them before thesubmission of the tender.

6.2 In case of any discrepancy between the type of working drawings on one hand and the working of thecorresponding items and specifications, thereof, as per the contract, the latter shall be deciding for the purpose ofactual execution of items. However the Executive Engineer’s decision should be obtained in the matter before takingwork in hand. For a composite item any higher specification needs to be adopted for any component as a result thanspecified in the item and specifications therefore, extra rate shall be payable. No major deviation involvingsubstantial extra outlay shall be made without the prior approval of the Superintending Engineer.

ADDITIONAL CONTRACT CONDITIONS-III

1. The contractor shall provide free of charge all labours and materials required for work included in this tender. Hewill have to provide such aids as decided by the Executive Engineer as are considered necessary for the purpose andsystematic execution of the work.

2. Orders issued by the Engineer-in-charge from time to time regarding the conduct of the work shall be binding onthe contractor.

3. It shall be the contractor’s responsibility to inspect and investigate the work sites thoroughly so as to arrive at therates quoted in the tender. In this regard necessary information available with the department will be given to himwithout any guarantee about it’s full proof ness.

Page 23 / 83 Executive EngineerContractor

Page 26: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA STATE COMMISSIONER OF SALES TAX

NOTIFICATION NO.VAT-1505/CR-123/TAXATION-1 DT.1.4.2005

MAHARASHTRA VALUE ADDED TAX ACT-2002

1. The tendered rates shall be inclusive of all taxes, rates & cesses & shall also be inclusive of the tax leviable in respect of VATunder the provision of the Maharashtra Value Added Tax Act-2002.

2. The contractors who submit the tenders should necessarily be a Registered Dealer under the MaharashtraValue Added Tax Act, 2002.

3. The contractor shall submit the Registration Certificate as a registered dealer under the above said Act atthe time of submission of tender/at the time of issuing the work order.

4. MIDC will deduct this tax at source at 2% (for registered contractors) & 4% (in other case) of the value ofthe work done as per Section 31 of Maharashtra VAT Act, 2002 & Notification No.VAT-1505/CR-123/TAXATION-1 DT.1.4.2005. TDS certificate to this effect will be issued by MI DC.

REGISTRATION UNDER CONTRACT LABOUR ACT -1970

While submitting the tender, the tenderer should note that he should produce the certified xerox copy ofRegistration in prescribed form issued by Labour Commissioner under Contract Labour Act, 1970, as an employer,as much as they are directly employing the workers for execution of the contract works awarded to them by MI DC& comply with the provision of the Act. After acceptance of tender by MIDC the contractor has to give intimationabout work order & get this particular work registered within a period of 15 days from the date of issue of work orderfrom labour commissioner under Contract Labour Act, 1970 failing which no permission will be granted to continuefurther work under the agreement.

DEDUCTION OF INCOME TAX

The Income Tax including surcharges or percentage in force from time to time or at the rate as intimated bythe competent Income Tax authority shall be deducted from bill amount whether measured bill, advance payment orsecured advance.

IMPORTANT NOTE:-

The point No.viii & ix of detailed tender notice is not applicable for this work.

In Clause of Value Added Tax (VAT) Act please read point No.4 as below.

MIDC will deduct this tax at source at 2% (for registered contractors) & 5% (in other case) of the value of the work done as per

Amendments

Page 24 / 83 Executive EngineerContractor

Page 27: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MIDC will deduct this tax at source at 2% (for registered contractors) & 5% (in other case) of the value of the work done as perSection 31 of M-VAT Act, 2002 & Notification No.VAT-1505/CR- 123/TAXATION-1 DT.1.4.2005. TDS certificate to this effect will beissued by MI DC.

Page 25 / 83 Executive EngineerContractor

Page 28: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION( A Govt. of Maharashtra Undertaking)

STANDARD CEMENT CONSUMPTION STATEMENT

Item of Work Rate of CementConsumption inbags.

Remarks

A] Cement Concrete (Nominal Mix)

Lower Limit Upper Limit

1:5:10 (M-5) 2.60/m3 2.35 2.85

1:4:8 (M-7.5) 3.10/m3 2.80 3.40

1:3:6 (M-10) 4.10/m3 3.80 4.40

1:2:4 (M-15) 6.20/m3 5.90 6.50

1:1&frac12;:3 (M-20) 8.20/m3 7.90 8.50

1: 1: 2 (M-25) 8.70/m3 8.40 9.00

B] Cement Concrete (Design Mix) Minimum cementconsumption forDesign Mix

M-15 5.80/m3 The grater value of either theminimum cement contentspecified or cementconsumption as per design mixwill prevail during execution ofwork.

M-20 6.60/m3

M-25 6.60/m3

M-30 7.00/m3

M-35 7.50m3

M-40 8.00/m3

C] Brick Masonry II Class with 30% mortar

CM - 1:8 1.05/m3

CM - 1:6 1.40/m3

CM - 1:5 1.70/m3

CM - 1:4 2.10/m3

D] 115 mm thick Brick Masonry II Class

CM - 1:3 0.28/m2

E] Brick Masonry I Class withoutpointing with 25% mortar

CM - 1:6 1.15/m3

CM - 1:5 1.40/m3

CM - 1:4 1.70/m3

F] UCR Masonry without pointing with 35% mortar

CM - 1:6 1.70/m3

CM - 1:5 2.00/m3

CM - 1:4 2.50/m3

G] UCR Masonry without pointing with 45% to 50% mortar

CM - 1:6 2.15/m3

CM - 1:5 2.60/m3

CM - 1:4 3.10/m3

H] Laterite Stone Masonry with 18% mortar

CM - 1:6 0.85/m3

CM - 1:5 1.00/m3

CM - 1:4 1.30/m3

I] Cement Plaster with Cement mortar 1:3 (neeru finish)

6 mm 0.07/m2

12 mm 0.13/m2

20 mm 0.20/m2

25 mm 0.23/m2

40 mm 0.40/m2

J] Cement Plaster with Cement mortar 1:4 (without neeru finish)

6 mm 0.06/m2

12 mm 0.11/m2

20 mm 0.17/m2

25 mm 0.22/m2

40 mm 0.34/m2

K] Coursed Rubble masonry with pointing 30% mortar

1:6 CM 1.70/m3

1:5 CM 2.00/m3

1:4 CM 2.50/ m3

L] Sand Faced plaster CM 1:3

12 MM 0.20/m2

20 MM 0.23/m2

25 MM 0.25/m2

M] Cement plaster without neeru finish CM 1:3

6 MM 0.07/m2

12 MM 0.13/m2

20 MM 0.20/m2

25 MM 0.25/m2

N] Cement plaster with neeru finish CM 1:4

6 MM 0.06/m2

12 MM 0.10/m2

20 MM 0.17/m2

25 MM 0.22/m2

O] Decorative texture plaster

CM 1:4 0.15/m2

P] Neat Cement Finish over green surface

1.5 mm Thick 0.04/m2

Q] Wet on wet finish CM 1:3

12 MM 1.05/m2

R] Pointing with Cement Mortar 1:3

Brick Masonry 0.03/m2

Stone Masonry 0.05/m2

S] Paving and Flooring

Shahabad / Tandur / Kotta / KaddapaChequred tiles / plain cement tiles /marble / mosaic / granite CM 1:4 bedand with pointing 1:3

0.19/m2

Skirting & Daddo 0.30/m2

Shahabad / Tandur / Kadappa CM 1:6 0.14/m2

White / coloured glazed tiles 0.28/m2

Granite stone facing plaster CM 1:3 0.20/m2

Ceramic tiles 0.22/m2

IPS flooring 40 mm 0.30/m2

T] Colgrout Masonry with 45 % mortar

Cement 1:3 sand mortar 3.54/m3

U] Gunniting CM 1:3

25 MM 0.28/m2

40 MM 0.45/m2

50 MM 0.55/m2

V] Water proofing

Box type water proofing 0.80/m2

Water proofing by injection grouting 1.00/m2

Water proofing on terrace slab 0.50/m2

Page 26 / 83 Executive EngineerContractor

Page 29: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Item of Work Rate of CementConsumption inbags.

Remarks

A] Cement Concrete (Nominal Mix)

Lower Limit Upper Limit

1:5:10 (M-5) 2.60/m3 2.35 2.85

1:4:8 (M-7.5) 3.10/m3 2.80 3.40

1:3:6 (M-10) 4.10/m3 3.80 4.40

1:2:4 (M-15) 6.20/m3 5.90 6.50

1:1&frac12;:3 (M-20) 8.20/m3 7.90 8.50

1: 1: 2 (M-25) 8.70/m3 8.40 9.00

B] Cement Concrete (Design Mix) Minimumcementconsumption forDesign Mix

M-15 5.80/m3 The grater value of either theminimum cement contentspecified or cementconsumption as per design mixwill prevail during execution ofwork.

M-20 6.60/m3

M-25 6.60/m3

M-30 7.00/m3

M-35 7.50m3

M-40 8.00/m3

C] Brick Masonry II Class with 30% mortar

CM - 1:8 1.05/m3

CM - 1:6 1.40/m3

CM - 1:5 1.70/m3

CM - 1:4 2.10/m3

D] 115 mm thick Brick Masonry II Class

CM - 1:3 0.28/m2

E] Brick Masonry I Class withoutpointing with 25% mortar

CM - 1:6 1.15/m3

CM - 1:5 1.40/m3

CM - 1:4 1.70/m3

F] UCR Masonry without pointing with 35% mortar

CM - 1:6 1.70/m3

CM - 1:5 2.00/m3

CM - 1:4 2.50/m3

G] UCR Masonry without pointing with 45% to 50% mortar

CM - 1:6 2.15/m3

CM - 1:5 2.60/m3

CM - 1:4 3.10/m3

H] Laterite Stone Masonry with 18% mortar

CM - 1:6 0.85/m3

CM - 1:5 1.00/m3

CM - 1:4 1.30/m3

I] Cement Plaster with Cement mortar 1:3 (neeru finish)

6 mm 0.07/m2

12 mm 0.13/m2

20 mm 0.20/m2

25 mm 0.23/m2

40 mm 0.40/m2

J] Cement Plaster with Cement mortar 1:4 (without neeru finish)

6 mm 0.06/m2

12 mm 0.11/m2

20 mm 0.17/m2

25 mm 0.22/m2

40 mm 0.34/m2

K] Coursed Rubble masonry with pointing 30% mortar

1:6 CM 1.70/m3

1:5 CM 2.00/m3

1:4 CM 2.50/ m3

L] Sand Faced plaster CM 1:3

12 MM 0.20/m2

20 MM 0.23/m2

25 MM 0.25/m2

M] Cement plaster without neeru finish CM 1:3

6 MM 0.07/m2

12 MM 0.13/m2

20 MM 0.20/m2

25 MM 0.25/m2

N] Cement plaster with neeru finish CM 1:4

6 MM 0.06/m2

12 MM 0.10/m2

20 MM 0.17/m2

25 MM 0.22/m2

O] Decorative texture plaster

CM 1:4 0.15/m2

P] Neat Cement Finish over green surface

1.5 mm Thick 0.04/m2

Q] Wet on wet finish CM 1:3

12 MM 1.05/m2

R] Pointing with Cement Mortar 1:3

Brick Masonry 0.03/m2

Stone Masonry 0.05/m2

S] Paving and Flooring

Shahabad / Tandur / Kotta / KaddapaChequred tiles / plain cement tiles /marble / mosaic / granite CM 1:4 bedand with pointing 1:3

0.19/m2

Skirting & Daddo 0.30/m2

Shahabad / Tandur / Kadappa CM 1:6 0.14/m2

White / coloured glazed tiles 0.28/m2

Granite stone facing plaster CM 1:3 0.20/m2

Ceramic tiles 0.22/m2

IPS flooring 40 mm 0.30/m2

T] Colgrout Masonry with 45 % mortar

Cement 1:3 sand mortar 3.54/m3

U] Gunniting CM 1:3

25 MM 0.28/m2

40 MM 0.45/m2

50 MM 0.55/m2

V] Water proofing

Box type water proofing 0.80/m2

Water proofing by injection grouting 1.00/m2

Water proofing on terrace slab 0.50/m2

Page 27 / 83 Executive EngineerContractor

Page 30: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Item of Work Rate of CementConsumption inbags.

Remarks

A] Cement Concrete (Nominal Mix)

Lower Limit Upper Limit

1:5:10 (M-5) 2.60/m3 2.35 2.85

1:4:8 (M-7.5) 3.10/m3 2.80 3.40

1:3:6 (M-10) 4.10/m3 3.80 4.40

1:2:4 (M-15) 6.20/m3 5.90 6.50

1:1&frac12;:3 (M-20) 8.20/m3 7.90 8.50

1: 1: 2 (M-25) 8.70/m3 8.40 9.00

B] Cement Concrete (Design Mix) Minimumcementconsumption forDesign Mix

M-15 5.80/m3 The grater value of either theminimum cement contentspecified or cementconsumption as per design mixwill prevail during executionof work.

M-20 6.60/m3

M-25 6.60/m3

M-30 7.00/m3

M-35 7.50m3

M-40 8.00/m3

C] Brick Masonry II Class with 30% mortar

CM - 1:8 1.05/m3

CM - 1:6 1.40/m3

CM - 1:5 1.70/m3

CM - 1:4 2.10/m3

D] 115 mm thick Brick Masonry II Class

CM - 1:3 0.28/m2

E] Brick Masonry I Class withoutpointing with 25% mortar

CM - 1:6 1.15/m3

CM - 1:5 1.40/m3

CM - 1:4 1.70/m3

F] UCR Masonry without pointing with 35% mortar

CM - 1:6 1.70/m3

CM - 1:5 2.00/m3

CM - 1:4 2.50/m3

G] UCR Masonry without pointing with 45% to 50% mortar

CM - 1:6 2.15/m3

CM - 1:5 2.60/m3

CM - 1:4 3.10/m3

H] Laterite Stone Masonry with 18% mortar

CM - 1:6 0.85/m3

CM - 1:5 1.00/m3

CM - 1:4 1.30/m3

I] Cement Plaster with Cement mortar 1:3 (neeru finish)

6 mm 0.07/m2

12 mm 0.13/m2

20 mm 0.20/m2

25 mm 0.23/m2

40 mm 0.40/m2

J] Cement Plaster with Cement mortar 1:4 (without neeru finish)

6 mm 0.06/m2

12 mm 0.11/m2

20 mm 0.17/m2

25 mm 0.22/m2

40 mm 0.34/m2

K] Coursed Rubble masonry with pointing 30% mortar

1:6 CM 1.70/m3

1:5 CM 2.00/m3

1:4 CM 2.50/ m3

L] Sand Faced plaster CM 1:3

12 MM 0.20/m2

20 MM 0.23/m2

25 MM 0.25/m2

M] Cement plaster without neeru finish CM 1:3

6 MM 0.07/m2

12 MM 0.13/m2

20 MM 0.20/m2

25 MM 0.25/m2

N] Cement plaster with neeru finish CM 1:4

6 MM 0.06/m2

12 MM 0.10/m2

20 MM 0.17/m2

25 MM 0.22/m2

O] Decorative texture plaster

CM 1:4 0.15/m2

P] Neat Cement Finish over green surface

1.5 mm Thick 0.04/m2

Q] Wet on wet finish CM 1:3

12 MM 1.05/m2

R] Pointing with Cement Mortar 1:3

Brick Masonry 0.03/m2

Stone Masonry 0.05/m2

S] Paving and Flooring

Shahabad / Tandur / Kotta / KaddapaChequred tiles / plain cement tiles /marble / mosaic / granite CM 1:4 bedand with pointing 1:3

0.19/m2

Skirting & Daddo 0.30/m2

Shahabad / Tandur / Kadappa CM 1:6 0.14/m2

White / coloured glazed tiles 0.28/m2

Granite stone facing plaster CM 1:3 0.20/m2

Ceramic tiles 0.22/m2

IPS flooring 40 mm 0.30/m2

T] Colgrout Masonry with 45 % mortar

Cement 1:3 sand mortar 3.54/m3

U] Gunniting CM 1:3

25 MM 0.28/m2

40 MM 0.45/m2

50 MM 0.55/m2

V] Water proofing

Box type water proofing 0.80/m2

Water proofing by injection grouting 1.00/m2

Water proofing on terrace slab 0.50/m2

Page 28 / 83 Executive EngineerContractor

Page 31: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Item of Work Rate of CementConsumption inbags.

Remarks

A] Cement Concrete (Nominal Mix)

Lower Limit Upper Limit

1:5:10 (M-5) 2.60/m3 2.35 2.85

1:4:8 (M-7.5) 3.10/m3 2.80 3.40

1:3:6 (M-10) 4.10/m3 3.80 4.40

1:2:4 (M-15) 6.20/m3 5.90 6.50

1:1&frac12;:3 (M-20) 8.20/m3 7.90 8.50

1: 1: 2 (M-25) 8.70/m3 8.40 9.00

B] Cement Concrete (Design Mix) Minimumcementconsumption forDesign Mix

M-15 5.80/m3 The grater value of either theminimum cement contentspecified or cementconsumption as per designmix will prevail duringexecution of work.

M-20 6.60/m3

M-25 6.60/m3

M-30 7.00/m3

M-35 7.50m3

M-40 8.00/m3

C] Brick Masonry II Class with 30% mortar

CM - 1:8 1.05/m3

CM - 1:6 1.40/m3

CM - 1:5 1.70/m3

CM - 1:4 2.10/m3

D] 115 mm thick Brick Masonry II Class

CM - 1:3 0.28/m2

E] Brick Masonry I Class withoutpointing with 25% mortar

CM - 1:6 1.15/m3

CM - 1:5 1.40/m3

CM - 1:4 1.70/m3

F] UCR Masonry without pointing with 35% mortar

CM - 1:6 1.70/m3

CM - 1:5 2.00/m3

CM - 1:4 2.50/m3

G] UCR Masonry without pointing with 45% to 50% mortar

CM - 1:6 2.15/m3

CM - 1:5 2.60/m3

CM - 1:4 3.10/m3

H] Laterite Stone Masonry with 18% mortar

CM - 1:6 0.85/m3

CM - 1:5 1.00/m3

CM - 1:4 1.30/m3

I] Cement Plaster with Cement mortar 1:3 (neeru finish)

6 mm 0.07/m2

12 mm 0.13/m2

20 mm 0.20/m2

25 mm 0.23/m2

40 mm 0.40/m2

J] Cement Plaster with Cement mortar 1:4 (without neeru finish)

6 mm 0.06/m2

12 mm 0.11/m2

20 mm 0.17/m2

25 mm 0.22/m2

40 mm 0.34/m2

K] Coursed Rubble masonry with pointing 30% mortar

1:6 CM 1.70/m3

1:5 CM 2.00/m3

1:4 CM 2.50/ m3

L] Sand Faced plaster CM 1:3

12 MM 0.20/m2

20 MM 0.23/m2

25 MM 0.25/m2

M] Cement plaster without neeru finish CM 1:3

6 MM 0.07/m2

12 MM 0.13/m2

20 MM 0.20/m2

25 MM 0.25/m2

N] Cement plaster with neeru finish CM 1:4

6 MM 0.06/m2

12 MM 0.10/m2

20 MM 0.17/m2

25 MM 0.22/m2

O] Decorative texture plaster

CM 1:4 0.15/m2

P] Neat Cement Finish over green surface

1.5 mm Thick 0.04/m2

Q] Wet on wet finish CM 1:3

12 MM 1.05/m2

R] Pointing with Cement Mortar 1:3

Brick Masonry 0.03/m2

Stone Masonry 0.05/m2

S] Paving and Flooring

Shahabad / Tandur / Kotta / KaddapaChequred tiles / plain cement tiles /marble / mosaic / granite CM 1:4 bedand with pointing 1:3

0.19/m2

Skirting & Daddo 0.30/m2

Shahabad / Tandur / Kadappa CM 1:6 0.14/m2

White / coloured glazed tiles 0.28/m2

Granite stone facing plaster CM 1:3 0.20/m2

Ceramic tiles 0.22/m2

IPS flooring 40 mm 0.30/m2

T] Colgrout Masonry with 45 % mortar

Cement 1:3 sand mortar 3.54/m3

U] Gunniting CM 1:3

25 MM 0.28/m2

40 MM 0.45/m2

50 MM 0.55/m2

V] Water proofing

Box type water proofing 0.80/m2

Water proofing by injection grouting 1.00/m2

Water proofing on terrace slab 0.50/m2Page 29 / 83 Executive EngineerContractor

Page 32: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Item of Work Rate of CementConsumption inbags.

Remarks

A] Cement Concrete (Nominal Mix)

Lower Limit Upper Limit

1:5:10 (M-5) 2.60/m3 2.35 2.85

1:4:8 (M-7.5) 3.10/m3 2.80 3.40

1:3:6 (M-10) 4.10/m3 3.80 4.40

1:2:4 (M-15) 6.20/m3 5.90 6.50

1:1&frac12;:3 (M-20) 8.20/m3 7.90 8.50

1: 1: 2 (M-25) 8.70/m3 8.40 9.00

B] Cement Concrete (Design Mix) Minimumcementconsumption forDesign Mix

M-15 5.80/m3 The grater value of either theminimum cement contentspecified or cementconsumption as per designmix will prevail duringexecution of work.

M-20 6.60/m3

M-25 6.60/m3

M-30 7.00/m3

M-35 7.50m3

M-40 8.00/m3

C] Brick Masonry II Class with 30% mortar

CM - 1:8 1.05/m3

CM - 1:6 1.40/m3

CM - 1:5 1.70/m3

CM - 1:4 2.10/m3

D] 115 mm thick Brick Masonry II Class

CM - 1:3 0.28/m2

E] Brick Masonry I Class withoutpointing with 25% mortar

CM - 1:6 1.15/m3

CM - 1:5 1.40/m3

CM - 1:4 1.70/m3

F] UCR Masonry without pointing with 35% mortar

CM - 1:6 1.70/m3

CM - 1:5 2.00/m3

CM - 1:4 2.50/m3

G] UCR Masonry without pointing with 45% to 50% mortar

CM - 1:6 2.15/m3

CM - 1:5 2.60/m3

CM - 1:4 3.10/m3

H] Laterite Stone Masonry with 18% mortar

CM - 1:6 0.85/m3

CM - 1:5 1.00/m3

CM - 1:4 1.30/m3

I] Cement Plaster with Cement mortar 1:3 (neeru finish)

6 mm 0.07/m2

12 mm 0.13/m2

20 mm 0.20/m2

25 mm 0.23/m2

40 mm 0.40/m2

J] Cement Plaster with Cement mortar 1:4 (without neeru finish)

6 mm 0.06/m2

12 mm 0.11/m2

20 mm 0.17/m2

25 mm 0.22/m2

40 mm 0.34/m2

K] Coursed Rubble masonry with pointing 30% mortar

1:6 CM 1.70/m3

1:5 CM 2.00/m3

1:4 CM 2.50/ m3

L] Sand Faced plaster CM 1:3

12 MM 0.20/m2

20 MM 0.23/m2

25 MM 0.25/m2

M] Cement plaster without neeru finish CM 1:3

6 MM 0.07/m2

12 MM 0.13/m2

20 MM 0.20/m2

25 MM 0.25/m2

N] Cement plaster with neeru finish CM 1:4

6 MM 0.06/m2

12 MM 0.10/m2

20 MM 0.17/m2

25 MM 0.22/m2

O] Decorative texture plaster

CM 1:4 0.15/m2

P] Neat Cement Finish over green surface

1.5 mm Thick 0.04/m2

Q] Wet on wet finish CM 1:3

12 MM 1.05/m2

R] Pointing with Cement Mortar 1:3

Brick Masonry 0.03/m2

Stone Masonry 0.05/m2

S] Paving and Flooring

Shahabad / Tandur / Kotta / KaddapaChequred tiles / plain cement tiles /marble / mosaic / granite CM 1:4 bedand with pointing 1:3

0.19/m2

Skirting & Daddo 0.30/m2

Shahabad / Tandur / Kadappa CM 1:6 0.14/m2

White / coloured glazed tiles 0.28/m2

Granite stone facing plaster CM 1:3 0.20/m2

Ceramic tiles 0.22/m2

IPS flooring 40 mm 0.30/m2

T] Colgrout Masonry with 45 % mortar

Cement 1:3 sand mortar 3.54/m3

U] Gunniting CM 1:3

25 MM 0.28/m2

40 MM 0.45/m2

50 MM 0.55/m2

V] Water proofing

Box type water proofing 0.80/m2

Water proofing by injection grouting 1.00/m2

Water proofing on terrace slab 0.50/m2

Page 30 / 83 Executive EngineerContractor

Page 33: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION ( A Govt. of Maharashtra Undertaking)

CEMENT VARIATION CLAUSE

The rates in Schudule are based on the above stated rates of cement consumption. The permissible variation in the cement consumptionshall be as given under Item No.1 above. For rest of the item permissible variation shall be + 5% of figures give above. If the actualconsuption on any work is below these limits, reduced rates shall be paid (considering double the prevailing market rate) for any item ofwork on which less cement has been used below limit of -5%. If consumption goes beyond the limit of +5% the same shall not be paid.It may be noted that when specifically ordered out to adopt richer mix than specified in the tender, the excess cement soconsumed above the specified mix in the tender, the same will be paid at prevailing market rate. However, for cement saveddue to adoption of poorer mix when so specifically directed by the department, a reduced rate will be paid (as per prevailingmarket rate).For excess/less cement use on work as per cement variation clause the standarad consumption for cement shall be as pertable given above.

Page 31 / 83 Executive EngineerContractor

Page 34: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

DECLARATION

I/We hereby declare that in the forma­tion of our Company, either by way of partnership or consultant, no

MIDC ex-employee has been on the enrollment of the Company.

It is further to certify that the ex-employee of the MIDC, who has joined the Company, has completed 2

years from his date of resignation from MIDC or from the date of retirement from MIDC.

Date :

Place : Signature of Contractor

Page 32 / 83 Executive EngineerContractor

Page 35: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION(A Government of Maharashtra Undertaking)

INSURANCE OF WORK

The contractor shall take out necessary Insurance Policy/Policies immediately after issuing work order and produce acopy of same prior to payment of first RA bill so as to pro­vide adequate insurance cover for exe­cution of theawardedcontract work for total contract value & complete con­tract period including defect liability period asstipulated in thetenderpaper and upto the period for which the extension of time limit is granted from the "Directorateof Insurance,MaharashtraState, Mumbai" only. Its postal address for correspon­dence is "264, MHADA, 1st floor,Opp Kalanagar,Bandra (E), Mumbai-400 051". Tel.26438690 / 26438746 & Fax:26438461. Similarly, all workmenappointed to complete the contract work are required to be insured under Workmen's Compensa­tion InsurancePolicy. Insurance Policy /Policies taken out from any other com­pany will not be accepted. If any con­tractor haseffected insurance with any Insurance Company, the same will not be accepted.

Page 33 / 83 Executive EngineerContractor

Page 36: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

SERVICE TAX CLAUSE

(For maintenance, labour oriented and consultancy works)

The contractor in person himself or his registered firm or institute or public ltd. Company ororganization or construction agency or any other agency should be register under service taxauthority .The rates quoted by the tenderer should be inclusive of all taxes, duties, education tax or cessor any type of taxes which will be imposed by Central Govt. or State Govt. or local bodies except servicetax. The offer shall be quoted excluding service tax. It shall be responsibility of contractor to make thepayment of service tax to excise department within the prescribed period as per service tax act. Forrecovery of payment/reimbursement of service tax the contractor shall submit the proforma invoice at thetime of RA Bills with documentary proof and same shall be paid by MIDC alongwith RA bills.

Page 34 / 83 Executive EngineerContractor

Page 37: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

SERVICE TAX CLAUSE

(For other than maintenance, labour oriented and consultancy works)

1. The tendered rate shall be inclusive of all taxes, rates & cesses & shall also be inclusive of thetax liable in re­spect of Service Tax under the provision of Service Tax Act.

2. The contractors who submit the tenders should necessarily be registered under the Service TaxAct, if he is providing services covered under Service Tax Act.

3. The contractor shall submit the registration certificate/ authorized documents under the serviceTax Act at the time of submission of tender.

4. The successful tenderer shall himself be liable/responsible to pay the Service Tax witheducation cess thereon to con­cerned government authority directly (after receiving the payment)as per the prescribed rate declared by concerned

government authority time to time & within the prescribed period as per Service Tax Act.

Page 35 / 83 Executive EngineerContractor

Page 38: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

COMMON CONDITIONS & ADDITIONAL CONTRACT CONDITIONS

1. COMMON CONDITIONS: Extra charges for any item of work shall not be allowed unless the work to which it is related is clearly withinthe spirit & meaning of the specification or unless such works are ordered in writing by the Engr-in-charge & are claimed for in thespecified manner before the commencement of work. The contractor shall at his own expense make all necessary provisions for housing,water supply, electricity & sanitary arrangements for his employees at site of works as required. He shall pay directly to the concernedauthorities all rates, taxes, royalties & other charges. He shall also comply with all requirements of health department of the concernedauthorities.

2. MATERIALS: Unless otherwise specifically provided for either in the item or in the specifications or in the Schedule 'A' for Supply ofMaterials by MIDC, all items in the tender are inclusive of costs of material required for the execution of the items. Materials not stipulatedto be supplied by MIDC, shall be brought by the contractor at his cost. The quality, type & make of materials used in the work shall be asper samples got previously approved from Engineer-in-charge, as mentioned in the detailed specification All rejected material shall beremoved by the contractor from site of work immediately failing which the same will be got removed by MIDC at his cost.

3. WORKS: The lining out of all works shall be marked by the contractor on site with permanent pillars as directed. The necessary levelswill be given by MIDC. The contractor must however, provide the necessary labour & material for making out the ground & keeping allreferences, levels & lining props sealed in cement concrete & execute the work in accordance with those levels for which he will beresponsible throughout the whole period of contract. The few bench mark pillars to be connected with MIDC benchmark shall beconstructed by the contractor at the site of work as directed for reference of various levels in connection with work. The line out if requiredto be carried out more than one time, the same shall be done by the contractor without extra cost.

4. CARTING: The contractor shall convey pipes, specials & other sundry materials required for the Execution of the work at his owncost.The contractor shall provide diversion to the affected existing road, if required, as directed by Engineer-in-charge at his own cost

5. GENERAL: The contractor shall be deemed to be thoroughly conversant with the local condition such as the availability of allconstruction materials, skilled & unskilled labour & to have based his rates accordingly for this work. He shall be deemed to have carefullystudied all the specifications & drawings & followed them before the submission of his tender.

6. In case of any discrepancy between the type of working drawings on one hand & the wording of the corresponding item & specificationsthereof as per the contract, the later will be deciding for the purpose of actual execution of items. However, the Exe. Engineer's decisionshould be obtained in the matter before hand. For a composite item, if any higher specification are to be adopted for any component as aresult than specified in the item & specification therefore, extra rate will be payable on approvaNo major deviation involving substantialextra outlay will be made without the prior approval of the Superintending Engineer.

7. Work progress register will be maintained by MIDC on site &/or in the Divisional office &/or Sub division under it. The contractor willsign all instruction issued by Exe. Engineer or his representative/ his superior officers & comply with them. For this purpose the contractoror his authorised representative shall attend the site or said office daily for receiving instructions.

8. i) Metered water supply will be made available to the contractor from MIDC pipeline if available & water consumed will be charged atthe prevailing industrial rate or near by industrial area or in that area subject to change as decided by MIDC from time to time. Theconnection, metering etc. shall be taken by the contractor at his cost. In case of water supply to CETP and CHWTSDF will be provided atdomestic rate applicable in that area during construction and operation period.

ii) For taking water supply connection separate agreement for water supply connection is necessary to be executed with MIDC and the termsand conditions of this agreement will prevail until water supply connection is in force.

9. It willbe the contractor's responsibility to inspect & investigate the work site thoroughly so as to arrive at the rates quoted in the tender.In

Page 36 / 83 Executive EngineerContractor

Page 39: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

this regard necessary information available with MIDC Will be given to him without any guarantee about it's foolproofness.

10. Contractor has to clear road land width/plot which includes cutting trees less than 30 Cms. In girth with permission from concernedcompetent authority, cleaning brush wood, loose stones, vegetation, bushes, stumps & mole hills without any extra cost. The contractor shallprovide diversion to the affected existing road, if required as directed by Engineer-in-charge at his own cost.

11. The contractor shall engage an authorised all time person on this work capable of engaging & guiding the work & understanding allspecifications. He will take orders as willbe issued by the Exe.Engineer, or his authorised representative & shall be responsible for carryingthem out. The person shall not be changed without prior intimation to the Exe. Engineer & his representative on the work site.

12. The contractor will take all precautions during the execution of work so as not to cause any damage to any property/ adjacent properties& shall be responsible to make good any damaged property as directed by the Exe. Engineer till his satisfaction.

13. All installations such as electric cable, water pipeline, telephone lines, OFC, Sewer main manhole, natural drainage, gas/ fuile pipelines,CD works, strom water draines etc coming in the way shall be looked after carefully. The protections and support against any damages,which otherwise willhave to made good by contractor at his cost. In case any permission is required from Concerned authority for handlingthese lines, the contractor will co-ordinate with such authority. All safety precautions shall be taken from traffic flow point of view.

14. Contractor should specifically indicate the metal & murum quarries from which he proposes to bring the material for completing thework.

15. Where the proper measurement of work, it is necessary to have an initial set of levels taken,the same as recorded in the authorised fieldbook by the Exe. Engineer or his authorized representative & willbe signed by the contractor who willbe entitled to have a true copy of thesame on demand. Any failure on the part of the contractor to get such levels before starting the work will render him liable to accept thedecision of the Exe. Engineer as to the basis of taking measurements. Likewise the contractor will not cover any work which will render itssubsequent measurement difficult or impossible, without first getting the same jointly measured by himself & the authorised representativeof the Exe. Engineer. The record of such measurements on to Department's side willbe signed by the contractor & he willbe entitled to havea true copy of the same on demand.

16. All work before being finally taken over by MIDC will be entire liability of the contractor for guardingmaintaining & making good anydamage of any magnitude. Interim payments made for such work will not alter this position. The handing over by the contractor & takingover by the Exe. Engineer, or his authorised representative, will be always in writing, of which copies will go the Exe. Engineer, hisauthorised representative & the contractor. It is, however understood that before taking over such work, MIDC will not put it to its regularuse distinct from casual/incidental one.

17. Orders issued by the Superintending Engineer of MIDC by whatever designation he may be knownfrom time to time regarding theconduct of the work shall be binding on the contractor.

18. The tendered rates for supply of materials are for delivery of materials properly stacked in regular heaps or otherwise as directed forfacility of measurement before use. In case of road materials, the same shall be stacked by the road side as directed. Materials shall not betacked at places where they are likely to be damaged or lost. The contractor shall have no claim for any loss on this account. If such materialhas been paid for& is subsequently lost before use in the work, the contractor shall make good the loss.

19. No material shall be removed from the road land, except for excavation of gutters, or any other adjoining land unless permitted in writingsubject to such conditions as the Exe. Engineer may specifyThe contractor is liable for the damages/compensation arising out of disregard ofthis condition.

20. The orders of collection & utilisation of materials shall be decided by Exe.Engineer/his authorised representative so as to ensure orderlywork.

21. For the items so indicated, no materials shall be used without first having been measured by regular stacks. The whole of the quantity ofa particular material required for a sizable section of the work shall be first collected before it can be measured & used. The same materialshall either be collected separately or the collection shall not be started at all unless the material collected in the section under reference has

Page 37 / 83 Executive EngineerContractor

Page 40: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

shall either be collected separately or the collection shall not be started at all unless the material collected in the section under reference hasbeen all used.

22. The contractor will have to construct a shed for storing controlled & valuable materials issued to him under Schedule 'A' of theagreement, at work site, having double locking arrangement.The material shall be taken for use in the presence of the departmental person.No material will be allowed to be removed from site of work.

23. Under no circumstances shall any contractor be entitled to claim enhanced rates for any items in this contract.

24. The contractor shall study all the plans, specifications & other terms & conditions of the contract carefully before tendering & shall alsoinspect the site & get self acquainted with nature of work & local conditions regarding the availability of labour, material, source &sufficiency of water supply required for the execution of the work & site conditions, rivers, nallas, topography etc existing roads, means ofcommunication & access to site of work etc.

25. The contractor shall submit, within one month from the date of work order of MIDC, designs & drawings to the Exe.Engineer. Aftergetting the letter of approval of design from Exe.Engineer, the contractor shall at his own expense clear the site & take up theprovisional & final setting & carryout the work under the supervision of his responsible representative & shall provide necessary material,labour, tools, instruments etc required for the same. The line & setting out shall be done most accurately & it shall be the full responsibilityof the contractor for correctness of the position, level, dimensions, alignment etc of all parts of the work & if any time during the execution,any error appears/arises, the same shall be rectified by the contractor at his own cost. The checking of any setting out/line/level by theEngineer shall not in any way absolve the contractor of his own responsibility for the correctness thereof. The contractor shall protect &preserve all benchmark, site rails etc used for setting out of the work.

26. The contractor shall, if necessary, construct temporary roads & maintain these in proper condition till the completion of work at hisown cost. If necessary, he shall also at his own cost, make necessary arrangement for acquisition of land for construction of suchtemporary road or for any other purpose in connection with the execution of work.

27. The contractor shall comply with all proper & legal orders & direction of the local/public authority/ municipality & abide by their rules& regulations & pay all such fees & charges which he may be liable to. No reimbursement of such fees & charges will be made by MIDC.

28. The contractor shall inform the Engineer-in-charge in writing when any portion of the work is ready for inspection giving himsufficient notice to enable him to inspect the same without regarding the further r progress of work. The work shall not be considered tohave been completed inaccordance with terms of contract until the Engineer-in-charge shall have certified in writing to that effect

29. If contractor desires to use any design/material/process covered by letter "Patent" or "Copy Right", it shall be responsibility of thecontractor to observe all legal formalities for the use of the same

30. In the event of there being reasonable doubt as to the quality of workmanship & material used in the construction, the Engineer-in-chargemay order to the contractor to satisfy MIDC by carrying out suitable test of structure or part thereof. In the manner as prescribed in Clauseon Page 53 of the Indian Std. Code for practice for PCC & RCC for general building construction & as per Std.Spcf. of Deptt. As may beapproved by the Engineer-in- charge regarding the sufficiency wherever necessary at his own cost to the entire satisfaction of the Exe.Engineer

31. All the laboratory equipment required for the field test of materials, concrete, steel shall be arranged by contractor at his own cost

32. The contractor shall take all precautions, due care against damage by floods, rains, storms,out break of fire & accidents. Nocompensation willbe allowed to the contractor for his plants/materials lost, damaged by way of the above cause or other causes which isin charge of the contractor.

33. Safety of materials & recoveries: The contractor shall use the materials supplied to him by the department at free of cost or as mentionedin the Schedule ‘A’ very properly & economically. The contractor shall be responsible for proper handling & safe custody of the materialsso issued to him. The materials remaining unused after the completion of the work shall be returned by the contractor at the Department. Thedepartment will accept only such materials as are in perfect conditions. If any of the materials issued to the contractor free of cost there of

Page 38 / 83 Executive EngineerContractor

Page 41: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

department will accept only such materials as are in perfect conditions. If any of the materials issued to the contractor free of cost there ofshall be recovered from the contractor at double the rate at which it was purchased by the department, or the market rate prevailing at thetime whichever is higher. The contractor shall maintain a day to day account of materials issued to him by the department & shall produce itto the Engineer-in-charge when demanded.

34. Road Crossings: Any work at the road crossing shall be restricted only to half the width of the road, leaving the other half open fortraffic. Second half is taken up only after the first half is completed & made upto the original surface, serviceable with the permission ofEngineer-in-charge. All roads shall be reinstated by the contractor without any extra cost after proper consolidation, watering, cutting etc.Guarding barricading shall be provided by the contractor for 24 hrs. a day. The work of road crossing shall be planned well in advance &shall be carried out within the minimum possible time thereby causing least disturbance to traffic. No road sha ll remain excavated for morethan 24 hrs. Where the roads are very narrow such that traffic cannot be allowed in the second half when the work in first half is in progress,the contractor shall provide necessary diversions & maintain the same at his cost till such time as the work is in progress & the road isopened to traffic.

35. Interpretation: Singular & Plural 'Work' imparting the singular number shall include the plural number also & vice versa where thecontext requires.

36. Removal of Contractor's Employees: The contractor shall employ in & about the execution of the works only such persons as are careful,skilled, competent & experienced in their several trades & shall, on the direction of the Engineer-in-charge forthwith cease to employ in &about the execution of the works. Any person who in the opinion of the MIDC or En-Engineer-in-charge, misconduct himself, or isincompetent or negligent in the proper performance of his duties or whose continued employment is undesirable for any reason, suchpersons shall not be again employed upon the works without the written permission of the MIDC/Engineer-in-charge

37. Access to site of work: The provisions of clauses & conditions of this contract shall also apply to all premises, work shops, factories,plants, quarries & all other places from where materials, manufactured articles & machineries are being obtained or stored for the works.The MIDC/Engineer-in-charge or their representative & other subordinates shall be furnished with such information, assistance & facility bythe contractor as is required to make a complete & detailed investigation/inspection/supervision of the said goods.

38. Inspection of Works & Materials:

All materials & each part of details of the work shall be subject at all times, to inspection by the MIDC/Engineer-in-charge or theirrepresentative or other authorized subordinateswho shall be furnished with reasonable facilities & assistance by the contractor forascertaining whether or not the work as performed or the materials used are in accordance with the requirements & intent of the plans &specifications.

The contractor shall also inform the Engineer-in-charge in writing, when any portion is readyfor inspection giving him at least 24 hrs.advance intimation to enable him to inspect the same without regarding further progress of the work.

Any work done or materials used without supervision or inspection by the MIDC/Engineer-in-charge or is representative, is liable to beordered to be removed & replaced at the contractor's expense.

39. Testing of Materials & Works: All materials before being incorporated in the work shall be inspected. After satisfactory necessary testsas per prevalent standards shall be approved by the Engineer-in-charge. The testing shall be done in the Government approvedlab or anylaboratory approved by MIDC & the testing charges shall be borne by the contractor himself only.

Any work in which such materials are used prior to inspection & when necessary, testing & without approval or written permission of theEngineer-in-charge shall be considered as unauthorized, defective & not acceptable.

The testing of materials & works where necessary shall be carried out in accordance with the latest standards Methods of Bureau of IndianStandards Institution current on the date fixed for opening of the tender. If no such standard exists for a particular test, the standard methodas laid down by the British Standard Institution or by American Association of State Highway Officials or the American Society or othersuitable organization for testing of materials, will be used at the discretion of the Engineer-in-charge. He may also adopt any other suitable

Page 39 / 83 Executive EngineerContractor

Page 42: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

method at his discretion.

The contractor shall furnish such facilities instruments, machinery, equipment, labour and material as the Engineer-in-charge may require forcollecting & forwarding sample or for ascertaining the quantity, quantity or weight of materials used and if so directed shall not make usedof or incorporate in the work of any materials represented by the said sample until the required test are made and the materials accepted.

The contractor shall establish a laboratory at site where routine testing of materials of concrete, asphalt etccan be done to the requirements asper work at his cost. The daily test report register should be maintained at site/ lab and shall be produced as and when required.

The cost of collection of sample including transportations as well as of the testing shall be borne by the contractor for the followings.

i) The collection & supply of the samples & carrying out of such tests is provided for or clearly intended in the contract, willbe carried outin the laboratories approved by the Engineer-in-charge.

ii) The collection & supply of the samples & the carrying out of such tests if not provided for or clearly intended in the contract but ontesting, the material is found defective & has to be rejected. The defective material should be removed from site within 24 hours & report ofthe same should be given to Engineer-in-charge.

40. Unauthorized & Defective Works: No work shall be done without lines, levels, grades, lengths & other dimensions having been givenor approved by the Engineer-in-charge or when authorized by him or by his representative or other authorized subordinates. Any work doneby the contractor prior to the approval of the contract, work done contrary to or regardless of the instructions of the Engineer-in-charge,work done beyond the lines shown on the plans or as given, or any extra work done without authority willbe considered as unauthorized &willnot be paid for under the provisions of this contract. Work so done shall be ordered to be removed or replace at the contractor's expense.All works & materials which do not conform to the requirements of the contract whether on account of poor workmanship, defectivematerials, unsuitable equipments & plans, carelessness or any other causes, shall be considered as defective.

The Engineer-in-charge shall have the power to order removal or replacement of all unauthorized/defective materials/works which in hisopinion should be removed or replaced all defects, be removed, replaced or corrected as may be directed by the Engineer-in-charge.

41. Night Work: Subject to any provisions to the contrary contained in the contract, no work shall be carried out between the hours of sun set& sunrise without the written permission of the Engineer-in-charge except when the work is unavoidable or absolutely necessary,for savinglife or property or for the safety of the work, in which case, the contractor shall immediately inform the Engineer-in-charge or hisrepresentative, provided always that the provision of this clause shall not be applicable in the case of any work which it is customary to carryout by double or rotary shifts in which case sufficient advance notice shall be given of the intention of work at night to the Engineer-in-charge. After making all requisite arrangements & managementof areas, materials & equipments,required under any emergency etc.Overtime to supervisory staff of the MIDC, in such cases shall have to be however borne by the contractor.

The contractor shall also carry on work between sunset & sunrise if so required by the Engineer-in-charge, subject to obtaining approval inwriting, for expediting the progress on the works or for any other reasons of technical safety.

Whenever any work is required to be carried out at night in the interest of structural safety or any other reason with express approval of theEngineer-in-charge or his representativeauthorized to supervise, adequate lighting & other arrangement shall be made in advance by thecontractor for proper execution & supervision of the such work. The contractor shall not be however entitled to any extra payments for nightwork. Before such work to be carried, the contractor should also inform to local Police Station in writing.

42. Explosive and inflammable Materials: The MIDC does not anticipate use of any explosive or any inflammable material on this work,however, in the event, explosive of inflammable materials are used for the execution of the works, the contractor shall at his own expense,obtain such license or license as may be required for storing and using explosives and or inflammable materials and locate, construct andmaintain magazines if such area is required for storage in accordance with relevant Government rules in force. Such magazine shall clearlymarked dangerous – explosive in the original language and devnagriand shall be in the care of competent watchman all the time. All theseshall be done under intimation and after getting concurrence Engineer-in-charge.

The contactor shall exercise utmost care while using explosives and or inflammable material not to endanger life or property and shall be

Page 40 / 83 Executive EngineerContractor

Page 43: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

The contactor shall exercise utmost care while using explosives and or inflammable material not to endanger life or property and shall besolely responsible for any and all damages resulting from their storage and use, and shall indemnify absolutely MIDC and its office andemployees against any claim and liability arising out of any accident or any violation and or any law, rules, orders etc.

43. Care, Maintenance and repair of works:-

a) From the commencement until the time, the works are completed and finally accepted and handed over to the MIDC, the contractor shalltake full responsibility for care and maintenance thereof including care of all temporary works to the satisfaction of the Engineer-in-chargeand in case any damage the Deterioration loss or injury shall happen to the works or to any part there of or to any temporary work, fromstorms, fire, rains, accidents or any case whatsoever other than earthquake, volcanic eruption or other convulsionof nature or act of God,War, Invasion, act of foreign enemies, hostilities (whether war be declared or not) Civil war, rebellion, revolution, insurrection or military orinsured power, shall at his own cost maintain, repair and make good the same so that till the time of final acceptance, the works shall be ingood order and condition and in conformity in every respects with the requirements of the contract and the instructions of the Engineer-in-charge.

b) If the contractor fails to comply with the requirements mentioned in Sub Clause 1 above, the Engineer-in-charge will immediately askhim to comply with the same within prescribed period.In the event of contractor failing to comply with these instructions, the Engineer-in-charge will immediately proceed to take care of the same viz. maintain or repair as required at the cost of the contractor. The clauseregarding defect liability period is given separately.

44. Compliance of Laws: The contractor shall keep himself fully informed of all acts, laws of the Central & state Governments, all local byelaws, ordinances, rules & regulations & all orders & decrees of bodies/tribunals having any jurisdiction/authority which in any manner effectthose engaged or employed on the work or which in way effect the conduct of the works. He shall at all time observe & comply with all suchlaws, ordinances, rules, regulations, orders & decrees & shall give all notices & pay out of his own money, say fees or charges to which hemay be liable.

He shall protect & indemnify the MIDC & its officers & employees against any claim or liability arising from or based on the violation ofany such laws, ordinances, regulations orders, or decrees whether by himself or by his employees

45. Treasure Trove: In the event of the discovery by the contractor or his employees during the progress of the works of any treasure, coins,antiquities, fossils, minerals or other articles or things of value or interest, whether geological, archeological or any other such treasure orother things shall be deemed to be the absolute property of MIDC.

The contractor shall take all reasonable precautions to prevent his workmen or another persons from removing such things as above & shallimmediately upon discovery thereof & before removal, acquaint the Engineer-in-charge of such discovery &carry out his orders as to thedisposal of the same which will be at the contractors expense.

46. Patented Devices, Materials & Processes: Whenever the contractor desires to use any design, device, drawing information's, materials, orprocess covered by a patent of copyright,he shall procure the rights for such use by suitable legal agreement with the patentee or owner at hisown expenses & a copy of the agreement shall be filed with the Engineer-in-charge.

The contractor shall indemnify the MIDC from & against all claims, proceedings, damages, costs & expenses which may be brought ormade against the MIDC or to which they may be put by reason of the contract infringing or being held to have infringed any patent rights orcopyright in relation to any design, device drawing, materials or process at anytime during the prosecution or after the completion of thework & in the event of any injunction being obtained against the use of the same, the contractor shall replace the same with other materialsdesign, drawing, device, process etc. which do not infringe any such patent right or copy right, to the infringe any such patent right or copyright, to the satisfaction of the Engineer-in-charge.

47. Trespass: The contractor shall at all times be responsible for any damages due to trespass committed by his agents & work people incarrying out the work, unless authorized by the Engineer-in-charge in writing in which case,all repair work shall be done by the contractor at

Page 41 / 83 Executive EngineerContractor

Page 44: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

his own cost to restore the original condition.

48. Indemnity: The MIDC shall on behalf of the contractor shall indemnify their officers, employees etc against all actions, suits, claims &demands of any character brought in respect of any matter or thing done or omitted to be done by the contractor in the excavation of or inconnection with the works of this contract & against any loss or damage to MIDC his workman/labourers in consequence, for any action orsuit being brought against the contractor for anything done or omitted to be done in the execution of the works of the contract orcompensation to be paid by contractor to his workman/labourers in consequence of accidents causing damage or loss of life of hisworkman/labourers etc. All such payments made by the MIDC shall be recovered from the contractor from his dues out standing, or remainsto be paid or that which becomes payable.

The MIDC shall not be liable to the contractor for damages or losses or delays resulting, from work by third parties or by injunction or otherrestraining orders obtained by third parties.

49. Police Protection: If police is asked for by the contractor for special protection of his camp of work, the MIDC may arrange for suchprotection so far as possible with the authorities concerned and full cost of such protection shall be debited to the contractor and recoverfrom his bills without any extra claim

50. Permits, Licenses, Priorities, Certificates etc: The contractor shall make his own arrangements at his own cost, if required.

a.To obtain permits, licenses, quota certificates, foreign exchange etc for any materials or items of work etc if required by him.

b.To obtain rail & other priorities for transport of his plant, tools equipments, stores, machinery materials, labour staff etc.

c.To arrange with civil supply authorities for release of controlled goods if so, for his labour & staff.

The MIDC will not undertake to arrange for these but will not undertake to arrange for these but will render reasonable help within itscompetence without accepting any responsibility for delay if any.

51. Field Book: Whichever payments is based on levels, all sets of levels such as initial, intermediate & final shall be taken & recorded bythe Engr-in-charge or his representative in the presence of Contractor or his authorised representative. Contractor shall attend the site forchecking these levels & signing in token of acceptance thereof. If Contractor fails to attend the site on the day or for any reason fails to signthe documents in which these levels are recorded,they shall be final & binding on the contractor

52. Levels shown on the drawings: Whichever payment is based on the levels, all sets of levels such as initial, intermediate & final shall betaken & recorded by the Engr-in-charge or his representative in the presence of contractor or his authorised representative.Advanceintimation of day & time when the levels would be taken will be given by MIDC to the contractor/ his authorised representative.Contractorshall attend the site for checking these levels & signing in token of acceptance thereof.If contractor fails to attend the site on the day or forany reason fails to sign the documents in which these levels are recorded, they shall be final & binding on the contractor

53. Sign Boards:Necessary sign boards, danger flags & lamps during night time to mark the closure of the road shall be provided by thecontractor at his cost.A chowkidar is essential to be appointed by the contractor to keep light & watch the materials lying on site,intactthrough the night. Contractor is responsible for the accidents if above care in not taken properly. He will have to pay compensation for thesame.

Page 42 / 83 Executive EngineerContractor

Page 45: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

Special Condition for Royalty Payment

Clause regarding recovery of royalty charges through the bills of contractor towards Minor Minerals such as murum, excavation,

sand, metal etc. work done by the contractor

1) It shall be noted by the contractor that the amount of royalty charges towards the minor minerals(Excavation, murum, metal, sand etc.) consumed/used by the contractor for the work will be deducted from his billsand will be paid to the concerned Revenue Deptt. by MIDC.2) The contractor shall obtain above types of minor minerals from Govt. approved quarries or from the privateland after obtaining legal permission from the concerned authorities. However, in case the contractor brings thematerial from unauthorized quarries or in illegal manner, he shall be fully responsible for any legal action taken bythe Revenue or any Govt. authorities against him for such unauthorized or illegal act, even thoughthe royaltycharges are recovered from his bills and paid to be Revenue Department. He shall also indemnify MIDCofficers from any legal action so taken by the Govt. authorities for default on his part.3) The contractor shall give an undertaking on court fee stamp of Rs.100/- for indemnifying MIDC officersfrom any legal action taken by Govt. as detailed above.

Page 43 / 83 Executive EngineerContractor

Page 46: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

QUALITY AUDIT CLAUSE

The contractor shall note that, following exercise of Quality Audit of the work shall be carried out by the nominated

authority from MIDC.

1. The quality audit of the work shall be exercised by authority nominated by MIDC at a stage when 80% of the workis completed or at stage as decided by MIDC.

2. The contractor should remain present (alongwith all test re­ports & necessary documents for the works) at site whenquality audit of the work is being exercised.

3. Final Bill will be released for payment only after complia­nce of the points/remarks raised by the quality auditor withproper reasoning to the competent authority & only after re­ceipt of clearance of nominated authority.

4. The contractor has to make all necessary rectifications, al­terations to the work executed, as suggested by thequality auditor without any extra cost. If the contractor fails to do so, or does not intend to do so, then the probableamount required for the rectifi­cation shall be withheld from the bills & other dues payable to the contractor. Thecontractor shall be liable to pay suitable compensation as decided by the Superintending Engineer.

Page 44 / 83 Executive EngineerContractor

Page 47: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

Maintenance Guarantee Clause during Defect Liability Period .

1. The contractor willhave to guarantee the work executed under the agreement for a period of 3 Year from the date of completion of thework. During this period of 3 Year , the contractor will have to make good all damages caused to the works done by him under thisagreement, to the full satisfac­tion of Engineer-in-charge, without charging any extra cost. The repairs to defects due to bad workmanshipshall be done.

2. The contractor willhave to maintain the work done by him under this agreement in good condition during the defect liability period. Thelist of defects to be observed and rectified is attached separately in the tender document.

3. The contractor will have to carry out the repairs within 8 days from the date of intimation by MIDC about the damages.

4. If during the guarantee period, the company/contractor's firm gets dissolved or some new partners are introduced, then the responsibilityto maintain the work done under this agree­ment during the defect liability period will have to be borne by the new Company/Contractor'sfirm.

5. For enforcing this guarantee, 8.00 % Security Deposit of esti­mated cost or tendered cost whichever is higher, shall be recovered from thecontractor as under:

a) 3.00 % initial security deposit in the form of DD/BG at the time of issue of work order.

b) 5.00 % to be recovered through RA bills.

Out of this 8.00 %, the initial security deposit of 3.00 % in the form of BG/DD willbe released alongwith the final bill. However, remaining

5.00 % recovered through RA Bills shall be released after completion of defect liability period or after 3 Year from the date of completion

of work.

Before releasing such security deposit after 3 Year or after the defect liability period, the Executive Engineer along with the representative

of the contractor shall in­spect the work & if the work is found to be satisfactory then only 5.00 % security deposit shall be released.

6. Considering the guarantee offered by the contractor, the contractor is requested to thoroughly inspect & study the site conditions beforequoting for this work. No extra claim on this account will be entertained later.7. If certain works are neglected by the contractor, the same shall be carried out by the department at the risk & cost of the contractor. Thecost of the same shall be recovered from the amount balance with MIDC.8. Before starting the work, the contractor will have to give in writing,guarantee on stamp paper of Rs.100/- for free maintenance of workdone by him for the period of 3 Year from the date of completion of work.9. This Maintenance Guarantee Clause supersedes all clauses regarding security deposit mentioned elsewhere in this tender.

Page 45 / 83 Executive EngineerContractor

Page 48: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION ( A Govt. of Maharashtra Undertaking)

List of Defects Required to be observed and Rectified by the Contractor during the Defect Liability Period

For WBM Road, CD works & Asphalting Works

1. Sinkiing of embankment, side shoulders, forming depressions, forming boils etc.

2. Developing pot holes, ruts, boils, wavy surface.3. Sinking of road at CD Works, forming depressions/ bumps.4. Underpining at CD works.5. Developing longitudinal cracks.6. Side shoulders not devleoped and compacted to level of asphalted road surface.7. Damage of NP2/NP3 Class pipes and pipe joints of CD works.8. Damge of UCR masonry.9. Sinking of cushioning over CD works pipes.10. Peeling out of pointing of UCR masonary.11. Developing horizontal and vertical cracks to UCR masonry, coping, concrete and plaster.12. Any other defect crititical or logical defect informed by Engineer-in-charge.

For Building :-

1. Sinking of foundaton.2. Crack in plaster by side of column/ beams etc.3. sinking of floor/ developing of cracks in floor, wavy tiles etc.4. Leakages through roof slab, chajja, masonary joints etc.5. Leakages in & through toilet block, joints of all pipes, fittings etc.6. Leakages/ Dampness through roof/ walls.7. Damage to roofing materials like AC sheets.8. Bulging of door frames, door suhtters, warping of frames/ shutter.9. Improper functioning of tower bolts, hand rails, hinges, handles, other fixtures.10. Damage to Aluminium window frame and shutter.11. Leakages through water pipes and sanitory pipes.12. Peeling of paint.13. Leakages through structrual glazing due to improper fixing of panels.

Page 46 / 83 Executive EngineerContractor

Page 49: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

14. Any other defect critical or logical defect informed by Engineer-in-charge.

For Electrical Works:

1. Cables getting damaged/ over heated.2. Burning of switches.3. Damage of switchgears/ earthing etc.4. Damage or improper functioning of pumps.5. Wall bracket swings due to breeze.6. Cables getting damaged due to inadequate cover/ protection (improper laying of cable.)7. Painting peeled off/ faded.8. Improper functioning of lamps and included fixtures.9. Any other defects critical or logical defect informed by Engineer-in-charge.10. Water retaining strucutures

i) Hydraulic test not as per norms.

ii) Lekages through floor, side walls, through joints of pipes and concrete and inlet/ outlet connection.

1. Pipelines:

i) Painting peeled offf/ faded.ii) Tilting of supports.iii) Leakages through pipe joints.iv) Leakages through joints of specials.v) Gaps between pipes and supports.vi) Failure of specials, Sluice Valves, Air Valves supplied and erected.vii) Hydraulic test not as per norms.

1. Sewers:

Page 47 / 83 Executive EngineerContractor

Page 50: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

i) Sinking of line.

ii) Cracking of pipes for want of bedding.

iii) Leakages through joints.

iv) Chember height not at least 0.6 m above ground.

v) Hyraulic test not as per norms.

vi) Sinking of supports.

vii) Peeling of plaster provided for manhole chember.

1. ESR/ GSR/ Collection sumps:

i) Lekages through floor, side walls, through joints of pipes and concrete.

ii) Plaster peeling off.

iii) Verticle cracks in walls.

iv) Level indicator properly working.

v) Lightening conductor provided whether in good conditions.

vi) Hydraulic test not as per norms.

Note:

i. Any other defect over and above those mentioned above or any defect as an when pointed out by the\Engineer-in-charge will have to be attended satisfactorily by the contractor at his own cost during the defect liabilityperiod.

ii. Out of the above mentioned defects, the defects relevent to the work executed under this contract shallonly be observed.

Page 48 / 83 Executive EngineerContractor

Page 51: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Govt. of Maharashtra Undertaking)

List of approved Makes / Brands for MIDC works

Sr.No

Equipment / Material Acceptable Makes / Brands

1 All types of Pumps

(100HP & above)

Kirloskar/ Jyoti /M&P (Wilo) / FBM(Pentair)/ Aqua / WPIL /Grundfoss / Flowserve/CNP/ Flowmore

2 All types of Motors

(100HP & above)

Kirloskar (KEC) / Jyoti / Siemens/ Crompton / BHEL /NGEF /GE /Bharat Bijlee / Kirloskar (KBL)

3

All types of Valves

(900 mm dia. & above)

Fouress / IVC/ Kirloskar/ IVI /Calsens / VAG / Patsons /Avishkar / Durga / Mayur/ Dynamic/ KPM /AVK / Jupiter /KEJRIWAL / UNIQUE / KVMC / SIGMAFLOW / BALAJI /KAMLA / Gavhane-Patil / INTERVALVE / Mahadevi (MDI) /Upadhyay / VIMAL

4

All types of Transformers

( 1000 KVA & above)

Bharat Bijlee / Kirloskar / Crompton / EMCO/ Areva / ABB /BHEL / IMP/ Alstom / Aditya / Vijay/ Siemens / GEC /Voltas / SEPL (Silverline) / Rakesh / GURUD / Kamath

5

All types of Flowmeters

(900 mm dia. & above)

ABB/ Siemens/ Endress-Houser/ Krohne-Marshal/ ADEPT

Note: All other Equipments/Materials other than above table to be used for Works or Supply confirming to relevant standard specificationsi.e. IS / ISO / ASTM / International standard shall only be acceptable.

Contractor Executive Engineer

Page 49 / 83 Executive EngineerContractor

Page 52: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

CERTIFICATE

I/We hereby certify that the rates have been quoted by me/us after:

a) I/We have fully acquainted myself/ ourselves with site conditions &b) I/We have fully read, understood & accepted all terms, conditions, specifications & requirementsmentioned in these tender documents.

Stamped & dated

Signature of the

Contractor

Page 50 / 83 Executive EngineerContractor

Page 53: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

DECLARATION

I/We hereby declare that in the forma­tion of our Company, either by way of partnership or consultant, no MIDC ex-

employee has been on the enrollment of the Company.

It is further to certify that the ex-employee of the MIDC, who has joined the Company, has completed 2 years fromhis date of resignation from MIDC or from the date of retirement from MIDC.

Date :

Place : Signature of Contractor

Page 51 / 83 Executive EngineerContractor

Page 54: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Government of Maharashtra Undertaking)

FORM B-1

PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS

General Rules and Directions for the Guidance of contractors.

1.All works proposed to be executed by contract shall be notified in a form of invitation to tender pasted on a boardhung up in the office of the Executive Engineer, MIDC Division, Nanded. and signed by the Executive Engineer,MIDC Dn.Nanded.

This form will state the work to be carried out as well as the date for submitting and opening tenders, and the timeallowed for carrying out the work, also the amount of earnest money to be deposited with the tender and the amountof security deposit to be deposited by the successful tenderer, and the percentage, if any, to be deducted from bills. Itwill also state whether a refund of quarry fees, royalties, dues and ground rents will be granted. Copies of thespecifications, designs and drawings, estimated rates, scheduled rates and any other documents required inconnection with the work shall be signed by the Executive Engineer for the purpose of identification and shall also beopen for inspection by contractors at the office of the Executive Engineer during office hours.

Where the works are proposed to be executed according to the specifications recommended by a contractor andapproved by a competent authority on behalf of MIDC such specifications with designs and drawings shall form partof the accepted tender.

2. In the event of the tender being submitted by a firm, it must be signed separately by each partner thereof, and inthe event of the absence of any partner, it shall be signed on his behalf by a person holding a power of attorneyauthorising him to do so.

3. Receipts for payments made on account of any work, when executed by a firm, should also be signed by all thepartners except where the contractors are described in their tender as a firm, in which case the receipt shall be signedin the name of the firm's one of the partners, or by some other person having authority to give official receipts for thefirm.

4. Any person who submits a tender shall fill up the usual printed form stating at what percentage above or below therates specified in Schedule 'B' (memorandum showing items of work. to be carried out) he is willing to undertake thework. Only one rate or such percentage on all the estimated rates/ scheduled rates shall be named. Tenders whichpropose any alterations in the works specified in the said form of invitation to tender, or in the time allowed forcarrying out the work, or which contain any other conditions, of any sort will be liable for rejection. No printed formof tender shall include a tender for more than one works but if contractor who wish to tender for two or more works,they shall submit separate tender for each work.

5. The Superintending/ Executive Engineer or his duly authorised Assistant shall open tenders in the presence of

Page 52 / 83 Executive EngineerContractor

Page 55: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

contractors who have submitted tenders or their representatives who may be present at the time, and he will enter theamounts of the several tenders in a comparative statement in a suitable form. In the event of a tender being accepted,the contractor shall, for the purpose of identification, sign copies of the specifications and other documentsmentioned in Rule 1. In the event of tender being rejected. the Divisional/ Competent officer shall authorise theScheduled Bank concerned to refund the amount of earnest money deposited to the contractor making the tender, onhis giving a receipt for the return of the money.

6. The officer competent to dispose of the: tenders shall have the right of rejecting all or any of the tender withoutassigning any reason thereof.

7. No receipt for any payment alleged to have been made by a contractor in regard to any matter relating to thistender or the contract shall be valid and binding on MIDC unless it is signed by the Executive Engineer.

8. The memorandum of work to be tendered for and the schedule of materials to be supplied by MIDC and their ratesshall be filled in and completed by the office of the Executive Engineer, before the tender form is uploaded. If a formwhich has not been so filled in and completed, contractor shall request the said office through query to have this donebefore he completes and submits his tender.

9. All works shall be measured net by standard measure and according to the rules and customs of MIDC and theirrates shall be without reference to any local custom.

10. Under no circumstances shall any contractor be entitled to claim enhanced rates for any items in this contract.

11. The measurements of work will be taken according to the usual methods in use in MIDC and no proposals toadopt alternative methods will be accepted. The Executive Engineer's decision as to what is the usual method in usein the MIDC will be final.

12. The contractor shall comply with the provision of the Apprentices Act 1961 and the rules and orders issuedthere under from time to time. If he fails to do so, his failure will be a breach of the contract and the SuperintendingEngineer, may in his discretion, cancel the contract. The contractor shall also be liable, for any pecuniary liabilityarising on account of any violation by him of the provisions of the Act.

Page 53 / 83 Executive EngineerContractor

Page 56: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

MEMORANDUM ( B1 Tender Form )

a Name of work KRUSHNUR (CENTRAL GOVERMENTGROWTHCENTER)...Krushnoor Indl.Area…M & R to watersupply scheme...Providing Painting to LLR withminor repairs at Krushnoor I/A.

b Estimated Cost Rs.9,22,576/-

c E.M.D. Rs. 9,300/- paid online.

d Security Deposit Initial SD Rs.27,700/- or 3 % of tendered cost

whichever is higher by DD / RTGS of NationalizedBank / Scheduled Bank/ Bank approved byGovernment of Maharashtra. S. D. inform of BGwill be accepted when amount of S.D. is more thanRs.50,000/-

Rs.46,200/- or 5 % of tendered cost whichever ishigher through RA bills.

Total SD Rs.73,900/-or 8 % of tendered cost whichever ishigher.

e Percentage, if any, to be deductedfrom bills so as to make up the totalamount required as security deposit

08 %

f Compensation for non-completionof work in time/slow progress ofwork, for every day the work iscarried out at disproportionatelyslow rate

Rs.500/- per day

g Time allowed for the work from thedate of written order to commencethe work.

02 Months [including] monsoon

Page 54 / 83 Executive EngineerContractor

Page 57: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Name of work KRUSHNUR (CENTRAL GOVERMENTGROWTHCENTER)...Krushnoor Indl.Area…M & R towater supply scheme...Providing Painting to LLRwith minor repairs at Krushnoor I/A.

Estimated Cost Rs.9,22,576/-

E.M.D. Rs. 9,300/- paid online.

Security Deposit Initial SD Rs.27,700/- or 3 % of tendered costwhichever is higher by DD / RTGS of NationalizedBank / Scheduled Bank/ Bank approved byGovernment of Maharashtra. S. D. inform of BGwill be accepted when amount of S.D. is more thanRs.50,000/-

Rs.46,200/- or 5 % of tendered cost whichever ishigher through RA bills.

Total SD Rs.73,900/-or 8 % of tendered cost whichever ishigher.

Percentage, if any, to be deductedfrom bills so as to make up the totalamount required as security deposit

08 %

Compensation for non-completionof work in time/slow progress ofwork, for every day the work iscarried out at disproportionatelyslow rate

Rs.500/- per day

Time allowed for the work from thedate of written order to commencethe work.

02 Months [including] monsoon

I/We hereby tender for the execution of above stated work for Maharashtra Industrial Development Corporation(hereinafter referred to as MIDC) at (in figures) _____________________________________ percentabove/below. (in words) ________________________________________________ _percent above/below. Theestimated rates entered in Schedule B (memorandum showing items of work to be carried out) & in accordance withall specifications, designs, drawings, instructions & rules, terms & conditions of contract as hereinabove &hereinafter included in these documents & agree that when materials are provided by the MIDC, such material & therates to be paid for them shall be as provided in Schedule A hereto. Should this tender be accepted, I/We herebyagree to abide by & fulfill all the terms & conditions of contract annexed hereto & in default thereof to forfeit & payto MIDC the sums of money mentioned in the said conditions. Paid the following online

(i) Cost of blank tender form Rs.________________ (Non refundable)(ii)

EMD (in absence of EMDExemption Certificate)

Rs.________________

(iii) Application Support Cost Rs.________________ (Non refundable)

(iv) Deposit towards erection of Asphaltplant & machinery within 30 Kms

(if applicable )

Rs.________________

Total Rs.________________

The earnest money, full value of which is to be absolutely forfeited to MIDC should I/We do not deposit thefull amount of security deposit specified in the above memorandum, in accordance with Clause I(A) of the ContractConditions; otherwise the said earnest money shall be refunded to us.

Signature of witness: Signature of the contractor.

Page 55 / 83 Executive EngineerContractor

Page 58: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Address: Address:

Occupation:

Date: Date:

The above tender is hereby accepted by me on behalf of the MIDC______ at % above/ below the estimated cost.

Place: Executive EngineerDate:

Maharashtra Industrial Development Corporation

Maharashtra Industrial Development Corporation

CONDITION OF CONTRACT

CLAUSE 1; Securiy deposit: The person(s) whose tender may be accepted (hereinafter called the contractor, whichexpression shall unless excluded by or repugnant to the context include his heirs, executors, administrators &assigns) shall A) within 10 days (which may be extended by the Suptd. Engineer concerned upto 15 days if theSuperintending Engineer thinks fit to do so) of the receipt by him of the notification of the acceptance of his tender,deposit with the Exe. Engineer in cash to the Exe. Engineer (if deposited for more than 12months) of sum sufficientwhich will make up the full security deposit specified in the tender or B) Permit MIDC at the time of making anypayment to him for work done under the contract to deduct such as will amount (*% of all money so payable)suchdeductions to be held by MIDC by way of Security deposits) provided always that in the event of the contractordepositing a lump sum by way of security deposit as contemplated at (A) above, then & in such case, if the sum sodeposited shall not amount to 8.00 % of the total estimated cost of the work, it shall be lawful for MIDC at the timeof making any payment to the contractor for work done under the contract to make up the full amount of 8.00 % bydeducting a sufficient sum from every such payment at last aforesaid until the full amount of the security deposit ismade up. All compensation or other sums of money payable by the contractor to MIDC under the terms of hiscontract may be deducted from or paid by the sale of sufficient part of his security deposit or from interest arisingthere from or from any sums which may be due or may become due by MIDC to the contractor under any othercontract or transaction of any nature, on any account whatsoever & in the event of his Security deposit being reducedby reasons of any such deductions or sale as aforesaid, the contractor shall, within 10 days thereafter, make good incash as aforesaid any sum(s) which may have been deducted from (* or raised by sale of his security deposit) or any

Page 56 / 83 Executive EngineerContractor

Page 59: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

part thereof.

If the amount of security deposit to be paid in a lump sum within the period specified at (A) above is not paidthe tender/contract already accepted shall be considered as cancelled & legal steps taken against the contractor forrecovery of the amount.

* [NOTE: This will be the same percentage as that in the tender at (f)]

CLAUSE 2; Compensation for delay: The time allowed for carrying out the work as entered in the tender shall bestrictly observed by the contractor & shall be reckoned from the date on which the order to commence work is givento the contractor. The work shall throughout the stipulated period of the contract be proceeded with, with all duediligence (time being deemed to be of the essence of the contract on the part of the contractor). In the event of thecontractor failing to comply with this condition he shall be liable to pay as compensation an amount of Rs.500/- perday or such amount upto 1% as Suptd. Engineer (whose decision in writing shall be final) may decide, of the amountof the estimated cost of the whole work as shown by the tender for each day that the work remainsuncommenced /unfinished, after the proper date. And further to ensure good progress during the execution of thework, the contractor shall be bound, in all the cases in which the time allowed for any work exceeds 1 month tocomplete:

25% of the work in 25 % of the time

50% of the work in 50% of the time

75% of the work in 75% of the time

100% of the work in 100% of the time

Note: The quantity of work to be done within a particular time to be specified above shall be fixed by the officercompetent to accept the contracts after taking into consideration the circumstances of each case and inserted in theblank space kept for the purpose & abide by the programme of detailed progress laid down by the Exe. Engineer.

In the event of contractor failing to comply with this condition, he shall be liable to pay as compensation an amountof Rs.500/- per day or such amount upto 1% as Suptd. Engineer (whose decision in writing shall be final) may decideof said estimated cost of the whole work for every day that the due quantity of work remains incomplete, providedalways that the total amount of compensation to be paid under the provisions of this clause shall not exceed 10% ofthe estimated cost of the work as shown in the tender.

CLAUSE 3: In any case in which under any clause(s) of this contract, the contractor shall have rendered himselfliable to pay compensation amounting to the whole of this security deposit (whether paid in one sum or deducted byinstallments) or in case of the abandonment of work owing to serious illness or death of the contractor or any othercause the Exe. Engineer on behalf of MIDC shall have power to adopt any of the following courses, as he may deembest suited to the interest of MIDC:-

Action when whole of security deposit is forfeited.

a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of the Exe.

Page 57 / 83 Executive EngineerContractor

Page 60: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Action when whole of security deposit is forfeited.

a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of the Exe.Engineer shall be conclusive evidence) & in that case the security deposit of the contractor shall stand forfeited & beabsolutely at the disposal of MIDC.

b) To carry out the work or any part of the work departmentally debiting the contractor with the cost of the work,expenditure incurred on the tools & plants, & charges on additional supervisory staff including the cost of workcharged establishment employed for getting the unexecuted part of the work completed & crediting him with thevalue of the work done departmentally in all respects in the same manner & at the same rates as if it had been carriedout by the contractor under the terms of his contract. The certificate of Exe. Engineer, as to the cost & other alliedexpenses so incurred & as to the value of the work so done departmentally shall be final & conclusive against thecontractor.

c) To order that the work of the contractor be measured up & to take such part thereof as shall be unexecuted out ofhis hands & to give it to another contractor to complete in which case all expenses incurred on advertisement forfixing a new contracting agency additional supervisory staff including the cost of work charged establishment & costof the work executed by the new contract agency will be debited to the contractor & the value of the work done orexecuted through the new contractor shall be credited to the contractor in all respects & in the same manner & at thesame rates as if it had been carried out by the contractor under the terms of his contract. The certificate of the Exe.Engineer as to all the cost of the work & other expenses incurred as aforesaid for or in getting the unexecuted workdone by the new contract & as to the value of work so done shall be final & conclusive against the contractor.

In case the contract shall be rescinded under clause:

a) above, the contractor shall not be entitled to recover or be paid any sum for any work therefor, actually performedby him under this contract unless & until the Exe. Engineer shall have certified in writing the performance of suchwork & the amount payable to him in respect thereof, & he shall only be entitled to be paid the amount so certified.In the event of either of the courses referred to in clauses

b) or c) being adopted & the cost of the work executed departmentally or through a new contractor & other alliedexpenses exceeding the value of such work credited to the contractors, the amount of excess shall be deducted fromany money due to the contractor by MIDC under the contract or otherwise howsoever or from his security deposit orthe sale proceed thereof provided. However, the contractor shall have no claim against MIDC even if certified valueof the work done departmentally or through a new contractor, exceeds the certified cost of such work & alliedexpenses, provided always that whichever of the three courses mentioned in clause a), b) or c) is adopted by the Exe.Engineer the contractor shall have no claim to compensation for any loss sustained by him by reason of his havingpurchased or procured any materials, or entered into any engagements or made any advances on account of or with aview to the execution of the work or the performance of the contract.

The certificate of the Executive Engineer as to all cost of the work done by the new contractor and as to thevalue of the work so done and shall be final and conclusive against the contractor.

CLAUSE 4; Action when the progress of any particular portion of the work is unsatisfactory: If the progress of anyparticular portion of the work is unsatisfactory the Exe. Engineer shall, notwithstanding that the general progress ofthe work is in accordance with the conditions mentioned in Clause 2, be entitled to take action under Clause 3(b)

Page 58 / 83 Executive EngineerContractor

Page 61: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

the work is in accordance with the conditions mentioned in Clause 2, be entitled to take action under Clause 3(b)after giving the contractor 10 days notice in writing. The contractor will have no claim for compensation, for any losssustained by him owing to such action.

CLAUSE 5; Contractor shall remain liable to pay compensation if action not taken under Clauses 3 & 4. Power totake possession of or require removal of, or sell contractor's plant: In any case in which any of the powers conferredupon the Exe. Engineer by Clauses 3 & 4 hereof shall have become exercisable & the same shall not have beenexercised, the non exercise thereof shall not constitute a waiver of any of the conditions hereof & such powers shallnotwithstanding be exercisable in the event of any future case of default by the contractor for which under any clause(s) hereof he is declared liable to pay compensation amounting to the whole of his security deposit & the liability ofthe contractor for past & future compensation shall remain unaffected. In the event of the Exe. Engineer taking actionunder sub-clause a) or c) of Clause 3: he may, if he so desires, take possession of all or any tools, plant, materials &stores, in or upon the works or the site thereof or belonging to the contractor, or procured by him & intended to beused for the execution of the work or any part thereof, paying or allowing for the same in account at the contractrates, or in the case of contract rates not being applicable at current market rates, to be certified by the Exe. Engineerwhose certificate thereof shall be final. In the alternative the Exe. Engineer may, after giving notice in writing to thecontractor or his clerk of the works, foreman or other authorised agent, require him to remove such tools, plant,materials or stores from the premises within a time to be specified in such notice; & in the event of the contractorfailing to comply with any such requisition, the Exe. Engineer may remove them at the contractor's expense or sellthem by auction or private sale on account of the contractor & at his risk in all respects & the certificateof the Exe. Engineer as to the expense of any such removal, & the amount of the proceeds & expense of any suchsale shall be final & conclusive against the contractor.

CLAUSE 6; Extension of time: If the contractor shall desire an extension of the time for completion of the work onthe ground of his having been unavoidably hindered in its execution or on any other ground, he shall apply in writingto the Exe. Engineer before the expiration of the period stipulated in the tender or before the expiration of 30 daysfrom the date on which he was hindered as aforesaid or on which the case for asking for extension occurred, which,is earlier ever & the Exe. Engineer may, if, in his opinion, there are reasonable grounds for granting an extension,grant such extension as he thinks necessary or proper. The decision of the Exe. Engineer in this matter shall be final.

CLAUSE 7; Final certificate: On completion of the work, the contractor shall be furnished with a certificate by theExe. Engineer (hereinafter called the Engineer-in-charge) of such completion, but no such certificate shall be givennor shall the work be considered to be complete until the contractor shall have removed from the premises on whichthe work shall have been executed all scaffolding, surplus materials & rubbish, & shall have cleaned off the dirt fromall woodwork, doors, windows, walls, floor or other parts of any buildings, in or upon which the work has beenexecuted, or of which he may have had possession for the purpose of executing the work, nor until the works shallhave been measured by the Engineer-in-charge or where the measurements have been taken by his subordinates untilthey have received the approval of the Engineer-in-charge, the said measurements being binding & conclusiveagainst the contractor. If the contractor shall fail to comply with the requirements of this clause as to the removal ofscaffolding, surplus materials & rubbish, & cleaning off dirt on/before the date fixed for the completion of the work,the Engineer-in-charge may, at the expense of the contractor, remove such scaffolding, surplus materials & rubbish& dispose of the same as he thinks fit & clean off such dirt as aforesaid & the contractor shall forthwith pay theamount of all expense so incurred, but shall have no claim in respect of any such scaffolding or surplus materials as

Page 59 / 83 Executive EngineerContractor

Page 62: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

aforesaid except for any sum actually realised by the sale thereof.

CLAUSE 8; Payments on intermediate certificates to be regarded as advances: No payment shall be made for anywork, estimated to cost less than rupees one thousand till after the whole of the work shall have been completed & acertificate of completion given. But in the case of works estimated to cost more than rupees one thousand, thecontractor shall, on submitting a monthly bill therefor, be entitled to receive payment proportionate to the part of thework then approved & passed by the Engineer-in-charge, whose certificate of such approval & passing of the sum sopayable shall be final & conclusive against the contractor. All such intermediate payments shall be regarded aspayments by way of advance against the final payments only & not as payments for work actually done &completed, & shall not preclude the Engineer-in-charge from requiring any bad, unsound, imperfect or unskillfulwork to be removed or taken away & reconstructed or re-erected, nor shall any such payment be considered as anadmission of the date performance of the contract or any part thereof in any respect or the accruing of any claim, norshall it conclude, determine, or affect in any other way the powers of the Engineer-in-charge as to the final settlement& adjustment of accounts or otherwise, or in any other way vary or affect the contract. The final bill shall besubmitted by the contractor within one month of the date fixed for the completion of the work, otherwise, theEngineer-in-charge's certificate of the measurements & of the total amount payable for the work shall be final &binding on all parties.

CLAUSE 9; Payment at reduced rates on account of items of work not accepted as completed to be at the discretionof Engineer-in-charge: The rates for several items of works estimated to cost more than Rs.1000/- agreed to within,shall be valid only when the item concerned is accepted as having been completed fully in accordance with thesanctioned specifications. In cases where the items of work are not accepted as so completed the Engineer-in-chargemay make payment on account of such items at such reduced rates as he may consider reasonable in the preparationof final or on account bills.

CLAUSE 10; Bills to be submitted monthly: A bill shall be submitted by the contractor each month on or before thedate fixed by the Engineer-in-charge for all work executed in the previous month, & the Engineer-in-charge shalltake or cause to be taken the requisite measurement for the purpose of having the same verified, & the claim, so faras it is admissible, shall be adjusted, if possible, within ten days from the presentation of the bill. If the contractordoes not submit the bill within the time fixed as aforesaid, the Engineer-in-charge may depute a subordinate tomeasure up the said work in the presence of the contractor or his duly authorised agent whose counter signature tothe measurement list shall be sufficient warrant, & the Engineer-in-charge may prepare a bill from such list whichshall be binding on the contractor in all respects.

CLAUSE 11; Bills to be on printed forms: The contractor shall submit all bills on the printed forms to be had onapplication at the office of the Engineer-in-charge. The charges to be made in the bills shall always be entered at therates specified in the tender or in the case of any extra work ordered in pursuance of these conditions, & notmentioned or provided for in the tender, at the rate herein after provided for such work.

CLAUSE 12; Stores supplied by MIDC: If the specification or estimate of the work provides for the use of anyspecial description of materials to be supplied from the store of MIDC or if it is required that the contractor shall usecertain stores to be provided by the Engineer-in-charge (such material & stores, & the prices to be charged thereforeas hereinafter mentioned being so far as practicable for the convenience of the contractor but not so as in any way tocontrol the meaning or effect of this contract specified in the schedule or memorandum hereto annexed) thecontractor shall be supplied with such materials & stores as may be required from time to time to be used by him for

Page 60 / 83 Executive EngineerContractor

Page 63: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

contractor shall be supplied with such materials & stores as may be required from time to time to be used by him forthe purpose of the contract only, & the value of the full quantity of the materials & stores so supplied shall be set offor deducted from any sums then due, or thereafter to become due to the contractor under the contract, or otherwise,or from the security deposit, or the proceeds of sale thereof; of the security deposit is held in Government securities,the same of a sufficient portion thereof shall in that case be sold for the purpose. All materials supplied to thecontractor shall remain the absolute property of MIDC, & shall on no account be removed from the site of work, &shall at all times be open to inspection by the Engineer-in-charge. Any such materials unused & in perfectly goodcondition at the time of completion or termination of the contract shall be returned to MIDC store, if the Engineer-in-charge so requires by a notice in writing given under his hand, but the contractor shall not be entitled to return anysuch material except with consent of the Engineer-in-charge & he shall have no claim for compensation on accountof any such material supplied to him as aforesaid but remaining unused by him or for any wastage in or damage toany such materials.

CLAUSE 13; Works to be executed in accordance with specifications, drawings, orders etc.: The contractor shallexecute the whole & every part of the work in most substantial & workmanlike manner, both as regards materials &in every other respect in strict accordance with specifications. The contractor shall also conform exactly, fully &faithfully to the designs, drawings & instructions in writing relating to the work signed by the Exe. Engineer-in-charge & lodged in the office to which the contractor shall be entitled to have access for the purpose of inspection atsuch office, or on the site of work during the office hours. The contractor will be entitled to receive 3 sets of contractdrawings & working drawings as well as one certified copy of the accepted tender along with the work order free ofcost. Further copies of the contract drawings & working drawings if required by him shall be supplied at the rate ofRs.100 per No. of contract drawings & Rs.100 per No. of drawings except where otherwise specified.

CLAUSE 14; Alterations in specifications & designs not to invalidate contracts: The Engineer-in-charge shall havepower to make any alterations in, or addition to, the original specifications, drawings, designs & instructions thatmay appear him to be necessary or advisable during the progress of work, & the contractor shall be bound to carryout the work in accordance with any instructions in this connection which may be given to him in writing signed bythe Engineer-in-charge & such alteration shall not invalidate the contract; & any additional work which thecontractor may be directed to do in the manner above specified as part of the work shall be carried out by thecontractor on the same conditions in all respects on which he agreed to do the main work & at the same rates as arespecified in the tender for the main work.

Rates for works not entered in estimate, for schedule of rates of the district: And if the additional & altered workincludes any class of work for which no rate is specified in this contract; then such class of work shall be carried outat the rates entered in the Schedule of Rates of the Division or at the rates mutually agreed upon between theEngineer-in-charge & the contractor, whichever are lower. If the additional or altered work, for which no rate isentered in the Schedule of Rates of the Division, is ordered to be carried out before the rates are agreed upon them,the contractor shall, within seven days of the date of receipt by him of the order to carry out the work, inform theEngineer-in-charge of the rate which he intends to charge for such class of work & if the Engineer-in-charge does notagree to this rate, he shall By Notice in writing be at liberty to cancel his order to carry out such class of work, &arrange to carry it out in such manner as he may consider advisable provided always that if the contractor shallcommence work or incur any expenditure in regard thereto before the rates shall have been determined as lastlyhereinbefore mentioned, then in such case he shall only be entitled to be paid in respect of the work carried out orexpenditure incurred by him prior to the date of the determination of the rate as aforesaid according to such rate(s) asshall be fixed by the Engineer-in-charge. In the event of the dispute, the decision of the Suptd. Engineer of the circle

Page 61 / 83 Executive EngineerContractor

Page 64: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

shall be fixed by the Engineer-in-charge. In the event of the dispute, the decision of the Suptd. Engineer of the circlewill be final.

Where, however, the work is to be executed according to the designs, drawings & specifications recommended bythe contractor & accepted by the competent authority the alterations above referred to shall be within the scope ofsuch designs, drawings & specifications appended to the tender.

Extensions of time in consequence of additions or alterations: The time limit for the completion of the work shall beextended in the proportions that the increase in its cost occasioned by alterations/additions bears to the cost of theoriginal contract work & the certificate of the Engineer-in-charge as to such proportions shall be conclusive.

CLAUSE 15; No claim to any payment or compensation for alteration in, or restriction of work:

1. If at any time after execution of the contract documents the Engineer shall for any reason whatsoever (other thandefault on the part of the contractor for which MIDC is entitled to rescind the contract) desire that the whole or anypart of the work specified in the tender should be suspended for any period or that the whole or part of the workshould not be carried out at all he shall give to the contractor a notice in writing of such desire & upon the receipt ofsuch notice the contractor shall forth required after having the regard of the appropriate stage at which the workshould be stopped or suspended so as to cause any damage or injury to the work already done or endanger the safetythereon provided that the decision of the Engineer as to the stage at which the work or any part of it could be or couldhave been safely stopped or suspended shall be final & conclusive against the contractor. The contractor shall haveno claim to any payment or compensation whatsoever by reason of or in pursuance of any notice as aforesaid onaccount of any suspension, stoppage or curtailment except to the extent specified here in after.

2. Where the total suspension of work ordered as aforesaid continued for continuous period exceeding 90 days, thecontractor shall be at liberty to withdraw from the contractual obligations under the contract so far as it pertains tothe unexecuted part of the work by giving 10 days prior notice in writing to the Engineer within 30 days of the expiryof the said period of 90 days of such intention are requiring the Engineer to record the final measurement of the workalready done & to pay the final bill. Upon giving such notice, the contractor shall be deemed to have been dischargedfrom his obligation to complete the remaining unexecuted work under this contract. On receipt of such notice theEngineer shall proceed to complete the measurement & make such payment as may be finally due to the contractorwithin a period of 90 days from receipt of such notice in respect of the work already done by the contractor. Suchpayment shall not in any manner prejudice the right of the contractor to any further compensation under theremaining provisions of this clause.

3. Where the Engineer requires the contractor to suspend the work for a period in excess of 30 days at any time or60 days in the aggregate, the contractor shall be entitled to apply to the Engineer within 30 days of resumption ofwork after such suspension for payment of compensation to the extent of pecuniary loss suffered by him in respect ofworking machinery rendered idle on the site or on account of his having had to pay the salary/wages of a labourengaged by him during the said period of suspension provided always that the contractor shall not be entitled to anyclaim in respect of any such working machinery, salary/wages for the first 30 days whether consecutive or in theaggregate of such suspension or in respect of any suspension where so ever occasioned by unsatisfactory work or anyother default on his part. The decision of the Engineer in this regard shall be final & conclusive against thecontractor.

Page 62 / 83 Executive EngineerContractor

Page 65: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

4. In the event of.

i) Any total stoppage of work on notice from the Engineer under sub-clause(1) in that behalf.

ii) Withdrawal by the contractor from the contractual obligation to complete the remaining unexecuted work undersub-clause (2) on account of continued suspension of work for a period exceeding 90 days, iii) Curtailment in thequantity of item(s) originally tendered on account of any alteration, omission or substitutions in the specifications,drawings, designs or instructions under Clause 14(1) where such curtailment exceeds 25% in quantity & the value ofthe quantity curtailed beyond 25% at the rates for the item specified in the tender is more than Rs.5000/-. It shallbe open to the contractor, within 90 days from the service of... i) The notice of stoppage of work or; ii) Othernotice of withdrawal from the contractual obligations under the contract on account of the continued suspension ofwork or;

iii) Notice under Clause 15(i) resulting in such curtailment to produce to the Engineer satisfactory documentaryevidence of that he had purchased or agreed to purchase material for use in the contracted work before receipt by himof the notice of stoppage, suspension or curtailment & require MIDC to take over on payment such material at therates determined by the Engineer. Provided, however, that such rates shall in no case exceed the rates at which thesame were acquired by the contractor. The MIDC shall thereafter take over the material so offered, provided thequantities, offered, are not in excess of the requirements of the unexecuted work as specified in the accepted tenderand are of quality and specifications approved by the Engineer.

CLAUSE 15(A); No claim to compensation on account of loss due to delay in supply of material by MIDC: Thecontractor shall not be entitled to claim any compensation from MIDC for the loss suffered by him on account ofdelay by MIDC in the supply of materials entered in Schedule 'A' where such delay is caused by:

i) Difficulties relating to the supply of railway wagons.ii) Force majeure.iii) Act of God.iv) Act of enemies of the state or any other reasonable cause beyond the control of MIDC.

In the case of delay in the supply of materials MIDC shall grant such extension of time for the completion of theworks as shall appear to the Exe. Engineer to be reasonable in accordance with the circumstances of the case. Thedecision of the Exe. Engineer as to the extension of time shall be accepted as final by the contractor.

CLAUSE 15 (B); Time limit for unforeseen claims: Under no circumstances whatever shall the contractor be entitledto any compensation from MIDC on any account unless the contractors shall have submitted a claim in writing to theEngineer-in-charge within one month of the cause of such claim occurring.

CLAUSE 16; Action & compensation payable in case of bad work: If any time before the security deposit or any partthereof is refunded to the contractor it shall appear to the Engineer-in-charge or his subordinate in charge of thework, that any work has been executed with unsound, imperfect or unskillful workmanship or with materials ofinferior quality or that materials / articles provided by him for the execution of the work are unsound, or of a qualityinferior to that contracted for, or are otherwise not in accordance with the contract, it shall be lawful for the Engineer-in-charge to intimate this fact in writing to the contractor & then not with standing the fact that the work, materialsor articles complained of may have been inadvertently passed, certified & paid for, the contractor shall be bound to

Page 63 / 83 Executive EngineerContractor

Page 66: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

or articles complained of may have been inadvertently passed, certified & paid for, the contractor shall be bound toforthwith rectify, or remove & reconstruct the work so specified in whole or in part, as the case may require or if sorequired, shall remove the materials or articles so specified & provided other proper & suitable materials or articles athis own charge & cost & in the event of his failing to do so within a period to be specified by the Engineer-in-chargein the written intimation aforesaid, the contractor shall be liable to pay compensation at the rate of one percent on theamount of the estimate for every day not exceeding 10 days, during which the failure so continues & in the case ofany failure the Engineer-in-charge may rectify or remove & re-execute the work or remove & replace the materialsor articles complained of as the case may be at the risk & expense in all respects of the contractor. Should theEngineer-in-charge consider that any such inferior work or materials as described above may be accepted or madeuse of, it shall be within his discretion to accept the same at such reduced rates as he may fix therefore.

CLAUSE 17; Work to be open to inspection. Contractor or responsible agent to be present: All works under or incourse of execution or executed in pursuance of the contract shall at all times be open to the inspection & supervisionof the Engineer-in-charge & his subordinates, & the contractor shall at all times during the usual working hours, & atall other times at which reasonable notice of the intention of the Engineer-in-charge or his subordinate to visit thework shall have been given to the contractor, either himself be present to receive orders & instructions, or have aresponsible agent duly accredited in writing present for that purpose. Orders given to the contractor's duly authorisedagent shall be considered to have the same force & effect as if they had been given to the contractor himself.

CLAUSE 18; Notice to be given before work is covered up: The contractor shall give not less than five day's noticein writing to the Engineer-in-charge or his subordinate in-charge of the work before covering up or otherwise placingbeyond the reach of measurement any work in order that the same may be measured & correct dimensions thereoftaken before the same is so covered up or placed beyond the reach of measurement, & shall not cover up or placebeyond the reach of measurement any work without the consent in writing of the Engineer-in-charge or hissubordinate in-charge of the work & if any work shall be covered up or placed beyond the reach of measurementwithout such notice having been given or consent obtained, the same shall be uncovered at the contractor's expense,& in default thereof no payment or allowance shall be made for such work or for the materials with which the samewas executed.

CLAUSE 19; Contractor liable for damage done & for imperfections: If during the period of 36 Months from thedate of completion as certified by the Engineer-in-charge pursuant to Clause-7 of the contract or 36 Months aftercommissioning the work, whichever is earlier in the opinion of the Exe. Engineer, the said work is defective in anymanner whatsoever, the contractor shall forthwith on receipt of notice in that behalf from the Exe. Engineer, dulycommence execution & completely carry out at his cost in every respect all the work that may be necessary forrectifying & setting right the defects specified therein including dismantling & reconstruction of unsafe portionsstrictly in accordance with & in the manner prescribed & under the supervision of the Exe. Engineer. In the event ofthe contractor failing or neglecting to commence execution of the said rectification work within the period prescribedtherefore in the said notice &/or to complete the same as aforesaid as required by the said notice, the Exe. Engineerget the same executed & carried out departmentally or by any other agency at the risk on account & at the cost ofcontractor. The contractor shall forthwith on demand pay to the MIDC the amount of such costs, charges & expensessustained or incurred by the MIDC of which the certificate of the Exe. Engineer shall be final & binding on thecontractor. Such costs, charges & expenses shall be deemed to be arrears of land revenue & in the event of thecontractor failing or neglecting to pay the same on demand as aforesaid without prejudice to any other rights &remedies of the MIDC the same may be recovered from the contractor as arrears of land revenue. The MIDC shallalso be entitled to deduct the same from any amount which may then be payable or which may thereafter become

Page 64 / 83 Executive EngineerContractor

Page 67: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

remedies of the MIDC the same may be recovered from the contractor as arrears of land revenue. The MIDC shallalso be entitled to deduct the same from any amount which may then be payable or which may thereafter becomepayable by the MIDC to the contractor either in respect of the said work or any other work whatsoever or from theamount of security deposit retained by MIDC (of which the certificate of the Engineer-in-charge shall be final) fromany sums that may then be due or may thereafter become due to the contractor; or from his security deposit or theproceeds of sale thereof, or of a sufficient portion thereof.

CLAUSE 20 Contractor to supply plant, ladders, scaffoldings etc.: The contractor shall supply at his own cost allmaterials (except such special materials, if any, as may, in accordance with the contract, be supplied from the MIDCstores) plant, tools, appliances, implements, ladders, cordage, tackles, scaffolding, & temporary works requisite orproper for the proper execution of the work, whether, in the original, altered or substituted form, & whether includedin the specifications, or other documents forming part of the contract or referred to in these conditions or not &which may be necessary for the purpose of satisfying or complying with the requirements of the Engineer-in-chargeas to any matter as to which under these conditions he is entitled to be satisfied, or which is entitled to requiretogether with carriage therefore, to & from the work.

Contractor is liable for damages arising from non-provisions of lights, fencing etc.

The contractor shall also supply without charge the requisite number of persons with the means & materialsnecessary for the purpose of setting out works, &, counting, weighing & assisting the measurement or examination atany time & from time to time of the work or the materials. Failing this the same may be provided by the Engineer-in-charge at the expense of the contractor & the expenses may be deducted from any money due to the contractor underthe contract or from his security deposit or the proceeds of sale thereof, or of a sufficient portion thereof. Thecontractor shall provide all necessary fencing & lights required to protect the public from accident, & shall also bebound to bear expenses of defense of every suit, action or other legal proceedings, that may be brought by anypersons for injury sustained owing to neglect of the above precautions, & to pay any damages & costs which may beawarded in any such suit, action or proceedings to any such person, or which may with the consent of the contractorbe paid for compromising any claim by any such person.

CLAUSE 21: The contractor shall provide suitable scaffolds & working platforms, gangways & stairways, & shallcomply with the following regulations in connections therewith.

a) Suitable scaffolds shall be provided for workmen for all work that cannot be safely done from a ladder or byother means

.b) A scaffold shall not be constructed, taken down, or substantially altered, except i)Under the supervision of a competent & responsible person; &

ii) as far as possible by competent workers possessing adequate experience in this kind of work.

c) All scaffolds & appliances connected therewith & all ladders shall :-

i) be of sound materials;

ii) be of adequate strength having regard to the loads & strains to which they will be subjected; &

Page 65 / 83 Executive EngineerContractor

Page 68: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

ii) be of adequate strength having regard to the loads & strains to which they will be subjected; &

iii) be maintained in proper condition

d) Scaffolds shall be so constructed that no part thereof can be displaced in consequence of normal use.

e) Scaffolds shall not be overloaded & so far as practicable the load shall be evenly distributed.

f) Before installing lifting gear on scaffolds special precautions shall be taken to ensure the strength & stabilityof the scaffolds.

g) Scaffolds shall be periodically inspected by a competent person.

h) Before allowing a scaffold to be used by his workmen the contractor shall, whether the scaffold has beenerected by his workmen or not, take steps to ensure that it complies fully with the regulations herein specified.

i) Working platforms, gangways & stairways shall :-

i) be so constructed that no part thereof can sag unduly or unequally.

ii) be so constructed & maintained, having regard to the prevailing conditions as to reduce as far as practicable risksof persons tripping or slipping; &

iii) be kept free from any unnecessary obstructions,

j) In the case of working platforms, gangways, working places & stairways at a height exceeding eight feet.

i) every working platform & every gangway shall be closely boarded unless other adequate measure are taken toensure safety.

ii) every working platform & gangway shall have adequate width; &

iii) every working platform, gangway, working place & stairway shall be suitably fenced.

k) Every opening in the floor of a building or in a working platform shall, except for the time & to the extentrequired to allow the access of persons or the transport of shifting of material, be provided with suitable means toprevent the fall of persons or material.

l) When persons are employed on a roof where there is a danger of falling from a height exceeding six feetsuitable precautions shall be taken to prevent fall of persons or material,

m) Suitable precautions shall be taken to prevent persons being struck by articles which might fall from scaffoldsor other working places,

n) Safe means of access shall be provided to all working platforms & other working places.

CLAUSE 22: The contractor shall comply with the following regulations as regards hoisting appliances to be used by

Page 66 / 83 Executive EngineerContractor

Page 69: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

him:a) Hoisting machines & tackles, including their attachments, anchorages & support shall:-

i) be of good mechanical construction, sound material & adequate strength & free from patent defect; &

ii) be kept in good repair & in good working order.

b) Every rope used in hoisting/lowering materials or as a means of suspension shall be of suitable quality, adequatestrength & free from patent defect.

c) Hoisting machines & tackle shall be examined & adequately tested after erection on the site & before use & bere-examined in position at intervals to be prescribed by the MIDC.

d) Every chain, ring, hook, shackle, swivel & pulley block used in hoisting/lowering materials or as a means ofsuspension shall be periodically examined.e) Every crane driver/hoisting appliance operator shall be properly qualified.

f) No person who is below the age of 18 years shall be in control of any hoisting machine including any scaffold orgive signals to the operator.

g) In the case of every hoisting machine & of every chain, ring, hook, shackle, swivel & pulley block used inhoisting/ lowering/ as a means of suspension the safe working load shall be ascertained by adequate means.

h) Every hoisting machine & all gears referred to in the preceding regulation shall be plainly marked with thesafe working load.

i) In the case of a hoisting machine having a variable safe working load each safe working load & the conditionsunder which it is applicable shall be clearly indicated. j) No part of any hoisting machine or of any gear referredto in regulation (g) above shall be loaded beyond the safe working load except for the purpose of testing.

k) Motors, gearings, transmissions, electric wiring & other dangerous parts of hoisting appliance shall be providedwith efficient safeguards.

l) Hoisting appliances shall be provided with such means as will reduce to a minimum the risk of the accidentaldescent of the load.

m) Adequate precautions shall be taken to reduce to a minimum the risk of any part of a suspended load becomingaccidentally displaced.

CLAUSE 23: Measure for prevention of fire: The contractor shall not set fire to any standing jungle, trees,brushwood or grass without written permit from the Exe. Engineer.When such permit is given, & also in all caseswhen destroying cut or dug up trees, brushwood, grass etc. by fire, the contractor shall take necessary measures toprevent such fire spreading to or otherwise damaging surrounding property. The contractor shall make his ownarrangements for drinking water for the labour employed by him.

CLAUSE 24: Liability of contractor for any damage done in or outside work area: Compensation for all damage

Page 67 / 83 Executive EngineerContractor

Page 70: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

CLAUSE 24: Liability of contractor for any damage done in or outside work area: Compensation for all damagedone intentionally or unintentionally by contractor's labour whether in or beyond the limits of MIDC propertyincluding any damage caused by the spreading of fire mentioned in Clause 22 shall be estimated by the Engineer-in-charge or such other officer as he may appoint & the estimates of the Engineer-in-charge subject to the decision ofthe Suptd. Engineer on appeal shall be final & the contractor shall be bound to pay the amount of the assessedcompensation on demand failing which the same will be recovered from the contractor as damages in the mannerprescribed in Clause 1 or deducted by the Engineer-in-charge from any sums that may be due or become due fromMIDC to the contractor under this contract or otherwise.

The contractor shall bear the expenses of defending any action or other legal proceedings that may be brought by anypersons for injury sustained by him owing to neglect of precautions to prevent the spread of fire & he shall pay anydamages & cost that may be awarded by the court in consequence.

CLAUSE 25: Employment of female labour: The employment of female labourers on works in the neighbourhood ofsoldier's barracks should be avoided as far as possible.

CLAUSE 26: Work on Sundays: No work shall be done on a Sunday without the sanction in writing of the Engineer-in-charge.

CLAUSE 27: Work not to be sublet. Contract may be rescinded & security deposit forfeited for subletting it withoutapproval or for bribing a public officer or if contractor becomes insolvent: The contract shall not be assigned/subletwithout the written approval of the Engineer-in-charge. And if the contractor shall assign or sublet his contract, orattempt so to do or become insolvent or commence any proceeding to get himself adjudicated an insolvent or makeany composition with his creditors, or attempt so to do or if any bribe, gratuity, gift, loan, perquisite, reward oradvantage, pecuniary or otherwise, shall either directly or indirectly be given, promised or offered by the contractor,or any of his servants or agents to any public officer or person in the employ of MIDC in any way relating to hisoffice or employment, or if any such officer or person shall become in any way directly or indirectly interested in thecontract, the Engineer-in-charge may thereupon by notice in writing rescind the contract, & the security deposit ofthe contractor shall thereupon stand forfeited & be absolutely at the disposal of MIDC & the same consequencesshall ensue as if the contract had been rescinded under Clause 3 hereof & in addition the contractor shall not beentitled to recover or be paid for any work therefore actually performed under the contract.

CLAUSE 28: Sum payable by way of compensation to be considered as reasonable compensation without referenceto actual loss: All sums payable by a contractor by way of compensation under any of these conditions shall beconsidered as a reasonable compensation to be applied to the use of MIDC without reference to the actual loss ordamage sustained, & whether any damage has or has not been sustained.

CLAUSE 29: Changes in the constitution of firm to be notified: In the case of tender by partners, any change in theconstitution of a firm shall be forthwith notified by the contractor to the Engineer-in-charge for his information.

CLAUSE 30: Works to be under direction of Suptd.Engineer: All works to be executed under the contract shall beexecuted under the direction & subject to the approval in all respects of the Superintending Engineer of the Circle forthe time being, who shall be entitled to direct at what point(s) & in what manner they are to be commenced, & fromtime to time carried on.

Page 68 / 83 Executive EngineerContractor

Page 71: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

CLAUSE 31: Decision of Superintending Engineer to be final:Except where otherwise specified in the contract & subject to the powers delegated to him by MIDC under the Coderules then in force, the decision of the Suptd. Engineer of the Circle for the time being shall be final, conclusive &binding on all parties to the contract upon all questions relating to the meaning of the specifications, designs,drawings & instructions hereinbefore mentioned & as to the quality of workmanship, or materials used on the work,or as to any other question, claim, right, matter or thing whatsoever, if any way arising out of, or relating to thecontract, designs, drawings, specifications, estimates, instructions, orders or other conditions, or otherwise,concerning the works or the execution, or failure to execute the same, whether arising during the progress of work, orafter the completion or abandonment thereof.

CLAUSE 32: Stores of European/American manufacture to be obtained from MIDC: The contractor shall obtainfrom the MIDC's store all stores & articles of European or American manufacture which may be required for thework, or any part thereof or in making up any articles required therefor or in connection therewith unless he hasobtained permission in writing from the Engineer-in-charge to obtain such stores & articles elsewhere. The value ofsuch stores & articles as may be supplied to the contractor by the Engineer-in-charge will be debited to the contractorin his account at the rates shown in the Schedule in Form 'A' attached to the contract & if they are not entered in thesaid Schedule, they shall be debited to him at cost price which for the purposes of this contract shall include the costof carriage & all other expenses whatsoever, which shall have been incurred in obtaining delivery of the same at thestores aforesaid.

CLAUSE 33: Lump sums in estimates: When the estimate on which a tender is made, includes lump sums in respectof parts of the work, the contractor shall be entitled to payment in respect of the items of work involved or the part ofthe work in question at the same rates as are payable under this contract for each items, or if the part of the work inquestion is not in the opinion of the Engineer-in-charge capable of measurement, the Engineer-in-charge may at hisdiscretion pay the lump amount entered in the estimate, & the certificate in writing of the Engineer-in-charge shall befinal & conclusive against the contractor with regard to any sum(s) payable to him under the provision of this clause.

CLAUSE 34: Action where no specification exists: In the case of any class of work for which there is no suchspecification as is mentioned in Rule 1 such work shall be carried out in accordance with the Divisional specification,& in the event of there being no Divisional specification, then in such case the work shall be carried out in allrespects in accordance with the instructions & requirements of the Engineer-in-charge.

CLAUSE 35: Definition of work: The expression "work(s)" where used in these conditions, shall, unless there besomething in the subject or context repugnant to such construction, be construed to mean the work(s) contracted to beexecuted under or in virtue of the contract, whether temporary or permanent & whether original, altered, substitutedor additional.

CLAUSE 36: Contractor's percentage whether applied to net or gross amounts of bill: The percentage referred to inthe tender shall be deducted from/added to the gross amount of the bill before deducting the value of any stockissued.

CLAUSE 37: Payment of quarry fees & royalties: All quarry fees, royalties, octroi, duties & ground rent for stackingmaterials, if any, should be paid by the contractor, as specified elsewhere in tender.

CLAUSE 38: Compensation under the Workmen's Compensation Act: The contractor shall be responsible for &

Page 69 / 83 Executive EngineerContractor

Page 72: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

CLAUSE 38: Compensation under the Workmen's Compensation Act: The contractor shall be responsible for &shall pay any compensation to his workmen payable under the Workmen's Compensation Act, 1923 (VIII of 1923),hereinafter called the said Act) for injuries caused to the workmen. If such compensation is paid by MIDC asprincipal under sub-section (1) of section 12 of the said Act on behalf of the contractor, it shall be recoverable byMIDC from the contractor under sub-section (2) of the said section. Such compensation shall be recovered in themanner laid down in Clause 1 above.

CLAUSE 39: The contractor shall be responsible for & shall pay the expenses of providing medical aid to anyworkman who may suffer a bodily injury as a result of an accident. If such, expenses are incurred by MIDC the sameshall be recoverable from the contractor forthwith & be deducted without prejudice to any other remedy of MIDCfrom any amount due or that may become due to the contractor.

CLAUSE 40: The contractor shall provide all necessary personal safety equipment & first aid apparatus available forthe use of the persons employed on the site, shall maintain the same conditions suitable for immediate use at any time& shall comply with the following regulations in connection herewith :-

a) The workers shall be required to use the equipment so provided by the contractor & the contractor shall takeadequate steps to ensure proper use of the equipment by those concerned.

b) When work is carried on in proximity to any place where there is a risk of drowning, all necessary equipmentshall be provided & kept ready for use & all necessary steps shall be taken for the prompt rescue of any person indanger.

c) Adequate provision shall be made for prompt first aid treatment of all injuries likely to be sustained during thecourse of the work.

CLAUSE 41: Claim for Quantities entered in the Tender or Estimate:

1.Quantities in respect of the several items shown in the tender are approximate & no revision in the tendered rateshall be permitted in respect of any of the items so long as, subject to any special provision contained in thespecifications prescribing different percentage of permissible variation, the quantity of the item does not exceed thetender quantity by more than 25% & so long as the value of the excess quantity beyond this limit at the rate of theitem specified in the tender is not more than Rs.5,000/-.

2.The contractor shall, if ordered in writing by the Engineer to do so, carry out any quantities in excess of the limitmentioned above in sub-clause (1) hereof, on the same conditions as & in accordance with the specifications in thetender & at the rates (i) derived from the rates entered in the current Schedule of Rates & in absence of suchrates, (ii) at the rate prevailing in the market. The said rate being increased/decreased as the case may be, by thepercentage which the total tendered amount bears to the estimated cost of the work as put to tender based onSchedule of Rates applicable to the year in which the tender was invited. For the purpose of operation of this clause,this cost shall be taken to be worked out from the DSR prevailing at the time at the acceptance of tender.

3.Claims arising out of reduction in the tender quantity of any item beyond 25% will be governed by the provision ofClause 15 only, when the amount of such reduction beyond 25% at the rate of the item specified in the tender is more

Page 70 / 83 Executive EngineerContractor

Page 73: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

than Rs.5,000/-.(The clause is not applicable to extra items)

4. The clause is not applicable to extra items.

5.There is no change in the item rate if the excess is more than 25% of the tendered quantity but the value of excesswork at the tendered rate does not exceed Rs.5000/-

6.The quantities to be paid at tendered rate shall include

a) Tendered quantity plus

b) 25% excess of the tendered quantity or the excess quantity of the value of Rs.5000/- at the tendered rates,whichever is more.

CLAUSE 42: Employment of famine affected labour: The contractor shall employ any famine, affected, convict orother labour of a particular kind or class if ordered in writing to do so by the Engineer-in-charge.

CLAUSE 43: Claim for compensation for delay in starting the work: No compensation shall be allowed for any delaycaused in the starting of the work on account of acquisition of land or, in the case of clearance works, on account ofany delay in according sanction to estimates.

CLAUSE 44: Claim for compensation for delay in the execution of work: No compensation shall be allowed for anydelay in the execution of the work on account of water standing in borrow pits or compartments. The rates areinclusive for hard or cracked soil, excavation in mud, sub-soil water or water standing in borrow pits & no claim foran extra rate shall be entertained, unless otherwise expressly specified.

CLAUSE 45: Entering upon or commencing any portion of work: The contractor shall not enter upon or commenceany portion of work except with the written authority & instructions of the Engineer-in-charge or of his subordinate-in-charge of the work. Failing such authority the contractor shall have no claim to ask for measurements of orpayment for work.

CLAUSE 46: Minimum age of persons employed, the employment of donkeys &/or other animals & the payment offair wages:

i) No contractor shall employ any person who is under the age of 18 years.

ii) No contractor shall employ donkeys or other animals with breaching of string or thin rope. The breaching must beatleast three inches wide & should be of tape (Nawar).

iii) No animal suffering from sores, lameness or emaciation or which is immature shall be employed on the work.

iv) The Engineer-in-charge or his agent is authorised to remove from the work any person/ animal found workingwhich does not satisfy these conditions & no responsibility shall be accepted by MIDC for any delay caused in thecompletion of work by such removal.

v) The contractor shall pay fair & reasonable wages to the workmen employed by him in the contract undertaken byhim. In the event of any dispute arising between the contractor & his workmen on the grounds that the wages paid

Page 71 / 83 Executive EngineerContractor

Page 74: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

him. In the event of any dispute arising between the contractor & his workmen on the grounds that the wages paidare not fair & reasonable the dispute shall be referred without delay to the Exe. Engineer, who shall decide the same.The decision of the Exe. Engineer shall be conclusive & binding on the contractor but such decision shall not in anyway affect the conditions in the contract regarding the payment to be made by MIDC at the sanctioned tender rates.

vi) The contractor shall provide drinking water facilities to the workers. Similar amenities shall be provided to theworkers engaged on large work in urban areas.

CLAUSE 47: Method of payment: Payment to contractors shall be made by cheques drawn on any bank within theDivision convenient to them, provided the amount exceeds Rs.10. Amounts not exceeding Rs.10 will be paid in cash.

CLAUSE 48: Acceptance of conditions compulsory before tendering for work: Any contractor who does not acceptthese conditions shall not be allowed to tender for works.

CLAUSE 49: Employment of scarcity labour: If Government declares a state of scarcity or famine to exist in anyvillage situated within 10 miles of work, the contractor shall employ upon such parts of the work, as are suitable forunskilled labour, any person certified to him by the Exe. Engineer or be any person to whom the Exe. Engineer mayhave delegated this duty in writing to be in need of relief & shall be bound to pay to such persons wages not belowthe minimum which the Government may have fixed in this behalf. Any dispute which may arise in connection withthe implementation of this clause shall be decided by the Exe. Engineer whose decision shall be final & binding onthe contractor.

CLAUSE 50: The prices quoted by the contractor shall not in any case exceed the control price if any fixed byGovernment or reasonable price which is permissible for him to charge a private purchaser for the same class &description of goods under the provisions of Hoarding & Profiteering Prevention Ordinance, 1943 as amended formtime to time. If the price quoted exceeds the controlled price or the price permissible under Hoarding & ProfiteeringPrevention Ordinance the contractor will specifically mention this fact in his tender along with the reasons forquoting such higher price. The purchaser at his discretion will in such case exercise the right of revising the price atany stage so as to conform with the controlled price on the permissible under the Hoarding & Profiteering PreventionOrdinance. This discretion will be exercised without prejudice to any other action that may be taken against thecontractor.

CLAUSE 51: The rates to be quoted by the contractor must be inclusive of sales tax/VAT, LBT etc. no extrapayment on this account will be made to the contractor.

CLAUSE 52: The contractor should as far as possible obtain his requirement of labour, skilled & unskilled from thenearest Employment Exchange.

CLAUSE 53: The provision regarding contractor's labours provisioning the Contract Labour (Regulation &Abolition) Act, 1970 with the Maharashtra Contract Labour (Regulation & Abolition) Rule, 1971 shall be binding onthe contractors. If the provision in the said Act contradicts with any of the provisions regarding Contractor's laboursin any of the clauses in this tender, the provisions in the Contract Labour (Regulation & Abolition) Act, 1970 withthe Maharashtra Labour (Regulation & Abolition) Rules, 1971 shall prevail.

CLAUSE 54: The contractor shall comply with the provisions of the Apprentices Act, 1961 & the rules & the ordersissued under these from time to time. If he/they fails to do so, the failure will be a breach of the contract & the

Page 72 / 83 Executive EngineerContractor

Page 75: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

CLAUSE 54: The contractor shall comply with the provisions of the Apprentices Act, 1961 & the rules & the ordersissued under these from time to time. If he/they fails to do so, the failure will be a breach of the contract & theSuperintending Engineer, may in his discretion, cancel the contract. The contractor shall be liable to him/them, of theprovisions of the Act.

CLAUSE 55: Supply of materials etc. by the contractors: The contractors are to provide every article (with theexceptions noted in Schedule 'A' attached) which may be necessary & requisite for the due & proper execution of theseveral works included in contract according to the true indent & measuring of the drawings & specifications takentogether which are to be signed by Exe. Engineer, MIDC, (hereinafter called the Exe. Engineer) & by the contractor(s) whether the same may or may not have been prescribed in the specifications or shown on the drawings providedhowever that the same are reasonable & obviously to be informed therefor. In case of any discrepancy between thedrawing & the specification the Exe. Engineer, shall decide which of the two is to be followed.

CLAUSE 56: Execution of work: The contractor shall set out the whole of the work as per approved drawings &details supplied to him & as per the instruction given during the execution of work by the Engineer-in-charge or hisagent, & shall rectify any errors, which may be found therein & shall provide all necessary labour & materials for thepurpose. The contractor shall also provide plants, labour & materials (with the exceptions noted in Schedule attachedwhich may be necessary & requisite for the works). The materials & workmanship are to be the best of theirrespective jobs. The contractor shall have the work in all respects clean & perfect at the completion thereof.

CLAUSE 57: Drawings & Specifications: Atleast 6 copies of the drawings & specifications submitted by theContractor & approved & signed by the Superintending Engineer shall be furnished by the Contractors to the MIDC& copies there of shall be kept on binding. Contractor's agent who is to be constantly kept on the ground by the Exe.Engineer, MIDC, under Schedule 'A' of the contract will supply plain MS rounds &/or TOR steel depending upon theavailability. As such, designs based on exclusive use Tor steel shall not be accepted.

CLAUSE 58: Control over works: The Exe. Engineer or his duly authorised representative have at all times access tothe works which are to be entirely under his control. He may require the Contractors to dismiss person in theContractor's employment upon the works if such person in his opinion is incompetent or misconducts himself & thecontractor shall forthwith comply with every such requirements.

CLAUSE 59: Materials left at site: All works & materials brought & left upon the site of the work either by thecontractor or by his orders for the purpose of forming part of the work are to be considered to be property of theMIDC, & the same shall not be removed or carried away by the Contractor or any other person, without the specialleave or consent in writing of the Exe. Engineer, but the MIDC shall not in any way be answerable for any loss ordamage which may happen to or in respect of any such work or materials on account of the same being lost or stolenor injured or damaged by weather or otherwise.

CLAUSE 60: Removal & substitution of materials: The Exe. Engineer, shall have full power to order the removalfrom the premises of the materials which in his opinion are not in accordance with the specifications & may employother persons to remove the same without having to be answerable or accountable for any loss or damage that may be

caused to such materials. The Exe. Engineer, shall also have full power to order other proper material to besubstituted & in case of default the Exe. Engineer, may cause the same to be supplied & all cost which be incurred in

Page 73 / 83 Executive EngineerContractor

Page 76: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

substituted & in case of default the Exe. Engineer, may cause the same to be supplied & all cost which be incurred insuch removal & substitution shall be borne by the contractor.

CLAUSE 61: Action in case of improper materials & workmanship: If in the opinion of the Exe. Engineer, any workor any part thereof is executed with improper materials or defective workmanship, the contractor shall when requiredby the Exe. Engineer, forthwith re-execute the same & substitute proper material & workmanship & in case ofdefault by the contractor in so doing within a week from the date of the requisition, the Exe. Engineer, shall have fullpower to employ other persons to re-execute the work & cost there of shall be borne by the contractor.

CLAUSE 62: Action & compensation payable in case of backlog/delay: If at any time before security deposit isrefunded to the Contractor, it shall appear to the Exe. Engineer or his subordinate in-charge of the work, that anyworks have been executed with unsound, imperfect or unskillful workmanship or with materials or articles providedby him for the execution of the work are unsound, or of a quality inferior to that contracted, it shall be lawful for theEngineer-in-charge to intimate this fact in writing to the Contractor & then not with standing the fact that the work,materials or articles complained or any have been inadvertently passed, certified & paid for, the contractor shall bebound to forthwith rectify or remove or reconstruct the work so specified in whole or in part, as the case may require,or if so required, shall remove the materials or articles so specified & provide other proper & suitable materials orarticles at his own charge & cost. In the event of his failing to do so within in the limit aforesaid, the Contractor shallbe liable, to pay compensation at the rate of 1 % on the amount of the estimated cost for every day not exceeding 10days, during which the failure so continues & in the event of any such failures as aforesaid the Engineer-in-chargemay rectify or remove & re-execute the work or remove & replace the material/articles complained of, as the casemay be, at the risk & expenses in all respects of the Contractor. Should the Engineer-in-charge consider that any suchinferior work or materials as described above is not acceptable, then it will be straight way rejected.

CLAUSE 63: Performance & guarantee of the work or plant completed by the contractor: The contractor shall makegood & repair defects in materials & workmanship & performance etc. revealed in the finished work or the plantcompleted by him, for a period of 36 Months from the date of which final completion certificate, is issued by theEngineer-in-charge. The decision of the Engineer-in-charge as to the necessity of repairs shall be binding on thecontractor. If the contractor fails to maintain & keep in proper condition the work completed by him or if the planterected by him falls in performance of guarantee furnished by the contractor over the stipulated period ofmaintenance or performance, then the Engineer-in-charge shall be entitled to carry out the necessary repairs,departmentally or through another agency at the cost of contractor. The decision of Engineer-in-charge regarding theamount of the expenses incurred in carrying out the repairs shall be final & binding on the contractor. The Engineer-in-charge shall be entitled to forfeit the whole or any part of the security deposit towards the expenses incurred byhim in repairing the work completed by the contractor.

CLAUSE 64: Responsibility of contractor for damage or fire etc.: From the commencement of the work to thecompletion of the same, the work shall be under the Contractor's charge. The contractor shall be held responsible forany damage done to the same by fire or any other cause & they shall be liable to make good all such damages & tocarry out any repairs which may be rendered necessary to the same by fire or other causes & they are to hold theMIDC harmless from any claims for injuries to persons or structural damage, damage to property happening fromany neglect or default or want of proper care or misconduct on the part of the Contractor or any of their employeeduring the execution of the work.

CLAUSE 65: Execution of work included in the contract: The Exe. Engineer shall have full power to send workmenPage 74 / 83 Executive EngineerContractor

Page 77: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

CLAUSE 65: Execution of work included in the contract: The Exe. Engineer shall have full power to send workmenon the premises to execute fittings & other works not included in the Contract & for which the Contractors shallafford every reasonable facility during ordinary working hours, provided that such operations shall be carried on insuch a manner as not to impede the progress of the work included in the contract. The contractor shall not howeverbe responsible for any damage which may happen to or be occasioned in the execution of any such fittings or otherworks.

Page 75 / 83 Executive EngineerContractor

Page 78: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Schedule B

Maharashtra Industrial Development Corporation

Name Of Work : Krushnoor Indl.Area…M & R to water supply scheme...Providing Painting to LLR with minorrepairs at Krushnoor I/A.

Amount And Rate In (Rs)

Sr.No Item DescriptionQuantity Rate Unit AmountRate In Words

6,300.00SquareMeter

600.0010.50 Providing and fixing glass panes,plain / frosted, 4mm thick for steeland wooden windows includingproviding putty of best quality andclamping material with 6 x 6 mmaluminium / timber beading fixedwith coach screws with rubberpadding etc. complete as directed.

1 Rupees SixHundred Only

Providing and fixing anodisedaluminum openable (top and sidehung) windows & ventilators,conforming to IS:1948-1991&1949-1991 with windows frame madeof standard Z sections with minimum4 mm. thick (as specified by themanufacturer) plain/frosted/whitesheet glass as specified bydepartment, including aluminumstays, specially designed butthinges(design to be got approvedfrom the Dept.) locking arrangementand other necessary fixtures andfastenings, including PVC lining forwater tightness, glass water fixingclips as approved by the Departmentetc. complete including finishing,cleaning, polishing the aluminumframe with petrol and/or other agentsas specified by the manufacturer etc.complete (the rate shall be inclusiveof Neoprene gasket and siliconsealant as required).Note: For top and side hungaluminum windows total weight ofsections shall be between 10 to 12kg/sq.m

2

Page 76 / 83 Executive EngineerContractor

Page 79: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Amount And Rate In (Rs)

Sr.No Item DescriptionQuantity Rate Unit AmountRate In Words

9,125.00kilogram365.0025.00 For aluminum section used.2.1 Rupees ThreeHundred SixtyFive Only

1,800.00SquareMeter

500.003.60 For 3.5 mm thick glass used.2.2 Rupees FiveHundred Only

4,774.00SquareMeter

5.50868.00 Removing including rubbing down,washing cleaning with dry cloth etc.the existing white colour or lime washor the distemper wash, includingscaffolding and making the surfacesmooth by ordinary enamel putty,plaster of paris etc to receive white orcolour washing etc. complete.

3 Rupees FiveAnd Paisa FiftyOnly

80,620.00SquareMeter

139.00580.00 Providing and applying two coats ofExterior Acrylic paint of approvedmake and ofapproved colour to the plasteredsurfaces includingcleaning, prepairing the plastersurface ,applying primercoat as per manufacturer'sspecifications, , scaffolding ifnecessary, etc.complete.

4 Rupees OneHundred ThirtyNine Only

Providing and applying washable oilbound distemper conforming toIS:428-1993 of approved colour &shade to old and new surfaceincluding scaffolding preparing thesurface to receive priming & finishingcoats.

5

17,280.00SquareMeter

60.00288.00 Two coats over primer.5.1 Rupees SixtyOnly

157.50SquareMeter

3.0052.50 Add when the work for any of theabove items is on ceiling.

6 Rupees ThreeOnly

558.00SquareMeter

9.0062.00 Removing and scrapping oil paintfrom wood work, ironwork, includingknotting, scrapping, rubbing down,including sand papering sealing thecracks with putty, filling with enamelputty, flattening, rubbing and makingthe surface smooth to receive thepaint.

7 Rupees NineOnly

Page 77 / 83 Executive EngineerContractor

Page 80: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Amount And Rate In (Rs)

Sr.No Item DescriptionQuantity Rate Unit AmountRate In Words

Providing and applying syntheticsuper enamel paint conforming toIS:2932 – 1991 of approved colour,including scaffolding if necessary andcleaning and preparing the surface,including primer coat etc. complete.

8

4,030.00SquareMeter

65.0062.00 Two coats.8.1 Rupees SixtyFive Only

550.00SquareMeter

220.002.50 Providing and applying Apcolite paintand painting of letters of given sizeas per requirement on Civilstructures.

9 Rupees TwoHundredTwenty Only

Providing and fixing in line & levelpaver blocks as specified. The paverblocks shall confirm to BS 6717 ASTMC 936 - 96 including providing andpreparing sand beds as specified,fixing blocks in position at site, fillingthe joints by jointing sand,compacting the blocks by platevibrator including filling the sidejoints by m-20 grade cementconcrete if required etc. complete.

10

4,11,840.00SquareMeter

880.00468.00 65 mm thick (strength 35 M pa) onsand bed 30 mm thick

10.1 Rupees EightHundred EightyOnly

70,200.00SquareMeter

150.00468.00 Add extra for pavor blocks with topsurface of 10 mm thickness in whitecement with colour pigments (lackerfinish) manufactured as per italiantechnolgy

10.2 Rupees OneHundred FiftyOnly

Earthwork in embankment withapproved material having field soakCBR not less than 8 and laboratorysoak CBR not less than 12 obtainedby the Contractor from his borrowareas including all lifts and leadsincluding laying in layers of 20cm to30cm for power roller and 45cm to60cm for vibratory compactor,breaking clods, and dressing to therequired lines, curves and sectionincluding payment of royalty chargesto the Govt. of Maharashtra.

11

Page 78 / 83 Executive EngineerContractor

Page 81: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Amount And Rate In (Rs)

Sr.No Item DescriptionQuantity Rate Unit AmountRate In Words

59,670.00CubicMeter

425.00140.40 For all leads.11.1 Rupees FourHundredTwenty FiveOnly

Watering and compacting theembankment to 97% of modifiedproctor dry density after laying inlayer of 20 to 30 cm. (testedembankment),.

12

2,667.60CubicMeter

19.00140.40 With 8-10 tonne roller in 20 to 30 cmlayers

12.1 RupeesNineteen Only

5,600.00Hours700.008.00 Excavator / Loader/ JCB.13 Rupees SevenHundred Only

15,390.00CubicMeter

285.0054.00 Dismantling Stone Masonry incement mortar or lime mortar andstacking the material as directed withall leads & lifts complete.

14 Rupees TwoHundred EightyFive Only

1,54,980.00CubicMeter

2,870.0054.00 Providing uncoursed rubble masonryof trap / granite / quartzite / gneissstone upto +/- 5 m above / belowplinth level orground level in foundation and plinthincluding dewatering, striking outjoints on exposed faces, curing,scaffolding etccomplete (not less than 35% ofmortar to be used).The recoveredrubble from UCR Masonry shall be theproperty of contractor.

15 Rupees TwoThousand EightHundredSeventy Only

Providing cement pointing for stonework using cement mortar 1:3proportion

16

10,150.00SquareMeter

70.00145.00 Flush Pointing16.1 RupeesSeventy Only

Providing and laying in position plaincement concrete using granite orblack trap graded metal includingmixing in a mechanically operatedmixer, dewatering, compacting,curing as required complete for alllifts up to a +/- 5 m. above or belowthe ground level where concrete isproposed, includingcentering/shuttering using ordinaryPortland cement.

17

Page 79 / 83 Executive EngineerContractor

Page 82: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Amount And Rate In (Rs)

Sr.No Item DescriptionQuantity Rate Unit AmountRate In Words

With Natural Sand17.1

25,200.00CubicMeter

4,200.006.00 a) In 1:3:6 proportion. Rupees FourThousand TwoHundred Only

10,800.00CubicMeter

4,800.002.25 b) In 1:2:4 proportion. Rupees FourThousand EightHundred Only

Providing and laying UPVC pipes ofstandard make in line and levelincluding necessary labour, bends,tees, fixtures etc. and testing thepipes complete.

18

U.P.V.C pipes as rain water downtake pipes

18.1

945.00RunningMeter

210.004.50 i) 75 mm diameter Rupees TwoHundred TenOnly

25,013.50RunningMeter

500.2750.00 Providing and fixing chain linkfencing 1.5 m height on MS angleposts of 50 x 50 x 6 mm size at 2.5m c/c 1.5 m above ground / copingand 0.30 m embedded in ground /coping in c.c.1:3:6 1 :2:4 grade of0.30 m. and at every corner chainlink of 50 mm mesh and 10 gauge GIstrand wire, including 2 nos. of 12gauge GI wire at top and bottom withnecessary U hooks, nuts and bolts,washers, 3 coats of anticorrosive oilpaint to steelwork etc. complete asper drawings, designsand specifications.Recovered Chainlink shall be the property ofcontractor.

19 Rupees FiveHundred AndPaisa TwentySeven Only

Page 80 / 83 Executive EngineerContractor

Page 83: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Amount And Rate In (Rs)

Sr.No Item DescriptionQuantity Rate Unit AmountRate In Words

Providing at the site of work andlowering, laying and jointing RCC NP2class pipes conforming to IS:458-1988 in prepared trenches ingrade and level, including hoisting,making rubber ring / collar joints incement mortar 1:1, including cost ofcollar / rubber ring, jointing materiallike cement, sand etc. and hydraulictesting of the pipes at factory as wellas on site as per the stipulation inrelevant IS code etc. complete.

20

4,925.00RunningMeter

1,970.002.50 600 mm dia.20.1 Rupees OneThousand NineHundredSeventy Only

9,22,575.60Total Amount Rs :

Schedule B -- Summary

Description Amount In RsSr.No.

Krushnoor Indl.Area…M & R to water supply scheme...Providing Painting to LLR withminor repairs at Krushnoor I/A.

9,22,575.601

Total

Say

9,22,575.60

9,22,576.00

Page 81 / 83 Executive EngineerContractor

Page 84: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

List of Amended Documents

Sr. No. Document Name

1 Value Added Tax (VAT) Act and Contract Labour, Income Tax Clause

Page 82 / 83 Executive EngineerContractor

Page 85: TENDER FOR CC - Maharashtra Industrial Development Corporationwms1.midcindia.org/seWMSUploadedfiles/DTP/4518/TenderDocument/... · MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Signed By

Organisation Unit

Signed Date

NAGPURE KEDAR

IN

10/04/2017

:

:

:

Page 83 / 83 Executive EngineerContractor