6
TEST REPORT FOR CURRENT TRANSFORMER 1. Designation: CURRENT TRANSFORMER Location: 220/33KV Switchyard Bus Coupler (Bay- 7) 2. Name Plate Details: Date 22/1/11 Make: AREVA Ratio 1600 - 800/1 - 1 - 1 - 1 - 1 Core No. 1 2 3 4 5 Rated Primary Current (Amp) 1600 Rated Sec. Current (Amp) 1 1 1 1 1 Output (VA) - - 15 - 7.5 10 - Accuracy Class PS PS 5P 0.2S PS I.S.F./A.I.F. - - 20 <5 - Rct at 75 0 C Ohms) 6.4 -3.2 6.4 - 3.2 6.4 - 3.2 6.4 - 3.2 KPV (V) 1200 - 600 - - 1200 - 600 Iexc at Vk/2 (mA) 20 - 40 - - 20 - 40 Freq: 50Hz Ith: 40/3 kA/Sec. HSV/ NSV : 245/220 Kv BIL: 460/1050 KV Idyn: 100 kAp Oil Weight: 300kg Total Weight: 1400 Kg Primary/Secondary Current (A) 1600/1 800/1 Primary Connection P1 - P2 P1 - P2 Secondary connection Core 1 1S1 - 1S3 1S1 - 1S2 Core 2 2S1 - 2S3 2S1 - 2S2 Core 3 3S1 - 3S3 3S1 - 3S2 Core 4 4S1 - 4S3 S’ 4S1 - 4S2 S’ Core 5 5S1 - 5S3 5S1 - 5S2 3. INSULATION RESISTANCE VAULE (GΩ) R Y B SR. NO. 42090701069 42090701068 42090701067 PRIMARY TO EARTH 1.14 (TΩ) 107 335 TIME 30 Sec. 30 Sec. 30 Sec. REMARKS: TEST RESULT FOUND SATISFACTORY Engg. Date Sign. VENUS AINL Mr. Stalin 22/1/11 1S1 1S2 1S3 2S1 2S2 2S3 3S1 3S2 3S3 5S1 5S2 5S3 P2 EARTHING P1 SCHEMATIC DIAGRAM AND CONNECTION 4S1 4S3 S A C 4S2 ABHIJEET MADC NAGPUR ENERGY PRIVATE LIMITED

Test Report for Current Transformer

Embed Size (px)

Citation preview

Page 1: Test Report for Current Transformer

TEST REPORT FOR CURRENT TRANSFORMER

1. Designation: CURRENT TRANSFORMER

Location: 220/33KV Switchyard Bus Coupler (Bay- 7)

2. Name Plate Details: Date 22/1/11

Make: AREVA

Ratio 1600 - 800/1 - 1 - 1 - 1 - 1

Core No. 1 2 3 4 5

Rated Primary Current (Amp) 1600

Rated Sec. Current (Amp) 1 1 1 1 1

Output (VA) - - 15 - 7.5 10 -

Accuracy Class PS PS 5P 0.2S PS

I.S.F./A.I.F. - - 20 <5 -

Rct at 750 C Ohms) 6.4 -3.2 6.4 - 3.2 6.4 - 3.2 6.4 - 3.2

KPV (V) 1200 - 600 - - 1200 - 600

Iexc at Vk/2 (mA) 20 - 40 - - 20 - 40

Freq: 50Hz Ith: 40/3 kA/Sec.

HSV/ NSV : 245/220 Kv BIL: 460/1050 KV Idyn: 100 kAp

Oil Weight: 300kg Total Weight: 1400 Kg

Primary/Secondary Current (A) 1600/1 800/1

Primary Connection P1 - P2 P1 - P2Secondary connection Core 1 1S1 - 1S3 1S1 - 1S2

Core 2 2S1 - 2S3 2S1 - 2S2

Core 3 3S1 - 3S3 3S1 - 3S2

Core 4 4S1 - 4S3 S’ 4S1 - 4S2 S’

Core 5 5S1 - 5S3 5S1 - 5S2

3. INSULATION RESISTANCE VAULE (GΩ)

R Y B

SR. NO. 42090701069 42090701068 42090701067

PRIMARY TO EARTH 1.14 (TΩ) 107 335

TIME 30 Sec. 30 Sec. 30 Sec.

REMARKS: TEST RESULT FOUND SATISFACTORY

Engg. Date Sign.

VENUS

AINL Mr. Stalin 22/1/11

1S1 1S2 1S3 2S1 2S2 2S3 3S1 3S2 3S3 5S1 5S2 5S3

P2

EARTHING

P1 SCHEMATIC DIAGRAM AND CONNECTION

4S1 4S3S

AC

4S2

ABHIJEET MADC NAGPUR ENERGY PRIVATE LIMITED

Page 2: Test Report for Current Transformer

ABHIJEET MADC NAGPUR ENERGY PRIVATE LIMITED

Page 3: Test Report for Current Transformer

TEST REPORT FOR CURRENT TRANSFORMER

1. Designation: CURRENT TRANSFORMER

Location: 220/33KV Switchyard Transformer - 2 (Bay - 4)

2. Name Plate Details: Date 06/12/10

Make: AREVA

Ratio 300 – 200/1 – 1 – 1A, 1600 – 800/ 1, 300 – 200/1A

Core No. 1 2 3 4 5

Rated Primary Current (Amp) 300 – 200 1600 – 800 300 - 200

Rated Sec. Current (Amp) 1 1 1 1 1

Output (VA) 20 -10 - 7.5 - -

Accuracy Class 5P PS 0.2S PS PS

I.S.F./A.I.F. 20 - <5 - -

Rct at 750 C Ohms) 2.5 – 1.7 2.5 – 1.7 - 12.6 2.5 – 1.7

KPV (V) - 650 - 400 - 1200 -600 650 - 400

Iexc at Vk/2 (mA) - 25 - 40 - 20 – 40 25 - 40

Freq: 50Hz Ith: 40/3 kA/Sec.

HSV/ NSV : 245/220 Kv BIL: 460/1050 KV Idyn: 100 kAp

Oil Weight: 300kg Total Weight: 1400 Kg

Primary/Secondary Current (A) 300/1 200/1 800/1 1600/1

Primary Connection P1 - P2 P1 - P2 P1 - P2 P1 - P2Secondary connection Core 1 1S1 - 1S3 1S1 – 1S2 - -

Core 2 2S1 - 2S3 2S1 - 2S2 - -

Core 3 3S1 - 3S3 S’ 3S1 - 3S2 S’ - -

Core 4 - - 4S1 - 4S2 4S1 - 4S3

Core 5 5S1 - 5S3 5S1 - 5S2 - -

3. INSULATION RESISTANCE VAULE (GΩ)

R Y B

SR. NO. 42090701061 42090701059 42090701057

PRIMARY TO EARTH 568 532 1.02 (TΩ)

TIME 60 Sec. 60 Sec. 60 Sec.

REMARKS: TEST RESULT FOUND SATISFACTORY

Engg. Date Sign.

VENUS

AINL Mr. Stalin 6/12/10

1S1 1S2 1S3 2S1 2S2 2S3 4S1 4S2 4S35S1 5S2 5S3

P2

EARTHING

P1 SCHEMATIC DIAGRAM AND CONNECTION

C

3S1 S

A

3S2 3S3

ABHIJEET MADC NAGPUR ENERGY PRIVATE LIMITED

Page 4: Test Report for Current Transformer

TEST REPORT FOR CURRENT TRANSFORMER

1. Designation: CURRENT TRANSFORMER

Location: 220/33KV Switchyard IPP Line - 2 (Bay-5)

2. Name Plate Details: Date 09/12/10

Make: AREVA

Ratio 1600 - 800/1 - 1 - 1 - 1 - 1

Rated Primary Current (Amp) 1600

Core No. 1 2 3 4 5

Rated Sec. Current (Amp) 1 1 1 1 1

Output (VA) - - 15 - 7.5 10 -

Accuracy Class PS PS 5P 0.2S PS

I.S.F./A.I.F. - - 20 <5 -

Rct at 750 C Ohms) 6.4 -3.2 6.4 - 3.2 6.4 - 3.2 6.4 - 3.2

KPV (V) 1200 - 600 - - 1200 - 600

Iexc at Vk/2 (mA) 20 - 40 - - 20 - 40

Freq: 50Hz Ith: 40/3 kA/Sec.

HSV/ NSV : 245/220 Kv BIL: 460/1050 KV Idyn: 100 kAp

Oil Weight: 300kg Total Weight: 1400 Kg

Primary/Secondary Current (A) 1600/1 800/1

Primary Connection P1 - P2 P1 - P2Secondary connection Core 1 1S1 - 1S3 1S1 - 1S2

Core 2 2S1 - 2S3 2S1 - 2S2

Core 3 3S1 - 3S3 3S1 - 3S2

Core 4 4S1 - 4S3 4S1 - 4S2

Core 5 5S1 - 5S3 5S1 - 5S2

3. INSULATION RESISTANCE VAULE (GΩ)

R Y B

SR. NO. 42100300181 42100300177 42100300176

PRIMARY TO EARTH 243 366 323

TIME 60 Sec. 60 Sec. 60 Sec.

REMARKS: TEST RESULT FOUND SATISFACTORY

Engg. Date Sign.

VENUS

AINL Mr. Stalin 09/12/10

1S1 1S2 1S3 2S1 2S2 2S3 4S1 4S2 4S35S1 5S2 5S3

P2

EARTHING

P1 SCHEMATIC DIAGRAM AND CONNECTION

C

3S1 S

A

3S2 3S3

ABHIJEET MADC NAGPUR ENERGY PRIVATE LIMITED

Page 5: Test Report for Current Transformer

TEST REPORT FOR CURRENT TRANSFORMER

1. Designation: CURRENT TRANSFORMER

Location: 220/33KV Switchyard Transformer - 3 (Bay - 6)

2. Name Plate Details: Date 18/01/11

Make: AREVA

Ratio 300 – 200/1 – 1 – 1A, 1600 – 800/ 1, 300 – 200/1A

Core No. 1 2 3 4 5

Rated Primary Current (Amp) 300 – 200 1600 – 800 300 - 200

Rated Sec. Current (Amp) 1 1 1 1 1

Output (VA) 20 -10 - 7.5 - -

Accuracy Class 5P PS 0.2S PS PS

I.S.F./A.I.F. 20 - <5 - -

Rct at 750 C Ohms) 2.5 – 1.7 2.5 – 1.7 - 12.6 2.5 – 1.7

KPV (V) - 650 - 400 - 1200 -600 650 - 400

Iexc at Vk/2 (mA) - 25 - 40 - 20 – 40 25 - 40

Freq: 50Hz Ith: 40/3 kA/Sec.

HSV/ NSV : 245/220 Kv BIL: 460/1050 KV Idyn: 100 kAp

Oil Weight: 300kg Total Weight: 1400 Kg

Primary/Secondary Current (A) 300/1 200/1 800/1 1600/1

Primary Connection P1 - P2 P1 - P2 P1 - P2 P1 - P2Secondary connection Core 1 1S1 - 1S3 1S1 – 1S2 - -

Core 2 2S1 - 2S3 2S1 - 2S2 - -

Core 3 3S1 - 3S3 S’ 3S1 - 3S2 S’ - -

Core 4 - - 4S1 - 4S2 4S1 - 4S3

Core 5 5S1 - 5S3 5S1 - 5S2 - -

3. INSULATION RESISTANCE VAULE (GΩ)

R Y B

SR. NO. 42090701063 42090701062 420907010

PRIMARY TO EARTH 319 265

TIME 60 Sec. 60 Sec. 60 Sec.

REMARKS: TEST RESULT FOUND SATISFACTORY

Engg. Date Sign.

VENUS

AINL Mr. Stalin 18/1/11

1S1 1S2 1S3 2S1 2S2 2S3 4S1 4S2 4S35S1 5S2 5S3

P2

EARTHING

P1 SCHEMATIC DIAGRAM AND CONNECTION

C

3S1 S

A

3S2 3S3

ABHIJEET MADC NAGPUR ENERGY PRIVATE LIMITED

Page 6: Test Report for Current Transformer

TEST REPORT FOR CURRENT TRANSFORMER

1. Designation: CURRENT TRANSFORMER

Location: 220/33KV Switchyard Transformer - 4 (Bay – 8)

2. Name Plate Details: Date 11/01/11

Make: AREVA

Ratio 300 – 200/1 – 1 – 1A, 1600 – 800/ 1, 300 – 200/1A

Core No. 1 2 3 4 5

Rated Primary Current (Amp) 300 – 200 1600 – 800 300 - 200

Rated Sec. Current (Amp) 1 1 1 1 1

Output (VA) 20 -10 - 7.5 - -

Accuracy Class 5P PS 0.2S PS PS

I.S.F./A.I.F. 20 - <5 - -

Rct at 750 C Ohms) 2.5 – 1.7 2.5 – 1.7 - 12.6 2.5 – 1.7

KPV (V) - 650 - 400 - 1200 -600 650 - 400

Iexc at Vk/2 (mA) - 25 - 40 - 20 – 40 25 - 40

Freq: 50Hz Ith: 40/3 kA/Sec.

HSV/ NSV : 245/220 Kv BIL: 460/1050 KV Idyn: 100 kAp

Oil Weight: 300kg Total Weight: 1400 Kg

Primary/Secondary Current (A) 300/1 200/1 800/1 1600/1

Primary Connection P1 - P2 P1 - P2 P1 - P2 P1 - P2Secondary connection Core 1 1S1 - 1S3 1S1 – 1S2 - -

Core 2 2S1 - 2S3 2S1 - 2S2 - -

Core 3 3S1 - 3S3 S’ 3S1 - 3S2 S’ - -

Core 4 - - 4S1 - 4S2 4S1 - 4S3

Core 5 5S1 - 5S3 5S1 - 5S2 - -

3. INSULATION RESISTANCE VAULE (GΩ)

R Y B

SR. NO. 42100100098 420100100097 420100100096

PRIMARY TO EARTH 880 813 329

TIME 60 Sec. 60 Sec. 60 Sec.

REMARKS: TEST RESULT FOUND SATISFACTORY

Engg. Date Sign.

VENUS

AINL Mr. Stalin 11/1/11

1S1 1S2 1S3 2S1 2S2 2S3 4S1 4S2 4S35S1 5S2 5S3

P2

EARTHING

P1 SCHEMATIC DIAGRAM AND CONNECTION

C

3S1 S

A

3S2 3S3