Note: This report is issued subject to TUV SUD PSB (Thailand) Limited's "Terms and Conditions Governing Technical Services". The terms and conditions governing the issue of this report are set out as attached within this report.
Test Report No. EEE/R10/0161-03 dated 14 May 2010
Laboratory: TÜV SÜD PSB (Thailand) Limited Thailand Science Park, 111 Moo 9 Paholyothin Rd., Klong 1, Klong Luang, Pathumthani 12120 Thailand
Phone : +66 2564 8041 Fax : +66 2564 8042 E-mail: [email protected] www.tuv-sud-psb.co.th
Regional Head Office: TÜV SÜD Asia Pacific Pte. Ltd. 3 Science Park Drive #04-01/0 The Franklin, Singapore 118223
Page 1 of 13 Page
SUBJECT Witness of the performances test for All Terrain Runflat (ATR) CLIENT Tyron International Ltd., Le Hurel Business Centre, La Router de Plemon, St. Ouen, Jersy JE3 2BD JOB NUMBER EEE10/0161 TEST DATE May 12, 2010
DESCRIPTION OF SAMPLE / CONDITION OF SAMPLE RECEIVED Trade Name : Tyron Model No. : All Terrain Runflat (ATR): 17 inches Sample Condition : The samples are received with good appearances and assembly on the new rims and
tyres without damages and cracks of the rims and tyres. METHOD OF TEST The samples were tested in accordance with the client's requirement. TEST FACILITY AND LOCATION Test facilities are responsible of the manufacturer. The test is performed at Nakhonchaisri Motorsports Complex (Thailand Circuit), Nakhonpathom, Thailand. PREPARED BY APPROVED BY
Mr. Chanachai Marangsri Mr. Bancherd Kajchamaporn
Senior Test Engineer Product Services Manager
Test Report No. EEE/R10/0161-03
dated 14 May 2010
.
Contents
EEE/R10/0161-03 Tyron International Ltd., Page 2 of 13 ATR
CONTENTS PAGE TEST SPECIFICATIONS
3
PRODUCT DESCRIPTIONS
4-5
TEST RESULTS 6-9
TEST SUMMARY 10 ANNEX A - LAYOUT OF TEST TRACK 11 ANNEX B - TEST INSTRUMENTATION & GENERAL
PROCEDURES 12-13
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Test Specifications
EEE/R10/0161-03 Tyron International Ltd., Page 3 of 13 ATR
The samples were tested in accordance with the client's specifications. Test Description /Specification
1. Deflated 2 tyres, one on the front and one on the rear axles. The driver can controls the vehicle and continue drives to achieve the distance and speed/*:
1.1) 3 km at Maximum Speed whichever the driver can achieve 1.2) Further 22 km at 50 km/h 1.3) Further 75 km at 50 Km/h
/*the test condition is originated from Finabel Agreement NE A.20.A (20.A.5) with test condition,
- 3 km at maximum speed - 22 km at 50 km/h - 75 km at 25 km/h - +50 km at 25 km/h (desirable)
2. After test per paragraph 1, shall not show any damages or cracks on the rims with ATR.
3. After finish paragraph 2, all 4 tyres were deflated for desirable test; further test for 2 wheels in paragraph 1 and replaced by 2 deflated wheels with ATR for other 2 wheels. Then, the driver continues to drives and controls the vehicle to achieve the further distance 50 km and speed at 25 km/h additionally.
4. After test per paragraph 3, the wheels shall not show any damages or cracks on the rims.
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Product Descriptions
EEE/R10/0161-03 Tyron International Ltd., Page 4 of 13 ATR
Product
ATR
:
ATR is a rubber and steel components used for fitting on the vehicle’s rim and only suitable for the tubeless tyre. It is used to assist the driver to continuously controls and drives the vehicle with deflated tyres.
Trade name
: TYRON
Dimensional
ATR
:
17 inch of rim with 590 mm of outer diameter
Testing vehicles ATR
:
TOYOTA FORTUNER 3.0 Diesel, Model year 2009, Laden mass 3200 kg
Ambient conditions : Temperature: 39.7 oC Relative Humidity: 42.5 %RH Road Surface Temperature: 42 oC
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Product Descriptions
EEE/R10/0161-03 Tyron International Ltd., Page 5 of 13 ATR
Pictures of product:
ATR
ATR assembled on Wheel
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Test Results
EEE/R10/0161-03 Tyron International Ltd., Page 6 of 13 ATR
ATR Performance: Control of vehicle with 2 deflated tyres The ATRs were assembled to the test vehicle by one on the front-right axel and the other one on the rear-left axle. The position of wheels with ATRs installation was shown by the picture as follow;
Front
Right
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Test Results
EEE/R10/0161-03 Tyron International Ltd., Page 7 of 13 ATR
Test condition
Pictures of Test
Front Axle Rear Axle
The wheels
with ATRs before
test
After 3 km at 60 km/h
and 22 km at 50 km/h:
After further
75 km at 50 km/h:
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Test Results
EEE/R10/0161-03 Tyron International Ltd., Page 8 of 13 ATR
Control of the vehicle with 4 deflated tyres
Before
Front Left
Front Right*
Rear Left*
Rear Right
*The tyres passed the test for total distance 100 km
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Test Results
EEE/R10/0161-03 Tyron International Ltd., Page 9 of 13 ATR
After Up to 50 km at average speed 30 km/h
Front Left
Front Right
Rear Left
Rear Right
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
Test Summary
EEE/R10/0161-03 Tyron International Ltd., Page 10 of 13 ATR
Test Summary
ATR 17” shall be installed to the wheel by the experienced staff. It can support and protect the rims on the test vehicle from crack or damage in case of the tyres are deflated. Test result can meet the specification of Finabel Agreement NE A.20.A (20.A.5) as follow;
Test condition Finabel Specification Actual Speed Remarks
3 km at Maximum Speed whichever the driver can achieve 3 km at maximum speed 60 km/h 2 wheels deflated
Further 22 km at 50 km/h 22 km at 50 km/h 50 km/h 2 wheels deflated Further 75 km at 50 Km/h 75 km at 25 km/h 50 km/h 2 wheels deflated Up to 50 km at 25 km/h +50 km at 25 km/h (desirable) 30 km/h 4 wheels deflated
In above table, the driver can control and continue to drives the vehicle by meet the distance and speed, 3 km at average 60 km/h which was as fast as the circuit would allow and further 97 km at average 50km/h, respectively. The rims were not damage and crack after total 100 km. The vehicle with 4 deflated tyres and included ATRs can additionally be controlled and driven up to 50 km with average speed 30 km/h. The rims do not show any cracks and damages after finish 150 km for the tyres on front right and rear left axels and 50 km for other 2 wheels.
Test Report No. EEE/R10/0161-03
dated 14 May 2010 .
APPENDIX A
EEE/R10/0161-03 Tyron International Ltd., Page 11 of 13 ATR
Layout of Test Track
Total length 2.5 km and road width 12 m
Nakhonchaisri Motorsports Complex (Thailand Circuit) layout, Nakhonpathom, Thailand
Test Report No. EEE/R10/0161-03
Reported date 14 May 2010 .
APPENDIX B
EEE/R10/0161-03 Tyron International Ltd., Page 12 of 13 ATR
TEST INSTRUMENTATION & GENERAL PROCEDURES
1. Test Instrument
Instrument Model S/No Cal Due Date
Temperature and humidity recorder HIOKI 2007 EEE 000335 3 May 2011
Thermometer FLUKE 51 II CHM 000100 July 2010
Test Report No. EEE/R10/0161-03
Reported date 14 May 2010 .
APPENDIX B
EEE/R10/0161-03 Tyron International Ltd., Page 13 of 13 ATR
This Report is issued under the following conditions: 1. Results of the testing/calibration in the form of a report will be issued immediately after the service has been completed or terminated. 2. Unless otherwise requested, a report shall contain only technical results. Analysis and interpretation of the results and professional opinion
and recommendations expressed thereupon, if required, shall be clearly indicated and additional fee paid for, by the Client. 3. This report applies to the sample of the specific product/equipment given at the time of its testing/calibration. The results are not used to
indicate or imply that they are applicable to other similar items. In addition, such results must not be used to indicate or imply that TUV SUD PSB (Thailand) approves, recommends or endorses the manufacturer, supplier or user of such product/equipment, or that TUV SUD PSB (Thailand) in any way “guarantees” the later performance of the product/equipment.
4. The sample/s mentioned in this report is/are submitted/supplied/manufactured by the Client. TUV SUD PSB (Thailand) therefore assumes no
responsibility for the accuracy of information on the brand name, model number, origin of manufacture, consignment or any information supplied.
5. Additional copies of the report are available to the Client at an additional fee. No third party can obtain a copy of this report through TUV SUD
PSB (Thailand), unless the Client has authorised TUV SUD PSB (Thailand) in writing to do so. 6. TUV SUD PSB (Thailand) may at its sole discretion add to or amend the conditions of the report at the time of issue of the report and such
report and such additions or amendments shall be binding on the Client. 7. All copyright in the report shall remain with TUV SUD PSB (Thailand) and the Client shall, upon payment of TUV SUD PSB (Thailand)’s fees
for the carrying out of the tests/calibrations, be granted a license to use or publish the report to the third parties subject to the terms and conditions herein, provided always that TUV SUD PSB (Thailand) may at its absolute discretion be entitled to impose such conditions on the license as it sees fit.
8. Nothing in this report shall be interpreted to mean that TUV SUD PSB (Thailand) has verified or ascertained any endorsement or marks from
any other testing authority or bodies that may be found on that sample. 9. This report shall not be reproduced wholly or in parts and no reference shall be made by the Client to TUV SUD PSB (Thailand) or to the
report or results furnished by TUV SUD PSB (Thailand) in any advertisements or sales promotion. 10. Unless otherwise stated, the tests are carried out in TUV SUD PSB (Thailand) Limited, Thailand Science Park, 111 Moo 9 Paholyothin Rd.,
T.Klong Nueng, A.Klong Luang, Pathumthani 12120 Thailand February 2008