Page 1: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S Y S T E M S [ C I R I A C 7 3 5 ]

July 2015

Presenter
Presentation Notes
Cover slide 1: White (no picture) Use cover slide 1 to start a presentation (or cover slide 2 with an image, if appropriate) Title and date must appear in ‘Brown, Accent 1’ from the colour pallet, in caps, using Segoe UI Semibold at 18pt and 14pt respectively Keep title to a maximum of three lines. Text box can be extended, but must always be centred on the slide NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 2: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Guidance on membranes as VOC barriers [CIRIA C748]

Testing and verification of gas protection systems [CIRIA C735]

1. The Project

2. Project Issues

3. Verification Procedure

4. Integrity testing

5. Reporting

6. Recommendations

Case study

Conclusions

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S . O U T L I N E O F P R E S E N TAT I O N

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 3: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Authors

S Wilson (EPG)

S Abbot (TCNF/ University of Leeds)

S Mallett (Buro Happold)

Background

1. Gas membrane – break VOC migration pathways

2. VOCs migrate through polymeric materials

3. Guidance presents information on permeation

4. Risk based approach

G U I DA N C E O N M E M B R A N E S A S V O C B A R R I E R S [ C I R I A C 7 4 8 ]

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 4: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Membrane function

“Hydrocarbon resistant”

HDPE – not impermeable to VOCs

Vapour transport mechanisms

Permeation tests

Membrane performance factors

G U I DA N C E O N M E M B R A N E S A S V O C B A R R I E R S [ C I R I A C 7 4 8 ]

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 5: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Membrane durability

1. Potential chemical degradation

2. Chemical resistance tests

G U I DA N C E O N M E M B R A N E S A S V O C B A R R I E R S [ C I R I A C 7 4 8 ]

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 6: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Membrane Selection

Design Life

Degradation

Risk associated with VOC migration

Potential for exposure

Loading

Installation

Installation and verification

G U I DA N C E O N M E M B R A N E S A S V O C B A R R I E R S [ C I R I A C 7 4 8 ]

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 7: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S Y S T E M S [ C I R I A C 7 3 5 ]

October 2014

Presenter
Presentation Notes
Cover slide 1: White (no picture) Use cover slide 1 to start a presentation (or cover slide 2 with an image, if appropriate) Title and date must appear in ‘Brown, Accent 1’ from the colour pallet, in caps, using Segoe UI Semibold at 18pt and 14pt respectively Keep title to a maximum of three lines. Text box can be extended, but must always be centred on the slide NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 8: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

1. The Project

2. Project Issues

3. Verification Procedure

4. Integrity testing

5. Reporting

6. Recommendations

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C 7 3 5 P R E S E N TAT I O N S T R U C T U R E

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 9: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Need Installed gas protection systems often inadequate Verification - fundamental to remediation Little current guidance for verification of gas protection systems Verification absent in design/ construction of buildings with gas protection systems Membrane resilience and integrity and well designed venting systems fundamental

to performance of gas protection systems

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C 7 3 5 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 10: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Need

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide: bulleted list Use Text slide 1 layout Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab If formatting is lost, highlight all text and click reset button in slides tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 11: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Need

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide: bulleted list Use Text slide 1 layout Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab If formatting is lost, highlight all text and click reset button in slides tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 12: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Need

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide: bulleted list Use Text slide 1 layout Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab If formatting is lost, highlight all text and click reset button in slides tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 13: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Team CIRIA - J Kwan PSG Chair - G Card (GB Card) - L Cox neeTaffel -Andureau (Buro Happold/Arup) Research - M Corban (MEC Environmental) Contractor - H Mallett (Buro Happold) - S Wilson (EPG) PSG - 27 members from: NHBC LA & EA regulators contractors consultant suppliers

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide: comparison Use Text slide 2: comparison, or Text slide 3: two content layouts when presenting two columns of text or one column of text with an image alongside Slide heading must be black, in caps, using Segoe UI Semibold Subheadings should be grey, using Segoe UI Semibold at 16pt Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab If formatting is lost, highlight all text and click reset button in slides tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 14: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Objectives

1. Determine and promote good practice

2. Define need and scope of verification

3. Describe integrity test methods and their selection

4. Identify practical constraints

5. Set out details of Verification Report [ CLR11 and SC030114]

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 15: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Regulatory framework

Part 2A [Statutory guidance] Any remedial treatment action should include appropriate verification measures. In arranging for such measures, the enforcing authority should ensure that the person responsible for verification is a suitably qualified experienced practitioner. (Defra, 2012)

NPPF Responsibility rests with developer Competent person

CLG 2008 [Standard Conditions] “Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority”.

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 16: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Regulatory framework

NHBC [Chapter 4.1] Robust design and verification required [Cl D6 and D7] Specialist membrane installers [CSC – National Occupational Standards VR612,613; NVQ level 2 Diploma – Installation of gas membranes] “Suitable person” to prepare Verification Reports [Appendix 4.1D] Verification required on “higher risk” sites (Amber 2 and above)

CIRIA [C735] The role and responsibilities of the local authority as primary regulator of land contamination, including land affected by ground gas emissions, is important for their assessment and approval of both the developers’ initial planning proposals (including remedial strategy) and the post development verification report

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 1 . T H E P R O J E C T

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 17: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

1. Verification

2. Ventilation

3. Membrane integrity

4. Robustness and levels of redundancy

5. Conceptual Site Model

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 2 . P R O J E C T I S S U E S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 18: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

1. Verification – “currently insufficient attention in design of gas protection systems”

A Verification Plan should be prepared as an integral part of the gas protection system at the design stage and submitted to the local authority regulator as an integral part of the remediation strategy. The verification plan should address

i. Gas regime and gas protection system

ii. Inspection regime

iii. Integrity test programme (if any)

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 2 . P R O J E C T I S S U E S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 19: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

2. High permeability layer and venting.

1990s reports - efficacy of venting

Wilson & Card - proven screening method

- high level of redundancy CIRIA C735

“Ventilation is a very effective first line of defence in gas protection systems”.

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 2 . P R O J E C T I S S U E S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 20: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

3. Integrity of membranes BRE – Minimum 1200g polyethylene Intact survival during construction.

CIRIA C735

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 2 . P R O J E C T I S S U E S

Critical property – ability to survive construction intact. Key parameters – material type; tensile strength, puncture resistance; permeability; need for protection; thickness (if welded).

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 21: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

4. Robustness and levels of redundancy Increase with Characteristics Situation [Basis of approach in Wilson&Card 99, CIRIA C665, British Standard 8485, NHBC 2007].

5. Conceptual site model An appropriate understanding of the conceptual site model is a critical element in the verification process

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 2 . P R O J E C T I S S U E S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 22: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Need for appropriately qualified workforce

Verification by competent experienced trained personnel.

Third party verification

Risk based approach to verification activities.

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 3 . V E R I F I C AT I O N P R O C E D U R E S

Verifying that a gas protection system works is as important as design and installation.

A Verification Plan should be prepared as an integral part of the gas protection system at the design stage and submitted to the local authority regulator as an integral part of the remediation strategy.

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 23: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Risk based approach to verification and independence

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 3 . V E R I F I C AT I O N P R O C E D U R E S

Requirement for 3rd party verification increases with risk.

Environment Agency recommends avoidance of conflicts of interest in verification [independent verifier]

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 24: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Inspection

Verifier (independent or not) to be;

Competent

Experienced

Suitably trained

Pro Forma

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 3 . V E R I F I C AT I O N P R O C E D U R E S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 25: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Competence of installer

Appropriately experienced & qualified workforce install gas protection system

If not more intensive verification required

Relevant qualification – CSC level 2 NVQ Diploma in sub structure work occupations (Construction) – installation of gas membranes.

Qualification helps ensure work complies with National Occupational Standards V612, V613.

A qualified workforce helps ensure adequate gas membrane installation and can make provision for less onerous verification plans.

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 3 . V E R I F I C AT I O N P R O C E D U R E S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 26: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Combine with visual inspection

Risk based

Not – Substitute for well designed/ installed gas protection systems

Not – to be used to obtain BS 8485 points

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 4 . I N T E G R I T Y T E S T I N G

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 27: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

a) Seams - Air channel - Mechanical - Air lance

b) Areal - Tracer gas - Smoke - Dielectric porosity

All have advantage and limitations.

Risk based decision on need

Planned

Practical application/ limitation.

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 4 . I N T E G R I T Y T E S T I N G

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 28: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Standard specifications for

1. Tracer gas test

2. Smoke test

3. Dielectric porosity test

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 4 . I N T E G R I T Y T E S T I N G - M E T H O D S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 29: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Integrity testing – Issues to consider

1. Definition of test method

2. Issues specific to test type

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 4 . I N T E G R I T Y T E S T I N G - M E T H O D S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 30: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Selection of verification & integrity testing

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 4 . I N T E G R I T Y T E S T I N G

Annex 1 Risk based structure for verification and integrity testing Considers; • Development type • Gas regime • Slab type • Installer experience Provides • Level of verification • Type of integrity testing Read the explanatory Notes

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 31: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Accord with CLR11, SC030114/RI and NHBC Chapter 4.1, Tech Extra 07

Clear concise description of verification activities

Phasing

Verification report - Contents list

Lines of evidence

- Description of inspection regime

- Description of elements of gas protection system

- Presentation of material specifications etc.

Meet regulatory requirements (inc planning conditions)

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 5 . R E P O RT I N G

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 32: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

1. Recognition of CLO role and responsibility 2. Use of Conditions to require verification 3. Reject unsuitable reports 4. Upskill workforce [CSC - competent person] 5. Installers have / working towards NVQ 6. Verification plan – integral element of strategy

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 6 . R E C O M M E N DAT I O N S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 33: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

7. Recognition of independent verification as important element 8. Risk based decision on verification (independence, gas regime, gas protection

system, quality of product, installer competence) 9. Verifier – independent, competent, experienced 10. Proprietary gas membrane should be specified [material type, tensile strength,

puncture resistance, permeability, thickness (welded) & protected] 11. Research into integrity test methods 12. Use of standard inspection pro formas

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S 6 . R E C O M M E N DAT I O N S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 34: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Question for you

What is this a picture of?

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C A S E S T U D Y

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 35: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

New building with passive gas protection measures

Void former

Membrane

Venting via perimeter granular filled trench

Verification

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C A S E S T U D Y

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 36: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Drawings prepared by Engineer

Contractor installed gas protection system

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C A S E S T U D Y

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 37: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Drawings prepared by Engineer

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C A S E S T U D Y

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 38: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

Contractor installed gas protection system

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C A S E S T U D Y

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 39: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

1. Membrane sealed over vent pipes

2. Concrete pavement laid

3. Debacle!

But solved by good verification

1. Inspection

2. Identify issue

3. Devise solution [in conjunction with specialist & contractor]

4. Implement and

5. Verify and record

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C A S E S T U D Y

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 40: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

1. Installed gas protection systems often inadequate – Solution: Adopt C735

2. Verification plan integral to Remedial Strategy

3. Ventilation VIP of system

4. Maintenance of membrane integrity

5. Integrity tests – planned implemented by competent persons [as required]

6. Upskilling of workforce and verifier

7. Risk based approach to verification [activities, type, frequency, competence]

T E S T I N G A N D V E R I F I C AT I O N O F G A S P R OT E C T I O N S YS T E M S C O N C LU S I O N S

Presenter
Presentation Notes
Text slide Three text slide layout options available Slide heading must be black, in caps, using Segoe UI Semibold Body text should be black and left aligned, using Segoe UI (regular) at 16pt Use the bullet points and line spacing preformatted within text box, ensure style and text indentation remains consistent throughout presentation To turn bullet points on and off, click inside text box before adding text (or highlight existing text), then click bullets button in paragraph tool bar on home tab NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection
Page 41: TESTING AND VERIFICATION OF GAS PROTECTION SYSTEMS [CIRIA ...CIRIA_C735]_Hugh_Mallet.pdf · Guidance on membranes as VOC barriers [CIRIA C748] Testing and verification of gas protection

COPYRIGHT © 1976-2014 BUROHAPPOLD ENGINEERING. ALL RIGHTS RESERVED

www.burohappold.com

Presenter
Presentation Notes
Sample end slide Use end slide layout as final slide for all external presentations Logo hyperlinked to BuroHappold website NB – there are additional slide master layouts available to those demonstrated in this guidance presentation – use drop down menu under new slide button to see full selection