ATTACHMENT 2B* PROPOSED WELL DESIGN (INCLUDED ON THUMB DRIVE)
Texas Custodial Trust 2301 West Paisano Drive El Paso, Texas 79922-1622
East Property Groundwater Hydraulic Barrier Design
April 2015
Prepared for Project Navigator, LTD (Trustee) By:
Malcolm Pirnie, Inc. 401 East Main Street Suite 400 El Paso, Texas 79901 915-533-9025
6835001
Table of Contents
East Property Groundwater Hydraulic Barrier Design Former ASARCO Smelter, El Paso, Texas 63835001
ii
Table of Contents
1. Electrical Drawings
Electrical Legend and One Line Diagram
Electrical Details
Electrical Site Plan
2. GBH Wellhead Sketch
GBH Wellhead Sketch - Profile View
GBH Wellhead Sketch - Plan View
3. GHB Pumping Well EP-163
Well Construction and Pump Installation
4. Tank Schematics
5. GHB Pipeline Civil Drawings
GHB Pipeline
Civil Details and Flow DiagramSoil Boring Results
142"
173
3 8"
179
1 2"
15 916 " D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
THE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFAgrimaxx, Enduraplas. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OFAgrimaxx, Enduraplas, IS PROHIBITED.
PROPRIETARY AND CONFIDENTIAL
NEXT ASSY USED ON
APPLICATION
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONALANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL
INTERPRET GEOMETRICTOLERANCING PER:
MATERIAL
FINISH
DRAWN
CHECKED
ENG APPR.
MFG APPR.
Q.A.
COMMENTS:
DATENAME EnduraplasTITLE:
SIZE
BDWG. NO. REV
WEIGHT: SCALE: 1:100
UNLESS OTHERWISE SPECIFIED:
1
DNS 9/6/11
SHEET 1 OF 1
EVT 10000 - 144 inch
DO NOT SCALE DRAWING
VENT DETAIL
FLOW DIAGRAM
EARTHED BERM DETAIL