Textile Parks for Make in India A Report on Scheme for Integrated Textile Parks (SITP)

Textile Parks for Make in India

Embed Size (px)

DESCRIPTION

A Report on Scheme for Integrated Textile Parks (SITP)

Citation preview

  • Textile Parks for Make in India

    A Report

    on

    Scheme for Integrated Textile Parks (SITP)

  • 3The Make in India initiative launched by the Government of India aims to transform India into a global manufacturing hub. The focus of the programme is to create jobs and enhance skills in 25 sectors identified on the basis of employment generation and strategic importance for the country. Textile has been identified as one of the focus sectors, in view of its investment and employment intensity, employing over 45 million people, and huge export potential.

    The Indian textiles industry is extremely varied, with the hand-spun and hand-woven sector at one end of the spectrum, and the capital intensive sophisticated mill sector at the other. The Government of India has undertaken several initiatives to promote the textiles and apparel sector in the country.The flagship Scheme for Integrated Textiles Parks (SITP ) aims at providing the industry with world-class infrastructure facilities for setting up textile units and be globally competitive.

    The future for the Indian textile industry looks promising, sustained by both a strong domestic consumption and export demand. Combined with Indias comparative advantage in terms of skilled labor and abundant availability of raw materials makes the country a favorable destination for global manufacturers and be a part of the Make in India initiative. I am confident that the favorable conditions of the country backed by the initiatives of the Central and State governments, will go a long way in making India a global textile and apparels manufacturing hub.

    The compilation of data on the textile parks in the country is a useful guide for all the stakeholders in the textile and apparel industry and the release of it is timely. I compliment all who have contributed to the compilation of this publication.

    The SITP has been very helpful in supporting the industry in terms of good quality and need based infrastructure. I would urge the state governments and the industry to proactively participate, support and contribute in implementation of the Scheme successfully.

    I wish all the stakeholders of the textile and apparel industry all success.

    Ministry of Textiles Government of India

    Santosh Kumar GangwarMinister of State for Textiles

    Government of India

    Message

  • 4

  • 5Indias textiles and clothing industry forms a major component of our national economy accounting for 14% of the industrial production and 4% of the Gross Domestic Product. With a contribution of 13% of the total exports and 23% year-on-year growth, this sector plays a critical role in exports, which is estimated to touch USD 65 billion by March 2017.

    Under the Make in India initiative, the sector is set to grow with stress on Zero defect Zero effect (on environment) , Scale, Skill and Speed for making the development participative and inclusive Sabka Saath- Sabka Vikas. In this context, availability of quality world class infrastructure and consolidation of the segments assumes enormous significance. The Scheme for Integrated Textile Parks (SITP) was launched in 2005 embracing the broad principles of cluster development with a view to facilitate setting up of textile units along with basic facilities including the international environmental standards. These parks are being set up under Public Private Partnership (PPP) model by entrepreneurs with financial assistance under the schemes. The Scheme has provided the much needed flexibility to address constraints experienced along the value chain and contributed significantly to the modernization and growth of Indias textile sector.

    Over 70 textile parks have been approved under the Scheme so far, of which 30 have started commercial operations. It is expected that on completion, these parks would attract investments of over Rs 30,000 Crore and generate direct and indirect employment for 11 lakh people. It has been felt that the Scheme has been instrumental in creating several Greenfield textile clusters and providing the much needed impetus to Indias textile industry to realize its potential. It is felt necessary to learn from the experiences of entrepreneurs and stakeholders on implementation of the scheme for replicating the success stories and also to take necessary corrective steps for overcoming the weaknesses. With these objectives, Ministry of Textiles has taken up compilation of the status of the parks set up under SITP. It is hoped that this publication will help as a reference material for all the stakeholders in the textile sector in working out appropriate interventions for strengthening it further to get the best out of Indias favorable position in textile manufacturing in terms of workforce, raw material availability and low cost of production for meeting the domestic demand as well as exports.

    Ministry of Textiles Government of India

    Sanjay Kumar Panda, IASSecretary, Ministry of Textiles

    Government of India

    Foreword

  • 6

  • 7In order to assist the Indian Textile industry to take advantage of post quota global trade regime, Ministry of Textiles, Government of India introduced the Scheme for Integrated Textile Parks (SITP) in August 2005. SITP is running successfully in the 12th five year plan. The objective of the scheme is to provide world-class infrastructure facilities to the textiles industry thus enhancing its competitiveness.

    Salient Features of SchemeThe Scheme targets development of Textile Parks on cluster based approach, under which the Parks are developed, owned, operated and maintained by the user entrepreneurs themselves. The scheme thus focuses on collaborative efforts by the enterprises to overcome the critical constraints in the value chain especially related to infrastructure. The salient features of the Scheme are given below:

    (a) A typical textile park to have need based infrastructure covering the following components: a) Basic Infrastructure( roads, water supply, power supply, drainage , effluent treatment etc b) Common Facilities (Skill development centre, testing lab, design centre, canteen, conference

    facility, workers hostel etc ) and c) individual production facilities/ factories. Parks could cover a part or the entire textile value chain

    from fibre production to apparel manufacturing

    (b) The Parks are domiciled in a project/ park specific Special Purpose Vehicle (SPV) company promoted by the user entrepreneurs. The Users are required to hold at-least 51% of the equity share capital of the SPV. State Governments, Industry Associations and other investors could contribute the balance equity of the SPV, if any.

    (c) While the SPVs implement and own the project, the State Governments act as facilitators in land procurement, assistance in regulatory clearances, dovetailing of State schemes if applicable etc

    (d) Based on a bankable DPR prepared and appraised by Project Management Consultant (PMC), Ministry provides a grant to the extent of 40% of the cost of basic infrastructure, common facilities and factory buildings (if owned by the SPV), subject to a ceiling of Rs. 40 Crore for each Park. The balance project cost is to be mobilized by the SPV through equity and debt funding.

    (e) Ministry utilizes the services of professional agencies as Project Management Consultant (PMC) in implementing the scheme. PMCs are responsible for identification of projects, preparation and appraisal of DPR, assisting entrepreneurs in establishment of SPVs, obtaining necessary statutory approvals and clearances and assisting the Ministry of Textiles in overall monitoring of projects.

    Status and ImpactAs on March 2015, 70 parks spread across 16 states have been approved with total SITP project cost of Rs 7,100 Crore of which Rs 2586 Crore is grant assistance from the Ministry of Textiles. These parks are expected to generate employment to the tune of 11 lakhs and investment of approx Rs 30,000 Crore on completion and full capacity utilisation.

    The Scheme has been relatively successful considering the complexity and challenges associated with establishment of industrial parks and the economic down turn over the past few years :30 parks, out of 36 parks sanctioned till 11th FYP, are operational. The scheme enabled mobilisation of significant level

    Scheme for Integrated Textile Parks (SITP)

  • 8of private sector investment, including FDI, of Rs 5400 Crore ( including plant and machinery) against the grant of Rs 1092 Crore released for parks approved during 10th and 11th FYP. World class and customised infrastructure, particularly, related to effluent treatment has been created in some parks. World Bank in its study titled The Implementation of Industrial Parks- Some Lessons Learned in Indiapublished in 2013 identified SITP as an appropriate model for industrial infrastructure development.

    However, there have also been the cases where the SPVs struggled to complete the projects due to several reasons: lack of leadership and cohesion amongst the SPV members, difficulties related to financial closure, delays on account of approvals related to land and environment and other factors. There is a need to study such cases and draw the lessons for further improvement.

    Overall, the SITP, proved to be a very effective tool in clustering the SMEs, providing economies of scale, creating shared common infrastructure and thus enabling the industry in enhancing its competitiveness. In view of this, the Ministry of Textiles has initiated the following schemes to leverage the infrastructure and institutional framework created by SITP : Scheme for Apparel Manufacturing, Textile Workers Accommodation, Incubation Centres.

    Detailed scheme guidelines are available at www.texmin.nic.in

    States Completed/Ongoing

    ParksNew Parks

    Total

    Andhra Pradesh

    3 4 7

    Assam - 1 1Bihar - 1 1Gujarat 8 5 13Haryana - 1 1Himachal Pradesh

    1 - 1

    Jammu & Kashmir

    1 1 2

    Karnataka 2 - 2Madhya Pradesh

    1 - 1

    Maharashtra 12 4 16Punjab 3 1 4Rajasthan 6 - 6Tamil Nadu 9 - 9Telangana 2 1 3Uttar Pradesh

    - 1 1

    West Bengal 2 - 2Total 50 20 70

    Completed / Ongoing ParksNew Parks

  • 9Table of ContentsMessage 3

    Foreword 5

    Introduction 7

    Andhra Pradesh1 l Brandix India Apparel City Private Ltd., Vishakhapatnam 122 l Hindupur Vyapar Apparel Park Ltd., Ananthpur, Andhra Pradesh 143 l MAS Fabric Park India Ltd., Nellore, Andhra Pradesh 164 l Gautambudha Textile Park Pvt. Ltd., Andhra Pradesh 185 l Guntur Textile Park, Guntur 206 l Rangaraya Textile Park Pvt. Ltd., West Godavari 227 l Tarakeswara Textile Park Pvt. Ltd., Nellore 24

    Assam8 l Prag Jyoti Textile Park, Darrang 28

    Bihar9 l JVL Textile Park, Rohtas 32

    Gujarat10 l Fairdeal Textile Park Pvt Ltd., Surat 3611 l Gujarat Eco Textile Park Ltd., Surat 3812 l Kejriwal Integrated Textile Park, Surat 4013 l Mundra SEZ Textile & Apparel Park Ltd., Kutch 4214 l RJD Integrated Textile Park Ltd., Surat 4415 l Sayana Textile Park Ltd., Surat 4616 l Surat Super Yarn Park Ltd., Surat 4817 l Vraj Integrated Textile Park Ltd., Kheda 5018 l Amitara Green Hi-Tech Textile Park, Kheda 5219 l Karnaj Textile Park Pvt. Ltd., Surat 5420 l Madhav Textile Park, Surendranagar 5621 l Palsana Textile Park Pvt. Ltd., Surat 5822 l Shanti Textile Park, Surat 60

    Haryana23 l Aalishan Eco Textile Park Pvt. Ltd., Panipat 64

    Himachal Pradesh24 l Himachal Textile Park, Una 68

    Jammu & Kashmir25 l J&K Textile Park, Kathua 7226 l Kashmir Wool & Silk Textile Park Pvt. Ltd., Ghatti 74

    Karnataka27 l Doddabalapur Integerated Textile Park, Doddabalapur 7828 l Gulbarga Textile Park, Gulbarga 80

    Madhya Pradesh29 l CLC Textile Park Pvt Ltd., Chhindwara 84

    Maharashtra30 l Asiatic Co-op. Textile Park, Solapur 8831 l Asmeeta Infratech Private Ltd.,Thane 90

  • 10

    32 l Baramati Hi Tech Textile Park Ltd., Baramati 9233 l Deesan Infrastructure Pvt Ltd., Dhule 9434 l Islampur Integrated Textile Park Ltd., Sangli 9635 l Kallappana Awade Textiles Park, Kolhapur 9836 l Khed Textile Park, Pune 10037 l Latur Integrated Textile Park, Latur 10238 l Metro Hi-Tech Cooperative Park Ltd., Ichalkaranji 10439 l Pride india cooperative Textile park Ltd., Ichalkaranji 10640 l Purna Global Textiles Park Ltd., Hingoli 10841 l Sundarrao Solanke Textile Park, Beed 11042 l Dhule Textile Park, Dhule 11243 l Hinganghat Integrated Textile Park, Warda 11444 l Satyaraj Integrated Textile Park, Kolhapur 11645 l Shree Ganesh Integrated Textile Park Pvt. Ltd., Dhule 118

    Punjab46 l Lotus Integrated Tex Park, Barnala 12247 l Rhythm Textile & Apparel Park Ltd., Nawanshehar 12448 l Ludhiana Integrated Textile Park Ltd., Ludhiana 12649 l Progressive Integrated Textile Park Pvt. Ltd., Bathinda 128

    Rajasthan50 l Next Gen Textile Park Pvt Ltd., Pali 13251 l Jaipur Texweaving Park Ltd., Kishangarh 13452 l Kishangarh Hi-Tech Textile Park Ltd., Kishangarh 13653 l Jaipur Integrated Texcraft Park Pvt Ltd., Jaipur 13854 l Jaipur Kaleen Textile Park, Dausa 14055 l Himmada Textile Park, Balotra 142

    Tamil Nadu56 l Perarignar Anna Handloom Silk Park, Kanchipuram 146 57 l Karur Integrated Textile Park, Karur 14858 l Komarapalayam Hi-Tech Weaving Park Ltd., Komarapalayam 15059 l Madurai Integrated Textile Park Ltd., Madurai 15260 l Palladam Hi-Tech Weaving Park, Palladam 15461 l Pallavada Technical Textiles Park Ltd., Chennai 15662 l SIMA Textile Processing Centre, Cuddalore 15863 l SLS Textile Park, Bagalur 16064 l The Great Indian Linen & Textile Infrastructure Company, Perundurai 162

    Telangana65 l Pochampally Handloom Park Ltd., Pochampally 16666 l Whitegold Textile Park, Ranga Reddy 16867 l Avantika Textile Park, Medak 170

    Uttar Pradesh68 l Ecotex Textile and Apparels Park Private , Bareilly 174

    West Bengal69 l EIGMEF Apparel Park Ltd., Kolkata 17870 l West Bengal Hosiery Park Infrastructure Ltd., Howrah 180

  • 11

    1 Brandix India Apparel City Pvt. Ltd., Vishakhapatnam

    2 Hindupur Vyapar Apparel Park Ltd., Ananthpur

    3 MAS Fabric Park India Ltd., Nellore

    4 Gouthambudha Textile Park Pvt. Ltd., Guntur

    5 Guntur Textile Park, Guntur

    6 Rangaraya Textile Park Pvt. Ltd., West Godavari

    7 Tarakeswara Textile Park Pvt. Ltd., Nellore

    Completed / Ongoing Parks

    New Parks

    Andhra Pradesh

  • Textile Parks for Make in India12

    Brandix India Apparel City Ltd. Vishakhapatnam, Andhra Pradesh

    Name of the SPV Brandix India Apparel City Private LtdPromoter(s) Mr Ashroff Omar, Group CEOLocation Vishakhapatnam, Andhra PradeshYear of Sanction 2006Year of Commencement of Operations 2008Year of Completion* 2010Area 1000 AcresSITP Project Cost & Means of Finance Rs 134.42 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 54.00 Crore from State Bank of India

    Members Contribution Rs 40.42 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs 4,878 Crore

    Mobilized as on March 2015 Rs 1,050 Crore

    Total Production Value (per annum)Estimated value Rs 4,500 Crore

    Production value as on March 2015 Rs 928 Crore

    Total Direct EmploymentEstimated 60,000 persons

    Employed as on March 2015 16,000 persons

    Value Chain (Activities) Knitting, weaving, processing and garmenting Integrated supply chain for knitted garments

    Product Mix Under Garments, lingerie, Mens Shirt, Yoga pants, Knitted fabric and Garment Accessories

    Total UnitsEstimated 17 Units

    Operational as on March 2015 14 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 13

    Special Infrastructure/Amenities in the Parkl Water treatment plant (60 MLD)l Substation at the park for uninterrupted power supply (200 MW)l Effluent treatment with marine outfall (56 MLD)l Marine outfall pipeline to carry treated effluent (9 kms)l Rainwater harvestingl Hostel & recreational facilities

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Sunil Kishen, Vice President

    ClustersPhone: Office (+91 8924 237000) &

    Mob (99496 15398)Email: [email protected]: www.brandixapparelcity.com

  • Textile Parks for Make in India14

    Hindupur Vyapar Apparel Park LimitedAnantpur, Andhra Pradesh

    Name of the SPV Hindupur Vyapar Apparel Park LimitedPromoter(s) Sri. Palla Adishulu, ChairmanLocation Anantapur District, Andhra PradeshYear of Sanction 2006Year of Commencement of Operations 2011Year of Completion* Project under implementationArea 73.1 acresSITP Project Cost & Means of Finance Rs 102.77 Crore

    Grant approved under SITP Rs 40 Crore

    Term loan, if any & name of bank Rs 35.27 Crore, SBI

    Members Contribution Rs 27 Crore

    Others (including State Govt. Grant) Rs 0.50 Crore

    Total InvestmentEstimated Rs 265 Crore

    Mobilized as on March 2015 Rs 50 Crore

    Total Production Value (per annum)Estimated value Rs 340 Crore

    Production value as on March 2015

    Total Direct EmploymentEstimated 10,500 persons

    Employed as on March 2015 200 persons

    Value Chain (Activities) Weaving, warping, sizing, garmenting unitsProduct Mix Fabric, Mens WearTotal Units

    Estimated 400 looms

    Operational as on March 2015 80 looms installed* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 15

    Special Infrastructure/Amenities in the Parkl Automated silk reeling unitl Warping machineryl 400 modern looms and 3700 sewing machines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Ravindra

    ClustersPhone: 08556-223899Email: [email protected]

  • Textile Parks for Make in India16

    MAS Fabric Park (India) Pvt. Ltd.Nellore, Andhra Pradesh

    Name of the SPV MAS fabric Park (India) Pvt. Ltd.Promoter(s) MAS Investment Pvt Ltd,SrilankaLocation Chinthavaram Yeruru Villages, ChilakurMandal,

    Nellore Dist, Andhra Pradesh

    Year of Sanction 2008Year of Commencement of Operations 2013Year of Completion* Project under implementation Area 581.68 acresSITP Project Cost & Means of Finance Rs 273.73 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs138.29 Crore, State Bank of India

    Members Contribution Rs 76.41 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs1932.85 Crore

    Mobilized as on March 2015 Rs58.84 Crore

    Total Production Value (per annum)Estimated value Rs 2500 Crore

    Production value as on March 2015 21.75 Crore

    Total Direct EmploymentEstimated 31000

    Employed as on March 2015 512

    Value Chain (Activities) Garmenting and Processing units along with Stitching, Finishing and Packaging

    Product Mix Ladies Garments, Track Suits and T-shirts for Nike Brand.Total Units

    Estimated 16

    Operational as on March 2015 1* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 17

    Special Infrastructure/Amenities in the Parkl Staging unitl Training centrel Administrative hubl Customs officel Telecom exchangel Canteen/ food courtsl First aidl Medical centre

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr P Kanaka Sundaram, COO, MAS Fabric Park (India) Pvt. Ltd.

    ClustersPhone: 9840038800Email: [email protected]

  • Textile Parks for Make in India18

    Gouthambudha Textile Park Pvt. Ltd.Guntur, Andhra Pradesh

    Name of the SPV Gouthambudha Textile Park Pvt LtdPromoter(s) Sri. BollaBrahmanaidu, Managing DirectorLocation Vankayalapadu Village, EdlapaduMandal, Guntur

    District,Andhra Pradesh

    Year of Sanction February 2015Year of Commencement of Operations 2018Year of Completion* 2018Area 78.25 AcresSITP Project Cost & Means of Finance Rs 102.91 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 34.88 Crore

    Members Contribution Rs 28.03 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs 571 Crore

    Mobilized as on March 2015 Rs 12 Crore

    Total Production Value (per annum)Estimated value Rs 450 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,810 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Ginning, Spinning, Weaving, Garmenting, Warping & Sizing, Technical Textiles and Allied Activities

    Product Mix Woven fabric, Ready-made garments, Technical textilesTotal Units

    Estimated 42 Units

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 19

    Special Infrastructure/Amenities in the Parkl Total Park power demand of 15.7 MW to be met by dedicated sub-stationl Administration, Park Management & Security officesl Testing laboratory, Design center& Training centerl Ware housing facility/ raw material depot & Packaging unitl Weaving preparatory (warping & sizing) processesl Crche, Canteen, Bank, PO, Medical & Recreation facilities etc

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr.BollaBrahmanaidu Managing Director, Mr.M.V.Bhaskar

    Phone: 09848157536, 09701799363Email: [email protected], m_v_Bhaskar@

    yahoo.com

  • Textile Parks for Make in India20

    Guntur Textile Park Pvt. Ltd.Guntur, Andhra Pradesh

    Name of the SPV Guntur Textile Park Pvt. Ltd., Promoter(s) G. PunnaiahChoudhary,

    PrathipatiPulla Rao,KandimallaSrinivasa Rao

    Location Guntur, Andhra PradeshYear of Sanction 2014Year of Commencement of Operations -Year of Completion* Project under implementationArea 41.77 AcresSITP Project Cost & Means of Finance Rs 109.86 Crore

    Grant approved under SITP Rs. 40 Crore

    Term loan, if any & name of bank NA

    Members Contribution Rs 69.86 Crore

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs 419.86 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 625.95 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,960

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Weaving and garmentingProduct Mix Fabric and garmentTotal Units

    Estimated 61

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 21

    Special Infrastructure/Amenities in the Parkl 1.1 MLD of Sewerage treatment plant l Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Canteenl Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    G. Punnaiah Choudhary, Director

    Phone: + 91 - 9705566731Email: [email protected]

  • Textile Parks for Make in India22

    Rangaraya Textile Park Pvt. Ltd. West Godavari, Andhra Pradesh

    Name of the SPV Rangaraya Textile Park Pvt. Ltd.,Promoter(s) Mr M.S.R.V.K Ranga Rao,

    Mr Srinivasa Rao, Mrs. M. Satyanarayanamma,Mr M. Venkatarayudu

    Location West Godavari, Andhra PradeshYear of Sanction 2014Year of Commencement of Operations -Year of Completion* Project under implementationArea 55.94 AcresSITP Project Cost & Means of Finance Rs. 131.73 Crore

    Grant approved under SITP Rs. 40 Crore

    Term loan, if any & name of bank Rs. 54.73 Crore

    Members Contribution Rs. 37 Crore

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs. 358.13 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 421 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 3,970

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Garmenting, spinning and weavingProduct Mix Yarn, fabric and garmentTotal Units

    Estimated 27

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 23

    Special Infrastructure/Amenities in the Parkl 430 KLD of Sewerage treatment plant l Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Medical facilityl Canteenl Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    V. Venkata ramana

    Phone: + 91 - 9958330430Email: [email protected]

  • Textile Parks for Make in India24

    Tarakeswara Textile Park Pvt. Ltd. (TTPPL)Nellore, Andhra Pradesh

    Name of the SPV Tarakeswara Textile Park Private Limited,Promoter(s) Tirumala Cotton And Agro Products P Ltd.,

    Vasundara Cotton Mill P Ltd., Danda Brahmanadam, G.ramalingeswara Rao, Javvaji Ramanjaneyulu, R. Satyanarayana, B. Ramakrishna, P. Naga Vamsi, Y.krishnaiah

    Location Nellore, Andhra PradeshYear of Sanction 2015Year of Commencement of Operations -Year of Completion* Project under implementationArea 51.34 AcresSITP Project Cost & Means of Finance Rs 103.44 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 44.82 Crore

    Members Contribution Rs 36.35 Crore

    Total Investment Rs 344.17 CroreEstimated Project under implementation

    Mobilized as on March 2015

    Total Production Value (per annum)Estimated value Rs 355.81 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,275 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Spinning, Weaving, Knitting & GarmentingProduct Mix Yarn, Fabric and GarmentsTotal Units

    Estimated 10 Units

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 25

    Special Infrastructure/Amenities in the Parkl Boundary wallsl RCC Roadsl Water storage and distribution systeml Solar Captive Plant(2MW)l Security main entrancel Training centers-Shop floorl Canteenl Rest Areal Crchel Primary health carel Street Lighting

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr B Ramakrishna, Director

    Phone: 09966757555Email: [email protected]

  • Textile Parks for Make in India26

  • A Report on Scheme for Integrated Textile Parks (SITP) 27

    1 Prag Jyoti Textile Park, Darrang

    New Parks

    Assam

  • Textile Parks for Make in India28

    Prag Jyoti Textile Park Pvt. Ltd.Darrang, Assam

    Name of the SPV Prag Jyoti Textile Park Pvt. Ltd.Promoter(s) Mr. Hemant Vyas, DirectorLocation Bhotar Dall, Darrang, AssamYear of Sanction 2014Year of Commencement of Operations 2018 (scheduled)Year of Completion* 2018 (scheduled)Area 60.08 AcresSITP Project Cost & Means of Finance Rs. 54.31 Crore

    Grant approved under SITP Rs. 40.00 Crore

    Term loan, if any & name of bank Nil

    Members Contribution Rs. 14.31 Crore

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs. 321.92 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs. 500 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,603 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Polyester Texturising, Sizing, Fabric Weaving, Warp Knitting, Circular Knitting, Yarn & Fabric Dyeing, Woven Technical Textile, Garmenting, Quilting, Textile Packaging

    Product Mix Made-Ups, Ladies Dress materials, Baby leggings, Cushion, Mattress, Pillow Covers, Cartons, paper tubes.

    Total UnitsEstimated 42 Units

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 29

    Special Infrastructure/Amenities in the Parkl Paved roads with lightingl 24 hours water supply with water treatment plantl Common Effluent Treatment Plantl Uninterrupted quality power supplyl Training centerl Labour rest room and Workers Hostell Telecommunication linesl Weigh bridge

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Hemant Vyas, DirectorMr. Ramesh C. Pokhriyal, CEO

    Phone: 0361-2200473; 022- 2266 0300/301Email: [email protected]

    [email protected]

  • Textile Parks for Make in India30

  • 31

    1 JVL Textile Park Pvt. Ltd., Rohtas

    Bihar

    New Parks

  • Textile Parks for Make in India32

    JVL Textile Park Pvt. Ltd.Rohtas, Bihar

    Name of the SPV JVL Textile Park Pvt.LtdPromoter(s) Mr Adarsh JhunjunwalaLocation Rohtas, BiharYear of Sanction 2014Year of Commencement of OperationsYear of Completion* 2017Area 42.59 acresSITP Project Cost & Means of Finance Rs 113. 11 Crore

    Grant approved under SITP Rs 40 Crore

    Term loan, if any & name of bank Rs 39.09 Crore

    Members Contribution Rs 34.02 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs 113.11 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 99.55 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 3,770 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Apparel, weaving, knitting, embroidery, packaging, accessories

    Product Mix Mens & Ladies trousers and shirts, Cotton weaving, Cotton knitting, Embroidery etc

    Total UnitsEstimated 26

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 33

    Special Infrastructure/Amenities in the Parkl Factory Buildingsl Flatted factoriesl Roadsl Seweragel Water supply, powerl Commercial centrel Workers hostell Warehousel Workshopl Design centrel Training centre

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Adarsh jhunjhunwala

    Phone: +91-542-2211312/13Email: [email protected]

  • Textile Parks for Make in India34

  • 35

    Completed / Ongoing Parks

    New Parks

    1 Fairdeal Textile Park Pvt Ltd, Surat

    2 Gujarat Eco Textile Park Ltd, Surat

    3 Kejriwal Integrated Textile Park, Surat

    4 Mundra SEZ Textile & Apparel Park Ltd, Kutch

    5 RJD Integrated Textile Park Ltd, Surat

    6 Sayana Textile Park Ltd, Surat

    7 Surat Super Yarn Park Ltd, Surat

    8 Vraj Integrated Textile Park Ltd, Kheda

    9 Amitara Green Hi-Tech Textile Park, Kheda10 Karnaj Textile Park Pvt. Ltd., Surat11 Madhav Textile Park, Surendranagar12 Palsana Textile Park Pvt. Ltd., Surat13 Shanti Integrated Textile Park Pvt. Ltd., Surat

    Gujarat

  • Textile Parks for Make in India36

    Fairdeal Textile Park Pvt. Ltd.Surat,Gujarat

    Name of the SPV Fairdeal Textile Park Pvt. Ltd.Promoter(s) Mr.Dhiraj Shah, ChairmanLocation Surat,GujaratYear of Sanction 58.76 AcresYear of Commencement of Operations 2007Year of Completion* 2008Area 2014SITP Project Cost & Means of Finance Rs 102.15 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 22.00 Crore

    Members Contribution Rs 48.08 Crore

    Others (including State Govt. Grant) Rs. 0.97 Crore

    Total InvestmentEstimated Rs 300 Crore

    Mobilized as on March 2015 Rs 160 Crore

    Total Production Value (per annum)Estimated value Rs.2000.00 Crore

    Production value as on March 2015 Rs.1100.00 Crore

    Total Direct EmploymentEstimated 2900 persons

    Employed as on March 2015 1625 persons (358 SC/ST persons)

    Value Chain (Activities) Weaving, Yarn Preparatory, Texturising, Technical Textile & Composite

    Product Mix Cloth, Carpet Yarn, Cabel Yarn, Texturised Yarn, Sized Yarn & Non Woven Fabrics

    Total UnitsEstimated 30 Units

    Operational as on March 2015 17 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 37

    Special Infrastructure/Amenities in the Parkl Center of Excellencel Workers Hostell Canteen Facilityl GETCO 11/66 kv Substation in the park for uninterrupted power supplyl Power Distribution Networkl Water treatment plant (3 MLD)l Water Reservoirl Fire Hydrant Linel Cement Concrete Roadl Street Lightsl Green Belt & Landscaping

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Dhiraj Shah, Chairman

    ClustersPhone: 0261-3090200, Mobile:9825114363Email: [email protected]

  • Textile Parks for Make in India38

    Gujarat Eco Textile Park Ltd. Surat, Gujarat

    Name of the SPV Gujarat Eco Textile Park Ltd. Promoter(s) MrGirishLuthra, ChairmanLocation Surat, GujaratYear of Sanction 2005Year of Commencement of Operations 2007Year of Completion* 2009Area 122.79 AcresSITP Project Cost & Means of Finance Rs 137.71 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs55.00 Crore from Bank of India

    Members Contribution Rs 42.71 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs705 Crore

    Mobilized as on March 2015 Rs1035 Crore

    Total Production Value (per annum)Estimated value Rs850.00 Crore

    Production value as on March 2015 Rs1,396.63 Crore

    Total Direct EmploymentEstimated 9000 persons

    Employed as on March 2015 10,370 persons

    Value Chain (Activities) Textile Processing, Weaving, Yarn Dyeing, Composite Denim

    Product Mix Fabrics, Shirting,Sarees, Denim Synthetic TextileTotal Units

    Estimated 33 Units

    Operational as on March 2015 30 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 39

    Special Infrastructure/Amenities in the Parkl Common Effluent Treatment Plant (CETP, 60 MLD)l Captive Power Plant (CPP)l Center of Excellence l Rainwater Harvestingl Roads & related Infrastructurel Common Solid Waste Management Incineration with Heat Recovery

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Mohanlal Daruwala, Vice President

    ClustersPhone: (0261-2890606-7-8) & Mob (09327477678)Email: [email protected]

  • Textile Parks for Make in India40

    Kejriwal Integrated Textile Park Pvt. Ltd.Surat, Gujarat

    Name of the SPV Kejriwal Integrated Textile Park Pvt. LtdPromoter(s) Mr.Girdharilal Kejriwal, ChairmanLocation Surat, GujaratYear of Sanction 2011Year of Commencement of Operations Under ProgressYear of Completion* March 2016Area 52.02 AcresSITP Project Cost & Means of Finance Rs 110.55 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank NIL

    Members Contribution Rs 60.55 Crore

    Others (including State Govt. Grant) Rs.10 Crore

    Total InvestmentEstimated Rs 524 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 1201 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 4454 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Texturising, Spinning, Weaving/Looms, Embroiedery Units etc.

    Product Mix POY,FDY, DTY, Weaved Cloth, Embroideried FabricsTotal Units

    Estimated 34 Units

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 41

    Special Infrastructure/Amenities in the Parkl Water treatment plant l Arterial & Sub-Arterial Roads l Substation at the park for uninterrupted power supplyl Storm Water Drainage l Sewerage Collection & Treatment System l Hostel & recreational facilitiesl Common Facility Centre, Canteen, Crenches, Tool Room, Packaging Facility

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Girdharilal Kejriwal

    ClustersPhone: 0261-3017265 & Mob-9824054982Email: [email protected]: www.kejriwaltextilepark.com

  • Textile Parks for Make in India42

    Mundra SEZ Integrated Textile and Apparel Park Pvt. Ltd.Mundra, Gujarat

    Name of the SPV Mundra SEZ Integrated Textile and Apparel Park Pvt. LtdPromoter(s) Mr. Ravichandran Iyer, Director

    Mr. Amit Uplenchwar, Director

    Location Mundra, Gujarat Year of Sanction 2006Year of Commencement of Operations 2011Year of Completion* 2011Area 133 AcresSITP Project Cost & Means of Finance Rs 103.53 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Nil

    Members Contribution Rs 63.53 Crore

    Others (including State Govt. Grant) Nil

    Total InvestmentEstimated Rs 567 Crore

    Mobilized as on March 2015 Rs 999 Crore

    Total Production Value (per annum)Estimated value Rs 740 Crore

    Production value as on March 2015 Rs 321 Crore

    Total Direct EmploymentEstimated 3077 persons

    Employed as on March 2015 810 persons

    Value Chain (Activities) Technical Textiles - Woven, Non-Woven (Geo Textiles, Medical Textiles, Automotive Textiles, etc), Garmenting

    Product Mix Garments and Technical TextilesTotal Units

    Estimated 11 Units

    Operational as on March 2015 07 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 43

    Special Infrastructure/Amenities in the Parkl Substation at the park for uninterrupted power supply l CETPl Workers Dormitory l Roads, SWD and Pressurized Water Supply System l Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Ravichandran Iyer, Director

    ClustersPhone: Office (079-25555128) & Mob (09879500289)Email: [email protected]: www.mundrasez.com

  • Textile Parks for Make in India44

    RJD Integrated Textile Park Ltd.Surat, Gujarat

    Name of the SPV RJD Integrated Textile Park Ltd.Promoter(s) Mr Rajni Desai, DirectorLocation Surat,GujaratYear of Sanction 2008Year of Commencement of Operations 2011Year of Completion* 2011Area 55.94 AcresSITP Project Cost & Means of Finance Eligible Project Cost: Rs. 123.78 Crore

    (Revised Eligible Cost: Rs. 116.92 Crore )Promoters Contribution Rs. 44.45 Crore

    Grant approved under SITP Rs 40.00 Crore

    Leased deposit Rs. 32.47 Crore

    Members Contribution Rs 83.63 Crore

    Others (including State Govt. Grant) Rs 1 Crore

    Total Rs. 201.55 Crore

    Total InvestmentEstimated Rs. 352.69 Crore

    Mobilized as on March 2015 Rs 190 Crore .

    Total Production Value (per annum)Estimated value Rs 400 Crore

    Production value as on March 2015 Rs 52 Crore

    Total Direct EmploymentEstimated 4270 persons

    Employed as on March 2015 1200 persons

    Value Chain (Activities) Weaving-Water jet Loom, WeavingHS, Rapier Loom, Weaving-LS, Rapier Loom, Composite, Texturing Embroidery

    Product Mix Men Shirt, Readymade GarmentsTotal Units

    Estimated 579 Units

    Operational as on March 2015 179 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 45

    Special Infrastructure/Amenities in the Parkl Water requirement in the plant (46.72MLD per annum)l Total power supply required to the plant (14 MW)l Effluent treatment with marine outfall (56 MLD)l The length of the storm water drains in the Park (provided on both sides of the road) is 35597.00

    meters. l 12337 meters of internal minor roads with 15 meter of ROW and 13.50 meter of carriageway are

    planned inside major plotsl Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Jiral, Project Coordinator

    Phone: 09099345069Email: [email protected]

  • Textile Parks for Make in India46

    Sayan Textile Park Ltd.Surat, Gujarat

    Name of the SPV Sayan Textile Park Ltd.Promoter(s) Mr. Rajendra Chokhawala, ChairmanLocation Surat, GujaratYear of Sanction 2008Year of Commencement of Operations 2008Year of Completion* 2015Area 56.80 AcresSITP Project Cost & Means of Finance Rs90.00 Crore

    Grant approved under SITP Rs36.00 Crore

    Term loan, if any & name of bank Rs39.00 Crore from Bank of Baroda

    Members Contribution Rs15.00 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs299 Crore

    Mobilized as on March 2015 Rs50 Crore

    Total Production Value (per annum)Estimated value Rs1300 Crore

    Production value as on March 2015 Rs 100 Crore

    Total Direct EmploymentEstimated 3155 persons

    Employed as on March 2015 566 persons

    Value Chain (Activities) Weaving, Embroidery, Texturising, Garmenting, Technical Textile, Digital Printing

    Product Mix Sarees, Garmentsetc. Total Units

    Estimated 50 Units

    Operational as on March 2015 25 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 47

    Special Infrastructure/Amenities in the Parkl Water Reservoir 1.25 Crore Ltr. with Water Distribution Network l Overhead Tank l Sewage Treatment Plant (STP) 2400 KLD l Labour Hostel l RCC Roads l Center of ExcellencyBuilding

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Rajendra Chokhawala, Chairman

    ClustersPhone: 09925146784Email: [email protected]

  • Textile Parks for Make in India48

    Surat Super Yarn Park Ltd.Surat, Gujarat

    Name of the SPV Surat Super Yarn Park LimitedPromoter(s) Mr. Babulal Jain, Chairman Location Surat, Gujarat Year of Sanction 2006Year of Commencement of Operations 2007Year of Completion* 2013Area 43.29 AcresSITP Project Cost & Means of Finance Rs 104.76 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 51.74 Crore from PMDO

    Members Contribution Rs 13.02 Crore

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs 240 Crore

    Mobilized as on March 2015 Rs 150 Crore

    Total Production Value (per annum)Estimated value Rs 1250 Crore

    Production value as on March 2015 Rs 120 Crore

    Total Direct EmploymentEstimated 1000 persons

    Employed as on March 2015 250 persons

    Value Chain (Activities) TexturisingProduct Mix Texturising Total Units

    Estimated 27 Units

    Operational as on March 2015 08 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 49

    Special Infrastructure/Amenities in the Parkl Sewage treatment plantl 15 MW installed Captive Power Plant (7.5 MW operational)l RCC Roads l Training Center

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Kartik Jain, MD

    ClustersPhone: 09327308797Email: [email protected]

  • Textile Parks for Make in India50

    Vraj Integrated Textile Park Ltd.Kheda, Gujarat

    Name of the SPV Vraj Integrated Textile Park Ltd.Promoter(s) Mr Jaiprakash D. Chiripal, Chairman Location Village: Bidaj, Tal. & Dist. Kheda - GujaratYear of Sanction 2006Year of Commencement of Operations 2008Year of Completion* 2010Area 69.82 AcresSITP Project Cost & Means of Finance Rs 105.40 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 19.70 Crore from IDBI Rs.16.30 Crore from State Bank of Bikaner & Jaipur

    Members Contribution Rs 29.40 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated

    Mobilized as on March 2015 Rs 1,500 Crore

    Total Production Value (per annum) Rs 732 Crore Estimated value Rs 500 Crore

    Production value as on March 2015 Rs 275 Crore

    Total Direct EmploymentEstimated 15,000 persons

    Employed as on March 2015 6,000 persons

    Value Chain (Activities) Knitting, Weaving, Technical textiles, Textile packaging, Rope dyeing

    Product Mix Shirts, Denim, Technical Textile applicationsTotal Units

    Estimated 21 Units

    Operational as on March 2015 11 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 51

    Special Infrastructure/Amenities in the Parkl Water Supply Strong and distribution network for supplying 3.2 MLD of water;l Road 1.6 kms of 24 meter wide roads;l Sewage Water Drainage l Electrical Distribution System 3.0 kms sewage water drainage system;l Common Effluent Treatment Plant 2.1 MLD

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Yogesh Thaker, Director

    ClustersPhone: 09925195590Email: [email protected]

  • Textile Parks for Make in India52

    Amitara Green Hi- Tech Textile Park Pvt. Ltd.Kheda, Gujarat

    Name of the SPV Amitara Green Hi- Tech Textile Park Pvt. Ltd., Promoter(s) Mr Amit Agarwal

    Mr Raghav Agarwal,Mr Yash Agarwal

    Location Kheda, GujaratYear of Sanction 2014Year of Commencement of Operations -Year of Completion* Project under implementationArea 53.10 AcresSITP Project Cost & Means of Finance Rs. 126.72 Crore

    Grant approved under SITP Rs. 40 Crore .

    Term loan, if any & name of bank Rs. 10 Crore .

    Members Contribution Rs. 45.04 Crore ., PNB Bank

    Others (including State Govt. Grant) Rs. 31.68 Crore .

    Total InvestmentEstimated Rs. 500.22 Crore .

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 690.6 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,580 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Spinning, weaving and garmentingProduct Mix Yarn, fabric and garmentTotal Units

    Estimated 11

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 53

    Special Infrastructure/Amenities in the Parkl 2 MLD of Common Effluent and Treatment Plant l Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Canteenl Warehousel Boiler and Compressor Housel Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Raghav Agarwal, Director

    Phone: Office (079-71001500) & Mob 9825416648Email: [email protected]

  • Textile Parks for Make in India54

    Karanj Textile Park Private LimitedSurat, Gujarat

    Name of the SPV Karanj Textile Park Private LimitedPromoter(s) MahendraRaichand Shah

    DineshchandraGopichandAgarwalAshok Kumar KerjiwalNitin K. ShahDineshchandra B. ShethVinodJayantilal ShahManishbhai Mafatlal GandhiKrunalNavinbhaiSavaliya

    Location Surat, GujaratYear of Sanction 2015Year of Commencement of Operations -Year of Completion* Project under implementationArea 47.21 AcresSITP Project Cost & Means of Finance Rs. 104.94 Crore .

    Grant approved under SITP Rs. 40 Crore .

    Term loan, if any & name of bank Rs 10 Crore

    Members Contribution Rs 24.96 Crore

    Others (including State Govt. Grant) Rs. 36.21 Crore .

    Total InvestmentEstimated Rs. 209.77 Crore .

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 345 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 1,045 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Weaving and KnittingProduct Mix FabricTotal Units

    Estimated 50

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 55

    Special Infrastructure/Amenities in the Parkl Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Workers Canteenl Warehousel Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    MrRajendraChokhawala

    Phone:Email: [email protected]

  • Textile Parks for Make in India56

    Madhav Industrial Park Ltd.Surendarnagar, Gujarat

    Name of the SPV Madhav Industrial Park Ltd.Promoter(s) Mr. Kirti Kumar ShahLocation Surendernagar, GujaratYear of Sanction 2014Year of Commencement of Operations -Year of Completion* 2017Area 104.20 acresSITP Project Cost & Means of Finance Rs 118.91 Crore

    Grant approved under SITP Rs 40 Crore

    Term loan, if any & name of bank Rs 48.91 Crore

    Members Contribution Rs 30 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs 118.91 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs. 405.1190 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 6,603 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Spinning, weaving, ginning, garments, HDPE woven factories, technical textiles, corrugated box manufacturing, polybag making, paper tube making, PVC sheet film, weaving preparatory

    Product Mix Cotton Spinning, weaving, Cotton Ginning, Mens Trousers

    Total UnitsEstimated 51

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 57

    Special Infrastructure/Amenities in the Parkl Factory Buildingsl Flatted factoriesl Roadsl Seweragel Water supply, powerl commercial centrel workers hostell warehousel Workshopl design centrel Staff quarters

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Kirtikumar N. Shah

    Phone: 93-77-780999Email: [email protected]

  • Textile Parks for Make in India58

    Palsana Textile Park Pvt. Ltd.Surat, Gujarat

    Name of the SPV Palsana Textile Park Pvt. Ltd., Promoter(s) Kamal Jain,

    Ramesh Gajjar, Keshav Arora,Umesh V Shroff, Ajay Pranlal Ghariwala

    Location Surat, GujaratYear of Sanction 2014Year of Commencement of Operations -Year of Completion* Project under implementationArea 31.54SITP Project Cost & Means of Finance Rs. 116.2 Crore .

    Grant approved under SITP Rs. 40 Crore .

    Term loan, if any & name of bank Rs. 10 Crore .

    Members Contribution Rs. 10 Crore ., IDBI Bank

    Others (including State Govt. Grant) RS. 56.21 Crore .

    Total InvestmentEstimated Rs. 489.35 Crore .

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 965.18 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 4,355 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Weaving, Technical Textiles, Garmenting, Textile Processing and Embroidery

    Product Mix Fabric and GarmentTotal Units

    Estimated 62

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 59

    Special Infrastructure/Amenities in the Parkl 8 MLD of Sewerage treatment plant l Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Canteenl Modern-high speed telecommunication and data linesl Common Effluent Treatment Plant (CETP) of Gujarat Eco textile Park will be used.

    SPV Contact Details Project Management ConsultantContact person & designation:

    Umesh Shroff, Director

    Phone: 91 -9377907026Email: [email protected]

  • Textile Parks for Make in India60

    Shanti Integrated Textile Park Pvt. Ltd.Surat, Gujarat

    Name of the SPV Shanti Integrated Textile Park Pvt. Ltd., Promoter(s)

    Mr. Vasantbhai Haribhai GajeraMr. Chunibhai Haribhai GajeraMr. Ashokbhai Haribhai GajeraMr. Bakulbhai Haribhai Gajera

    Location Surat, GujaratYear of Sanction 2014Year of Commencement of Operations -Year of Completion* Project under implementationArea 48.16 AcresSITP Project Cost & Means of Finance Rs. 150.070 Crore .

    Grant approved under SITP Rs. 40 Crore .

    Term loan, if any & name of bank Rs. 10 Crore .

    Members Contribution Rs. 63.03 Crore ., SBI Bank

    Others (including State Govt. Grant) Rs. 37.68 Crore .

    Total InvestmentEstimated Rs. 404.53 Crore .

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 525.86 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,777 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Spinning, weaving and garmentingProduct Mix Yarn, fabric and garmentTotal Units

    Estimated 45

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 61

    Special Infrastructure/Amenities in the Parkl 2 MLD of Sewerage treatment plant l Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Canteenl Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Rajesh Vekariyal

    Phone: 91 - 9824101536Email: [email protected]

  • Textile Parks for Make in India62

  • 63

    New Parks

    1 Aalishan Eco Textile Park Pvt. Ltd., Panipat

    Haryana

  • Textile Parks for Make in India64

    Aalishan Eco Textile Park Pvt. Ltd.Panipat, Haryana

    Name of the SPV Aalishan Eco Textile Park Pvt. Ltd.,Promoter(s) Sushil Kumar Gupta

    Minakshi GuptaKashmiri LalSunita KhannaRonny Ping Sung HsungJitender Kumar TayalSarla SinglaAmit SinglaNitin Tayal

    Location Panipat, HaryanaYear of Sanction 2015Year of Commencement of Operations -Year of Completion* Project under implementationArea 29.80 AcresSITP Project Cost & Means of Finance Rs. 139.63 Crore .

    Grant approved under SITP Rs. 40 Crore .

    Term loan, if any & name of bank Rs. 57.74 Crore .

    Members Contribution Rs. 41.89 Crore .

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs. 180.68 Crore .

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 197.2 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 996 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Weaving, knitting, printing, processing and garmentingProduct Mix Fabric and garmentTotal Units

    Estimated 12

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 65

    Special Infrastructure/Amenities in the Parkl 2 MLD of Waste Water Treatment Plantl Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Canteenl Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Sushil Kumar Gupta, Director

    Phone: 91 9254110021Email: [email protected]

  • Textile Parks for Make in India66

  • 67

    1 Himachal Textile Park Ltd., Una

    Completed / Ongoing Parks

    Himachal Pradesh

  • Textile Parks for Make in India68

    Himachal Textile Park Ltd.Una, Himachal Pradesh

    Name of the SPV Himachal Textile Park LtdPromoter(s) Mr. Vishal Sharma

    Mr. Sandeep Jindal

    Location Himachal PradeshYear of Sanction 2011Year of Commencement of Operations October 2014Year of Completion* November 2015Area 65 AcresSITP Project Cost & Means of Finance Rs 96.90 Crore

    Grant approved under SITP Rs 38.76 Crore

    Term loan, if any & name of bank NA

    Members Contribution Rs 58.14 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs 355.46 Crore

    Mobilized as on March 2015 Rs 75.00 Crore

    Total Production Value (per annum)Estimated value Rs 425 Crore

    Production value as on March 2015 Rs 84.41 Crore

    Total Direct EmploymentEstimated 2,800 persons

    Employed as on March 2015 1,000 persons

    Value Chain (Activities) Meditech (Weaving, Processing, Technical Textiles), Buildtech (Weaving, Processing, Technical Textiles), Packaging & Accessories

    Product Mix Meditech1. 100% Cotton crepe

    bandage rolls2. Cotton Stretch bandage3. Cotton Rolls4. Cotton ZigZag5. Cotton Pads6. Cotton Dental Roll &

    Balls

    Buildtech1. Structural Fabrics2. Inflatable fabric3. Tent Tarpaulin4. Blockout fabric5. General Tarpaulin6. Truck sider7. Backlit Banner fabric8. FrontlitBanner fabric

    Total UnitsEstimated 12 Units

    Operational as on March 2015 3 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 69

    Special Infrastructure/Amenities in the Parkl Arterial Roads- 1.85 Km of 15 mts widel Sub- Arterial Roads-1.21 Km of 12 mts widel Water Supply storage and distribution network of 1.25 MLD l Electricity Demand 7.00 MWl Storm Water Drainage-5.15 Kms for entire parkl Sewerage collection and Treatment Plant- 0.25 MLDl Stand by power -1.25 MW

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Vishal SharmaMr. Sandeep Jindal

    Phone: 098159-91665, 095011-13731Email: [email protected]

    [email protected]

  • Textile Parks for Make in India70

  • 71

    1 J&K Integrated Textile Park Ltd., Kathua

    2 Kashmir Wool & Silk Textile Park Pvt. Ltd., Ghatti

    Completed / Ongoing Parks

    New Parks

    Jammu & Kashmir

  • Textile Parks for Make in India72

    J&K Integrated Textile Park Ltd.Kathua, Jammu & Kashmir

    Name of the SPV J&K Integrated Textile Park Ltd.Promoter(s) Mr. Ram Avtar Aggarwal (CMD), Mr. Sunder Lal Aggarwal

    (Director)

    Location Kathua, Jammu & KashmirYear of Sanction 2011Year of Commencement of Operations 2015Year of Completion* 2016 (Expected)Area 25 acresSITP Project Cost & Means of Finance Rs. 44.11 Crore

    Grant approved under SITP Rs. 39.70 Crore

    Term loan, if any & name of bank NA

    Members Contribution Rs 4.41 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs. 141.95 Crore

    Mobilized as on March 2015 Rs 36 Crore

    Total Production Value (per annum)Estimated value Rs. 395 Crore

    Production value as on March 2015 N.A.

    Total Direct EmploymentEstimated 2,508 persons

    Employed as on March 2015 60 persons

    Value Chain (Activities) Spinning, Processing, Weaving, Garmenting, Texturising, Packaging, Engineering

    Product Mix Yarn, Fabric, Towels, Blankets, Garments etc.Total Units

    Estimated 27 units

    Operational as on March 2015 1 unit* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 73

    Special Infrastructure/Amenities in the Parkl Administration Blockl Training Centrel Exhibition Halll Workers Canteenl Storm Water Drainagel Rain Water Harvestingl Water Supply Bore & Supply Networkl Sewerage Line and Sewerage Treatment Plantl Security Roomsl Fire Fighting System & Distributionl Electrical Power House & Electrical Distribution

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Ram Avtar Aggarwal

    ClustersPhone: Office 09596798105 & Mob: 09812047470Email: [email protected]: www.jandktextilepark.com

  • Textile Parks for Make in India74

    Kashmir Wool & Silk Textile Park Pvt. Ltd.Ghatti, Jammu & Kashmir

    Name of the SPV Kashmir Wool & Silk Textile Park Pvt. Ltd.,Promoter(s) Mr. Sunil Kumar Jain,

    Mr. O P Garg, Mr. Kush Aggarwal, Mr. Zakir Hussain,Mr R.B Suri

    Location Ghatti, Jammu & KashmirYear of Sanction 2014Year of Commencement of Operations -Year of Completion* Project under implementationArea 26.16 AcresSITP Project Cost & Means of Finance Rs. 53.61 Crore .

    Grant approved under SITP Rs. 40 Crore .

    Term loan, if any & name of bank NA

    Members Contribution Rs. 13.61 Crore .

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs. 224.61 Crore .

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 801.405 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 3,110 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Spinning, weaving and garmentingProduct Mix Yarn, fabric and garmentTotal Units

    Estimated 50

    Operational as on March 2015 Project under implementation

  • A Report on Scheme for Integrated Textile Parks (SITP) 75

    * Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

    Special Infrastructure/Amenities in the Parkl 0.5 MLD of Sewerage treatment plant l Storm Water Drainage System & Rain Harvesting Systeml Workers Hostel & recreational facilitiesl Canteenl Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Kush Aggarwal, Director

    Phone: 9812437270Email: [email protected]

  • Textile Parks for Make in India76

  • 77

    Completed / Ongoing Parks

    1 Doddabalapur Integerated Textile Park, Doddabalapur

    2 Gulbarga Textile Park, Gulbarga

    Karnataka

  • Textile Parks for Make in India78

    Dodballapur Integrated Textile Park Ltd.Dodballapur, Karnataka

    Name of the SPV Dodballapur Integrated Textile Park LimitedPromoter(s) Mr Jaganath,Location Dodballapur, Bangalore Rural, KarnatakaYear of Sanction 2006Year of Commencement of Operations 2010Year of Completion* 2012Area 50 AcresSITP Project Cost & Means of Finance Rs. 80.25 Crore

    Grant approved under SITP Rs 31.97 Crore

    Term loan, if any & name of bank Rs 31.38 Crore

    Members Contribution Rs 19.23 Crore

    Others (including State Govt. Grant) Rs 4.81 Crore

    Total InvestmentEstimated Rs. 132.00 Crore

    Mobilized as on March 2015 Rs. 105.00 Crore

    Total Production Value (per annum)Estimated value Rs 350.00 Crore

    Production value as on March 2015 Rs 136.00 Crore

    Total Direct EmploymentEstimated 2,000 persons

    Employed as on March 2015 550 persons

    Value Chain (Activities) Garmenting and accessories Product Mix Sarees, Churidars, dhotis, blouse materials, dress

    material

    Total UnitsEstimated 72 Units

    Operational as on March 2015 35 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 79

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Jagannath

    ClustersPhone: Mob 9902733200Email: [email protected]

  • Textile Parks for Make in India80

    Gulbarga Textile Park Pvt. Ltd.Gulbarga, Karnataka

    Name of the SPV Gulbarga Textile Park Pvt. Ltd.Promoter(s) Mr Shubash Kamalapure, MDLocation Gulbarga, KarnatakaYear of Sanction December 2012Year of Commencement of Operations -Year of Completion* Project under implementationArea 50 AcresSITP Project Cost & Means of Finance Rs 52.10 Crore

    Grant approved under SITP Rs 18.56 Crore

    Term loan, if any & name of bank Rs 10.22 Crore

    Members Contribution Rs 7.82 Crore

    Others (including State Govt. Grant) Rs 14.42 Crore

    Total InvestmentEstimated Rs. 113.50 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 395.00 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 4000 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Garmenting and accessories Product Mix Garmenting for children, ladies and mens wear and

    accessories like scarves, stoles, handkerchiefs for women & girls

    Total UnitsEstimated 47 Units

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 81

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Shubhash Kamalapure

    ClustersPhone: 9448022194Email: [email protected]

  • Textile Parks for Make in India82

  • 83

    1 CLC Textile Park Pvt. Ltd., Chhindwara

    Completed / Ongoing Parks

    Madhya Pradesh

  • Textile Parks for Make in India84

    CLC Textile Park Pvt. Ltd.Chhindwara, Madhya Pradesh

    Name of the SPV CLC Textile Park Pvt. Ltd.,Promoter(s) CLC & Sons, Best Textiles Ltd, Alder Trading Co. Pvt. Ltd.,

    Amit Ruparelia

    Location Vill. Rajana, NH 69, Nagpur-Bhopal Highway, PO-Pandhurna, Dist - Chhindwara, Madhya Pradesh

    Year of Sanction Dec 2008Year of Commencement of Operations 2010Year of Completion* Under ImplementationArea 47.47 acresSITP Project Cost & Means of Finance Rs 99.48 Crore

    Grant approved under SITP Rs.38.26 Crore

    Term loan, if any & name of bank NA

    Members Contribution Rs.61.22 Crore

    Others (including State Govt. Grant) NA

    Total InvestmentEstimated Rs 295 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs.399 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 2,000 persons

    Employed as on March 2015 2

    Value Chain (Activities) Ginning & pressing, spinning, weaving, garmentingProduct Mix Yarn and fabricTotal Units

    Estimated 15-20

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 85

    Special Infrastructure/Amenities in the Parkl Administrative blockl Canteenl First Aid Centerl Storm water drainagel Telecommunicationl Electrical transmissionl Landscaping & gatehousel Sewage Treatment Plant

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Prem Malik

    ClustersPhone: 9820352437Email: [email protected]: www.clctextilepark.com

  • Textile Parks for Make in India86

  • 87

    Completed / Ongoing Parks

    New Parks

    14

    15

    16

    1 Asiatic Co-op. Textile Park, Solapur

    2 Asmeeta Infratech Private Ltd, Thane

    3 Baramati Hi Tech Textile Park Ltd, Baramati

    4 Deesan Infrastructure Pvt Ltd, Dhule

    5 Islampur Integrated Textile Park Ltd, Sangli

    6 Kallappana Awade Textiles Park, Kolhapur

    7 Khed Textile Park, Pune

    8 Latur Integrated Textile Park, Latur

    9 Metro Hi-Tech Cooperative Park Ltd, Kolhapur10 Pride india cooperative Textile park Ltd, Kolhapur11 Purna Global Textiles Park Ltd, Hingoli12 Sundarrao Solanke Textile Park, Beed13 Dhule Textile Park, Dhule14 Hinganghat Integrated Textile Park, Wardha15 Satyaraj Integrated Textile Park, Kolhapur16 Shree Ganesh Integrated Textile Park Pvt. Ltd., Dhule

    Maharashtra

  • Textile Parks for Make in India88

    Asiatic Co-operative Powerloom Textile Park Society LimitedSolapur, Maharashtra

    Name of the SPV Asiatic Co-operative Powerloom Textile Park Society Limited

    Promoter(s) Mr. Anil Palli, ChairmanLocation Solapur, MaharashtraYear of Sanction 2011Year of Commencement of Operations Under implementationYear of Completion* Under implementationArea 44 AcresSITP Project Cost & Means of Finance Rs 101.03 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank -

    Members Contribution Rs. 52.03 Crore

    Others (including State Govt. Grant) Rs. 9 Crore

    Total InvestmentEstimated Rs. 234 Crore

    Mobilized as on March 2015 Rs.13.20 Crore

    Total Production Value (per annum)Estimated value Rs. 378 Crore

    Production value as on March 2015 Park under implementation

    Total Direct EmploymentEstimated 1,500 persons

    Employed as on March 2015 Park under implementation

    Value Chain (Activities) Spinning, Dyeing, Sizing, WeavingProduct Mix Solapur Chadar and Terry TowelsTotal Units

    Estimated 80 Units

    Operational as on March 2015 Park under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 89

    Special Infrastructure/Amenities in the Parkl Internal roads & storm water drainsl Electrical distribution (7 MW)l Water Supply System (1.2 MLD)l Sewage Treatment Plant (0.6 MLD) and Common Effluent Treatment Plant (0.5 MLD)

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Anil Palli, Chairman

    ClustersPhone: +91-217-3204299Email: [email protected]: www.asiatictextilepark.com

  • Textile Parks for Make in India90

    Asmeeta Infratech Ltd.Thane, Maharashtra

    Name of the SPV Asmeeta Infratech Ltd.Promoter(s) Col. H.S.Kundu, Director

    Mr. Kamal Mathalia, DirectorMr. Anil Alhuwalia, Director

    Location Thane, MaharashtraYear of Sanction 2008Year of Commencement of Operations 2015 onwards (targeted)Year of Completion* April-2016

    (subject to approval of proposed revision)

    Area 48 AcresSITP Project Cost & Means of Finance SITP Project Cost: Rs.200.79 Crore ,

    Total Project Cost: Rs.205.81 Crore .(Revised SITP Eligible Cost: Rs 277.69 Crore ., Total Project Cost: Rs. 295.79 Crore .)

    Approved(Rs. In Crore )

    Proposed Revised(Rs. In Crore )

    Promoters Contribution 55.00 38.97

    Grant approved under SITP 40.00 40.00

    Term loan, if any & name of bank 70.00 70.00

    Leased deposit 40.81 137.82

    Others (including State Govt. Grant) - 09.00

    Total 205.81 295.79

    Total InvestmentEstimated Rs 673.23 Crore

    Mobilized as on March 2015 Rs 230.00 Crore

    Total Direct EmploymentEstimated 23,913 persons

    Employed as on March 2015 260 persons

    Value Chain (Activities) Garmenting units, Textile Accessories plazaProduct Mix Mens shirt, T-shirts, Readymade Garments, Ladies

    readymade garments etc.

    Total UnitsEstimated 599 Units

    Operational as on March 2015 02Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 91

    Special Infrastructure/Amenities in the Parkl Well laid wide enough concrete roads l Dedicated utility corridorl Substation at the park for uninterrupted power supply l Sewerage Network & Treatment plantl Modern-high speed telecommunication and data linesl Well designed manufacturing unitsl Dedicated loading unloading bays l Textile Accessory Plazal Common facility centers (CFCs)

    SPV Contact Details Project Management ConsultantContact person & designation:

    Hoshiyar Kundu, Director

    Phone: 9870986300Email: [email protected]

  • Textile Parks for Make in India92

    Baramati Hi-Tech Textile Park LimitedBaramati, Maharashtra

    Name of the SPV Baramati Hi-Tech Textile Park LimitedPromoter(s) Mrs. Sunetra Ajit Pawar, ChairpersonLocation Baramati, MaharashtraYear of Sanction 2007Year of Commencement of Operations 2009Year of Completion* 2013Area 60 AcresSITP Project Cost & Means of Finance Rs 108.52 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 42.00 Crore from Indian Overseas Bank, Baramati Branch

    Members Contribution Rs 36.18 Crore

    Others (including State Govt. Grant) Rs. 9.00 Crore

    Total InvestmentEstimated Rs 250 Crore

    Mobilized as on March 2015 Rs 200 Crore

    Total Production Value (per annum)Estimated value Rs 150 Crore

    Production value as on March 2015 Rs. 500 Crore

    Total Direct EmploymentEstimated 5,000 persons

    Employed as on March 2015 3,000 persons

    Value Chain (Activities) Garmenting, Technical Textiles, Garment Printing, Garment washing, packaging, Home furnishing, Embroidery.

    Product Mix Shirts, Trousers, Nightwears, sportswears, children wear, packing, ladies wears.

    Total UnitsEstimated 22 Units

    Operational as on March 2015 14 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 93

    Special Infrastructure/Amenities in the Parkl Substation at the park for uninterrupted power supply (33 KVA)l Effluent treatment plant (225 M3 per day) & sewage treatment plant. (300 m3 per day)l Landscaping.l Common Facility center.l Modern & specialized Garment Training center.

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr M.B. Sankeshwarkar, CEO

    ClustersPhone: Office (02112244112) & Mob (09595550666)Email: [email protected]: www.bhtpl.com

  • Textile Parks for Make in India94

    Deesan Infrastructure Pvt. Ltd.Dhule, Maharashtra

    Name of the SPV Deesan Infrastructure Pvt. Ltd.Promoter(s) Dhule, MaharashtraLocation Dhule, MaharashtraYear of Sanction 2008Year of Commencement of Operations 2014-15Year of Completion* 2014-15Area 105.74 AcresSITP Project Cost & Means of Finance Rs 108.76 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 50.00 Crore

    Members Contribution Rs 18.76 Crore

    Others (including State Govt. Grant) Rs 9.00 Crore

    Total Rs. 108.76 Crore

    Total InvestmentEstimated Rs 446.34 Crore

    Mobilized as on March 2015 Rs 190.38 Crore

    Total Production Value (per annum)Estimated value Rs 289.32 Crore

    Production value as on March 2015 Rs 53.95 Crore

    Total Direct EmploymentEstimated 2,816 persons

    Employed as on March 2015 1,662 persons

    Value Chain (Activities) Spinning, Weaving, Processing, Sizing, Readymade, Terry Towel

    Product Mix Terry Towel, Grey Cloths, Readymade shirts, T- shirts, etc.Total Units

    Estimated 50 Units

    Operational as on March 2015 42 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 95

    Special Infrastructure/Amenities in the Parkl Common Infrastructure Roads, SWD, Electrification l Water supply, GSR, ETPl First aid & Crche, canteen, bus stops, banks, etc. l Cotton Go-down, etc.

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Sunil Mandora,

  • Textile Parks for Make in India96

    Islampur Integrated Textile ParkSangli , Maharashtra

    Name of the SPV Islampur Integrated Textile ParkPromoter(s) BRFLLocation Sangli, MaharashtraYear of Sanction 2008Year of Commencement of Operations 2011Year of Completion* 2012Area 34.45 AcresSITP Project Cost & Means of Finance Rs 120 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 60.00 Crore from Axis Bank

    Members Contribution Rs 20.00 Crore

    Others (including State Govt. Grant)

    Total Investment Rs 334.28 Crore Estimated Rs 323 Crore

    Mobilized as on March 2015

    Total Production Value (per annum) Rs 900 Crore Estimated value Rs 327.65 Crore

    Production value as on March 2015

    Total Direct EmploymentEstimated 10,000 persons

    Employed as on March 2015 2,578 persons

    Value Chain (Activities) Weaving & GarmentingProduct Mix Fabric and GarmentsTotal Units

    Estimated 10 Units

    Operational as on March 2015 7 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 97

    Special Infrastructure/Amenities in the Parkl Boundary wallsl RCC Roadsl Water storage and distribution systeml Security main entrancel Training centers-Shop floorl Canteenl Rest Areal Crchel Primary health carel Street Lighting

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr S.N Todi

    Phone: 9930480641

  • Textile Parks for Make in India98

    Kallappanna Awade Co-Operative Industrial Estate & Integrated Textile Park LtdKolhapur, Maharashtra

    Name of the SPV Kallappanna Awade Co-Operative Industrial Estate & Integrated Textile Park Ltd

    Promoter(s)Location Kolhapur, MaharashtraYear of Sanction 2011Year of Commencement of Operations 2016-17Year of Completion* 2016-17Area 55.75 AcreSITP Project Cost & Means of Finance Rs. 107.10 Crore .

    Grant approved under SITP

    Term loan, if any & name of bank Rs 40.00 Crore

    Members Contribution Rs 09.00 Crore

    Others (including State Govt. Grant) Rs 58.10 Crore

    Total Rs.107.10 Crore

    Total InvestmentEstimated 326.83 Crore

    Mobilized as on March 2015 Rs 12.58 Crore

    Total Production Value (per annum)Estimated value Project under implementation

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 890 persons

    Employed as on March 2015 Project is under Implementation Stage

    Value Chain (Activities) Weaving, Sizing & Warping, GarmentingProduct Mix Shirting & Suiting & other garments Total Units

    Estimated 85 Units

    Operational as on March 2015 Project is under Implementation Stage* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 99

    Special Infrastructure/Amenities in the Parkl 2.5 MLD of water treatment plant l 20 KVA power substation at the park for uninterrupted power supplyl Rainwater harvestingl Hostel, recreational facilities, l Worker training centre, Dormitory, Creech, Conference hall etc. l Modern-high speed telecommunication and data lines

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr. Savardekar, MD

    Phone: 9890917077Email: [email protected]

  • Textile Parks for Make in India100

    Khed Textile ParkPune , Maharashtra

    Name of the SPV Khed Textile Park (KTP)Promoter(s) Kalyani GroupLocation Pune , MaharashtraYear of Sanction 2011Year of Commencement of Operations -Year of Completion* Project under implementationArea 80 AcresSITP Project Cost & Means of Finance Rs 80 Crore

    Grant approved under SITP Rs 80.67 Crore

    Term loan, if any & name of bank Rs 56.89 Crore from State Bank of Travancore

    Members Contribution Rs 24 Crore

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs 692.46 Crore

    Mobilized as on March 2015 Project under implementation

    Total Production Value (per annum)Estimated value Rs 579.30 Crore

    Production value as on March 2015 Project under implementation

    Total Direct EmploymentEstimated 9,000 persons

    Employed as on March 2015 Project under implementation

    Value Chain (Activities) Weaving Garmenting, Technical TextilesProduct Mix Fabric & GarmentTotal Units

    Estimated 12 Units

    Operational as on March 2015 Project under implementation* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 101

    Special Infrastructure/Amenities in the Parkl Administration Officel Product Display Centrel Conference & Exhibition Halll Entrance Gate & Security Cabinl Medical Centrel Testing Labl Crche/ Labour Welfare Centre

    l Workers Hostell Workers Training Centrel Display Centrel Commercial Area l Warehousing Facility l Power on Express Feeder Grid and Effluent Treatment Plant l Water readily available

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr Muktesh Sheth

    Phone: 9922956032Email: [email protected]

  • Textile Parks for Make in India102

    Latur Integrated Textile ParkLatur, Maharashtra

    Name of the SPV Latur Integrated Textile Park (LTP)Promoter(s) BRFLLocation Latur , MaharashtraYear of Sanction 2008Year of Commencement of Operations 2011Year of Completion* 2012Area 50 AcresSITP Project Cost & Means of Finance Rs 118.01 Crore

    Grant approved under SITP Rs 40.00 Crore

    Term loan, if any & name of bank Rs 59.00 Crore from Axis Bank

    Members Contribution Rs 19.0 Crore

    Others (including State Govt. Grant)

    Total InvestmentEstimated Rs 164.17 Crore

    Mobilized as on March 2015 Rs 180 Crore

    Total Production Value (per annum)Estimated value Rs 600 Crore

    Production value as on March 2015 Rs 40 Crore

    Total Direct EmploymentEstimated 10,000 persons

    Employed as on March 2015 1,186 persons

    Value Chain (Activities) Garmenting & EmbroideryProduct Mix GarmentsTotal Units

    Estimated 10 Units

    Operational as on March 2015 5 Units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 103

    Special Infrastructure/Amenities in the Parkl Boundary wallsl RCC Roadsl Water storage and distribution systeml Security main entrancel Training centers-Shop floorl Canteenl Rest Areal Crchel Primary health carel Street Lighting

    SPV Contact Details Project Management ConsultantContact person & designation:

    Mr S. N Todi

    Phone: 9930480641Email: [email protected]

  • Textile Parks for Make in India104

    Metro Hi-Tech Co-Operative Textile Park LimitedKolhapur,Maharashtra

    Name of the SPV Metro Hi-Tech Co-Operative Textile Park LimitedPromoter(s) Mr. Suresh LaxmaPatil, ChairmanLocation Kolhapur,MaharashtraYear of Sanction 2006Year of Commencement of Operations 2010Year of Completion* August 2015Area 101.31 AcresSITP Project Cost & Means of Finance Rs 100.80 Crore

    Grant approved under SITP Rs. 40.00 Crore

    Term loan, if any & name of bank Rs. 27.81 Crore from PMDO Consortium of 15 lenders lead by IL&FS

    Members Contribution Rs.33.58 Crore

    Others (including State Govt. Grant) Rs. 09.00 Crore

    Total InvestmentEstimated Rs.650 Crore

    Mobilized as on March 2015 Rs.360 Crore

    Total Production Value (per annum)Estimated value Rs.2500 Crore

    Production value as on March 2015 Rs. 1800 Crore

    Total Direct EmploymentEstimated 6,000 persons

    Employed as on March 2015 3,000persons

    Value Chain (Activities) Weaving, Sizing, Processing, Dyeing, Garmenting, Knitting Process, Terry Towel Weaving & Processing, Open End Spinning,

    Product Mix Yarn, Fabric, Shirts, Trousers, Surgical Cotton Proposed), Knitting Process

    Total UnitsEstimated 72 units

    Operational as on March 2015 29 units* Indicates completion of infrastructure under SITP and operationalization of 25% of units approved, as per the Scheme guidelines

  • A Report on Scheme for Integrated Textile Parks (SITP) 105

    Special Inf