27
DRAFT MINUTES OF THE 17 th S.L.C. MEETING HELD ON 25/01/2018 AT 10.00 A.M. IN THE CONFERENCE HALL OF COMMISSIONERATE OF INDUSTRIES, 1 st FLOOR, GOVERNMENT OF PRINTING PRESS BUILDINGS, MUTYALAMPADU, VIJAYAWADA. The list of the Members who attended the Meeting. Sl. No. Members Name & Designation of Member / Representative Sri / Smt. 1. Chairman, State Level Committee. Siddharth Jain, IAS., Chairman of SLC / Commissioner of Industries. 2. Deputy Director to Governemnt, Industries & Commerce Department D. Ramadevi Deputy Secretary, Industries & Commerce Department. 3. The Commissioner, Commercial Taxes, AP. M. Pampapathi, Addl. Commissioner (CT). 4. The Manager Director, APSFC R.Prabhakar Goud, General Manager. 5. The President, FAPSIA K. Subba Rao, President 6. The Commissioner, Transport Department K. Sankarachari, Asst. Secretary 7. The Commissioner & Inspector General, Registration Stamps Department. P. Ramalakshmi Patnaik, Asst. Inspector General. 8. The Chief Engineer (Commercial) APTRANSCO B. Sreedhar, DE/Commercial. 9. The Deputy General Manager, SBI G. Venkataramulu, CM CR 10. The President, ALEAP K. Kanaka Durga 11. The Chairman, C.I.I Y. V. Krishna Mohan, Convenor MSME 12. The Chairman, AP Spinning Mill Assosiation. D. Prasad, Chairman. 13. The Managing Director, APIIC M. Venkateswara Rao, GM 14. The Conviner, SLBC, Andhra Bank. KV Rao, AGM 15. The President, DICCI, (AP) K. Sarath, Procurement State Head. 16. The President, FSME APK Reddy, President. 17. The President, AP Chambers of Commerce & Industry Fadaration. T. Parthasaradhi, Executive Director. 18. Member-Convenor, State Level Committee. K. Vijaya Ratnam, Convenor of SLC / Joint Director (II). The Chairperson of the SLC welcomed the participating members and Special Invitees. The Chairperson requested all the members to introduce themselves. After introduction, the Chairperson explained the initiatives taken up by the Government for the benefits of the entrepreneurs. The SLC observed that the Operational guidelines of IDP 2015-20, issued vide G.O.Ms.No.108 Dated:14.11. 2015 of Industries and Commerce (P&I) department, dated: 14/11/2015, the Interest Subsidy is being sanctioned to various units by following two methods:

th S.L.C. MEETING HELD ON 25/01/2018 AT 10.00 A.M. IN … · The list of the Members who attended the Meeting. Sl. No. ... DICCI, (AP) K. Sarath, ... LIST OF UNIT WISE PROPOSALS PLACED

  • Upload
    lyhanh

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

DRAFT MINUTES OF THE 17th

S.L.C. MEETING HELD ON 25/01/2018 AT 10.00 A.M. IN THE CONFERENCE HALL OF

COMMISSIONERATE OF INDUSTRIES, 1st FLOOR, GOVERNMENT OF PRINTING PRESS BUILDINGS, MUTYALAMPADU,

VIJAYAWADA.

The list of the Members who attended the Meeting.

Sl.

No. Members

Name & Designation of Member /

Representative

Sri / Smt.

1. Chairman, State Level Committee. Siddharth Jain, IAS., Chairman of SLC / Commissioner of Industries.

2. Deputy Director to Governemnt, Industries & Commerce Department

D. Ramadevi Deputy Secretary, Industries & Commerce Department.

3. The Commissioner, Commercial Taxes, AP. M. Pampapathi, Addl. Commissioner (CT).

4. The Manager Director, APSFC R.Prabhakar Goud, General Manager.

5. The President, FAPSIA K. Subba Rao, President

6. The Commissioner, Transport Department K. Sankarachari, Asst. Secretary

7. The Commissioner & Inspector General, Registration Stamps Department.

P. Ramalakshmi Patnaik, Asst. Inspector General.

8. The Chief Engineer (Commercial) APTRANSCO B. Sreedhar, DE/Commercial.

9. The Deputy General Manager, SBI G. Venkataramulu, CM CR

10. The President, ALEAP K. Kanaka Durga

11. The Chairman, C.I.I Y. V. Krishna Mohan, Convenor MSME

12. The Chairman, AP Spinning Mill Assosiation. D. Prasad, Chairman.

13. The Managing Director, APIIC M. Venkateswara Rao, GM

14. The Conviner, SLBC, Andhra Bank. KV Rao, AGM

15. The President, DICCI, (AP) K. Sarath, Procurement State Head.

16. The President, FSME APK Reddy, President.

17. The President, AP Chambers of Commerce & Industry Fadaration. T. Parthasaradhi, Executive Director.

18. Member-Convenor, State Level Committee. K. Vijaya Ratnam, Convenor of SLC / Joint Director (II).

The Chairperson of the SLC welcomed the participating members and Special Invitees. The Chairperson requested all the members to introduce themselves. After introduction, the Chairperson explained the initiatives taken up by the Government for the benefits of the entrepreneurs. The SLC observed that the Operational guidelines of IDP 2015-20, issued vide G.O.Ms.No.108 Dated:14.11. 2015 of Industries and Commerce (P&I) department, dated: 14/11/2015, the Interest Subsidy is being sanctioned to various units by following two methods:

:: 2 ::

a) In case of general Micro Small Enterprises, a minimum 3% interest per annum should be borne by the Enterprise. Over and above 3% interest per annum, reimbursement will be done to the extent of maximum 9% for a period of 5 years.

b) In case of textiles, Interest Subsidy provided by Government after taking into account the assistance from all sources, (Centrally Sponsored

TUF scheme, Industrial Policy of the state etc.) shall be capped at 12.5% per annum in a way that maximum Interest Subsidy provided by Government will be up to 8% per annum for Weaving (with or without preparatory), Dyeing & Processing, Knitting, Garment/Made-ups Machine Carpeting, Machine Embroidery, Technical Textiles and any other activities/process like crimping, texturing, twisting, winding, sizing etc. within the textile value chain and up to 7.5% for Spinning & Modern Ginning.

In few cases, where the Textile units have availed Term Loan @11.50% from the Financial Institution and 4% of Interest rebate under TUF scheme, they can avail maximum Interest subsidy @7.50 % resulting the effective interest as 0% only on Term loan utilised. The SLC decided that the issue should brought to the notice of the Government that Micro and Small Enterprises are bearing a minimum of 3% Interest per annum and there is no such minimum rate to be borne by the Textile units. The State Level Committee has also observed that as per para no. (5.4.7) of IIPP 2010-15, “the base annual consumption will be either average annual power consumption of previous three financial years of the Expansion/Diversification project as certified by Chartered Accountant or power consumption for 75% of installed capacity utilization of the original industrial enterprise, whichever is higher. Power consumed over and above the base consumption will be eligible for reimbursement of power cost. If the Enterprise/Industry taken up expansion/diversification in the same year, the base power consumption will be calculated proportionately.”

Where as in the IDP 2015-20 policy, the para No. 5.6.8 indicates that “the base annual consumption will be either average annual power consumption of previous three financial years of the expansion / diversification project as certified by Chartered Accountant or power consumption for 75% of connected power load of the original Industrial Enterprise, whichever is higher. Power consumed over and above the base consumption will be eligible for reimbursement of power cost. If the Enterprise /Industry has taken up expansion/diversification in the same year, the base power consumption will be calculated proportionately.” The SLC observed that connected load will always more than the actual power consumed because the connected load is calculated as the total electric power-consuming rating of all devices (as lamps or motors) connected to a distribution system and it is being computed for 24 hours in a day and 350 days in a year (connected load in KVA X 24 hours X 350 days). Hence in all cases, the 75% of the connected load will be the maximum value which has to be fixed as base annual consumption. Therefore the committee observed that the connected load may not be taken in to consideration for fixing the base consumption.

Item wise decision of the 16th State Level Committee is as follows:

Agenda

Item Brief Description of the issue Decision of the Committee

1 Follow up action on the minutes of the previous Meeting

held on 29/12/2017.

Noted.

:: 3 ::

Brief Description of the issue SVC Opinion Decision of the Committee

2.

Change of name and Management fro,

M/s.Bogeashavara Polymers Private Limited to

M/s.Pavani Polymers Private Limited, Gadigirevula (V),

Gadivemula (M), Kurnool.

Opined to accord permission

for change of management &

name subject to executing the

agreement bond to the

satisfaction of the Commercial

Tax Department by both the

managements.

SLC discussed the issue in

detailed and agreed the opinion

of SVC.

3 Clarification on Power Cost reimbursement to

M/s.Amara Raja Batteries Limited, Chittoor District

SVC examined the issue in

detailed and opined that SLC

may take a view as it is policy

decision.

SLC examined the issue in

detailed and decided to sanction

the reimbursement of power cost

from the date of power

connection changed to the

M/s.Amara Raja Batteries

Limited.

4 Clarification on release of Incentives to M/s.Jaypee

Balaji Cement Plant, Budawada (V), Jaggaiahpeta (M),

Krishna Dist.

SVC examined the issue in

detailed and opined that as

Ultra Tech Cement Ltd. has

given NOC, incentives may be

released to M/s.Jaypee Balaji

Cement Plant.

Deferred. SLC advised to the

both the representatives to submit

their openion along with Board

resolution for authoring the

representatives.

5 Permission for change of Name and Management from

M/s.Sai Manasa Spintex India Limited to M/s. Hetro

Spinners Limited

SVC opined that permission

may be accorded for change of

management & unit’s name

subject to executing the

agreement bond to the

satisfaction of the Commercial

Tax Department by both the

managements.

SLC discussed the issue in

detailed and agreed the opinion

of SVC.

6 Permission for change of Name from M/s. Teamec

Chlorate Limited to M/s. Chemfab Alkalis Limited.

SVC opined that the industry

may be accorded permission

for change of unit’s name.

without change of

management.

SLC discussed the issue in

detailed and agreed the opinion

of SVC.

:: 4 ::

7

Rejection for sanction of various incentives:

S.

No

Name & Address of the

Unit filed claims in

Meeseva

No. of

claims Reason

1 M/s Naga Sindhu

Spinning Mills Pvt.

Ltd (Expansion)

1-Power Repeated

claim

2 M/s NG Fertilizers and

Chemicals Pvt. Ltd,

3-Sales Tax Repeated

claims

3 M/s Swarnalatha

Spintex Pvt. Ltd.,

1-Interest Repeated

claim

4 M/s Laila

Nutraceuticals

(Expansion)

4- Power Short falls

not filed

since long

time

5 M/s Godrej Agrovet

Limited, Krishna

District

1–Stamp

duty Land is on

other

unit’s

name

SVC opined to reject all the

proposals except Sl.No.(4)

where it is advised to issue final

notice for submission of claims.

SLC discussed the issue in

detailed and agreed the opinion

of SVC. Further, SLC advised to

issue final notice to M/s Laila

Nutraceuticals (Expansion) for

submission of required

shortfall documents within 15

days from the date of shortfall

notice received.

Further, the SLC advised the

representatives of M/s Godrej

Agrovet Limited, Krishna

District to approach after

transfer of the land documents

on the Company’s name for

sanction of reimbursement of

Stamp duty.

2 Claim applications for sanction / rejection of Reimbursement of Interest Subsidy, Reimbursement of Power Cost,

Reimbursement of sales tax, Mortgage duty & Stmp duty under IIPP – 2005-10, IIPP 2010-15 & IDP 2015-20 scrutinised &

recommended by the SVC to the SLC in its Meeting held on 14/09/2017, 14/11/2017 & 04/01/2018, the details are as follows:

ABSTRACT

Type of

Incentives

No. of

claims

No. of

Industries

Amount

Recommended by

SVC in Rs.

Amount

sanctioned by

SLC

Interest Subsidy 19 14 13,55,92,529 13,55,92,529

Mortgage Duty 2 2 2,65,665 2,65,665

Power cost 131 43 36,46,73,735 36,04,73,735

Sales Tax 13 11 17,40,32,090 17,40,32,090

Stamp Duty 2 2 13,41,620 13,41,620

:: 5 ::

Total 167 72 67,59,05,639 67,17,05,639

Rs. in Crores 67.59 67.17 67.59

(the proposal of M/s Samyu Glass is diferred)

DISTRICT WISE ABSTRACT

S.No. District No. of Claims

No. of industries Amount sanctioned by

SLC Rs. in crores

1 Chittoor 13 1 4.07

2 East Godavari 1 1 0.56

3 Guntur 102 32 33.36

4 Kadapa 3 2 0.14

5 Krishna 8 5 2.30

6 Kurnool 3 1 0.16

7 Nellore 4 3 11.52

8 Prakasam 14 7 3.68

9 Srikakulam 3 1 6.07

10 Visakhapatnam 4 3 1.90

11 Vizianagaram 1 1 1.57

12 West Godavari 11 6 1.83

Total 167 63 67.17

:: 6 ::

LIST OF UNIT WISE PROPOSALS PLACED BEFORE SLC MEETING HELD ON 25/01/2018

Sl.

No.

Date of

receipt

of claim

Name & address of

the Industry District

Line of

activity

Date of

Commence

ment of

commercial

production

Nature of

incentives Policy

SCV recommened

amount

Quarter

/ half

year

Year Decision of

SLC

1 30/12/12 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Stamp Duty IIPP

2010-15

Rs. 10,68,850/-

(Rupees ten lakhs sixty

eight thousand eight

hundred and fifty only)

2012-13 Agreed

2 12/07/13 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 14,409/- (Rupees

fourteen thousand four

hundred and nine only)

1st half

year 2012-13 Agreed

3 12/07/13 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 5,44792/- (Rupees

five lakhs forty four

thousand seven

hundred and ninety

two only)

2nd

half

year

2012-13 Agreed

4 12/07/13 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Sales Tax IIPP

2010-15

Rs. 6,40,990/- (Rupees

six lakhs forty

thousand nine hundred

and ninety only)

2012-13 Agreed

5 28/10/13 The KCP Limited,

KCP Cement unit-II,

Kuktyala Vikkage,

Jaggaiapeta (M),

Krishna Dist

Krishna Cement 29/10/11 Power cost IIPP

2010-15

Rs. 51,51,482/-

(Rupees fifty one lakhs

fifty one thousand four

hundred and eighty

two only)

1st

quarter

(defere

nce

amount

)

2013-14 Agreed

6 22/03/14 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 10,00,335/-

(Rupees ten lakhs three

hundred and thirty five

only)

1st half

year 2013-14 Agreed

7 22/03/14 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 7,67075/- (Rupees

seven lakhs sixty seven

thousand and seventy

five only)

2nd

half

year

2013-14 Agreed

8 25/08/14 NSL Textiles Ltd,

APIIC, Near JNTU,

Pulivendula , Kadapa

Dist

Kadapah Cotton

Yarn

31/03/10 Sales Tax IIPP

2005-10

Rs. 12,17,881/-

(Rupees twelve lakhs

seventeen thousand

eight hundred and

eighty one only)

2013-14 Agreed

:: 7 ::

9 15/09/14 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Sales Tax IIPP

2010-15

Rs. 23,12,942/-

(Rupees twenty three

lakhs twelve thousand

nine hundred and forty

two only)

2013-14 Agreed

10 21/10/14 Godrej Agrovet Ltd.,

Rs.276, Kanuru,

Bapulapadu (M),

Krishna District

Krishna Other

animal &

Bird feed

16/05/14 Power cost IIPP

2010-15

Rs. 11,54,355/-

(Rupees eleven lakhs

fifty four thousand

three hundred and fifty

five only)

1st half

year 2014-15 Agreed

11 05/11/14 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 10,81,560/-

(Rupees ten lakhs

eighty one thousand

five hundred and sixty

only)

1st half

year 2014-15 Agreed

12 25/12/14 Bogeshwara Polymers

(P) Ltd., Gadigarevula

(V) & (M), Kurnool

District

Kurnool PP Woven

Sacks

07/07/14 Power cost IIPP

2010-15

Rs. 2,54,390/- (Rupees

two lakhs fifty four

thousand three hundred

and ninety only)

1st half

year 2014-15 Agreed

13 24/03/15 Sai Manasa Spintex

(India) Ltd.,

(Expansion)G.T.

Road, Martur (V&M),

Prakasam District

Prakasam Cotton

Yarn

01/07/14 Power cost IIPP

2010-15

Rs. 6,69,350/- (Rupees

six lakhs sixty nine

thousand three hundred

and fifty only)

1st half

year 2014-15 Agreed

14 24/03/15 Sai Manasa Spintex

(India) Ltd (Existing).,

G.T. Road, Martur

(V&M), Prakasam

District

Prakasam Cotton

Yarn

14/01/11 Power cost IIPP

2010-15

Rs. 30,59,170/-

(Rupees thirty lakhs

fifty nine thousand one

hundred and seventy

only)

2nd

half

year

2015-16 Agreed

15 06/05/15 Aurabindo Pharma

Ltd.(Unit-XI

expansion),

Pydibheemavaram

(V), Ranstalam (M),

Srikakulam District:

Srikakulam Bulk drugs 18/08/11 Power cost IIPP

2010-15

Rs. 79,32,470/-

(Rupees seventy nine

lakhs thirty two

thousand four hundred

and seventy only)

2nd

half

year

2014-15 Agreed

16 16/05/15 Godrej Agrovet Ltd.,

Rs.276, Kanuru,

Bapulapadu (M),

Krishna District

Krishna Other

animal &

Bird feed

16/05/14 Power cost IIPP

2010-15

Rs. 19,01,535/-

(Rupees nineteen lakhs

one thousand five

hundred and thirty five

only)

2nd

half

year

2014-15 Agreed

17 10/06/15 Seeds Intimate

Apparel India (P)

Ltd., Plot No.11,

BIAC, SEZ,

Visakhapat

nam

Lingerie

(Bralette)

04/07/11 Power cost IIPP

2010-15

Rs. 11,86,980/-

(Rupees eleven lakhs

eighty six thousand

nine hundred and

2nd

half

year

2014-15 Agreed

:: 8 ::

Pudimadaka Road,

Athuthapuram (M),

Visakhapatnam

District

eighty only)

18 27/06/15 Bogeshwara Polymers

(P) Ltd., Gadigarevula

(V) & (M), Kurnool

District

Kurnool PP Woven

Sacks

07/07/14 Power cost IIPP

2010-15

Rs. 7,33,901/- (Rupees

seven lakhs thirty three

thousand nine hundred

and one only)

2nd

half

year

2014-15 Agreed

19 09/09/15 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 14,58,015/-

(Rupees fourteen lakhs

fifty eight thousand

and fifteen only)

2nd

half

year

2014-15 Agreed

20 11/09/15 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Sales Tax IIPP

2010-15

Rs. 54,91,289/-

(Rupees fifty four

lakhs ninety one

thousand two hundred

and eighty nine only)

2014-15 Agreed

21 16/10/15 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 18,54,517/-

(Rupees eighteen lakhs

fifty four thousand five

hundred and seventeen

only)

1st half

year 2015-16 Agreed

22 23/10/15 Aurabindo Pharma

Ltd.(Unit-XI

expansion),

Pydibheemavaram

(V), Ranstalam (M),

Srikakulam District:

Srikakulam Bulk drugs 18/08/11 Power cost IIPP

2010-15

Rs. 2,69,28,358/-

(Rupees two crores

sixty nine lakhs twenty

eight thousand three

hundred and fifty eight

only)

1st half

year 2015-16 Agreed

23 27/10/15 Sai Manasa Spintex

(India) Ltd.,

(Expansion)G.T.

Road, Martur (V&M),

Prakasam District

Prakasam Cotton

Yarn

01/07/14 Power cost IIPP

2010-15

Rs. 16,22,041/-

(Rupees sixteen lakhs

twenty two thousand

and forty one only)

1st half

year 2015-16 Agreed

24 15/12/15 Ravali Spinners Pvt

Ltd. (Expn-3), 13-

194,, Khandavalli (V),

Peravali (M), West

Godavari District

West

Godavari

Cotton

Yarn

14/05/15 Stamp Duty IDP

2015-20

Rs. 2,72,770/- (Rupees

two lakhs seventy two

thousand seven

hundred and seventy

only)

2015-16 Agreed

25 15/12/15 Ravali Spinners Pvt

Ltd. (Expn-3), 13-

194,, Khandavalli (V),

Peravali (M), West

Godavari District

West

Godavari

Cotton

Yarn

14/05/15 Mortgage

Duty

IDP

2015-20

Rs. 72,155/- (Rupees

seventy two thousand

one hundred and fifty

five only)

2015-16 Agreed

26 17/12/15 Seeds Intimate Visakhapat Lingerie 04/07/11 Power cost IIPP Rs. 15,08,940/- 1st half 2015-16 Agreed

:: 9 ::

Apparel India (P)

Ltd., Plot No.11,

BIAC, SEZ,

Pudimadaka Road,

Athuthapuram (M),

Visakhapatnam

District

nam (Bralette) 2010-15 (Rupees fifteen lakhs

eight thousand nine

hundred and forty

only)

year

27 29/12/15 Uma Spintex India

Pvt Ltd, (Expansion)

Rs No: 523 to 526,

Tamirisa (V),

Nandivada (M),

Krishna Dist

Krishna Cotton

Yarn

27/05/15 Mortgage

Duty

IDP

2015-20

Rs. 1,93,510/- (Rupees

one lakh ninety three

thousand five hundred

and ten only) 2015-16 Agreed

28 26/03/16 Growel Processors (P)

Ltd., Rs.No.8/5 & 8/6,

Main Road,

Singarayapalem,

Mudinepalli (M),

Krishna District

Krishna Processing

of Fish

shrimp

09/05/15 Power cost IDP

2015-20

Rs. 9,91,914/- (Rupees

nine lakhs ninety one

thousand nine hundred

and fourteen only)

1st half

year 2015-16 Agreed

29 29/03/16 Sai Manasa Spintex

(India)

Ltd.(Expansion), G.T.

Road, Martur (V&M),

Prakasam District

Prakasam Cotton

Yarn

01/07/14 Interest

Subsidy

IIPP

2010-15

Rs. 12,63,351/-

(Rupees twelve lakhs

sixty three thousand

three hundred and fifty

one only)

1st half

year 2015-16 Agreed

30 29/03/16 Sai Manasa Spintex

(India) Ltd., G.T.

Road, Martur (V&M),

Prakasam District

Prakasam Cotton

Yarn

14/01/11 Interest

Subsidy

IIPP

2010-15

Rs. 33,23,131/-

(Rupees thirty three

lakhs twenty three

thousand one hundred

and thirty one only)

1st half

year 2015-16 Agreed

31 30/03/16 Godrej Agrovet Ltd.,

Rs.276, Kanuru,

Bapulapadu (M),

Krishna District

Krishna Other

animal &

Bird feed

16/05/14 Power cost IIPP

2010-15

Rs. 25,20,750/-

(Rupees twenty five

lakhs twenty thousand

seven hundred and

fifty only)

1st half

year 2015-16 Agreed

32 30/03/16 Sri Lakshmi Godavari

Spinning Mills

Ltd.(2nd expansion),

S.No.113, Chebrolu

(V&M), Guntur

District

Guntur Cotton

Yarn

22/03/13 Interest

Subsidy

IIPP

2010-15

Rs. 1,17,69,529/-

(Rupees one crore

seventeen lakhs sixty

nine thousand five

hundred and twenty

nine only)

1st half

year 2015-16 Agreed

33 30/03/16 Sri Venkata Lakshmi

Narasimha Spinning

Mills (P) Ltd.

(Expansion),

Guntur Cotton

Yarn

20/11/14 Interest

Subsidy

IIPP

2010-15

Rs. 29,28,145/-

(Rupees twenty nine

lakhs twenty eight

thousand one hundred

1st half

year 2015-16 Agreed

:: 10 ::

S.No.176/4, Near

Reddy Palem Donda,

Chebrolu (M), Guntur

District

and forty five only)

34 30/03/16 Sri Venkata Siva

Parvathi Spinning

Mills (P) Ltd. (Unit-

II), S.No.414/1,2,3,

Pathareddy Palem

(V), Chebrolu (M),

Guntur District

Guntur Cotton

Yarn

10/05/12 Interest

Subsidy

IIPP

2010-15

Rs. 1,34,81,354/-

(Rupees one crore

thirty four lakhs eighty

one thousand three

hundred and fifty four

only)

1st half

year 2015-16 Agreed

35 31/03/16 Anjalee Granites (P)

Ltd, Plot No: 32,

BPSEZ, Annagi (V),

Maddipadu (M),

Prakasam dist

Prakasam Granite

Cutting and

Polishing

16/01/11 Power cost IIPP

2010-15

Rs. 21,32,570/-

(Rupees twenty one

lakhs thirty two

thousand five hundred

and seventy only)

1st half

year 2015-16 Agreed

36 31/03/16 Bogeshwara Polymers

(P) Ltd., Gadigarevula

(V) & (M), Kurnool

District

Kurnool PP Woven

Sacks

07/07/14 Power cost IIPP

2010-15

Rs. 6,29,355/- (Rupees

six lakhs twenty nine

thousand three hundred

and fifty five only)

1st half

year 2015-16 Agreed

37 31/03/16 Krishna Sai Exports,

Maddepadu, Prakasam

District

Prakasam Polished

Granite

16/03/11 Power cost IIPP

2010-15

Rs. 9,43,190/- (Rupees

nine lakhs forty three

thousand one hundred

and ninety only)

1st half

year 2015-16 Agreed

38 29/04/16 Aurabindo Pharma

Ltd.(Unit-XI

expansion),

Pydibheemavaram

(V), Ranstalam (M),

Srikakulam District:

Srikakulam Bulk drugs 18/08/11 Power cost IIPP

2010-15

Rs. 2,58,85,782/-

(Rupees two crores

fifty eight lakhs eighty

five thousand seven

hundred and eighty

two only)

2nd

half

year

2015-16 Agreed

39 03/05/16 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Power cost IIPP

2010-15

Rs. 18,71,302/-

(Rupees eighteen lakhs

seventy one thousand

three hundred and two

only)

2nd

half

year

2015-16 Agreed

40 16/05/16 Krishna Sai Exports,

Maddepadu, Prakasam

District

Prakasam Polished

Granite

16/03/11 Power cost IIPP

2010-15

Rs. 6,84,870/- (Rupees

six lakhs eighty four

thousand eight hundred

and seventy only)

2nd

half

year

2015-16 Agreed

41 17/05/16 Samyu Glass (P) Ltd.,

Plot No.11, ID Park,

Sy.No.526, 531, 532

& 533,

Gundlamadugu (V),

Kadapah Glass &

Glass

products

28/02/11 Power cost IIPP

2010-15

Rs. 42,03,950/-

(Rupees forty two

lakhs three thousand

nine hundred and fifty

only)

2nd

half

year

2015-16

Deferred

and advised

the GM,

DIC to

submit a

:: 11 ::

Thondur (M), Kadapa

District

detailed

report on

the working

status of the

unit.

42 17/05/16 Teamec Chlorates

Ltd., Plot No:558

&559, Industrial

Growth Centre,

Gundlapalli (V),

Maddipadu(M),

Prakasam District

Prakasam Sodium

Chloride &

Hydrogen

21/02/12 Power cost IIPP

2010-15

Rs. 1,52,30,370/-

(Rupees one crore fifty

two lakhs thirty

thousand three hundred

and seventy only)

2nd

half

year

2015-16 Agreed

43 20/05/16 J.C. Biotech Private

Limited, Plot No.548

To 550, Igc,

Gundlapadu (V),

Maddipadu (M),

Prakasam District

Prakasam Bio

Pharmacetic

als

25/05/11 Sales Tax IIPP

2010-15

Rs. 16,08,850/-

(Rupees sixteen lakhs

eight thousand eight

hundred and fifty only) 2015-16 Agreed

44 13/06/16 My Home Industries

Ltd. (Expansion),

Mulakalapalli (V),

Yelamanchi (M),

Visakhapatnam

District:

Visakhapat

nam

Cement 23/03/12 Sales Tax IIPP

2010-15

Rs. 1,52,28,208/-

(Rupees one crore fifty

two lakhs twenty eight

thousand two hundred

and eight only)

2015-16 Agreed

45 14/07/16 India Metal One Steel

Plate Processing (P)

Ltd., SEZ, Sricity,

Chittoor District

Chittoor Fabricated

Structures

Products of

Iron & Steel

01/08/12 Sales Tax IIPP

2010-15

Rs. 2,25,61,050/-

(Rupees two crores

twenty five lakhs sixty

one thousand and fifty

only)

2015-16 Agreed

46 28/07/16 Sai Manasa Spintex

(India) Ltd.,

(Expansion)G.T.

Road, Martur (V&M),

Prakasam District

Prakasam Cotton

Yarn

01/07/14 Power cost IIPP

2010-15

Rs. 22,70,309/-

(Rupees twenty two

lakhs seventy thousand

three hundred and nine

only)

2nd

half

year

2015-16 Agreed

47 19/08/16 South India Krishna

Oil And Fats Private

Limited,

275,279,280,281,

Epuru Bit-

1b,Nellore,,524344

Nellore Refined

Vegetable

Oil And

Margarine

28/09/11 Sales Tax IIPP

2010-15

Rs. 7,64,27,964/-

(Rupees Seven Crores

Sixty Four Lakhs

Twenty Seven

Thousand Nine

Hundred and Sixty

Four only)

2015-16 Agreed

48 15/09/16 KP Polyolefin Sacks

Pvt., Ltd., ,

913,Padamati Nagula

Nellore Plastics 03/08/12 Power cost IIPP

2010-15

Rs. 22,11,304/-

(Rupees Twenty Two

Lakhs Eleven

2nd

half

year

2015-16 Agreed

:: 12 ::

Doruvu,Nellore,,5243

23

Thousand Three

Hundred and Four

only)

49 23/09/16 KP Polyolefin Sacks

Pvt., Ltd., ,

913,Padamati Nagula

Doruvu,Nellore,,5243

23

Nellore PP Woven

Sacks,

Tarpaulin

And Fabric

03/08/12 Sales Tax IIPP

2010-15

Rs. 34,31,226/-

(Rupees Thirty Four

Lakhs Thirty One

Thousand Two

Hundred and Twenty

Six only)

2015-16 Agreed

50 24/09/16 NSL Textiles Limited,

371 To

382,Kunchalavaripale

m,Kuncharlavaripale

m,,522311

Guntur Weaving,

Yarn Dying

And

Procesing

31/03/10 Sales Tax IIPP

2005-10

Rs. 9,87,411/- (Rupees

Nine Lakhs Eighty

Seven Thousand Four

Hundred and Eleven

only)

2015-16 Agreed

51 24/09/16 NSL Textiles Limited,

APIIC,Near

Jntuec,Pulivendula,,51

6390

Kadapa Spinning 31/03/10 Sales Tax IIPP

2005-10

Rs. 2,95,685/- (Rupees

Two Lakhs Ninety

Five Thousand Six

Hundred and Eighty

Five only)

2015-16 Agreed

52 25/09/16 Growel Processors (P)

Ltd., Rs.No.8/5 & 8/6,

Main Road,

Singarayapalem,

Mudinepalli (M),

Krishna District

Krishna Processing

of Fish

shrimp

09/05/15 Power cost IIPP

2010-15

Rs. 22,81,635/-

(Rupees Twenty Two

Lakhs Eighty One

Thousand Six Hundred

and Thirty Five only)

2nd

half

year

2015-16 Agreed

53 26/09/16 Sri Srinivasa Spintex

India Ltd – Expansion

- I, 8-104,

Pedatadepalli,

Tadepalligudem,,5341

01

West

Godavari

Cotton

Yarn

01/01/11 Power cost IIPP

2010-15

Rs. 15,52,602/-

(Rupees Fifteen Lakhs

Fifty Two Thousand

Six Hundred and Two

only)

3rd

quarter 2015-16 Agreed

54 26/09/16 Krishnapatnam Oils

And Fats Pvt Ltd, 292

317, Pantapalem,

Muthukur,,524323

Nellore Refining

Cum

Fractionatio

n Of

Vegetable

Oils

22/06/10 Sales Tax IIPP

2005-10

Rs. 3,31,15,992/-

(Rupees Three Crores

Thirty One Lakhs

Fifteen Thousand Nine

Hundred and Ninety

Two only)

2015-16 Agreed

55 27/09/16 Kanoria Chemicals &

Industries Limited,

Visakhapatnam

Visakhapat

nam

Chemicals 06/01/11 Power cost IIPP

2010-15

Rs. 10,46,379/-

(Rupees Ten Lakhs

Forty Six Thousand

Three Hundred and

Seventy Nine only)

2nd

half

year

2015-16 Agreed

56 27/09/16 Yindu Textiles Private

Limited, 46,

Krishna Cotton

Spinning

03/11/15 Interest

Subsidy

IDP

2015-20

Rs. 87,70,609/-

(Rupees Eighty Seven

2nd

half 2015-16 Agreed

:: 13 ::

Tirumalagiri,

Tirumalagiri,,521178

Lakhs Seventy

Thousand Six Hundred

and Nine only)

year

57 28/09/16 Hues Granites Private

Limited, Plot

26,Bpsez

Annangi,Annangi,,52

3211

Prakasam Granite

Cutting

And

Polishing

27/10/14 Power cost IIPP

2010-15

Rs. 6,90,543/- (Rupees

Six Lakhs Ninety

Thousand Five

Hundred and Forty

Three only)

1st half

year 2015-16 Agreed

58 28/09/16 Sree Satyanarayana

Spinning Mills

Limited, Pb

No.3,Srinivasa

Talkiies

Road,Tanuku,,534215

West

Godavari

Cotton

Yarn

30/09/15 Interest

Subsidy

IDP

2015-20

Rs. 39,32,987/-

(Rupees Thirty Nine

Lakhs Thirty Two

Thousand Nine

Hundred and Eighty

Seven only)

2nd

half

year

2015-16 Agreed

59 28/09/16 Anjalee Granites (P)

Ltd, Plot No: 32,

BPSEZ, Annagi (V),

Maddipadu (M),

Prakasam dist

Prakasam Granite

Cutting and

Polishing

16/01/11 Power cost IIPP

2010-15

Rs. 10,16,140/-

(Rupees Ten Lakhs

Sixteen Thousand One

Hundred and Forty

only)

3rd

quarter 2015-16 Agreed

60 28/09/16 NSL Textiles Limited,

253,Budampadu,Gunt

ur,,522017

Guntur Garmenting 30/06/10 Sales Tax IIPP

2005-10

Rs. 5,31,908/- (Rupees

Five Lakhs Thirty One

Thousand Nine

Hundred and Eight

only)

2015-16 Agreed

61 29/09/16 Jyotirmaye Textiles

Private Limited, 41/1

And 41/3,

Ramireddypet,

Narasaraopet,,522601

Guntur Cotton

Yarn

18/06/15 Interest

Subsidy

IDP

2015-20

Rs. 1,35,75,885/-

(Rupees One Crore

Thirty Five Lakhs

Seventy Five

Thousand Eight

Hundred and Eighty

Five only)

2nd

half

year

2015-16 Agreed

62 29/09/16 Jyotirmaye Textiles

Pvt Ltd, 41/1 And

41/3, Gorijavolu,

Narasaraopet,,522601

Guntur Cotton

Yarn

04/02/11 Interest

Subsidy

IIPP

2010-15

Rs. 52,52,735/-

(Rupees Fifty Two

Lakhs Fifty Two

Thousand Seven

Hundred and Thirty

Five only)

2nd

half

year

2015-16 Agreed

63 29/09/16 Rayani Spintex

Private Limited , 82-

1b,Dhullipalla,Satena

palle,,522412

Guntur Cotton

Yarn

Spinning

16/11/11 Interest

Subsidy

IIPP

2010-15

Rs. 47,93,809/-

(Rupees Forty Seven

Lakhs Ninety Three

Thousand Eight

Hundred and Nine

only)

2nd

half

year

2015-16 Agreed

64 29/09/16 Sri Naga Malleswara Guntur Cotton 03/04/12 Interest IIPP Rs. 51,09,923/- 2nd 2015-16 Agreed

:: 14 ::

Spintex (India) Pvt

Ltd, 229/28

26,Rajupalem

Village,Rajupalem,,52

2412

Yarn

Spinning

Subsidy 2010-15 (Rupees Fifty One

Lakhs Nine Thousand

Nine Hundred and

Twenty Three only)

half

year

65 30/09/16 Royale Marine Imp

Ex Private Limited,

37/2b,37/4,42/4,Tulasi

Nagar, Kavurivari

Palem,

Chirala,,523166

Prakasam Prawn

Processing,

Frozen

Shrimp

22/12/14 Power cost IIPP

2010-15

Rs. 22,78,390/-

(Rupees Twenty Two

Lakhs Seventy Eight

Thousand Three

Hundred and Ninety

only)

2nd

half

year

2015-16 Agreed

66 30/09/16 Sri Lakshmi Godavari

Spinning Mills Ltd,

113,Chebrolu,Guntur,,

522212

Guntur Cotton

Yarn

Spinning

22/03/13 Interest

Subsidy

IIPP

2010-15

Rs. 1,11,86,411/-

(Rupees One Crore

Eleven Lakhs Eighty

Six Thousand Four

Hundred and Eleven

only)

2nd

half

year

2015-16 Agreed

67 30/09/16 Sri Sai Balaji Spintex

(India) Private

Limited, 403a,403b,

Unnava,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

14/04/11 Interest

Subsidy

IIPP

2010-15

Rs. 85,25,118/-

(Rupees Eighty Five

Lakhs Twenty Five

Thousand One

Hundred and Eighteen

only)

2nd

half

year

2015-16 Agreed

68 30/09/16 Steel Exchange India

Limited, 88-

4p.....,Srirampuram

Village,Vizianagaram,

,535161

Vizianagara

m

Iron & Steel 01/10/10 Sales Tax IIPP

2010-15

Rs. 1,5671,983/-

(Rupees One Crore

fifty Six Lakhs

Seventy One Thousand

Nine Hundred and

Eighty Three only)

2nd

half

year

2015-16 Agreed

69 30/09/16 Thatavarthi Apparels

Ltd, 104b

104c,Appapuram

Road, Kavuru

Village,Chilakaluripet

,,522611

Guntur Cotton

Yarn

Spinning

20/05/11 Interest

Subsidy

IIPP

2010-15

Rs. 71,39,055/-

(Rupees Seventy One

Lakhs Thirty Nine

Thousand and Fifty

Five only)

2nd

half

year

2015-16 Agreed

70 30/09/16 Lohiya Edible Oils

Pvt Ltd, 25,I D A

Vakalapudi,

Kakinada, 533005

East

Godavari

Edible Oil

Refinery

03/07/10 Power cost IIPP

2010-15

Rs. 56,49,416/-

(Rupees Fifty Six

Lakhs Forty Nine

Thousand Four

Hundred and Sixteen

only)

2015-16 Agreed

71 18/10/16 Sri Dhanalakshmi

Cotton And Rice

Mills Pvt Ltd,

Guntur Cotton

Yarn

04/01/14 Power cost IIPP

2010-15

Rs. 63,98,379/-

(Rupees Sixty Three

Lakhs Ninety Eight

2nd

half

year

2015-16 Agreed

:: 15 ::

460,Maruthi Nagar,

Boppudi,Chilakalurip

et,,522626

Thousand Three

Hundred and Seventy

Nine only)

72 25/10/16 Sri Venkata

Umasankar Spintex

Private Ltd, 33

35/1,Nrt

Road,Vemavaram,,52

2529

Guntur Cotton

Yarn

Spinning

29/06/13 Interest

Subsidy

IIPP

2010-15

Rs. 76,93,131/-

(Rupees Seventy Six

Lakhs Ninety Three

Thousand One

Hundred and Thirty

One only)

2nd

half

year

2015-16 Agreed

73 28/10/16 Gajavelli Spinning

Mills Private Limited,

1216/1 2,Chebrolu

Village,Guntur,,52221

2

Guntur Cotton

Yarn

19/09/11 Interest

Subsidy

IIPP

2010-15

Rs. 52,65,387/-

(Rupees Fifty Two

Lakhs Sixty Five

Thousand Three

Hundred and Eighty

Seven only)

2nd

half

year

2015-16 Agreed

74 29/10/16 Sri Ravichandra

Textiles Private

Limited, S9/D1,

9/D3,10, 11/1,11/3,

Ponnekallu,

Guntur,,522018

Guntur Cotton

Yarn

Spinning

05/11/12 Interest

Subsidy

IIPP

2010-15

Rs. 62,04,549/-

(Rupees Sixty Two

Lakhs Four Thousand

Five Hundred and

Forty Nine only)

2nd

half

year

2015-16 Agreed

75 31/10/16 Sri Venkata Lakshmi

Narasimha Spinning

Mill Private Limited,

176/4,Gbc Road,

Chebrolu Village,

Chebrolu,,522212

Guntur Cotton

Yarn

Spinning

20/11/14 Interest

Subsidy

IIPP

2010-15

Rs. 27,41,082/-

(Rupees Twenty Seven

Lakhs Forty One

Thousand and Eighty

Two only)

2nd

half

year

2015-16 Agreed

76 31/10/16 Sri Venkata Siva

Parvathi Spinning

Mills Private Limited

Unit-Ii, 414/1,2,3,

Pathareddypalem,

Chebrolu,Chebrolu

Guntur Cotton

Yarn

Spinning

10/05/12 Interest

Subsidy

IIPP

2010-15

Rs. 1,26,36,339/-

(Rupees One Crore

Twenty Six Lakhs

Thirty Six Thousand

Three Hundred and

Thirty Nine only)

2nd

half

year

2015-16 Agreed

77 31/10/16 Vasanthaindustries

Ltd (1st expansion), 4-

383/2, Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

04/12/09 Power cost IIPP

2005-10

Rs. 22,62,289/-

(Rupees Twenty Two

Lakhs Sixty Two

Thousand Two

Hundred Eighty Nine

only)

4th

quarter 2015-16 Agreed

78 09/01/17 Nandivardhana

Textile Mills Limited,

257/C, 256/D,

Thimmapuram,

Thimmapuram,

Guntur Cotton

Spinning

15/11/06 Power cost IIPP

2005-10

Rs. 13,89,990/-

(Rupees Thirteen

Lakhs Eighty Nine

Thousand Nine

Hundred and Ninety

4th

quarter 2015-16 Agreed

:: 16 ::

Guntur,522233 only)

79 11/01/17 Chowdary Spinners

Limited, 1-

168,Chivatam,Tanuku

,,534216

West

Godavari

Cotton

Yarn

29/01/07 Power cost IIPP

2005-10

Rs. 12,26,131/-

(Rupees Twelve Lakhs

Twenty Six Thousand

One Hundred and

Thirty One only)

2nd

quarter 2015-16 Agreed

80 12/01/17 Chowdary Spinners

Limited, 1-

168,Chivatam,Tanuku

,,534216

West

Godavari

Cotton

Yarn

29/01/07 Power cost IIPP

2005-10

Rs. 14,54,465/-

(Rupees Fourteen

Lakhs Fifty Four

Thousand Four

Hundred and Sixty

Five only)

3rd

quarter 2015-16 Agreed

81 13/01/17 The Gowthami

Solvent Oils Ltd

Spinning Unit Tetali,

7,Tetali, Tanuku,

534211

West

Godavari

Cotton

Yarn

Spinning

04/07/07 Power cost IIPP

2005-10

Rs. 46,85,940/-

(Rupees Forty Six

Lakhs Eighty Five

Thousand Nine

Hundred and Forty

only)

2nd

quarter 2015-16 Agreed

82 13/01/17 Chowdary Spinners

Limited, 1-

168,Chivatam,Tanuku

,,534216

West

Godavari

Cotton

Yarn

31/07/07 Power cost IIPP

2005-10

Rs. 9,11,079/- (Rupees

Nine Lakhs Eleven

Thousand and Seventy

Nine only)

4th

quarter 2015-16 Agreed

83 24/01/17 Sri Srinivasa Spintex

India Ltd – Expansion

- I, 8-104,

Pedatadepalli,

Tadepalligudem,,5341

01

West

Godavari

Cotton

Yarn

01/01/11 Power cost IIPP

2010-15

Rs. 31,05,204/-

(Rupees Thirty One

Lakhs five Thousand

Two Hundred and

Four only)

4th

quarter 2015-16 Agreed

84 26/01/17 PVR Spinning And

Weaving Limited,

110/2, 108/2, 108/3,

108/4, Kondayaplem

Road,Tetali

Village,,534218

West

Godavari

Yarn 27/08/10 Power cost IIPP

2010-15

Rs. 5,19,138/- (Rupees

Five Lakhs Nineteen

Thousand One

Hundred and Thirty

Eight only)

1st half

year 2015-16 Agreed

85 26/01/17 PVR Spinning And

Weaving Limited,

110/2, 108/2, 108/3,

108/4, Kondayaplem

Road,Tetali

Village,,534218

West

Godavari

Yarn 26/05/07 Power cost IIPP

2005-10

Rs. 6,04,732/- (Rupees

Six Lakhs Four

Thousand Seven

Hundred and Thirty

Two only)

1st

quarter 2015-16 Agreed

86 27/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 29,03,739/-

(Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

1st

quarter 2014-15 Agreed

:: 17 ::

ripet,,522619 Thirty Nine only)

87 29/01/17 Sakku Spinning Mills

Private Limited, NH-

5,Chinakondrupadu

Village,

Chinakondrupadu

Village

Guntur Cotton

Yarn

26/08/07 Power cost IIPP

2005-10

Rs. 20,83,940/-

(Rupees Twenty Lakhs

Eighty Three

Thousand Nine

Hundred and Forty

only)

3rd

quarter 2015-16 Agreed

88 29/01/17 Sakku Spinning Mills

Private Limited, NH-

5,Chinakondrupadu

Village,

Chinakondrupadu

Village

Guntur Cotton

Yarn

26/08/07 Power cost IIPP

2005-10

Rs. 16,56,465/-

(Rupees Sixteen Lakhs

Fifty Six Thousand

Four Hundred and

Sixty Five only)

4th

quarter 2015-16 Agreed

89 30/01/17 Viswateja Spinning

Mills Private Limited,

219, Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

09/04/05 Power cost IIPP

2005-10

Rs. 9,96,980/- (Rupees

Nine Lakhs Ninety Six

Thousand Nine

Hundred and Eighty

only)

1st

quarter 2013-14 Agreed

90 30/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 29,03,739/-

(Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

Thirty Nine only)

2nd

quarter 2014-15 Agreed

91 30/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 29,03,739/-

(Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

Thirty Nine only)

3rd

quarter 2014-15 Agreed

92 30/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 29,03,739/-

(Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

Thirty Nine only)

4th

quarter 2014-15 Agreed

93 30/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 29,03,739/-

(Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

Thirty Nine only)

1st

quarter 2015-16 Agreed

94 30/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 29,03,739/-

(Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

Thirty Nine only)

2nd

quarter 2015-16 Agreed

95 30/01/17 Siva Swati Textile Guntur Cotton and 01/03/06 Power cost IIPP Rs. 29,03,739/- 3rd 2015-16 Agreed

:: 18 ::

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

PV Yarn 2005-10 (Rupees Twenty Nine

Lakhs Three Thousand

Seven Hundred and

Thirty Nine only)

quarter

96 30/01/17 Siva Swati Textile

Private Limited,

168,169,170c4,170c,G

anapavaram,Chilakalu

ripet,,522619

Guntur Cotton and

PV Yarn

01/03/06 Power cost IIPP

2005-10

Rs. 23,50,646/-

(Rupees Twenty Three

Lakhs Fifty Thousand

Six Hundred and Forty

Six only)

4th

quarter 2015-16 Agreed

97 31/01/17 Supriya Spinning

Mills Private Limited,

4 And 6,Vunnava

Road,Boyapalem,Edla

padu,,522233

Guntur Cotton

Yarn

13/08/06 Power cost IIPP

2005-10

Rs. 22,05,000/-

(Rupees Twenty Two

Lakhs and Five

Thousand only)

1st

quarter 2015-16 Agreed

98 31/01/17 Supriya Spinning

Mills Private Limited,

4 And 6,Vunnava

Road,Boyapalem,Edla

padu,,522233

Guntur Cotton

Yarn

13/08/06 Power cost IIPP

2005-10

Rs. 22,05,000/-

(Rupees Twenty Two

Lakhs and Five

Thousand only)

2nd

quarter 2015-16 Agreed

99 31/01/17 Supriya Spinning

Mills Private Limited,

4 And 6,Vunnava

Road,Boyapalem,Edla

padu,,522233

Guntur Cotton

Yarn

13/08/06 Power cost IIPP

2005-10

Rs. 22,05,000/-

(Rupees Twenty Two

Lakhs and Five

Thousand only)

3rd

quarter 2015-16 Agreed

100 31/01/17 Supriya Spinning

Mills Private Limited,

4 And 6,Vunnava

Road,Boyapalem,Edla

padu,,522233

Guntur Cotton

Yarn

13/08/06 Power cost IIPP

2005-10

Rs. 22,05,000/-

(Rupees Twenty Two

Lakhs and Five

Thousand only)

4th

quarter 2015-16 Agreed

101 02/02/17 Viswateja Spinning

Mills Private Limited,

219, Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

26/09/07 Power cost IIPP

2005-10

Rs. 34,46,519/-

(Rupees Thirty Four

Lakhs Forty Six

Thousand Five

Hundred and Nineteen

only)

3rd

quarter 2015-16 Agreed

102 02/02/17 Viswateja Spinning

Mills Private Limited,

219, Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

26/09/07 Power cost IIPP

2005-10

Rs. 51,63,816/-

(Rupees Fifty one

Lakhs Sixty Three

Thousand Eight

Hundred and Sixteen

only)

4th

quarter 2015-16 Agreed

103 07/02/17 Siva Swati Textile

Private Limited,

168,169,170,Ganapav

Guntur Cotton and

PV Yarn

01/04/07 Power cost IIPP

2005-10

Rs. 59,37,852/-

(Rupees Fifty Nine

Lakhs Thirty Seven

1st

quarter 2015-16 Agreed

:: 19 ::

aram,Chilakaluripet,,5

22619

Thousand Eight

Hundred and Fifty

Two only)

104 07/02/17 Siva Swati Textile

Private Limited,

168,169,170,Ganapav

aram,Chilakaluripet,,5

22619

Guntur Cotton and

PV Yarn

01/04/07 Power cost IIPP

2005-10

Rs. 46,91,129/-

(Rupees Forty Six

Lakhs Ninety One

Thousand One

Hundred and Twenty

Nine only)

2nd

quarter 2015-16 Agreed

105 07/02/17 Siva Swati Textile

Private Limited,

168,169,170,Ganapav

aram,Chilakaluripet,,5

22619

Guntur Cotton and

PV Yarn

01/04/07 Power cost IIPP

2005-10

Rs. 70,74,370/-

(Rupees Seventy

Lakhs Seventy Four

Thousand Three

Hundred and Seventy

only)

3rd

quarter 2015-16 Agreed

106 07/02/17 Siva Swati Textile

Private Limited,

168,169,170,Ganapav

aram,Chilakaluripet,,5

22619

Guntur Cotton and

PV Yarn

01/04/07 Power cost IIPP

2005-10

Rs. 84,90,984/-

(Rupees Eighty Four

Lakhs Ninety

Thousand Nine

Hundred and Eighty

Four only)

4th

quarter 2015-16 Agreed

107 09/02/17 Kallam Brothers

Cottons Private

Limited, 160B,

DHULLIPALLA,

Sattenapalli,,522412

Guntur Cotton

Yarn

Spinning

27/04/07 Power cost IIPP

2005-10

Rs. 13,17,058/-

(Rupees Thirteen

Lakhs Seventeen

Thousand and Fifty

Eighty only)

1st

quarter 2015-16 Agreed

108 09/02/17 Sri Nukala Rama

Koteswara Rao

Textiles Pvt. Ltd., 1-

223,Chebrolu,Guntur,,

522212

Guntur Cotton

Yarn

Spinning

11/12/06 Power cost IIPP

2005-10

Rs. 18,58,640/-

(Rupees Eighteen

Lakhs Fifty Eight

Thousand Six Hundred

and Forty only)

1st

quarter 2015-16 Agreed

109 09/02/17 Kallam Brothers

Cottons Private

Limited, 160B,

DHULLIPALLA,

Sattenapalli,,522412

Guntur Cotton

Yarn

Spinning

27/04/07 Power cost IIPP

2005-10

Rs. 13,16,458/-

(Rupees Thirteen

Lakhs Sixteen

Thousand Four

Hundred and Fifty

Eight only)

2nd

quarter 2015-16 Agreed

110 09/02/17 Kallam Brothers

Cottons Private

Limited, 160B,

DHULLIPALLA,

Sattenapalli,,522412

Guntur Cotton

Yarn

Spinning

27/04/07 Power cost IIPP

2005-10

Rs. 19,74,687/-

(Rupees Nineteen

Lakhs Seventy Four

Thousand Six Hundred

and Eighty Seven

only)

3rd

quarter 2015-16 Agreed

111 09/02/17 Kallam Brothers Guntur Cotton 27/04/07 Power cost IIPP Rs. 22,59,919/- 4th 2015-16 Agreed

:: 20 ::

Cottons Private

Limited, 160B,

DHULLIPALLA,

Sattenapalli,,522412

Yarn

Spinning

2005-10 (Rupees Twenty Two

Lakhs Fifty Nine

Thousand Nine

Hundred and Nineteen

only)

quarter

112 12/02/17 Sri Nukala Rama

Koteswara Rao

Textiles Pvt. Ltd., 1-

223,Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

11/12/06 Power cost IIPP

2005-10

Rs. 18,58,640/-

(Rupees Eighteen

Lakhs Fifty Eight

Thousand Six Hundred

and Forty only)

3rd

quarter 2015-16 Agreed

113 12/02/17 Sri Nukala Rama

Koteswara Rao

Textiles Pvt. Ltd., 1-

223,Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

11/12/06 Power cost IIPP

2005-10

Rs. 18,58,640/-

(Rupees Eighteen

Lakhs Fifty Eight

Thousand Six Hundred

and Forty only)

4th

quarter 2015-16 Agreed

114 13/02/17 Sri Nukala Rama

Koteswara Rao

Textiles Pvt. Ltd., 1-

223,Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

11/12/06 Power cost IIPP

2005-10

Rs. 18,58,640/-

(Rupees Eighteen

Lakhs Fifty Eight

Thousand Six Hundred

and Forty only)

2nd

quarter 2015-16 Agreed

115 14/02/17 Sri Sesha Sai

Spinning Mills Private

Limited, 188, 189/1,

189/3, Reddypalem

Road, Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

01/11/06 Power cost IIPP

2005-10

Rs. 12,03,850/-

(Rupees Twelve Lakhs

Three Thousand Eight

Hundred and Fifty

only)

3rd

quarter 2014-15 Agreed

116 14/02/17 Sri Sesha Sai

Spinning Mills Private

Limited, 188, 189/1,

189/3, Reddypalem

Road, Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

01/11/06 Power cost IIPP

2005-10

Rs. 12,85,732/-

(Rupees Twelve Lakhs

Eighty Five Thousand

Seven Hundred and

Thirty Two only)

1st

quarter 2015-16 Agreed

117 14/02/17 Sri Sesha Sai

Spinning Mills Private

Limited, 188, 189/1,

189/3, Reddypalem

Road, Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

01/11/06 Power cost IIPP

2005-10

Rs. 14,80,035/-

(Rupees Fourteen

Lakhs Eighty

Thousand and Thirty

Five only)

2nd

quarter 2015-16 Agreed

118 14/02/17 Sri Sesha Sai

Spinning Mills Private

Limited, 188, 189/1,

189/3, Reddypalem

Road, Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

01/11/06 Power cost IIPP

2005-10

Rs. 14,19,600/-

(Rupees Fourteen

Lakhs Nineteen

Thousand and Six

Hundred only)

3rd

quarter 2015-16 Agreed

:: 21 ::

119 16/02/17 Kalpataruvu Spinning

Mills Limited,

210,211a,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

18/04/07 Power cost IIPP

2005-10

Rs. 18,26,820/-

(Rupees Eighteen

Lakhs Twenty Six

Thousand Eight

Hundred and Twenty

only)

1st

quarter 2015-16 Agreed

120 16/02/17 Kalpataruvu Spinning

Mills Limited,

210,211a,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

18/04/07 Power cost IIPP

2005-10

Rs. 18,26,820/-

(Rupees Eighteen

Lakhs Twenty Six

Thousand Eight

Hundred and Twenty

only)

2nd

quarter 2015-16 Agreed

121 16/02/17 Kalpataruvu Spinning

Mills Limited,

210,211a,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

18/04/07 Power cost IIPP

2005-10

Rs. 18,26,820/-

(Rupees Eighteen

Lakhs Twenty Six

Thousand Eight

Hundred and Twenty

only)

3rd

quarter 2015-16 Agreed

122 16/02/17 Kalpataruvu Spinning

Mills Limited,

210,211a,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

18/04/07 Power cost IIPP

2005-10

Rs. 18,26,820/-

(Rupees Eighteen

Lakhs Twenty Six

Thousand Eight

Hundred and Twenty

only)

4th

quarter 2015-16 Agreed

123 18/02/17 Sri Venkata

Sivaparvathi Spinning

Mills Pvt.Ltd.,

123,Gbc

Road,Chebrole,,52221

2

Guntur Cotton

Yarn

Spinning

10/01/07 Power cost IIPP

2005-10

Rs. 15,30,902/-

(Rupees Fifteen Lakhs

Thirty Thousand Nine

Hundred and Two

only)

1st

quarter 2015-16 Agreed

124 18/02/17 Sri Venkata

Sivaparvathi Spinning

Mills Pvt.Ltd.,

123,Gbc

Road,Chebrole,,52221

2

Guntur Cotton

Yarn

Spinning

10/01/07 Power cost IIPP

2005-10

Rs. 15,30,902/-

(Rupees Fifteen Lakhs

Thirty Thousand Nine

Hundred and Two

only)

2nd

quarter 2015-16 Agreed

125 18/02/17 Sri Venkata

Sivaparvathi Spinning

Mills Pvt.Ltd.,

123,Gbc

Road,Chebrole,,52221

2

Guntur Cotton

Yarn

Spinning

10/01/07 Power cost IIPP

2005-10

Rs. 15,30,902/-

(Rupees Fifteen Lakhs

Thirty Thousand Nine

Hundred and Two

only)

3rd

quarter 2015-16 Agreed

126 18/02/17 Sri Venkata

Sivaparvathi Spinning

Guntur Cotton

Yarn

10/01/07 Power cost IIPP

2005-10

Rs. 15,30,902/-

(Rupees Fifteen Lakhs

4th

quarter 2015-16 Agreed

:: 22 ::

Mills Pvt.Ltd.,

123,Gbc

Road,Chebrole,,52221

2

Spinning Thirty Thousand Nine

Hundred and Two

only)

127 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Road,,

Ganapavram,,522619

Guntur Cotton

Yarn

21/12/06 Power cost IIPP

2005-10

Rs. 23,46,734/-

(Rupees Twenty Three

Lakhs Forty Six

Thousand Seven

Hundred and Thirty

Four only)

1st

quarter 2015-16 Agreed

128 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Road,,Ganapavram,,5

22619

Guntur Cototn

Yarn

21/11/05 Power cost IIPP

2005-10

Rs. 11,83,701/-

(Rupees Eleven Lakhs

Eighty Three

Thousand Seven

Hundred and One

only)

1st

quarter 2015-16 Agreed

129 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Road,,

Ganapavram,,522619

Guntur Cotton

Yarn

21/12/06 Power cost IIPP

2005-10

Rs. 26,07,294/-

(Rupees Twenty Six

Lakhs Seven Thousand

Two Hundred and

Ninety Four only )

2nd

quarter 2015-16 Agreed

130 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Road,,

Ganapavram,,522619

Guntur Cototn

Yarn

21/11/05 Power cost IIPP

2005-10

Rs. 11,83,701/-

(Rupees Eleven Lakhs

Eighty Three

Thousand Seven

Hundred and One

only)

2nd

quarter 2015-16 Agreed

131 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Road,,

Ganapavram,,522619

Guntur Cotton

Yarn

21/12/06 Power cost IIPP

2005-10

Rs. 22,22,401/-

(Rupees Twenty Two

Lakhs Twenty Two

Thousand Four

Hundred and One

only)

3rd

quarter 2015-16 Agreed

132 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Road,,Ganapavram,,5

22619

Guntur Cototn

Yarn

21/11/05 Power cost IIPP

2005-10

Rs. 7,89,134/- (Rupees

Seven Lakhs Eighty

Nine Thousand One

Hundred and Thirty

Four only)

3rd

quarter 2015-16 Agreed

133 25/02/17 Prasuna Vamsikrishna

Spinning Mills Private

Limited, 135/A,

123/B,Nh-5, G T

Guntur Cotton

Yarn

21/12/06 Power cost IIPP

2005-10

Rs. 23,11,457/-

(Rupees Twenty Three

Lakhs Eleven

Thousand Four

4th

quarter 2015-16 Agreed

:: 23 ::

Road,,

Ganapavram,,522619

Hundred and Fifty

Seven only)

134 27/02/17 Sri Aanantha Lakshmi

Spinning Mills

Pvt.Ltd, 59/1,Nh-5,

Boyapalem,

GUNTUR,,522006

Guntur Spinning 01/01/06 Power cost IIPP

2005-10

Rs. 18,68,550/-

(Rupees Eighteen

Lakhs Sixty Eight

Thousand Five

Hundred and Fifty

only)

1st

quarter 2015-16 Agreed

135 27/02/17 Sri Aanantha Lakshmi

Spinning Mills

Pvt.Ltd, 59/1,Nh-5,

Boyapalem,

GUNTUR,,522006

Guntur Spinning 01/01/06 Power cost IIPP

2005-10

Rs. 18,68,550/-

(Rupees Eighteen

Lakhs Sixty Eight

Thousand Five

Hundred and Fifty

only)

2nd

quarter 2015-16 Agreed

136 27/02/17 Sri Aanantha Lakshmi

Spinning Mills

Pvt.Ltd, 59/1,Nh-5,

Boyapalem,

GUNTUR,,522006

Guntur Spinning 01/01/06 Power cost IIPP

2005-10

Rs. 18,68,550/-

(Rupees Eighteen

Lakhs Sixty Eight

Thousand Five

Hundred and Fifty

only)

3rd

quarter 2015-16 Agreed

137 01/03/17 Vasundhara Cotton

Mills Private Limited,

24 Abcde,

Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

01/06/07 Power cost IIPP

2005-10

Rs. 3,32,500/- (Rupees

Three Lakhs Thirty

Two Thousand and

Five Hundred only)

1st

quarter 2015-16 Agreed

138 01/03/17 Vasundhara Cotton

Mills Private Limited,

24 Abcde,

Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

01/06/07 Power cost IIPP

2005-10

Rs. 15,75,000/-

(Rupees Fifteen Lakhs

and Seventy Five

Thousands only)

2nd

quarter 2015-16 Agreed

139 01/03/17 Vasundhara Cotton

Mills Private Limited,

24 Abcde,

Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

01/06/07 Power cost IIPP

2005-10

Rs. 15,75,000/-

(Rupees Fifteen Lakhs

and Seventy Five

Thousands only)

3rd

quarter 2015-16 Agreed

140 01/03/17 Vasundhara Cotton

Mills Private Limited,

24 Abcde,

Boyapalem,

Guntur,,522233

Guntur Cotton

Yarn

Spinning

01/06/07 Power cost IIPP

2005-10

Rs. 15,75,000/-

(Rupees Fifteen Lakhs

and Seventy Five

Thousands only)

4th

quarter 2015-16 Agreed

141 07/03/17 Sri Venkata Lakshmi

Narasimha Spinning

Mills Private Limited,

176/4,Gbc Road,

Guntur Cotton

Yarn

Spinning

31/12/06 Power cost IIPP

2005-10

Rs. 13,21,016/-

(Rupees Thirteen

Lakhs Twenty One

Thousand and Sixteen

3rd

quarter 2015-16 Agreed

:: 24 ::

Chebrolu

Village,Chebrolu,,522

212

only)

142 12/03/17 Kallam Spinning

Mills Limited,

105,106, Nh-5,

Chowadavaram,

Guntur,,522019

Guntur Cotton

Yarn

Spinning

21/11/06 Power cost IIPP

2005-10

Rs. 6,01,338/- (Rupees

Six Lakhs One

Thousand Three

Hundred and Thirty

Eight only)

3rd

quarter 2014-15 Agreed

143 12/03/17 Kallam Spinning

Mills Limited,

105,106, Nh-5,

Chowadavaram,

Guntur,,522019

Guntur Cotton

Yarn

Spinning

21/11/06 Power cost IIPP

2005-10

Rs. 15,41,327/-

(Rupees Fifteen Lakhs

Forty One Thousand

Three Hundred and

Twenty Seven only)

4th

quarter 2014-15 Agreed

144 12/03/17 Kallam Spinning

Mills Limited,

105,106, Nh-5,

Chowadavaram,

Guntur,,522019

Guntur Cotton

Yarn

Spinning

21/11/06 Power cost IIPP

2005-10

Rs. 47,34,509/-

(Rupees Forty Seven

Lakhs Thirty Four

Thousand Five

Hundred and Nine

only)

1st

quarter 2015-16 Agreed

145 12/03/17 Kallam Spinning

Mills Limited,

105,106, Nh-5,

Chowadavaram,

Guntur,,522019

Guntur Cotton

Yarn

Spinning

21/11/06 Power cost IIPP

2005-10

Rs. 44,05,594/-

(Rupees Forty Four

Lakhs Five Thousand

Five Hundred and

Ninety Four only)

2nd

quarter 2015-16 Agreed

146 12/03/17 Kallam Spinning

Mills Limited,

105,106, Nh-5,

Chowadavaram,

Guntur,,522019

Guntur Cotton

Yarn

Spinning

21/11/06 Power cost IIPP

2005-10

Rs. 41,61,747/-

(Rupees Forty One

Lakhs Sixty One

Thousand Seven

Hundred and Forty

Seven only)

3rd

quarter 2015-16 Agreed

147 12/03/17 Kallam Spinning

Mills Limited,

105,106, Nh-5,

Chowadavaram,

Guntur,,522019

Guntur Cotton

Yarn

Spinning

21/11/06 Power cost IIPP

2005-10

Rs. 53,54,539/-

(Rupees Fifty Three

Lakhs Fifty Four

Thousand Five

Hundred and Thirty

Nine only)

4th

quarter 2015-16 Agreed

148 20/03/17 NSL Textiles Limited,

Nh - 5, Guntur Road,

Edlapadu,

Edlapadu,,522233

Guntur Spinning 01/04/06 Power cost IIPP

2005-10

Rs. 45,86,130/-

(Rupees Forty Five

Lakhs Eighty Six

Thousand One

Hundred and Thirty

only)

2015-16 Agreed

149 21/03/17 NSL Textiles Limited,

Nh - 5, Guntur

Guntur Spinning 01/04/06 Power cost IIPP

2005-10

Rs. 92,14,692/-

(Rupees Ninety Two 2015-16 Agreed

:: 25 ::

Road,Edlapadu,Edlap

adu,,522233

Lakhs Fourteen

Thousand Six Hundred

and Ninety Two only)

150 26/03/17 Sri Lakshmi Godavari

Spinning Mills Ltd,

Survey No113,

Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

21/10/07 Power cost IIPP

2005-10

Rs. 13,30,290/-

(Rupees Thirteen

Lakhs Thirty Thousand

Two Hundred and

Ninety only)

3rd

quarter 2015-16 Agreed

151 26/03/17 Sri Lakshmi Godavari

Spinning Mills Ltd,

Survey No113,

Chebrolu,

Guntur,,522212

Guntur Cotton

Yarn

Spinning

21/10/07 Power cost IIPP

2005-10

Rs. 19,95,435/-

(Rupees Nineteen

Lakhs Ninety Five

Thousand Four

Hundred and Thirty

Five only)

4th

quarter 2015-16 Agreed

152 28/03/17 Krishnamurthy

Spinning Mills

Pvt.Ltd., 141,

Nadendla Road,

Thimmapuram

Village,

Chilakaluripet

Guntur Cotton

Yarn

Spinning

06/10/07 Power cost IIPP

2005-10

Rs. 10,68,467/-

(Rupees Ten Lakhs

Sixty Eight Thousand

Four Hundred and

Sixty Seven only)

3rd

quarter 2015-16 Agreed

153 28/03/17 Krishnamurthy

Spinning Mills

Pvt.Ltd., 141,

Nadendla Road,

Thimmapuram

Village,

Chilakaluripet,,52223

3

Guntur Cotton

Yarn

Spinning

06/10/07 Power cost IIPP

2005-10

Rs. 13,82,813/-

(Rupees Thirteen

Lakhs Eighty Two

Thousand Eight

Hundred and Thirteen

only)

4th

quarter 2015-16 Agreed

154 06/04/17 Idupulapadu Cotton

Mills Pvt Ltd,

206a,Cinima Hall

Road,Ganapavaram,,5

22619

Guntur Cotton

Yarn

01/11/06 Power cost IIPP

2005-10

Rs. 12,61,298/-

(Rupees Twelve Lakhs

Sixty One Thousand

Two Hundred and

Ninety Eight only)

3rd

quarter 2014-15 Agreed

155 06/04/17 Idupulapadu Cotton

Mills Pvt Ltd,

206a,Cinima Hall

Road,Ganapavaram,,5

22619

Guntur Cotton

Yarn

01/11/06 Power cost IIPP

2005-10

Rs. 2,80,712/- (Rupees

Two Lakhs Eighty

Thousand Seven

Hundred and Twelve

only)

4th

quarter 2014-15 Agreed

156 06/04/17 VRV Textiles

Limited,

16/6a,17/1b,Kakuman

u,Kakumanu,,522112

Guntur Cotton

Yarn

05/01/07 Power cost IIPP

2005-10

Rs. 10,58,283/-

(Rupees Ten Lakhs

Fifty Eight Thousand

Two Hundred and

Eighty Three only)

1st

quarter 2015-16 Agreed

:: 26 ::

157 06/04/17 VRV Textiles

Limited, 16/6a,17/1b,

Kakumanu,

Kakumanu,,522112

Guntur Cotton

Yarn

05/01/07 Power cost IIPP

2005-10

Rs. 15,64,455/-

(Rupees Fifteen Lakhs

Sixty Four Thousand

Four Hundred and

Fifty Five only)

2nd

quarter 2015-16 Agreed

158 06/04/17 VRV Textiles

Limited, 16/6a,17/1b,

Kakumanu,

Kakumanu,,522112

Guntur Cotton

Yarn

05/01/07 Power cost IIPP

2005-10

Rs. 17,83,208/-

(Rupees Seventeen

Lakhs Eighty Three

Thousand Two

Hundred and Eighty

only)

3rd

quarter 2015-16 Agreed

159 06/04/17 VRV Textiles

Limited, 16/6a,17/1b,

Kakumanu,

Kakumanu,,522112

Guntur Cotton

Yarn

05/01/07 Power cost IIPP

2005-10

Rs. 20,38,949/-

(Rupees Twenty Lakhs

Thirty Eight Thousand

Nine Hundred and

Forty Nine only)

4th

quarter 2015-16 Agreed

160 07/04/17 Idupulapadu Cotton

Mills Pvt Ltd,

206a,Cinima Hall

Road,Ganapavaram,,5

22619

Guntur Cotton

Yarn

01/11/06 Power cost IIPP

2005-10

Rs. 32,03,862/-

(Rupees Thirty Two

Lakhs Three Thousand

Eight Hundred and

Sixty Two only)

1st

quarter 2015-16 Agreed

161 07/04/17 Idupulapadu Cotton

Mills Pvt Ltd,

206a,Cinima Hall

Road,Ganapavaram,,5

22619

Guntur Cotton

Yarn

01/11/06 Power cost IIPP

2005-10

Rs. 32,03,862/-

(Rupees Thirty Two

Lakhs Three Thousand

Eight Hundred and

Sixty Two only)

2nd

quarter 2015-16 Agreed

162 07/04/17 Idupulapadu Cotton

Mills Pvt Ltd,

206a,Cinima Hall

Road,Ganapavaram,,5

22619

Guntur Cotton

Yarn

01/11/06 Power cost IIPP

2005-10

Rs. 32,03,862/-

(Rupees Thirty Two

Lakhs Three Thousand

Eight Hundred and

Sixty Two only)

3rd

quarter 2015-16 Agreed

163 07/04/17 Idupulapadu Cotton

Mills Pvt Ltd,

206a,Cinima Hall

Road,Ganapavaram,,5

22619

Guntur Cotton

Yarn

01/11/06 Power cost IIPP

2005-10

Rs. 32,03,862/-

(Rupees Thirty Two

Lakhs Three Thousand

Eight Hundred and

Sixty Two only)

4th

quarter 2015-16 Agreed

164 13/05/17 Vasanthaindustries

Ltd, 4-383/2,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

29/01/07 Power cost IIPP

2005-10

Rs. 32,93,631/-

(Rupees Thirty Two

Lakhs Ninety Three

Thousand Six Hundred

and Thirty One only )

1st

quarter 2015-16 Agreed

165 13/05/17 Vasanthaindustries

Ltd, 4-383/2,

Thimmapuram,

Guntur Cotton

Yarn

29/01/07 Power cost IIPP

2005-10

Rs. 32,93,631/-

(Rupees Thirty Two

Lakhs Ninety Three

2nd

quarter 2015-16 Agreed

:: 27 ::

The SLC observed that all the above claims filed in time as per the respective policies i.e IIPP 2005-10, IIPP 2010-15, IDP 2015-

20 and extended policy vide G.O. Ms. No. 168, Industries &Commerce (Prog-II) Department, dt.30/11/2016.

Commissioner of Industries & Chariman of SLC.

Guntur,,522233 Thousand Six Hundred

and Thirty One only )

166 13/05/17 Vasanthaindustries

Ltd, 4-383/2,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

29/01/07 Power cost IIPP

2005-10

Rs. 32,93,631/-

(Rupees Thirty Two

Lakhs Ninety Three

Thousand Six Hundred

and Thirty One only )

3rd

quarter 2015-16 Agreed

167 13/05/17 Vasanthaindustries

Ltd, 4-383/2,

Thimmapuram,

Guntur,,522233

Guntur Cotton

Yarn

29/01/07 Power cost IIPP

2005-10

Rs. 38,60,277/-

(Rupees Thirty Eight

Lakhs Sixty Thousand

Two Hundred and

Seventy Seven only)

4th

quarter 2015-16 Agreed