The session will begin shortly Thank you for joining Inmarsat’s Webinar about our upcoming Billing Improvements Webinar Audio Options: 1) You will automatically be connected to the presentation audio via your computer speakers. 2) You can also dial in using the numbers found in your Webinar invitation email following registration and in the icalendar attachment to the same email

Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

The session will begin shortly

Thank you for joining Inmarsat’s Webinar aboutour upcoming Billing Improvements

Webinar Audio Options:

1) You will automatically be connected to the presentation audio via your computer speakers.

2) You can also dial in using the numbers found in your Webinar invitation email following

registration and in the icalendar attachment to the same email

Page 2: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

Billin

g T

ransfo

rmatio

n –

A O

neIT

Pro

gra

mm

e

Customer Webinar – 14th May 2019

Inmarsat Billing Improvements

Page 3: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

3

Today’s Webinar

Agenda

The Inmarsat team

Why are we investing in our billing capabilities?

When are these improvements being delivered?

What could they mean for you?

Your new Invoice

Introduction to DIR

CDR rationalisation and changes

Cutover Update

Our ongoing engagement with you

Page 4: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

Roger Butt,Director – GroupBilling Services

Eva Slattery,Billing Programme

Director

Matthew Evans,Billing Programme Communications

The Inmarsat Team

4

Page 5: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

• Increased billing accuracy as systems and billing data management improvements reduce the need for revisions

Invoice Format

Billing Options

Standardisation

Increased Billing accuracy

5

Improved Service – Increased Clarity – Added Flexibility

Why are we investing in our billing capabilities?

• Improved quality of billing services with a clearer invoice format for our customers

• Increased billing options based on customer preferences• Self-service access portal (later in 2019) for all invoicing information

• Standardisation and Harmonisation of billing, rating and charging parameters• Alignment of your services across Inmarsat

Following feedback from our customers a number of strategic initiatives are underway to drive investment across the organisation to improve the service Inmarsat customers and partners receive.

The OneIT programme, a Business-led IT improvement initiative, aims to make it easier for our customers to work with us. As part of this, Billing was highlighted early as a key area for investment that would have a direct and positive impact on our customers

Page 6: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

We have delivered our first 4 releases and now approaching our fifth releaseInmarsat products and services are being migrated from our current systems to a new solution over 6 individual releases

6

When are these improvements being delivered?

NB: Benefits will be delivered across multiple releases which also means that certain customers may have been impacted across multiple capability releases

Complete

SPS / GSPS

Complete

XpressLink Recurring

Sevsat Recurring

XL / Sevsat Post-paid Voice

Fleet Xpress

Complete

FB, BGAN, SB, GSPS for DPs

Fleet One

Carrier Interconnect

M2M

IsatHub

Complete

E&E for DPs (C, Fleet, S64)

XL / Sevsat pre-paid voice

Classic Aero

I3 Leases

May 2019

FB , E&E, Ifusion

BGAN, SB, GSPS, I3

Prepaid voice, Chatcard, I4 Vouchers

XL3, Iridium, Fleet One

M2M

Carrier Interconnect

Equipment, Accounting Authority

Manual Ad Hoc billing

Q4 2019

GX

Wholesale FX

GX for Aviation / Jet ConneX

TC Comms

Migration 1 Migration 2 Migration 3 Migration 4 Migration 5 Migration 6

Page 7: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

• In June 2019 you will start receiving your new improved invoice format for all Products and Services (aside from GX) - Service,

installation, equipment and freight charges. This will include consolidation of multiple invoices where business rules allow

• Your new invoice will be sent to you by email as a PDF attachment from [email protected]. The new invoice

format will no longer be available on our portals, however invoice copies can be requested from our customer support team by

emailing [email protected]

• A guide to the new invoice (‘Know Your Invoice’) is available on our website: www.Inmarsat.com/billingupgrades; which

provides details of all the Invoice sections

• Along side your new invoice format a new Detailed Invoice Report (DIR) will also be available. As part of previous

communication we shared a link to our ‘DIR Improvements’ specification document on www.Inmarsat.com/billingupgrades

• Should you request this, the DIR will be sent to you as a link in an email. For security purposes a username and password

will be required, this will be shared with you in a separate email

• Rated CDRs will now be sent in D91 or CSV format. All information currently received in different formats, will be in the new

format going forward

7

Invoice – Detailed Invoice Report – Account Statement – CDRs

What could these improvements mean for you?

Page 8: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

Our ‘Know your Invoice’ document is available at www.inmarsat.com/billingupgrades

8

The new invoice will be used for your May month usage (i.e. from May 2019)You will receive your new invoice in early-June 2019

Your new invoice

N.B. The above are screenshots from the guide on our webpage

Page 9: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

Our ‘DIR Improvements’ document is available at www.inmarsat.com/bilingupgrades 9

A new DIR will be made available to you if requested. This option will be available to you from early June 2019

Your new Detailed Invoice Report (DIR)

N.B. The above are screenshots from the guide on our webpage

Page 10: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

How does CDR rationalisation benefit you?

Reduced number of CDR feeds you receive from us

Reduced number of CDR formats to reduce the complexity of managing multiple formats. Two distinct formats: CSV & D91

Improved customer experience when CDR changes occurs – reduced number of changes required to your systems when Inmarsat introduces new products or services

Depending on the type of CDR format you have previously recorded this could mean:

New attribute fields providing you with further information

A change to the format of certain fields

A change to the file naming convention used for your CDR files

A change to the Data Codes used as part of your CDR

What will not change?

Whilst the format of your CDR may change, with further information included, all information you currently receive will continue to be available

Further information

• The Detailed Specification documents (D91 & CSV) are available on our Billing Upgrades webpage: www.Inmarsat.com/billingupgrades

10

You may notice that we are reducing the number of CDR types you receive from us

CDR Rationalisation

Page 11: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

• We are currently undergoing Cutover where we will be deploying the service upgrades. During this time there is intermittent disruption and outages to certain systems

• Created/ updated service requests from provisioning platforms (BGAN & Iridium dashboards and others) will be held until the completion of the deployment (but will proceed to the network). Some will appear as ‘Failed Billing’ or in a ‘Pending’ state

We would encourage you to avoid new activation requests unless critical during this window

• You will receive duplicated rated CDR feeds. CDR feeds will initially be sent in the existing format from the first day of the month until the deployment of system changes is completed. From the 18th of May you will receive the new CDR format as well as a catch up for the full month of CDRs (1st to 17th May) in the new format

• Please note there may be additional outages beyond communicated depending on progress

No impact to the network with services continuing to be provisioned to be used by customers

11

Customers will experience certain service outages during the deployment of the new systems to support the improvements previously discussed

What are the main deployment impacts?

4-5 May 6-7 May 8-9 May 10-11 May 12-13 May 14-15 May 16-17 May 18-19 May 20-21 May

Impacts / Outages

4-May: Orders will ‘Fail’ in Billing5-May: IDP outage

8-May: iPortalback online9-May: Unrated CDRs outage

18-May onwards: Catch up oforders.Normal resumption of service

14-May: We are here

No changes on an initiated change. Also encouraged to avoid new Activations requests unless critical

08-May: No New Crew Call vouchers available

Page 12: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

• These changes will predominantly affect your Accounts Payable teams, onward billing services and potentially some of the datarequired in your IT systems. Therefore we are aiming to reach your Finance/ Accounting Manager as well as your IT teams who specialise in billing/ accounting services

• Should there be individuals and teams who need further information within your own organisation then please do not hesitate to share the information we have communicated to you so far

• We are communicating using several mediums to ensure we engage with you appropriately. This has included ‘early warning’ and ‘detailed’ emails, through this Webinar, messages via Dashboards, documents available to download on our webpage, and furtherdetailed information also on our webpage

If you have any questions about future changes please visit www.Inmarsat.com/billingupgrades and complete the enquiry form

We appreciate your patience during these changes and have made every effort to plan and execute a smooth transition. If there are anomalies in your first invoice then let us know immediately via [email protected] so we can address the issue

It is our firm belief that this investment by Inmarsat will make us easier to work with and improve your billing services.

12

We are aiming to reach a varied community within our customer organisations including IT Managers and Finance/Accounting Managers

Our ongoing engagement with you

Page 13: Thank you for joining Inmarsat’s Webinar about our ...€¦ · for DPs Fleet One Carrier Interconnect M2M IsatHub Complete E&E for DPs (C, Fleet, S64) XL / Sevsat pre-paid voice

If you have any questions please use the Q&A function in the right hand panel of this WebEx. These questions will be private to the hosts from Inmarsat. We will attempt to answer all questions or capture them and feedback to you individually where required.

13

Any Questions?