1 THE 22@ PROJECT: Strategy THE 22@ PROJECT: Strategy Conclude the urban renewal of Poblenou Conclude the urban renewal of Poblenou Responding to the needs: the knowledge economy Responding to the needs: the knowledge economy

THE 22@ PROJECT: Strategy

Embed Size (px)

DESCRIPTION

THE 22@ PROJECT: Strategy. Conclude the urban renewal of Poblenou Responding to the needs: the knowledge economy. Metropolitan Area of Barcelona. THE PROCESS OF URBAN TRANSFORMATION IN POBLENOU. THE PROCESS OF URBAN TRANSFORMATION IN POBLENOU. THE SCALA OF TRANSFORMATION. - PowerPoint PPT Presentation

Citation preview

Page 1: THE 22@ PROJECT: Strategy

1

THE 22@ PROJECT: StrategyTHE 22@ PROJECT: Strategy

Conclude the urban renewal of Poblenou Conclude the urban renewal of Poblenou Responding to the needs: the knowledge economyResponding to the needs: the knowledge economy

Page 2: THE 22@ PROJECT: Strategy

2

Metropolitan Area of Barcelona

Page 3: THE 22@ PROJECT: Strategy

3

Page 4: THE 22@ PROJECT: Strategy

4THE PROCESS OF URBAN TRANSFORMATION IN POBLENOUTHE PROCESS OF URBAN TRANSFORMATION IN POBLENOU

Page 5: THE 22@ PROJECT: Strategy

5

Page 6: THE 22@ PROJECT: Strategy

6

Page 7: THE 22@ PROJECT: Strategy

7

Page 8: THE 22@ PROJECT: Strategy

8

Page 9: THE 22@ PROJECT: Strategy

9THE PROCESS OF URBAN TRANSFORMATION IN POBLENOUTHE PROCESS OF URBAN TRANSFORMATION IN POBLENOU

Page 10: THE 22@ PROJECT: Strategy

10

THE SCALA OF TRANSFORMATION

AREA:AREA: 198.26 ha., 115 blocks, 1,159,626 m² 22@ land 198.26 ha., 115 blocks, 1,159,626 m² 22@ land

POTENTIAL MAXIMUM ROOF SPACE:POTENTIAL MAXIMUM ROOF SPACE: 4.000.000 m² approx. 4.000.000 m² approx.• Production: 3.200.000 m² approx.Production: 3.200.000 m² approx.• Other uses (facilities, housing,..): 800.000 m² approx.Other uses (facilities, housing,..): 800.000 m² approx.

HOUSING:HOUSING: • Accepted: 4.614 existing dwellings Accepted: 4.614 existing dwellings • New social housing: 4.000 approx. (minimum of at least 25% rented)New social housing: 4.000 approx. (minimum of at least 25% rented)

INCREASE IN GREEN SPACE:INCREASE IN GREEN SPACE: 75.000 m² approx. 75.000 m² approx.

NEW FACILITIES:NEW FACILITIES: 145.000 m² 145.000 m²

NEW JOBS:NEW JOBS: 100.000 / 130.000 approx. 100.000 / 130.000 approx.

INVESTMENT IN INFRASTRUCTURE PLAN:INVESTMENT IN INFRASTRUCTURE PLAN: 162.3 million Euro 162.3 million Euro

Page 11: THE 22@ PROJECT: Strategy

11

BASIC AIMS OF THE PROJECT

@ Activities @ Activities

Non-polluting, city friendly activities (ie. low noise levels, etc.)

Intensive use of space

Intensive use of qualified personnel

Intensive use of Information and Telecoms Technology

Page 12: THE 22@ PROJECT: Strategy

12

Coexistence of different usesCoexistence of different uses

– IndustryIndustry

– Technology Technology – HousingHousing– OfficesOffices– ShopsShops– HotelsHotels– Corporate apartmentsCorporate apartments

– FacilitiesFacilities

PGM’ 76PGM’ 76

BASIC AIMS OF THE PROJECT

Page 13: THE 22@ PROJECT: Strategy

13

32,7

2,22

0

GENERALGENERAL

PGM’ 76PGM’ 76

GENERALGENERAL

22@ Plan22@ Plan

@ ACTIVITIES@ ACTIVITIES

PUBLIC HOUSINGPUBLIC HOUSING

of

roo

f p

er

of

lan

dm

² o

f ro

of

pe

r m

² o

f la

nd

BASIC AIMS OF THE PROJECT

Redensification Redensification

Page 14: THE 22@ PROJECT: Strategy

14

MANAGING THE TRANSFORMATION

A Municipal Corporation

– Urban planning

– Urban management

– Infrastructure

– Heritage management

– In co-ordination with the urban planning authorities

– Promotion

Page 15: THE 22@ PROJECT: Strategy

15

PEI 22@: BASIC CONTENTS

• Infrastructures implantations criteria

• Analysis of the different systems:

– Energy

– Telecomunications

– Hidraulic Cycle

– Wastes and Cleaning

– Accesibility and Public areas

• Stage planning

• Economical Funds from Land Use Tax (+roof, +value)

Page 16: THE 22@ PROJECT: Strategy

16

www.bcn.es/22@bcn

[email protected]

ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES

Page 17: THE 22@ PROJECT: Strategy

17

ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES

• Application of the city modal split

• Public Transport Infraestructures Previsions

• Connections with the road network of the city

• Road structure hierarchy

• Intelligent systems for the traffic management

• Car park standards in the sector

Page 18: THE 22@ PROJECT: Strategy

18

MOBILITYPedestrian roads

proposals

Page 19: THE 22@ PROJECT: Strategy

19

Infrastructure’s TrainProposalsMOBILITY

Page 20: THE 22@ PROJECT: Strategy

20

New AccessesNew Accesses

in existing Line 4in existing Line 4

Page 21: THE 22@ PROJECT: Strategy

21

MOBILITY Planning

Accessibility planning.Infrastructure Director Plan (PDI 2001-10)

Page 22: THE 22@ PROJECT: Strategy

22

MOBILITYGeneral View

General Road Proposal

Page 23: THE 22@ PROJECT: Strategy

23

MOBILITY Bicycle roads proposal

Page 24: THE 22@ PROJECT: Strategy

24

MOBILITYPrimary & Secondary

Roads section

Page 25: THE 22@ PROJECT: Strategy

25

MOBILITY Road network Plan

Page 26: THE 22@ PROJECT: Strategy

26

www.bcn.es/22@bcn