The American River Basin (ARB) Stormwater Resource Plan (SWRP)
Maureen Kerner, P.E. Office of Water Programs California State University, Sacramento
What is a SWRP? • Manages runoff on a watershed scale ▫ Stormwater and dry weather runoff
• Required by Water Code §10563 /Senate Bill 985 ▫ Required to receive grants ▫ Incentive to use runoff as a resource to: Improve water quality Reduce localized flooding Increase water supplies for beneficial uses
• A Living Document ▫ An ongoing, adaptive program ▫ Methods to identify, plan, & implement projects
SWRP Requirements • Incorporate into IRWMP • Define Watershed(s) • Describe Stakeholder Involvement • Address Water Quality Compliance • Quantify (Multiple) Benefits ▫ Water Quality ▫ Water Supply ▫ Flood Management ▫ Environmental ▫ Community
• Identify and Prioritize Projects • Describe Implementation
Collaborating Entities • Entities
• Responsibilities ▫ Attend monthly planning meetings ▫ Review draft documents ▫ Assist in stakeholder outreach ▫ Provide resources for GIS files/maps
▫ VFWC ▫ City of Sacramento ▫ City of Roseville ▫ RWA ▫ County of Sacramento ▫ SAFCA ▫ City of Rancho ▫ City of Rocklin
▫ City of Lincoln ▫ City of Folsom ▫ City of Elk Grove ▫ City of Citrus Heights ▫ Placer County ▫ City of Auburn ▫ Town of Loomis ▫ Cosumnes Coalition
▫ RegionalSan ▫ Sac. Central GWA ▫ OWP at Sac. State ▫ Florin RCD/Elk Grove
Water Service ▫ Vineyard Area
Citizens for Responsible Growth
• IRWMP Incorporation ▫ RWA collaboration ▫ Same stakeholders & boundaries ▫ Similar goals and objectives Multi-benefit projects
▫ Projects tracked in OPTI • Watersheds ▫ 8 IRMWP watersheds
The ARB SWRP
Lower American Lower Sacramento Upper Mokelumne Upper Cosumnes
South Fork American North Fork American Upper Bear Upper Coon-Upper Auburn
• Stakeholder Involvement ▫ Monthly planning meetings ▫ Presentations at IRWMP meetings ▫ Letter/email notifications Tribes, school districts, neighboring IRWMPs, VFWC
▫ 2018 LID/Watershed Conference ▫ OPTI tracking
• Water Quality Compliance ▫ TMDLs, 303(d)s, & NPDES/MS4 permits SSQP Phase I NPDES permit Statewide Phase II NPDES permit City of Sacramento CSS NPDES permit
The ARB SWRP
• Quantitative Methods ▫ Instructions for Quantifying Benefits
The ARB SWRP
Reduction in volume of runoff dischargedReduction in runoff pollutants dischargedIncrease in water supply reliability through direct groundwater rechargeIncrease in water supply reliability through in lieu recharge/conjunctive useIncrease in water supply reliability through direct use4
Reduction in amount of potential flood waterReduction in peak flow rate of flood waterIncrease in area mitigated for floodingReduction in combined sewer overflowsEnhancement, creation, or protection of wetlands, riparian zones, or habitatIncreased urban green spaceImprovement in instream flow rateReduced energy useReduced greenhouse gas emissionsImprovement in water temperatureIncrease in public educationIncrease in public involvementCreation or enhancement of public space
Water Quality
Water Supply
Flood Management
Environmental
Community
Benefit Category Benefit
• Projects & Prioritization ▫ Prioritized by # Benefits If Benefits Have Been Quantified Implementability
• Implementation ▫ Stakeholders Plan, Design, & Implement Projects ▫ OPTI Posting & Tracking IRWMP process for stakeholder notification
▫ VFWC Leadership Coordinate additional projects Coordinate SWRP updates
The ARB SWRP
Schedule
Questions? ▫ [email protected] ▫ 916-278-8117
Item/Activity Date(s) Call for Projects Mid September 2017
Project Submittals (OPTI) Ongoing
Public Draft Review 2/28/18-3/30/18
Final to RWA & SWRCB 5/25/18
Project Implementation Ongoing