The CSIRO ATNF Gigabit The CSIRO ATNF Gigabit Wide-Area NetworkWide-Area Network
Shaun W Amy<[email protected]>
CSIRO Australia Telescope
National Facility
Project Aim
• Initially provide a 1Gbit/s link to each of the three ATNF observatories:– Parkes,– Mopra (cost/fibre sharing with ANU’s Siding Springs
Observatory),– ATCA Narrabri (and then to CSIRO Plant Industry, Myall Vale).
• Uses the AARNet Regional Transmission Service (RTS).• Connect each observatory (without aggregation) back to
CSIRO ATNF headquarters at Marsfield in Sydney.• Require network performance and stability that can
enable “real” e-VLBI.• Production and Research traffic will share the same link.• Extend the network to WASP at UWA (via
CeNTIE/GrangeNet) and also to Swinburne University (via the southern leg) of the AARNet Regional Network.
An ATNF Telescope “Refresher”
• Parkes:– 64m prime-focus antenna,– range of receivers and backends,– celebrates its 45th birthday in October,– VLBI (including Mk III for geodesy),– the star of The Dish.
• Mopra:– 22m wheel-on-track, cassegrain antenna,– primary use is for mm observations during winter,– new spectrometer: MOPS,– almost always used for VLBI (including the first Mopra observations).
• Narrabri:– 6 x 22m (with 5 movable), cassegrain antennas,– frequency agility,– various antenna configurations (5km E-W track with N-S spur),– CABB wide-band backend scheduled for 2007-8,– VLBI: tied-array mode.
AARNet Regional Transmission Service
• Implemented using Nextgen fibre infrastructure.• The RTS provides a connection between the
Nextgen connection point on the regional network and the Nextgen POP located in the capital city.
• Point-to-point Ethernet service (Layer 2):– the customer can use this however they wish.
• Service delivered via CWDM MUX or direct fibre depending on the connection model (see later)
• Regional fibre tail builds are the responsibility of the customer not AARNet.
• “Last mile” in the capital city is the responsibility of the customer.
Backbone Design
• Nextgen:– AARNet have access to two fibre pairs (not the whole Nextgen
network),– Pair 1: AARNet DWDM 10Gbit/s service (provides inter-capital
city AARNet3 service),– Pair 2: Physical connections to tail sites.
• Implemented using Cisco Carrier-class (ONS 15454) optical transmission systems:– initially supports 16 x 10Gbit/s wavelengths,– can be upgraded to 32 x 10Gbit/s with no chassis changes.– each customer 1Gbit/s service is full-line rate (i.e. no
oversubscription).• Requires amplification/regeneration every 80-100km:
– optical-optical and optical-electrical-optical,– housed in a Controlled Environment Vault (CEV) but these are
not always located at ideal locations for site connections!
Cost Considerations (for a 1Gbit/s transmission service)
• Setup/Install/Construction:– fibre build (approx $2m),– break-out equipment ($32k per location)– initial connection charge within a network segment ($60k per circuit),– active equipment (switches, routers, optical transceivers, patch leads),– travel/labour.
• Recurrent:– access charge per circuit ($34k p.a.),– fibre maintenance charges (about $40k p.a.),– CSIRO equipment maintenance/self-sparing,– labour.
• Other:– depreciation,– whole-of-life costing and equipment rollover/upgrades.
Network Design
• Implemented by ATNF using mid-range equipment at the observatories capable of 1Gbit/s but NOT 10Gbit/s.
• Can support “jumbo” frames at Layer 2 but NOT at Layer 3.• CSIRO’s corporate IT group are interested in upgrading/exchanging this
equipment for high-end hardware that is modular and capable of 10Gbit/s but…
• Combined Layer 2 (Ethernet) and Layer 3 (IP) network.• For e-VLBI, a layer 2 Virtual Local Area Network (VLAN) has been
implemented across all ATNF sites (with extensions to UWA and Swinburne), primarily for performance reasons.
• The e-VLBI VLAN uses so-called CSIRO “untrusted” address space and thus can be accessible from hosts that aren’t connected to this VLAN (e.g. University of Tasmania, JIVE etc):
– this external connectivity is via a standard routed IP connection,– this traffic transits a CSIRO firewall appliance.
• For production traffic, layer 3 point-to-point links are used which allows for rapid failover to a backup link (via the existing Layer 3 routing protocols):
– a recent science-related use of the production network has been to implement Mopra remote observing from Narrabri.
Network Protocol and Performance Considerations
• TCP or UDP?– currently using TCP.
• Data recorders currently running kernel 2.6.16.• What about Ethernet “jumbo” frames:
– not currently being used by the ATNF disk/network-based recorders.
• A number of TCP variants were tested, including Reno, BIC, highspeed, htcp) and settled on BIC.
• Default TCP configuration is not tuned for high-bandwidth, long-haul networks:– TCP window is the amount of un-acknowledged data in the
network,– Optimise buffers (TCP window size) using:
window = bandwidth x RTT
Future Developments (1)
• Additional three 1Gbit/s links to be commissioned:– location of endpoints,– ensure ATNF production and research (e-VLBI) network requirements
are met,– satisifying the requirements of CSIRO’s corporate IT group,– load balancing/link sharing considerations.
• “Lighting up” the Swinburne connection:– ATNF have an agreement with Swinburne to provide a software
correllation facility starting 1 October 2006,– technically easy but legal issues causing the delay.
• Is there a simple mechanism to guarantee that e-VLBI gets the required bandwidth when needed (e.g. some form of policing/rate-limiting)?
• Is Quality of Service (QoS) required?• Should we use “jumbo” frames as the default even though good
results are being obtained with a 1500byte MTU on 1Gbit/s links.
Future Developments (2)
• The (not-so-wild) West:– Currently uses GrangeNet and CeNTIE (at no direct cost) to provide a
dedicated 1Gbit/s path to the hosts at WASP at UWA,– GrangeNet due to close before the end of 2006,– the 10Gbit/s (multiple 1Gbit/s circuits) CeNTIE Melbourne-Perth path will
be shutdown in December 2006– AARNet3 production service is a possible alternative but need to consider
the following:• cost (traffic charges and setup),• layer 3 (i.e. IPv4/v6 routed traffic) only,• currently provides 1Gbit/s connections via a somewhat restrictive connection
mechanism,– Need to factor in xNTD (and LFD) network requirements.
• EXPReS:– engineering of overseas links (will AARNet look to providing UCLP or
some sort of hybrid optical-packet technology on one of the two SX Transport 10Gbit/s links between Australia and the USA),
• 10Gbit/s and beyond…• Do we need to consider non-Ethernet based services?