The Cutty Sark Project in pictures

The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

  • Upload
    others

  • View
    13

  • Download
    5

Embed Size (px)

Citation preview

Page 1: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

      

   

      The Cutty Sark Project in pictures  

Page 2: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Cutty Sark by Frederick Tudgay

1872

Page 3: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Crossing the Equator, 6 June 1888

Restored in Falmouth, 1920s

Page 4: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Nannie, wearing a cutty

sark, the namesake for the ship

Above and right: crew on board Cutty Sark

Jock Willis, original owner of ship

Capt Richard Woodget, Master 1885-1895

Wilfred Dowman, saviour of ship 1920s

Page 5: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Bow view of ship on completion of Cutty Sark Conservation Project

Stern view of ship and new entrance on completion of Cutty Sark Conservation Project

Page 6: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project

Ship in raised position showing new structural elements and auditorium

Page 7: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

View down in to dry berth from south end of site

Entrance on board Cutty Sark through the exploded elements of the ship’s construction

Page 8: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Dry Berth when open to visitors during the day

Dry berth during an evening function

Page 9: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Visitors bracing the yards on main deck with a live interpreter

Live interpreters in the new auditorium in the Lower Hold

Page 10: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

New glass structure at stern, on completion of Conservation Project

New glass structure surrounding ship, on completion of Conservation Project

Page 11: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Tea-chest presentation

Cargoes: glass cubes displaying samples

The Voyages of Cutty Sark: the Globe

Interpretation Scheme: sample concepts

Page 12: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

The Tween Deck

3D graphics: image transition as visitor position moves

Page 13: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Removal of Main Mast Nov 2007

Removal of Bowsprit Nov 2007

Page 14: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Removal of Deckhouse Nov 2007 Removed material in storage at Chatham

Page 15: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Straightening fire damaged iron frame deck stringer from Tween

deck, above seat of fire Mar 2008Straightening fire damaged iron frame deck stringer, removing last localised distortions April 2008

Page 16: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

April 2008 All planks removed

Page 17: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Views of frame, end Aug 2008

Page 18: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Mechanical cleaning removes the corrosion from the iron frame

Red oxide is applied to protect the ironwork against further deterioration

A final coat of white paint is applied to the iron frame

The ‘tween

deck upon completion of conservation treatment

Page 19: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

The ‘tween

deck, June 2009 The frame has been wrapped to protect the paintwork while the conservation work continues.

Page 20: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

TOP: The ‘tween deck, June 2009 BOTTOM: The ‘tween deck, post fire May 2007

Page 21: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Bow view showing the exposed iron framework after it has been treated

The painting of the iron frame at the bow is finished by hand

Page 22: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Removal of counter for conservation Apr 08

Page 23: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

The counter during the mechanical cleaning process: following wet and dry blasting, red oxide is applied to protect the ironwork against further deterioration prior to the final stage of the treatment process. July 2009

Page 24: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

View of Cutty Sark’s stern following the removal of the counter for conservation treatment

Page 25: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Deckhouses upon completion of conservation work May 2009

Page 26: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Working on the windlass 2009

Page 27: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Plank removal and consolidation Cutty Sark Conservation Project

Page 28: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

The removed planks undergo conservation and consolidation in the

workshops

Page 29: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Planks stored in bespoke boxes to ensure they retain their shape

The final coat of white paint is applied to the interior face of a consolidated plank

June 2009: planks start to arrive back on site to be re-fitted to the ship’s iron frame.

Page 30: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

View along main rail and bulwarks showing areas of completed conservation works

Nov 2009

Page 31: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Nov 2009

Tween

Deck of ship following conservation treatment of iron frame

Lower Hold of ship following conservation treatment of iron frame

Page 32: The Cutty Sark Project in pictures Sark Trust_1.pdf · Ship in Cutty Sark Gardens on completion of the Cutty Sark Conservation Project. Ship in raised position showing new structural

Nov 2009Trials refitting the consolidated planks to the conserved iron frame