20
The defined benefit regime October 2012 Evidence and analysis

The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

  • Upload
    vankien

  • View
    218

  • Download
    2

Embed Size (px)

Citation preview

Page 1: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit regime

October 2012

Evidence and analysis

Page 2: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis2

IntroductionThe regulator aims to promote a good understanding of the defined benefit (DB) funding regime and to operate in an open and transparent manner.

This document sets out evidence on the way that schemes have used some of the flexibilities in the regime, notably with regard to discount rates, recovery plans, and contingent assets. As would be expected of a scheme-specific regime, practice varies.

It also provides information on the approach that informed our statement on DB funding in the current economic environment which we published earlier this year (April 2012). The analysis set out here includes a number of affordability measures and an assessment of how the approach to DB funding in our statement is expected to affect schemes.

Schemes’ use of the flexibilities in the systemWhere appropriate, schemes can make use of a number of flexibilities in the system. In the following charts and graphs we illustrate the wide range of scheme circumstances and examine the variations in discount rates, recovery plan lengths and use of contingent assets.

Page 3: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

3The defined benefit funding regime Evidence and analysis

Funding levels vary from scheme to scheme and contributions are scheme-specificContributions and technical provision (TP) funding levels for Tranche 4 schemes

20%

25%

30%

15%

35%

40%

10%

5%

0%

40% 50% 60% 70% 80% 90% 100%

Size of circle indicates scheme size

Co

ntri

but

ions

as

per

cent

age

of

TP d

efici

ts

TP funding level

• There is a wide variety of scheme circumstances and the regulatory framework must take account of a range of differing schemes and employers

• There is no significant correlation between funding levels and speed of recovery as many other factors contribute to the speed at which deficits are paid.

Sour

ce: T

he P

ensi

ons

Reg

ulat

or

Page 4: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis4

Discount rates are set on a scheme-specific basisDistribution of assumed outperformance over gilts

• This chart considers outperformance of nominal single effective discount rate (SEDR) over conventional 20 year UK gilts

• Discount rates vary substantially from scheme to scheme, representing a scheme-specific approach dependent on individual characteristics

• Outperformance over Tranches 1-5 has ranged from below zero to over 200 Basis Points (bps)

• The regulator views any increase in the asset outperformance assumed in the discount rate to reflect perceived market conditions as an increase in the reliance on the employer’s covenant.

1.50

2.00

2.50

1.00

0.50

0.00

-0.501 2 3 4 5

Tranche

Out

per

form

ance

(%

)

Box plots represent 5th, 25th, 75th and 95th percentiles

Sour

ce: T

he P

ensi

ons

Reg

ulat

or

Page 5: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

5The defined benefit funding regime Evidence and analysis

Schemes have used the flexibility available in setting recovery plan lengthsAverage recovery plan length by funding cycle

Tranches 1, 4 and 7

Tranches 2 and 5

Tranches 3 and 6

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

c7.48.4

8.17.3

9.5 9.57.8

Estimate on partial data for T6

c2 years

3.8 years

4.7 years

7.7 years

Assuming a three year extension

Second valuation

First valuation

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

• The first two sets of DB schemes have gone through two valuation cycles (Tranches 1 and 4, Tranches 2 and 5), on average plans have been extended by approximately 4.2 years from their original end date

• We expect that for Tranche 7 valuations, some trustees will need to make use of this flexibility to further extend the end date.

Source: The Pensions Regulator, average recovery plan lengths

Page 6: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis6

Alternative forms of supportSchemes have used the option of contingent assets as well as cash contributions

• Represents Pension Protection Fund (PPF) eligible contingent assets

• Over the last six years employers have made use of other forms of security beyond direct contributions to schemes

• The number of contingent assets has increased about seven-fold and over 20% of schemes in Tranche 5 reported using at least one contingent asset.

500

600

700

400

900

1000

800

300

200

100

0

Num

ber

of

cont

ing

ent

asse

ts in

pla

ce

2006/07 2007/08 2008/09 2009/10 2010/11 2011/12

Type A: Parent or group guarantees

Type B: Security over cash, UK real estate and securities

Type C: Letters of credit and bank guarantees

Sour

ce: P

urp

le B

oo

k

Page 7: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

7The defined benefit funding regime Evidence and analysis

Our analysis for Tranche 7 schemesAhead of producing our statement, Pension scheme funding in the current environment (April 2012), which was designed to assist the schemes currently undertaking valuations and scheme funding discussions (Tranche 7), we considered how to achieve the right balance between in regulating the appropriate funding of DB pension schemes, in particular giving due account to the affordability of employers. This analysis focuses on Tranche 7 valuations only. We considered three main factors:

• the expected funding positions as at March 2012 using ‘roll-forward techniques’ from summarised data collected from past valuations

• the projected estimated deficit recovery contributions (DRC) requirements under a number of scenarios, and

• the impact of the potential revised DRCs against standard metrics of corporate cash flow.

As a starting point, we tested whether it would be reasonable for schemes to continue with their current funding plans. We recognise that in practice scheme-specific assessments for covenant require more complex techniques and judgements and this analysis does not prejudice this need.

Our analysis is highly dependent on key assumptions. We have demonstrated this with a sensitivity analysis. Our conclusions based on this are that:

• about 25% of schemes would not need to amend their current recovery plans (Group D)

• for about 30% of schemes, they will need to make only small adjustments to their previous recovery plan end rate for instance a 10% increase in DRCs which is broadly in line with inflation and a modest increase, up to 3 years in recovery plan length (Group C)

• these 55% of schemes who will not need to significantly increase their contributions could rise to 75% if further flexibilities, such as adjusting the outperformance on the investment return in their recovery plans, were made (Group B).

• this leaves about 25% of schemes who would either need to make large increases in DRCs or, if there are significant affordability concerns, to make substantial use of a wider range of the flexibilities in the regime (Group A).

Based on this we concluded that movement across the board to reflect current conditions would not be justified, and therefore that flexibilities should be targeted on schemes facing affordability issues.

Flexibilities should target schemes with affordability issues

Page 8: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis8

Tranche 7 DRC impact analysisAnalysis of how current contributions would be affected by estimated funding levels

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

Number of schemes Amount of liability

Per

cent

age

of

Tran

che

7

Group A

Group B

Group C

Group D

This chart sets out possible impacts for four groupings of Tranche 7 schemes based on 31 March 2012 actuarial assessments:

• Group A: DRC increase above 10% even with a three year extension and weakened recovery plan assumption

• Group B: DRC increase contained to 10% if three year extension applied, but only through weakened recovery plan assumption

• Group C: DRC increase contained to 10% if three year extension applied

• Group D: No need to amend recovery plan.

When considered by amount of liabilities rather than number of schemes, those in the highest impact category represent a smaller percentage of the total.

We have assumed the same outperformance in the discount rate as reported by schemes in their Tranche 4 valuations and it is assumed that revised DRCs are index-linked.

Sour

ce: T

he P

ensi

ons

Reg

ulat

or

Bas

ed o

n 20

23 s

chem

es w

ith a

val

uatio

n d

ue d

ate

in T

ranc

he 7

Page 9: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

9The defined benefit funding regime Evidence and analysis

Sensitivity analysisDistribution of DRC impact groups is sensitive to assumptions

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

+0.25% discount rate

base case -0.25% discount rate

+7.5% assets -7.5% assets

Per

cent

age

of

Tran

che

7

Group A

Group B

Group C

Group D

The exact choice of discount rate, relative to the choices made in 2008/9, can significantly increase or decrease the affected results. Other changes, eg to mortality, could also have an effect.

The model is sensitive to the limitations of an index-based three year projection. In particular, individual scheme assets will not track the indices. There are also inevitable uncertainties in the liability projections.

We assessed this by assuming an increase/decrease in assets of +/-7.5%. To put this in context, running the model at 31 December 2011 would have been equivalent to approximately -5% assets.

Sour

ce: T

he P

ensi

ons

Reg

ulat

or

Bas

ed o

n 20

23 s

chem

es w

ith a

val

uatio

n d

ue d

ate

in T

ranc

he 7

Page 10: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis10

The impact of the estimated change in DRCs compared against corporate cash flowEstimated projected DRCs as a percentage of sponsors’ earnings before tax, depreciation and amortisation (EBTDA)

T4 T7

25-50%

10-25%

5-10%

Negative EBTDA

Over 100%

50-100%

0-5%

No DRCs

No EBTDA data available

Valuation tranche

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

Per

cent

age

of

Tran

che

7

Sour

ce: B

vD F

ame,

The

Pen

sio

ns R

egul

ato

r

Tranche 7 DRCs are estimated assuming a three year extension for those, who in our analysis, need to make amendments to their recovery plan.

Compared with amounts sponsors are currently paying under their agreed recovery plans, for the majority of schemes DRCs as a percentage of EBTDA is not significantly higher.

Our analysis shows that there are a number of companies which are not currently paying DRCs, but who will likely have to do so in future.

The position is obscured by the number of companies which have negative EBTDA but are paying DRCs. This reflects the limitations of this metric in looking at impacts on sponsors’ cash flow.

Page 11: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

11The defined benefit funding regime Evidence and analysis

Using other employer cash flow metrics

EBITDA(pre-tax DRCs)

EBTDA(pre-tax DRCs)

EBA(post-tax DRCs)

25-50%

10-25%

5-10%

Negative cash flow measure

Over 100%

50-100%

0-5%

No DRCs

Insufficient cash flow data

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

Per

cent

age

of

Tran

che

7

Sour

ce: B

vD F

ame,

The

Pen

sio

ns R

egul

ato

r B

ased

on

2,02

3 sc

hem

es w

ith a

val

uatio

n d

ue d

ate

in T

ranc

he 7

We repeated this analysis against two other cash flow metrics to ensure that using any one metric did not give materially different results.

The choice amongst these metrics has little impact on the pattern across schemes in this analysis.

Page 12: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis12

DRC/EBTDA metric by size of scheme (s75 liabilities)

V large (>£2bn)

58 schemes58% liabilities

Large (£500m-2bn)133 schemes22% liabilities

Medium (£50m-500m)641 schemes17% liabilities

Small (£20m-50m)344 schemes2% liabilities

Micro(<£20m)

847 schemes1% liabilities

25-50%

10-25%

5-10%

Negative EBTDA

Over 100%

50-100%

0-5%

No DRCs

No EBTDA data available

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

Per

cent

age

of

Tran

che

7

Schemes have many different characteristics. An important one is size and this chart shows whether DRC/EBTDA differs by size of scheme.

Higher ratios of DRC/EBTDA are in the large and small scheme categories. However, impacts are not heavily concentrated on schemes of a particular size.

For some schemes, data is not complete. Unavailable data is more prevalent in the smaller schemes representing a limited proportion of total liabilities.

Sour

ce: B

vD F

ame,

The

Pen

sio

ns R

egul

ato

r B

ased

on

2,02

3 sc

hem

es w

ith a

val

uatio

n d

ue d

ate

in T

ranc

he 7

Page 13: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

13The defined benefit funding regime Evidence and analysis

DRCs as a percentage of dividendsDRCs as a percentage of annualised dividends for FTSE350 entities with material pensions exposure

20

25

15

10

5

0No DRCs 5-10% 10-20% 20-50% Over 50% No

dividend paid

0-5%

DRCs as percentage of annualised dividends

Num

ber

of

FTSE

350

enti

ties

35

30

45

40

Current Tranche 4 DRCs as percentage of 2008 y/e (annualised) dividends

Estimated Tranche 7 DRCs as percentage of 2011 y/e (annualised) dividends

For those listed sponsors where recent dividend information was available, we investigated what the new DRC requirement might be as a proportion of dividends paid to shareholders. We looked at FTSE350 companies with material pensions exposure.

For more than half of FTSE350 sponsors in the sample, DRCs represent less than 20% of the value being paid in dividends.

For a limited number of schemes, DRCs are higher than current dividend payments; and for some, DRCs are being paid but dividends have been suspended.

The data is informative, but it says little for privately-held companies, mainly small/medium enterprises (SMEs).

Sour

ce: C

apita

reg

istr

ars,

The

Pen

sio

ns R

egul

ato

r

Page 14: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis14

Technical provision deficits TP deficits as a percentage of sponsors’ net assets

T4 T7

25-50%

10-25%

5-10%

Negative net assets

Over 100%

50-100%

0-5%

No deficit

No net asset data available

Valuation tranche

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

Per

cent

age

of

Tran

che

7

For around 10% of schemes no net asset data was available.

Approximately 25% of schemes have deficits less than 10% of net assets of the sponsor and therefore have lower significance.

For about 25% of schemes deficits are in the 10%-50% range and these may be manageable in the context of long term recovery plans.

Deficits exceed 50% of net assets in around 40% of cases. Where net assets fully reflect business value, these schemes may represent significant challenges to their sponsors.

Sour

ce: B

vD F

ame,

The

Pen

sio

ns R

egul

ato

r B

ased

on

2,02

3 sc

hem

es w

ith a

val

uatio

n d

ue d

ate

in T

ranc

he 7

Page 15: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

15The defined benefit funding regime Evidence and analysis

Bringing together the impact analysis and affordability assessmentThe next chart shows the extent to which schemes facing estimated increases in contributions are likely to be subject to affordability constraints.

The picture is mixed: additional contribution requirements of schemes do not appear to be correlated with sponsor affordability.

We observed that amongst the groups where no or minimal change was required in DRCs (Groups C and D, about 60% of Tranche 7 schemes), there are nevertheless schemes where pension contributions currently impose a substantial stress on sponsors’ cash flows and will continue to do so.

Additionally, some schemes which require the greatest additional contributions have sponsors with apparent affordability.

Therefore, the stress likely to result from changes to contributions will mainly fall in a subset of Groups A and B, which have high DRCs as a percentage of EBTDA.

Page 16: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis16

Are the schemes facing increased contributions likely to be subject to affordability constraints?DRC impact groups with DRC/EBTDA metric

80%

100%

60%

40%

20%

0%

90%

70%

50%

30%

10%

Group A Group B Group C Group D

Tranche 7 impact category

25-50%

10-25%

5-10%

Negative EBTDA

Over 100%

50-100%

0-5%vertical axis:significance of DRCs against sponsors’ EBTDA

No DRCs

No EBTDA data available

horizontal axis:estimated impact on T7 recovery plans

Per

cent

age

of

Tran

che

7

• Group A: DRC increase above 10% even with a three year extension and weakened recovery plan assumption

• Group B: DRC increase contained to 10% if three year extension applied, but only through weakened recovery plan assumption

• Group C: DRC increase contained to 10% if three year extension applied

• Group D: No need to amend recovery plan.

Sour

ce: B

vD F

ame,

The

Pen

sio

ns R

egul

ato

r B

ased

on

2,02

3 sc

hem

es w

ith a

val

uatio

n d

ue d

ate

in T

ranc

he 7

Page 17: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

17The defined benefit funding regime Evidence and analysis

AnnexQuality assurance

This report has been compiled by the regulator and is subject to appropriate checking and internal/external peer review. In particular the Government Actuary’s Department (GAD) were asked to review the methodology and confirm that, despite the highlighted limitations, the results of the analysis broadly supported our position.

Compliance with the Financial Reporting Council’s technical actuarial standards is neither asserted nor required by the FRC. These standards, along with others, do however inform the design of the regulator’s quality assurance process.

Key assumptions for Tranche 7 estimates

• TP real discount rates adjusted at Tranche 7 to maintain constant spread to >5 year index-linked gilts

• Other assumptions unchanged

• In our assessment of revised DRCs, we allowed for recovery plan credit of 50% of long-term best estimate outperformance over discount rate for 10 years

• Consumer price index (CPI) credit equal to 10% of non-pensioner liabilities

• No allowance for future service

• Index-tracking of main asset classes; no allowance for changes to investment strategy

• No allowance for hedging instruments to mitigate risk, or for risk transfers

• Where 2011 accounting year-end corporate financial measures are missing, 2010 (and in some instances 2009) accounting year-end corporate financial measures have been used

• Corporate financial measures are at scheme level, ie they have been aggregated over all named participating employers to a scheme for which data exists

• Where an employer participates in more than one scheme in the sample, its corporate financial measures have been apportioned by s75 liability.

Data limitations

• Accounting metrics may be poor indicators of formally assessed covenant strength. This data has been used for the purposes of analysis only and should not be seen to replace the outcomes from formal assessments for other purposes

• Missing financial data for sponsors is most prevalent in the SME market and therefore the analysis may not be fully representative of this market.

Page 18: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis18

Limitations of methodology

Compared with the more accurate calculations carried out for formal valuation and recovery plan reporting by scheme trustees, roll-forward techniques for approximate actuarial assessments involve numerous additional assumptions including:

• use of summarised scheme data effectively frozen at the scheme’s last valuation date (which does not take account of subsequent membership movements, or liability transfers or risk mitigation strategies)

• no account of asset or liability cash flow since the last valuation, except for deficit recovery contributions

• no account of changes to investment strategy since the last valuation date

• for individual schemes, any of these omissions in isolation could be a significant source of error.

Where corporate financial measures are unavailable for all participating employers to a scheme, the scheme level (aggregated) corporate financial measures are aggregated over only those for which data is available, thus understating the scheme level (aggregated) corporate financial measure.

In many instances the degree of support available to a scheme extends further than the named participating employers to a scheme.

Page 19: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

19The defined benefit funding regime Evidence and analysis

GlossaryTranches

’Tranche’ refers to the set of schemes which are required to carry out a scheme specific funding valuation within a particular time period. Schemes whose valuation dates fell between 22 September 2005 and 21 September 2006 were in Tranche 1, between 22 September 2006 and 21 September 2007 were Tranche 2, etc. Because scheme-specific funding valuations are generally required every three years, schemes whose valuations are in Tranche 1 will also be likely to carry out valuations in Tranches 4, 7 and 10.

TPs

Technical provisions

RPs

Recovery plans

SEDR

Single effective discount rate. We compute an effective single rate. The effective single rate is found using a model that converts the different rate approach into a single composite rate of equivalent strength to the actual rate allowing approximately for the maturity of the schemes.

DRCs

Deficit recovery contributions

EBITDA

Earnings before interest, tax, depreciation and amortisation – a measure of cash flow

EBTDA

Another measure of cash flow which treats interest items as an essential business expense

EBA

A further measure of cash flow, after deduction of interest, tax, and depreciation (latter being a proxy for smoothed capital expenditure)

Sponsors' net assets

Scheme level (aggregated) shareholders' funds adjusted for FRS17/IAS19 accounting liability where data available

Page 20: The defined benefit regime - The Pensions · PDF file2 The defined benefit funding regime Evidence and analysis ... • This chart considers outperformance of nominal single ... 2006/07

The defined benefit funding regime Evidence and analysis

© The Pensions Regulator October 2012

You can reproduce the text in this publication as long as you quote The Pensions Regulator’s name

and title of the publication. Please contact us if you have any questions about this publication. We can

produce it in Braille, large print or on audio tape. We can also produce it in other languages.