The Design, Supply and Installation of Specialist · PDF file3 4 ScrewFast Foundations Limited are the proven leaders in the design, supply and installation of helical piles and steel

  • Upload
    vannhan

  • View
    221

  • Download
    2

Embed Size (px)

Citation preview

  • The proven leaders in helical pile foundationsT H E P R O V E N L E A D E R S I N H E L I C A L P I L E F O U N D A T I O N ST H E P R O V E N L E A D E R S I N H E L I C A L P I L E F O U N D A T I O N S

    Unit 7-14 Smallford Works Smallford Lane St Albans, Herts AL4 0SA. UK

    Tel +44 (0) 1727 821 282Fax +44 (0) 1727 828 098

    e-mail [email protected] www.screwfast.com

    www.youtube.com/ScrewFastFoundations

    ADC

    AFTERWORKS LTD

    ALAN CAMPBELL GROUP

    ALAN DICK

    AMCO

    AMEY

    ARQIVA

    ARUP

    ATELIER ONE

    ATKINS

    BABCOCK NETWORKS

    BABCOCK RAIL

    BALFOUR BEATTY CIVILS

    BALFOUR BEATTY RAIL

    BALFOUR BEATTY UTILITIES

    BAM NUTTALL

    BARDENS

    BARHALE

    BIRSE

    BIRSE COASTAL

    BISLEY

    BLACKBURN & FRASER

    BUCKINGHAM GROUP

    CONTRACTING LTD.

    C SPENCER

    CAIP

    CAPITA SYMONDS/

    HAYMILLS

    CARILLION

    CARNELL

    CLANCY GROUP

    COREX

    COSTAIN

    CTS BRIDGES

    DALY INTERNATIONAL

    DAMBACH

    DEAN DYBALL

    DUDLEYS

    ENFIELD GOVERNMENT

    ERH COMMUNICATIONS

    ESS STAGING

    EUROTUNNEL

    FABER MAUNSELL

    FESTIVAL REPUBLIC GROUP

    FITZGERALD

    FJ FRENCH

    FOREST GATECONSTRUCTION

    FURNESS PARTNERSHIPLIMITED

    GIFFORDS

    GLOBAL RAIL

    GL EVENTS

    GML CONSTRUCTION

    HAYMILLS

    HEYROD COMMUNICATIONS

    HIGHPOINT

    INTER ROUTE

    J MCCANN LTD

    JACKSONS

    JOHN MCMILLANCONSTRUCTION

    KIER RAIL

    LEICESTER GOVERNMENT

    LENGARD

    LUNDY PROJECTS

    M A YOUNG

    MANSELL

    MASTERS CONSTRUCTION

    MAY GURNEY

    MCNICHOLAS

    MIKE POULTER

    MITIE

    MONO CONSULTANTS

    MORGAN EST.

    MORGAN SINDALL

    MOUCHEL

    MURPHY GROUP

    NEW EDGETELECOMMUNICATIONS

    NORTHCROFT

    OPTIMA

    OSBORNE

    PATRICK FARFAN

    PPMS EURO

    RAMBOLL

    SBBJV

    SCOTT WILSON

    SEESA

    SIEMENS

    SHIRE CONSULTANTS UK

    SKANSKA

    STOBART RAIL

    SWANN GROUP LTD

    T&B CONTRACTORS

    TERCON LIMITED

    TERRAWISE

    THE THOMAS PHILLIPS PRICE TRUST

    TPS

    TYCO ELECTRONICS

    UBIQUE

    UNDERHILL

    UNUSUAL RIGGING

    URS CORP

    VGC GROUP

    VINCI CONSTRUCTION

    VODAFONE

    VOLKER FITZPATRICK

    WEBB YATES

    WSP

    Working with:

    No. 510514 No. 77558 No. GB 9498

    The Design, Supply and Installationof Specialist foundations

  • 3 4

    ScrewFast Foundations Limited are the provenleaders in the design, supply and installationof helical piles and steel foundations.

    Since the company's formation in 2000, ScrewFast haspioneered the revolution in screw piling foundations andwas the first provider of Large Diameter Helical Piles inUK infrastructure. The steel foundations specialists offer a full range of solutions and supply to all industry sectors.

    Steel-based foundations (helical piles and driven piling)have grown to be recognised and accepted as a preferredoption for Highways and Rail Structures, Electrificationand Energy Structures, Telecommunication Masts,Marine-based Construction, Eco-Friendly Building and many other industries.

    Our ISO9001:2008 UKAS accreditation guarantees thequality, reliability and consistency of our service, productsand management. ScrewFast ensure the highest qualityat all stages of the process from design, manufacture,training and installation, testing and monitoring, and 24 hour support.

    ScrewFast provides turn-key foundation solutions whichinclude site investigation, design, supply, installation,monitoring and testing. A 24-hour support helpline forall our projects enables you to speak direct to a qualifiedengineer familiar with your project. ScrewFast offers awide range of steel foundations suited to any groundtype in any location.

    Leading the field of steel screw pile foundations

    Compared to conventionaltechniques, these have not onlyreduced the time on site by nearly 50%, but have generated cost savings of nearly 30%.

    The ScrewFast system dramatically reduces theamount of time and number of operatives requiredfor the site installation of the works making the process inherently safer and substantiallycheaper. This equates to a reduction in the time exposed to the risks of working on live carriageways of 70%.

    Sarah Revell | Carillion

  • Highways ProjectsRailways ProjectsCentral and LocalGovernment

    EnvironmentallySensitive Projects

    5 6

    ScrewFast has grown screw piling into a reputable andaccepted foundation option for structures within manyindustries including highways and roads, renewableenergy and electrification, rail and GSM-R, bridges, flooddefence and retaining walls, telecommunications andbuildings and general civils.

    These sectors continue to benefit from the numerousadvantages of our steel-based foundations, including:

    Significant reduction in project construction time,leading to cost savings

    Minimal environmental legacy; eliminating 'dig and dump'

    Reduced carbon footprint

    Ease of installation; reduced number of plant and workers

    Reduced risk to workforce

    Reduced risk and inconvenience to public

    Remote locations reached

    Ease of demolition; foundations quickly and easily unscrewed

    A full range of steel foundations are now available to suitany ground condition, including rock, in any location.

    ScrewFast in your industry

    All of the foundations are certified to be used acrossall industries and are used extensively within thefollowing Sectors:

    ScrewFast Foundations have the capacity toundertake projects of all sizes.

    Highways projects

    Railways projects

    Process Industries

    Infrastructure Providers

    Airports

    The EnvironmentAgency

    Central and Local Government

    Renewable Energyprojects

    Electrical Grid Projects

    Foundations designed to your requirements

    Each ScrewFast base wasinstalled in less than five shifts.

    It would have taken three weekshad we relied on the old system

    Bernie van Hoek | Birse Civils, Site Agent, M42 J9-11 scheme

  • 7 8

    Helical Screw Piles

    A steel pile with helical plates placed at strategicpositions along the shaft. The plates give the foundationboth tension and compression bearing capacity. Piles arenormally connected in groups to a steel load transfergrillage. No concrete is needed.

    Angel Pile

    A single helical pile with a winged sleeve attachment.The winged section is driven over the shaft of a helicalpile, to give the foundation extra lateral stability in thesofter top soil.

    Tubular Driven Steel Piles

    A large hollow tube, driven or vibrated into the ground inshort sections. A Down-the-Hole (DTH) hammer issometimes used during installation.

    GRIP Piles

    A rock anchor/shear tube hybrid adapted by ScrewFastfor support work in very hard soil conditions. A largeshear tube which encases the rock anchor is used totransfer the load through soft soils onto bed rock or veryhard strata.

    STAR Pile

    A steel winged pile, which is driven into the ground toprovide an instant foundation for smaller structures.

    ScrewFast Foundations responsive DesignDepartment and experienced Research andDevelopment Team are continuously designing newand innovative steel-based foundation solutions to satisfy the requirements of individual clients.

    Each foundation that ScrewFast supplies is tailoredto the specific structure, ground condition andlocation of the project. Since the company'sinception a number of standard solutions have been developed to accommodate common ground conditions and structural loadings.

    ScrewFast Foundation solutions

  • 9 10

    ScrewFasts innovative dynamic design approachproviding proven engineering solutions combinedwith geotechnical expertise is the strength behindour success. Our Design Team has been carefullydeveloped to blend a very high standard ofgeotechnical and structural design skills.

    Supply & InstallationWe supply a wide range of foundation solutions to meetthe requirements of your individual project. Each helicalscrew pile or alternative foundation is designed based uponaccurate soil testing, site investigation and the loading ofeach structure.

    Much of the work undertaken on site requires robustenvironmental management to protect and minimise anyadverse impact from construction. Sites are properlydefined with all protection measures in place and personnelfully briefed on the site requirements. Senior managershave clarity of vision and maturity of judgement, giving ourclients and staff confidence in the way forward.

    Monitoring & TestingIn line with ScrewFasts policy of conservative design,regular testing and monitoring of installed foundations iscarried out. This is normally done at the start of a newproject in order to verify that the pile design is correct forthe ground conditions as expected.

    TrainingScrewFast will license and train a limited number ofselected contractors who wish to carry out their owninstallations. Details on request.

    24hour SupportScrewFast provides a 24 hour Helpline for all projects,manned by qualified engineers.

    We believe that the cornerstones of partnering are:

    ScrewFast places emphasis, throughout the organisationand supply chain, on these principles and a sincere andenthusiastic customer care culture.

    We believe in team work with a can-do approach whilekeeping in sight the importance of Health, Safety andQuality. Everyone is actively encouraged and motivated tosuggest more efficient methods of working.

    ScrewFast encourages good communications andgenerous support throughout the project team to addressany issue